Scheduled Capacity Planning Quantity Report

Hi experts,
Can you please guide me for any report in SAP which can show all scheduled capacity planning quantity.
Regards,
Ragu

Hi
Try CM50
Regards,
Anupam Sharma

Similar Messages

  • Any std report in Capacity Planning showing only dispatched orders/opns ?

    Hi CRP gurus:
    Does SAP has any standard report/transaction in Capacity Planning that shows (or has a selection for showing) only "dispatched" orders/opns ?
    - Chetan

    Chetan,
    Use transaction COOIS. In this choose Operations, System status as DSPT at operation level, enter plant and execute. You will get only orders and the operations which are dispatched in this plant.
    You can navigate to the capacity planning table from the selected records through order change.
    Hope this is ok with you,...reward points..and close.
    Regards
    Ram

  • WAAS Capacity Planning TFO Connection Reporting?

    For WAAS Capacity Planning I'm trying to work out a way to gather WAAS appliance and module TFO connection statistics over time for each device. I'm looking to gather the number of TFO connections at regular intervals to allow us to get an accurate picture of the current WAAS capacity utilisation. The central manager reports a "The TFO accelerator is overloaded (connection limit)" when the maximum TFO connection limit for a devices is exceeded but it does not tell you the number of connections that exceeded the limit on the box.
    I've tried using the WAAS Monitoring XML API:
    http://www.cisco.com/en/US/docs/app_ntwk_services/waas/waas/v421/monitoring/guide/MG_XML_API.html
    But it does not allow reporting of this statistic as far as I can work out.
    If you run "show stat conn" on a WAAS device it gives you the "Current Active Optimized Flows", but this is the current number of flows and not the maximum number of TFO connections reached since the counters were last cleared?
    Current Active Optimized Flows:                                3258
       Current Active Optimized TCP Plus Flows:              812
       Current Active Optimized TCP Only Flows:              2453
       Current Active Optimized TCP Preposition Flows:    0
    Current Active Auto-Discovery Flows:                         411
    Current Reserved Flows:                                           99
    Current Active Pass-Through Flows:                          540
    Historical Flows:                                                      532
    Does anyone know anyway of anyway to either manually gather this statistic from a WAAS appliance or module? Or poll this statistic from a monitoring system like Solarwinds?

    Hello
    As of WAAS 4.4.1 it comes with a WAN optimization MIB CISCO-WAN-OPTIMIZATION-MIB, if you want to use a 3rd party software like Cacti to graph over time.
    http://www.cisco.com/en/US/customer/docs/app_ntwk_services/waas/waas/v441/configuration/guide/SNMP.html#wp1141055
    This MIB provides information about the status and statistics  associated  with the Application Optimizers.The following objects from  this MIB are  supported:
    •cwoAoStatsIsConfigured
    •cwoAoStatsIsLicensed
    •cwoAoStatsOperationalState
    •cwoAoStatsStartTime
    •cwoAoStatsTotalHandledConn
    •cwoAoStatsTotalOptConn
    •cwoAoStatsTotalHandedOffConn
    •cwoAoStatsTotalDroppedConn
    •cwoAoStatsActiveOptConn
    •cwoAoStatsPendingConn
    •cwoAoStatsMaxActiveOptConn
    This MIB also provides information about TFO statistics. The following objects are supported:
    •cwoTFOStatsTotalHandledConn
    •cwoTFOStatsActiveConn
    •cwoTFOStatsMaxActiveConn
    •cwoTFOStatsActiveOptTCPPlusConn
    •cwoTFOStatsActiveOptTCPOnlyConn
    •cwoTFOStatsActiveOptTCPPrepConn
    •cwoTFOStatsActiveADConn
    •cwoTFOStatsReservedConn
    •cwoTFOStatsPendingConn
    •cwoTFOStatsActivePTConn
    •cwoTFOStatsTotalNormalClosedConn
    •cwoTFOStatsResetConn

  • Consider preventive maintenance schedule into PP order capacity planning

    Hi PP experts,
    My client's requirement is that when a preventive maintenance order is created in PM module for a particular work center (used in production) on a given date, NO production order (which is processed on that work center) should get released or confirmed. In other words, the capacity should be blocked at all for the subject work center.
    Could you please guide how to make this effective?
    We are using discrete manufacturing with capacity planning. At the time of PP order release, system shows capacity situation so as to decide whether go-ahead even with overloaded capacity.
    Regards,
    HKV...

    First, you should assign the PP work center in the location tab of the PM equipment which refers this workcenter.
    Secondly you should enter the sytem condition in the task list of the equipment.
    During preventive schedule  the work center  will be reserved by PM orders for maintenance and this can be seen from capacity planning from PP side.
    regards

  • Machine capacity planning and efficency

    Dear Guru,
    I have number of machines and i want there individual capacity and efficency can we see that by any report or any tcode to see all capacity of machine.What is capacity leveling.
    Is thee any configuration for capacity planning.
    Thanks in advance

    Hi, the following configuration steps involved in the capacity planning: SPRO --> IMG --> PRODUCTION --> CAPACITY REQUIREMENT PLANNING Capacity Requirements Planning: 1) Define time units 2) Define Capacity Category 3) Set up Capacity Planner. 4) Define parameters 5) Define Standard value key. 6) Define Move time matrix. 7) Define Setup matrix. 8) Define Control Key. 9) Define Shift Sequence. 10) Define Key for performance efficiency rate. 11) Define Formula parameters. 12) Specify Scheduling type. 13) Set up Production scheduler group 14) Select Automatically. 15) Define Scheduling parameters for Production orders 16) Define Scheduling parameters for networks. 17) Define Reduction Strategies planned/ production orders. 18) Define Reduction Strategies for network/process orders. 19) Define Control Profile. 20) Define Selection profile. 21) Define time profile. 22) Define Evaluation profile. 23) Define Strategy Profile. You can follow these above configuration steps in capacity planning Yes you need to active your all work center for the finite scheduling at the bottom of capacity view. Use all standard SAP configurations, Capacity Leveling Profile. Define time profile in OPD2. Define the strategy profile in OPDB Define the Overall profiles in OPD0. Then only you need to to active your all work center for the finite scheduling at the bottom of capacity view in work center.(CR02) Then run MRP with scheduling- 2 Lead time scheduling and capacity planning.(MD02) You will get your capacity requirement in CM01, or CM25/CM21. In rem you can use MF50. -
    OR refer below steps Capacity Planning Evaluation: Use this procedure to Evaluate the Capacity of a Work Center (Resource). The same transaction will be used for finding out the Capacity Overload on the Work Center Select Logistics -> Production -> Capacity Planning -> Evaluation ->Work Center View ->Load and go to the Capacity Planning Selection screen (CM01) Through capacity planning : Standard overview :System will show week wise overload in Red Color. If there is no overload then system will show in the normal color. Date wise Capacity can be overviewed. If there were capacity overload, system would show with Red Color indication and Percentage overload can be viewed. Through capacity planning : Standard overview: Details: Date wise, planned process order wise capacity requirement. Through capacity planning : Standard overview: Graphical: Yellow Color indicates capacity lying un-used. Red Color Bars is the indication for Capacity Overload and Blue Color Bars indicate for Capacity available Use this procedure to Level / Schedule the Capacity of a Work Center Capacity Planning - Levelling/Scheduling: Select Logistics ->Production->Capacity Planning -> Levelling -> Work Center View and go to the Planning Table (Graphical) screen (CM21) Key Points u2022 This would be used for Shop floor production scheduling u2022 Capacity Scheduling is mandatory for correct results of Master Production Schedule and Material Requirement Planning For settings: Define formulas for resources: (OP54) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formulas for resources. For formula parameters for Resource/workcentre:(OP51) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formula parameters for resources-> Standard Value u2013 Define Parameters (OP7B) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Parameters Define standard value key(OP19) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Standard Value First configure the below settings in the capacity Planning. 1) Define time units Path : SPRO ->Production-> Capacity Requirements planning ->Master Data-> Define Time units (OPCF) 2) Define Capacity Category Path : SPRO ->Production ->Capacity Requirements planning->Master Data-> Capacity Data ->Define Capacity category. 3) Set up Capacity Planner. Path : SPRO ->Production ->Capacity Requirements planning -> Master Data->Capacity Data -> Set up Capacity Planner 4) Define parameters Path : SPRO->Production ->Capacity Requirements planning -> Master Data ->Work Center Data->Standard value ->Define Parameters (OP7B) 5)Define Move time matrix. Path : SPRO -> Production-> Capacity Requirements Planning -> Master Data-> Work Center Data -> Define Move time Matrix (OPCN) 6) Define Setup matrix. Path : SPRO -> Production ->Capacity Requirements Planning -> Master Data -> Routing data -> Define Setup Time Matrix 7)Define Control Key. Path : SPRO-> Production-> Capacity Requirements Planning -> Master Data ->Routing data -> Define Control Key(OPCG) 8) Define Shift Sequence. Path : SPRO -> Production-> Capacity Requirements Planning -> Operations -> Define Shift Sequences (OP4A) 9) Define Key for performance efficiency rate. Path : SPRO-> Production -> Capacity Requirements Planning -> Operations-> Available Capacity-> Define Key Performance Efficiency Rate (OPDU) 11) Specify Scheduling type. Path : SPRO ->Production ->Capacity requirements Planning->Operations->Scheduling ->Specify Scheduling Type (OPJN) 12) Set up Production scheduler group. Path : SPRO ->Production->Capacity requirements Planning -> Operations -> Scheduling -> Set up Production Scheduler Group (OPCH) 13) Select Automatically. Path : SPRO -> Production -> Capacity Requirements Planning ->Operations->Scheduling ->Task List Type-> Select Automatically (OPJF) 14) Define Scheduling parameters for Production orders. Path : SPRO -> Production ->Capacity Requirements Planning-> Operations->Scheduling -> Define Scheduling Parameters for Production orders (OPU3) 15) Define Reduction Strategies planned/ production orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies->Define reduction strategies planned-/production order 16) Define Reduction Strategies for network/process orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies-> Define reduction strategies for network/process order 17) Define Selection profile. Spro->Production->Capacity requirements Planning->Evalution->Profiles-> Define selection profiles Hope clear to u. Regards Alok

  • Constraint capacity planning for Un-Routed items in ASCP

    Hi All,
    Is there any possibility to create constraint capacity planning for items which do not have routings in ASCP?
    I tried by setting Bill of Resources (BOR) in Aggregatin tabbed region in Plan option. But i could not get an expected result. Kindly help me out in this.
    regards,
    Murlai R
    Edited by: user10942922 on Mar 27, 2009 9:30 AM

    Dear ,
    To answer the question for Capacity requirement planning on sales order I would say that MRP does  only materials planning based on demand and reciept  but never does Capacity Requirement Plannig .MRP generates Planned Order  and susequently , production order can be genreted and farther you can carry out capacity requirement planning based on the work cente available capacity , requirement and load for those MTO orders .
    But there are SAP business suit like APO-SNP APO PPDS which carriy our details scheduleing and caapcity check based on the demand situation : Sales Order ,Independent Order  and does capcaity vaialbality chek for those demands while planning .
    Now , here is the answer of your question :
    1) Can Capacities are Scheduled as per priority given in SO automatically. : Not possible  through  SAP MRP but in APO-PPDS, APO-SNP-CTM , Herustic model .
    2) Can revised availability dates will be reflected in SO. : It can be reflected as per the ATP chekc , Replishmenet Lead  Time and re-scheduling horizon maintained in OPPQ-Carry all overall plant parametres.
    3) Which reports will be useful for understanding consolidated availability date of material for given sales order/s. : You can check through MD04/MD05 or in sales order -Availaibility check -Schedule Line -Availaibility date .
    Hope your are clear about the requirememt .
    Regards
    JH
    Edited by: Jiaul Haque on Jun 5, 2010 1:59 PM
    Edited by: Jiaul Haque on Jun 5, 2010 1:59 PM

  • OPU5 settings and Capacity planning-CM01

    Hi All,
    I have a confusion while configuring the settings for scheduling for planned orders in REM environment PE order type, when i select the scheduling and capacity requirements in DS section system shows me capacity requirements in CM01,CM50 reports  and also DS tab in planned order but when i deselect the same check boxes there si no data in CM01, CM02 or CM50,
    If I need to generate the CM01, etc reports in REM environment , then do i need to select DS check boxes also?
    My OPU5 settings are as attached in this case CM01 reports are fine.
    Regards,
    Anupam Sharma

    Hi Anupam,
    Screen shot is missing. Rate based scheduling is fine for REM.
    Create a "Run schedule" planned order and schedule it via rate-based scheduling.
    In transaction OPU5, choose order type PE and the plant you use.
    Choose "Details" and in the field "Scheduling level", set "1 Via rate-based scheduling" and save the change.
    For more information on this visit the following links
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/a58a864adc11d189740000e8322d00/frameset.htm
    Levels of Scheduling - Planning Process - SAP Library
    Regards,
    R.Brahmankar

  • Capacity Planning - CM07

    Dear PP Gurus,
    I am using CM07 to view the work center for the capacity planning. My requirements load for  12 months.
    How come the planned order on July onwards is schedule all to June?
    It is supposed to load according to the month for the orders, but is not and the earlier months capacity is not fully utilised?
    Need you expertise on this.
    Appreciate the assistance
    Thanks & Regards
    Pooja

    Hi Abhijeet,
    You can use profile SAPPISAFRU - IS Confirmation and then after double clicking the particluar line item you can chose confirmed quantity in the field display.
    Otherwise you can use the transaction CN41 for actual work done or CN48n for confirmation line item display.

  • Capacity planning and schedulng production order based on availabe capacity

    Hi Gurus,
    I am trying to use capacity planning, when the production order is created it takes the order start date as the requirement date. Then when i do he capaity check it says capaity not available. After finite scheduling again it proposes to shift operations by certain days.
    I need the capity to be check in MRP and the palled orders to have start dates based on aviable capity, currenty all the palled orders are starting on the requirement date irresptive of avaiabe capaity. I tried using finite scheduling option in MD02 still it does not take in to account exsting production orders for giving dates of the planned orders.
    Regards
    Abhi

    Dear Abhishek,
    1) This is Std SAP of MRP, only material Av check will be carried out in MRP & create procurement
    Proposals
    2) Capacities will not Checked  ( consider ) in MRP in Std R/3
    3) Your Need can be only met through APO
    Regards
    Madhu

  • How to get the planned quantity of past month from md61

    Hi all,
           I couldnt get the planned quantity of past month from the tcode md61.It shows only the current and future month's demand.I want to know the planned quantity of past month's.
    I have checked PBIM,PBED,PBHI tables,here also I am facing the same problem.
        Is it possible to get past month quantity from md61? If No how to know the quantity planned for past month?...Please tel your ideas..
    Thanks in Advance!!!
    Edited by: Ranganayahi Chandirasekaran on Jul 30, 2008 8:17 AM

    Hi,
    You can check History of PIR through MD62 itself.
    Select particular row, Goto Menu, Select Item History(Shift +F6).
    Or
    You may pls execute transaction MD73.
    Plz select option "3 :History Planned ind reqmnts " in the display options and execute the report.
    Regards,
    R.Brahmankar

  • Setting needed for Capacity Planning.

    Hi PP Gurus,
    I want to know what setting we have to do for capacity planning.
    what I know is:
    1. W/C should be set for finite scheduling.
    2. In scheduling parameters for process order tick "Generate capacity Requirement".
    This both setting are made in my scenario, but it is'nt loading the work center fot that week.
    Any other setting nedded?
    Thanks, in advance.

    Dear ,
    You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
    1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
    2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
    1.Automatic Scheduling check box should be marked
    2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
    3.Scedulinga and Generate Capcity should be ticked .
    3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
    4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
    6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
    6.Period Profile : SAP___P001 -Weekly period
    7.List Profile : SAPSFCI001-Production Planing
    Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
    Refere the below theread for farther reference :
    Capacity problem in production order
    capacity planning
    Hope this will be useful .
    Regards
    JH

  • Planned order splitting during capacity planning

    Hello,
    anybody plese help me during the capacity planning in T.code.CM31 i want to split a planned order and want to assign alternative sequence. how can i do this and the capacity should be reschedule automatically to my requirement date. i am using backward scheduling.
    plese suggest immediately
    Thanks and reagards
    Bhakta

    Dear Bhakta
    MRP does not perfom any Capacity Requirement Planning .While  you are executing MRP with Lead Time Scheduling , MRP proposes Planned Order Dates based on the Routing Operation Timing not based on the Work Centre available Capacity because in SAP Std R/3 we did not have scope to check the finite scheduling and capacity requirement chek .MRP assume that Work Centre has infinite available capacity .
    In MRP run , it will give you Detail scheduling of the Operation in Planned Order -Detail Scheduling tab  and copied the routing , BOM as master data .When you convert that Planned order to Production order , it will copy the Routing details based on the Order Type denpendt Parameters -OPL8-Routing -Alternative sequnce  and Automatic selection -3 option
    Thats why we have Capacity Requirement Planning  for Detail Capcity check and production order scheduling  .
    Note : Earlier to my first  reply , please note that you have option in CM21  enter sequence number  at order level which may applicable to you .CM21-Work Centre -exectute -Select the Order from order pool -Goto Order -Sequence number maintainence
    This number( sequence number operation /order )  that can be assigned to production orders or planned orders at the level of the task list header and is therefore valid for all the operations in an order.
    Hope this is clear .Revert if you nees farther help
    Regards
    JH
    Edited by: Jiaul Haque on Jul 5, 2010 3:32 PM
    Edited by: Jiaul Haque on Jul 5, 2010 4:01 PM

  • Get latest order for a scheduled maintenance plan

    Hi experts,
    I have a requirement where i have to get the order id for a scheduled Maintenance plan.My scenario is explained as below:
    A maintenace plan is scheduled and as a result of it an order will be created automatically  by system. Now i have to write a Report program which will be running daily and this report has to pick only those order which are NOT complete and these order will come from the above scheduled maintenance plan.
    Therefore i have to pick incomplete order based on scheduled maintenance plan.Any idea how to achieve this requirement?
    In case of any doubt please let me know.
    Regards,
    Abhishek

    Thanks for reply. But my requirement is a bit differen.
    I need a BAPI which can take Maintenance Plan as input and it can return the latest created incomplete order which is created due to scheduling of Maintenance Plan.
    Regards,
    Abhishek

  • Function Module to get planned Quantity from posting date

    hi,
    i need one function module which takes plant and posting date date as an input parameter and get the Planned quantity for that range of that ...i dont want to fetch it from material since the report is run for the whole plant(werks).so it has got a lot of data entries so i need a function for that...
    is there any function module which will fetch this data ...
    Edited by: sonal musale on Jun 23, 2008 3:53 PM

    Hi,
    I have also the same problem. Any solution you have for this one?
    Thanks,
    Raymond

  • Capacity Plan for Partially Confirmed Order

    Hi Guys
    Can any one please guide me on Capacity Planning (CM29) how to:
    1. Plan to plan a partial order. Or in other terms: how to plan a part order in wk1 and rest in wk2
    2. If the process order is partially confirmed, then how should supervisor re-schedule it again for later date!
    3. Ideally what should be followed:
      a. Schedule the Planned Order on CM29 and then Convert them to Process Order , OR
      b. Convert the Planned Order and then Schedule the Process Order on the CM29 screen
    Thanks in advance
    -Rahul

    Hi Mehdi,
    Once order status is PCNF you cannot create lot with inspection type as 03. You need to reverse all the confirmations/Goods issue and activate 03 inspection type in material master, maintain MIC related data in routing and do Read Master data. Then system will create inspection lot.
    For 03 inspection type manually inspection lot cannot be created. Once order is released inspection lot will be automatically created by system.
    Thanks & Regards,
    Ramagiri

Maybe you are looking for

  • How to set up reverse proxy to allow user access portal site from internet

    Hi all, I have installed 10g(10.1.2.0.2) AS on same machine(single IP for both mid and infra with different users respectively). there is a DMZ on which windows IIS is working through which we need to redirect the request to application server such t

  • Error While activating business process in sxi_cache

    Hello, I get following warning in TX: sxi_cache, when I try to deploy a integration process. Conversion From '[NN.]' to '[XC.ZXI_PROXY_VV2_STATUS_ABS_0001]' Can Cause Data-Dependent Errors Any ideas what's the cause for this warning? Regards Christia

  • Provision for zonewise budget entry  in APO-DP

    Hi experts Is it possible to enter zonewise (we have four sales zones) budget in demand planning ? Forecast to be done against budget. Could you pl. explain step by step This is very urgent and help any one pl. Thanks in advance SR Chandu 970 440 451

  • Is there a best way of improving short lived process performance?

    Hi, Apart from setting the thread pooling option in adminui, cacheing the form templates, What other options are available for performance improvement ? We tried setting the thread pool options and no much difference was found in response time. Any i

  • Requeirements to test Dependency Maintenance Tables

    Hi there, we want to try out the possibility to use Dependency Maintenance Tables for Variant Configuration. We're on EHP6 and the relevant business functions are activated. Are there any other requirements which have to be complied to use / test the