Scheduled job doesn't appear in Control center

Hi,
I am facing a strange problem. I installed OWB 10g R2 and I have my target and source both on Oracle 10g DB. I created lots of mappings, and when it came to scheduling them, I installed Oracle Workflow.
In any of the OWB documents, nowhere it is specified that if OWB is already installed and Oracle Workflow Server is installed later, what are the steps to link them.
Then I created a schedule and spplied them to the mapping by editing its configurations. Then as per documents I checked in Control center. But, there was no job created and so didnt appear there.
I am wondering what can be the reason for this. I simply didn't get any documentation that tells that, what if the scheduled job doesn't get created? or how do you check from OWB whether the Oracel Workflow is properly working?
Please provide a clue!
Thanks
Goga

Means it cannot detect any airplay devices.

Similar Messages

  • Song playback doesn't work in control center

    The music playback doesn't work in control center anymore, any reason why?

    Hi...
    The Help viewer preferences may be corrupted.
    Open the Finder. From the Finder menu bar top of your screen click Go > Go to Folder
    Type this exactly as you see it here:
    ~/Library/Preferences
    Click Go
    Move these files from the Preferences folder to the Trash.
    com.apple.help.plist
    com.apple.helpviewer.plist
    Now try clicking Help from the menu bar.

  • Airplay toggle does not appear in control center on ios7 neither on my iphone 5 nor my iPad 3, can anyone help please

    On iOS 614 I used to have airplay toggle, when upgrading to iOS 7 it disappear on both my iphone 5 and iPad 3,

    Place your finger at the bottom of the screen and swipe up.  A "control center" screen will appear and you will have the options you are looking for plus a few others easily accessible.  Airplay device must be turned on, of course.

  • Control center service

    Hi all,
    how can I schedule control center service to startup every time server is rebooted?
    I've notice that server sometimes reboot due to upgrades and that control center service doesn't startup and so my scheduled job doesn't start.
    I'm using oracle 11g and win server 2003.
    Many thanks.

    I use win server 2003 and the user has permission to open file.
    In the log I notice this java exception:
    2008/11/13-03:05:51-CET [D6A05E][] oracle.wh.runtime.platform.adapter.InfrastructureException: RPE-01003: An infrastructure condition prevented the request from completing.
    - Closed Connection
         at oracle.wh.runtime.platform.service.controller.PlatformDb.disconnect(PlatformDb.java:108)
         at oracle.wh.runtime.platform.service.Service.run(Service.java:427)
         at oracle.wh.runtime.platform.service.Service.main(Service.java:1082)
         at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
         at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:39)
         at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25)
         at java.lang.reflect.Method.invoke(Method.java:585)
         at Launcher.main(Launcher.java:167)
    Caused by: java.sql.SQLException: Closed Connection
         at oracle.jdbc.driver.SQLStateMapping.newSQLException(SQLStateMapping.java:70)
         at oracle.jdbc.driver.DatabaseError.newSQLException(DatabaseError.java:110)
         at oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:171)
         at oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:227)
         at oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:439)
         at oracle.jdbc.driver.PhysicalConnection.commit(PhysicalConnection.java:3323)
         at oracle.jdbc.driver.PhysicalConnection.commit(PhysicalConnection.java:3357)
         at oracle.wh.runtime.platform.service.controller.PlatformDb.disconnect(PlatformDb.java:102)
         ... 7 more
    java.sql.SQLException: Closed Connection
         at oracle.jdbc.driver.SQLStateMapping.newSQLException(SQLStateMapping.java:70)
         at oracle.jdbc.driver.DatabaseError.newSQLException(DatabaseError.java:110)
         at oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:171)
         at oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:227)
         at oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:439)
         at oracle.jdbc.driver.PhysicalConnection.commit(PhysicalConnection.java:3323)
         at oracle.jdbc.driver.PhysicalConnection.commit(PhysicalConnection.java:3357)
         at oracle.wh.runtime.platform.service.controller.PlatformDb.disconnect(PlatformDb.java:102)
         at oracle.wh.runtime.platform.service.Service.run(Service.java:427)
         at oracle.wh.runtime.platform.service.Service.main(Service.java:1082)
         at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)
         at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:39)
         at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:25)
         at java.lang.reflect.Method.invoke(Method.java:585)
         at Launcher.main(Launcher.java:167)
    2008/11/13-03:05:51-CET [D6A05E][] The Control Center Service is shutting down due to a previously reported fatal error.
    This error can happens because I've 2 instance with owb on same server? The other instance started without problems.
    Thanks

  • OWB Scheduled job generates infrastructure problem..

    Hi everyone,
    I'm experincing a strange problem while scheduling a process flow using OWB schedule. The job is created and started fine. But the job throws up an exception of the kind 'Infrastructure Problem' etc when the machine is shut down after I start the job from the Control Center. The oracle enterprise manager shows that the job is scheduled and enabled after the job is started via the Control Center.
    Can anyone suggest anything regarding this?
    Thanks in advance.
    Regards,
    Sayantan

    Hi Sayantan,
    Which machine is being shut down, the design client? If so do you use the control center on that machine?
    JP

  • How do I uninstall an "AMD VISION engine control center" "program"? DV7 1264nr

    How do I remove AMD VISION Engine Control Center that appears in my programs section? It does not appear in control center programs for uninstalling. It has never worked--when I try to open it, it is stopped.  I installed it thinking it was an update to my preinstalled AMD audio program. I have Vista 64 bit on a HP pavilion dv7 1264nr. The error that comes up is "host application has stopped working" and the details are:
    Problem signature:
      Problem Event Name:    BEX64
      Application Name:    CCC.exe
      Application Version:    3.5.0.0
      Application Timestamp:    4ca242ed
      Fault Module Name:    StackHash_1a5d
      Fault Module Version:    0.0.0.0
      Fault Module Timestamp:    00000000
      Exception Offset:    0000000000000000
      Exception Code:    c0000005
      Exception Data:    0000000000000008
      OS Version:    6.0.6002.2.2.0.768.3
      Locale ID:    1033
      Additional Information 1:    1a5d
      Additional Information 2:    2763c682d3cf8924ea66429d911698ba
      Additional Information 3:    3711
      Additional Information 4:    a8feb839290a8e26ed1381ba97bf7bec

    Thanks, ideato! That worked great, and I didn't really even have to restart Firefox to see that it did. I just changed it as you suggested, then opened a new tab, and ''voila'', it was blank!
    For anyone else with this issue, if you use ideato's link to about:config, it takes you to a help page which says to type "about:config" into the browser's url field, which takes you to the page where this change can be made....

  • How to remove InDesign CC (doesn't show in Control Panel)?

    Hello everyone,
    I'm having a bit of a challenge.
    I started installing CC applications and all went well until I couldn't install Muse CC (I posted it in another post on the forum here but I haven't found anyone with the solution to this one yet...).
    Because Muse CC wouldn't install, Adobe guys recommened trying to uninstall  all CC apps and CC desktop app and try installing it again. I did that but after uninstalling all CC apps and  CC  desktop app I was left with InDesign CC, which appears in Start menu but doesn't appear in Control Panel so cannot be removed...
    Can anyone help?

    Hi Marek,
    You can use the creative cloud cleaner tool to get the uninstall  of indesign CC confirmed.
    The link to cleaner tool is http://www.adobe.com/support/contact/cscleanertool.html.
    Please let us know if it worked.
    Note: if Indesign is not  reflecting in control panel, in all probabilities it has been uninstalled, you can try launching Indesign CC from the Start menu , where Indesign is still being shown. If it does not launch then it has been uninstalled.
    Regards
    Rajshree

  • Empty "scheduled jobs" list in control center

    Hi all,
    due to a move to a new data warehouse environment i added a new configuration
    to my OWB project with new locations, control center etc.
    I was able to deploy and run all of the owb stuff into the new environment except all
    the scheduled jobs to deploy into OEM,
    which owb generates for all the process flows that have a schedule assigned ("Referred Calendar" in Configuration).
    The list of "Scheduled Jobs" in control center for the target location just appears empty.
    Are there any additional settings or privileges missings,
    i.e. for target location, owb repository owner, configuration, location, ...?
    Old env is Oracle DB 10.2.0.2 on Win Server 2003 32 bit, Workflow Server 2.6.4, OWB Client 10.2.0.1.31, OWB-Repository 10.2.0.1.0.
    New env is Oracle DB 10.2.0.2 on Redhat 64 bit, Workflow Server 2.6.4, OWB Client 10.2.0.1.31, OWB-Repository 10.2.0.1.0.
    Any hints would be appreciated.
    Thanks,
    Matthias

    Hi,
    I found out that I have to create a new schedule module.
    In the create module wizard you'll have to define a location where schedules
    are deployed to and there I defined the new target location.
    It is not possible to assign different deployment locations for same schedule
    module in each configuration.
    I don't know if it is a bug or a feature, but with the new seperate schedule module
    it works.
    Just to let you know,
    Matthias

  • Control Center status running scheduled jobs stops when DB is shutdown

    I have scheduled jobs in the Control Center of OWB, and the status is "Running" (Green Arrow ->), but everytime we stop and start the database I have to start the schedule job again under Status.
    Is there any way to fix this so that when the database stops and restarts somebody does not have to go into the Control Center and restart the jobs that are scheduled?
    Thanks

    I'm been told that it's a bug in the current version of OWB and to fix this problem we should upgrade to 10.2.0.3.

  • How to remove scheduled jobs from Control Center?

    Hi,
    My control center shows a bunch of jobs in the "scheduled" tab that no longer exist.
    They do not exist in Control Center and they also do not exist in the Design Center anymore.
    Is there a way I can delete entries from the list of schedule jobs?
    I am on OWB 10gR2
    Thanks,
    Sam
    PS, I saw this thread that talks about my problem. However the solution provided seems to only work if the jobs still exist
    in your control and design centers.
    OWB 11g  Control Centre, Want to Remove Schedule Jobs list

    Could it be that some process flows are still attached to a schedule? Perhaps you've made a copy of a Process Flow?

  • Error on Control Center while trying to run jobs

    Hi,
    I got a problem while trying to run the scheduled jobs or process flows.
    We tried restarting the control center service manually. It is started without throwing any errors at the backend. But when I open the control center service and try to start or stop a job, its throwing the below error.
    The error is as below.
    ORA-20029: The control center service is not currently available
    ORA-06512: at "OWB_REPO.WB_RTI_EXCEPTIONS", line 107
    ORA-06512: at "OWB_REPO.WB_RTI_QUEUES", line 200
    ORA-25207: enqueue failed, queue OWB_REPO.WB_RT_SERVICE_QUEUE is disabled from
    enqueueing
    ORA-06512: at "OWB_REPO.WB_RTI_SERVICE_EXECUTION", line 548
    ORA-06512: at "OWB_REPO.WB_RTI_SERVICE_EXECUTION", line 619
    ORA-06512: at "OWB_REPO.WB_RT_EXECUTION_CONTROL", line 27
    ORA-06512: at line 1
    I am not able to resolve it. Could any one of you please help me in resolving it?
    It is very urgent. Thanks a ton in advance
    Regards,
    SriGP.

    Hi Oliver,
    Thanks again!!
    There are a lot of queues in DBA_Queues.
    But how can we know which queues should be enabled and which queues should be disabled? As I observed, All the Exception queues are disabled and the reamining queues are enabled.
    About the parameter aq_tm_processes, we have not changed the value of it. Previously, all the jobs used to execute perfectly with the same setting. So, I dont think the value is a problem.
    Recently, we had the below problem in database, because of which all the jobs got stalled/hanged. The system DBA had resolved this problem by extending the SYSTEM tablespace. After that all the database is fine except the OWB jobs. Is there any impact on the on the owb jobs because of the below error?
    ORA-00604: error occurred at recursive SQL level 1
    ORA-01653: unable to extend table SYS.AUD$ by 8192 in tablespace SYSTEM
    ORA-02002: error while writing to audit trail
    ORA-00604: error occurred at recursive SQL level 1
    ORA-01653: unable to extend table SYS.AUD$ by 8192 in tablespace SYSTEM
    Thanks in advance,
    SriGP.

  • PC:Regulation and Regulation Configuration fields appears blank, while Scheduling Job

    Hi All,
    The regulation drop down does not show any entry,while scheduling job(Automated Monitoring -> Continuous monitoring scheduler)
    So, i tried to create regulation, for which i  got below error., while creating a Regulation Configuration
    i have been through SAP GRC Process Control - Not Displaying Regulations in Organizations menu
    I understand that it might be due to incomplete configuration in SPRO. So, could you anyone suggest on this.
    fyi, i have activated all BC sets
    Regards
    Plaban

    Hello Sahoo,
    check  the below note and perform the technical steps to make fields available for regulations
    1799427 - How to make fields available to be selected as regulation specific .
    Regulations will not appear until you assign objects to your organization such as Sub processes , policies and Indirect-Entity-Level Controls that have been assigned to regulations.
    Regards
    Baithi

  • Executing Scheduled jobs via Control Centre

    Hello Forum,
    We have a question on the scheduled jobs in OWB. We have some process flows that are attached to some (corresponding) schedules. Now in the Control Centre, we have two options to get the scheduled jobs executed:
    1. We can have the scheduled jobs deployed, but not started, in which case the scheduled jobs would run as our Repository Owner (say OWB).
    2. We can have the scheduled jobs deployed AND started, in which case the scheduled jobs would run as OWF (Oracle Workflow User).
    (Just to clarify - by "starting" a scheduled job we mean that we make use of the "Start" option available in the right-click menu for every scheduled job that appears under the "Scheduled Jobs" node in the Control Centre.)
    We would like to understand what is the advantage/disadvantage of setting up the scheduled jobs (for execution) for the two cases described above.
    Any help is much appreciated.
    Best Regards,
    Piyush
    For reference, following is our environment info:
    OWB Client Version - 10.2.0.1.31
    Repository Version - 10.2.0.1.0
    Database Version - 10.2.0.3.0
    OWF Version - 2.6.4
    -----------------------------------------------------------------------------------------

    Hi Sam,
    Thanks a lot for your kind inputs. Well the situation that I have at hand is that when I don't "start" the schedules (as in Case 1. described in my earlier post), everything goes fine. However, if I "start" the schedules jobs (as in Case 2. described in my earlier post), the scheduled jobs failed to execute after DB restart. So I feel we are better off by not starting the scheduled jobs so as to make them run as our target workflow user.
    Do you think this is the right approach for executing the scheduled jobs?
    Best Regards,
    Piyush

  • Sybase Control Center 3.2.7 -Automatic schedule Backups/Logs

    Hello Experts,
    I have 2 queries which need to be discussed with you people.
    1.I am currently working with Sybase database 15.7.0.122 and with Windows environment .It has also been released a sap note by sap that we sybase central has vanished and the customer's are forced to move to Sybase Control Center.Is there any way or plug ins that we can install and use sybase central.
    2.I have downloaded and configured the Sybase Control center 3.2.7 which came with Sybase database 15.7.0.122 software and able to launch ,configure the user database as well as took the backup successfully and it seem's the web gui interface looks good but sometimes clock revolves which is some time annoying.
    My question and requirement is to schedule the automatic backups with retention  through scripts which I was able to do in Sybase central and Dbacockpit but here don't find any option.However , I see that in Sybase 16.0 business suite there is TASK MANAGEMENT option in Sybase control center where you have option to schedule the jobs.May be I am not able to find in the current version .Appreciate your guidance in fixing it.
    Thanks
    Asim

    Hi Asim,
    For your 1st query refer SAP note
    1991153 - Sybase Central Unavailable on ASE 15.7 SP101 how to add it back
    For 2nd Query,
    It looks be possible system resource issue due to which you see the clock symbol.
    Once the sybase central is restored back you may schedule job using the same.
    Hope this helps.
    Regards,
    Deepak Kori

  • Control center doesn't work all the time in iOS 8

    I have the new iPhone 6+ and have noticed that sometimes I can't pull up control center.
    I have to unlock it, then lock it again and then it will pull up. I use this method to access the torch at night.
    Also to switch off the torch when the phone is locked, the camera icon could be tapped. However this feature doesn't work anymore.
    Now I have to click the home button > swipe up the control center (hopefully it works) > tap the torch icon.
    It used to be easier when you could just click the home button > tap the camera icon.
    Please fix these issues soon.

    You are not addressing Apple here, we are users like you, so we cannot fix these issues. If you would like to tell Apple what your problem is, then you can leave them feedback HERE. Click on the appropriate link.
    However, if you want to try and troubleshoot your Control Center issue, then I would go into Settings>Control Center>Access on Lock Screen and if that is on, turn it off and back on again. Also, when accessing Control Center from the lock screen, make sure you are starting off of the screen when you begin to swipe upwards. That tends to work better. Sometimes starting on the screen, the finger does not get low enough for it to register.
    As far as the flashlight button, I never attempted to turn it off with the camera, I just tapped in Control Center.

Maybe you are looking for

  • How to split list of columns into 2 tables in SSIS 2012?

    Hi, I have 200 columns in Source. Now i want to split these columns, few into Destination A and few more columns into Destination B. Multi cast i tried to use, but it coping all the columns . Any help would be appreciated. Thanks in Advance. Lets ass

  • How do I download Camera Raw for Elements 11?

    I've tried it through the "help" window and no luck.

  • DML on nested tables using SQL

    Hello. Can anyone tell me what's wrong?? SQL> create type mytype as table of varchar2(20); Type created real: 78 SQL> declare 2 c mytype; 3 begin 4 select table_name bulk collect into c from user_tables; 5 delete from table(cast(c as mytype)); 6 end;

  • Multivalue Picklists in Reporting

    Hi, We have a requirement to add new multivalue picklists to application. I have the information that MVPs cannot be used in realtime reporting so we have decided to build analytics reports (Only to include MVPs in report). Now, I need to know if the

  • How does syntax coloring work?

    Hello.. I was wondering how to do syntax coloring? I was planning on making a simple editor which has that (not for java at least). I think I've seen some Java classes for that but what if I want to define my own keywords? Hm.. so does the process in