Scheduled start and finish dates in the Work order.

Hi Friends,
I am facing peculiar issue that once the Work order has been released schedule start and finish dates should be derived from the control key and
operation hours and work center capacity,infact in my case while releasing the Work order,these dates (scheduled start & finish) are not been
populating in the Work order,(but SAP standard behavior is while releasing WO,the dates should be populated).
though i have maintained proper configuration
could you please light up some thing on it.
Regards,
Srinika

Check Scheduling Parameters assignment to order type, Scheduling option in Control key.

Similar Messages

  • Basic start and finish dates vs scheduled start and finish dates in work order

    Hi Friends,
    I have observed  that whenever releasing the work order,irresepective of number of operations in the work order, system generating scheduling start and finish dates are same, however after releasing the Work order and by adding another operation in the work order, immediately scheduling end date equaling to Basic finish date (i.e.: Basic start and finish dates are equal to Schedule start and finish dates).
    Can any body please explain why this is heppening
    Please find the screen shots.
    After adding one more operation in the operation list and save the Work order,then Basic start and finish dates are equal to schedule start and finish dates.
    Regards,
    Srinika

    Srinika
    There are many things that affect the order scheduling:
    IMG setting - scheduling parameters
    Work centre settings
    Operation values e.g. work, duration, operation control key settings
    Calendars
    Etc
    So one possible interpretation of the above data is that the initial order operations have no work assigned, or the operation control keys don't require scheduling, or the work centres arn't set up correctly.
    Then you add a new operation which does appear to work.
    Please supply a screen-shot of the operation tab.
    PeteA

  • Scheduled start and Finish date .

    Hi Everyone,
    I am facing a problem in dates in creating a process order in Production .
    In the tcode COR1, when input the BASIC START DATE manually, the BASIC FINISH DATE ,scheduled start date and finished dates should get calculated automatically  as per standard SAP.
    The problem that I am facing is that , if I input the BASIC START DATE in future , the scheduled start date and finished dates are always coming as  the system date.
    whatever date I input in the BASIC START DATE  the scheduled start date and finished dates are always coming as  the system date.
    But this is not happening in quality and development server .
    Please help me if you have any solution
    Thanks
    Bijay

    Dear ,
    1.Scheduling parameter for new process order type and plant combination, to be defined at OPUZ . U can copy the settings at standard order type PI01.Here you should keep Backward Scheduling as Scheduling Type  and Keep the adjustment  Scheduling as Adjust to Basic Date , depenent requirement Date .
    Now  Order Basic finish date = Order Basic start date + float before prod + Lead Time of Operations (operation time from routing )+ float after prod.
    These floats are predefined in SMK  and assinged to material master .It comes through Planned Order after MRP run andcoped to Production Order .
    .2.Check and Define Scheduling Margine key in MRP -Carry All over all palnt paremtres (OPPQ)
    If you are MTS process , then Keep the Scheudling Type as Forward .Enter the Basic Start date and Scheduling Margine Days ( Opening periods , FBP, FAP) and then hit the Scheduling Indicator .It will calcuate all the dates based on the SMK and operation setup and propose you Basic Finish Date .
    So adjust the Flaots in SMK tab in process order , enter Basic Finish Date , Choose Bacward Scheduling to arraive Basic Start  or Go in reverse direction by choosing Forward scheduling .
    Hope its clear
    Regards
    JH

  • Timeline Start and Finish Dates - how to not display finish dates for tasks not added to timeline

    I have a project, Project 1, with start date 1 Jan 2014 and finish date 31 Dec 2014.  When I switch to timeline view, the timeline spans this period. I now want to create a second view for a sub project within Project 1, called Project 1A.  It
    starts 1 June 2014 and finishes 31 August. I only want to see Project 1A's tasks and time span on this second custom timeline view. I create the new view, add the tasks from Project 1A to the timeline, and save the view as CustomView1A. My problem: CustomView1A
    shows the tasks for Project 1A, but also shows the dead space between 1 Jan 2014 and 1 June 2014, as well as the dead space between 31 August and 31 December.
    I dont want to see the dead space. I want CustomView 1A's timeline to start and finish on Project 1A's start and finish dates.
    How do I adjust CustomView 1A's timeline borders on the left and right to exclude the dead space?
    Hanneliese Fourie

    Dear Sir,
    I checked in CO41 and it allows me to convert planned order to production order and not have any provision to re-scheduling the planned order . Any function to reschedule planned order to future dates ( whose start dates and finish dates are in past ) ?
    Thanks,
    SL

  • Basic Start and Finish Date coming as default while Order Creation (IW31)

    Hi Members,
    I am in situation where in i am trying to cretae an order from IW31 but after the order creation basic start and basic finish date is being updated as default date which is the current date of creation.
    I have written my code in Include LCOINFNJ where basic start and basic finish date should get populated as per my written code .After debugging i found that the code is populating the dates in structure CAUFVD-GSTRP(basic start date)  and
    CAUFVD-GLTRP(basic end date) but whill posting at user command  SAVE the fields are getting updated back to default dates.
    Even after adding an enhancement point at the end of below given FM where in i am hardcoding the values still the issue remains the same .
    Function Module : CO_ZV_ORDER_POST is the FM responsible for posting.
    Please help regarding this issue .  
    Thanks and Regards.
    Gaurav Chopra

    Hi ,
          If you do not want start and finish date as current date then u can do it via config
    spro ->pm -->maintenance order processing -->Maintenance and service orders -->general data -->Activate default date for current date as basic date  here for a particular plant remove the tick mark in default current date , thus when u create MO on that plant then u will not get any default dates in basic start date and finish date ...
    regrds
    pushpa

  • 2LIS_04_P_MATNR Delta - Actual Start and Finish Dates

    My company is experiencing a problem with retrieving the actual start and finish dates and times from the 2LIS_04_P_MATNR data source with delta extraction. The R/3 source system is version 4.6C. The BI system is version 7.0. Specifically, the data source fields GETRI, GEUZI (finish), GSTRI, GSUZI (start) are sometimes never populated with data. These fields are often blank in the production data extracted. It was observed that the actual delivery date for the order (posting date of goods receipt from process order) was often an earlier date than the GETRI date. This scenario was tried in test systems, and it was found that if the final goods receipt for the process order was posted before the end of the last phase was confirmed, the actual finish date and time fields were not transferred to BI from R/3. In fact, it was noted that a new record was not created in the 2LIS_04_P_MATNR delta queue when the end of the last phase was confirmed. Regarding the actual start data, this is missing if a goods receipt from the process order is posted before the start of the first phase is confirmed.
    Has anyone else experienced this problem? How was it resolved?
    SAP Notes have been searched regarding this problem, and in fact, a customer message has been opened with SAP for this problem. However, we thought we would try asking the community as well, to see if any other users have experienced this, and how the problem was resolved. We also understand that it may be an unusual practice to post a goods receipt from the process order before the end of the last phase is confirmed. In a more general sense, has anyone else experienced that some of the data source fields are never populated if the R/3 information is entered after the posting of the final goods receipt against the process order? Our testing indicated that no more delta records are created for the 2LIS_04_P_MATNR data source after the final goods receipt was posted.
    Thank you,
    Chris Sopek

    Hello,
    we are experiencing your same problem! The only difference to your scenario is that wer are currently operating on SAP ECC 6.0.
    Did you receive any answer from SAP?
    We opened a request for the same topic.
    Thanks

  • Planning Profile Start and Finish Dates (Project systems)

    Hi Friends,
    I need a help from you in regard to Start and Finish dates of Planning Profile dates.
    For transactions cmp3 and cmp9, the start date should be the current date, and Finish date should be End of the current year for the selected profiles. I had done the necessary configuration for profiles in spro and tried. I could make the starting date appear as current date, but the year is increasing the next day, which i do not want.
    Can anyone suggest how to tackle this problem. Can we get the soln, by any non standard method.
    I appreaciate your valuable views.
    Regards,
    VENKAT

    The fourth parameter of your start condition is probably incorrect. When your event is not in the queue, the virtual attribute doesn't bind the webservice to the agent determination subworkflow, which probably causes the third instance of the org management object to fail, resulting in a knock on effect of the workflow inserting an incorrect planning date.
    Alternatively, might I gently suggest posting your question in a PS forum, we mostly deal with workflow and BPM-related issues here.
    Cheers,
    Mike

  • Adding a summary column in a table which contains the start and end dates in the week

    Hi,
    I've got a DIMENSION DATE table and want to add in another column which shows the start and end date of the week.
    See below, the new column is WEEKOFYEARTEXT.
    Does anybody know how i may generate this column using SQL and using the existing columns?
    Umar Javed

    See:  http://www.sqlusa.com/bestpractices/datetimeconversion/
    DECLARE @Year INT = '2015';
    WITH cteDays AS (SELECT DayOfYear=Dateadd(dd, number,
    CONVERT(DATE, CONVERT(char(4),@Year)+'0101'))
    FROM master.dbo.spt_values WHERE type='P'),
    CTE AS (SELECT DayOfYear, WeekOfYear=DATEPART(week,DayOfYear)
    FROM cteDays WHERE YEAR(DayOfYear)= @YEAR)
    SELECT WeekOfYear, StartOfWeek=MIN(DayOfYear), EndOfWeek=MAX(DayOfYear)
    FROM CTE GROUP BY WeekOfYear ORDER BY WeekOfYear;
    WeekOfYear StartOfWeek EndOfWeek
    1 2015-01-01 2015-01-03
    2 2015-01-04 2015-01-10
    3 2015-01-11 2015-01-17
    4 2015-01-18 2015-01-24
    5 2015-01-25 2015-01-31
    6 2015-02-01 2015-02-07
    7 2015-02-08 2015-02-14
    8 2015-02-15 2015-02-21
    Kalman Toth Database & OLAP Architect
    SQL Server 2014 Database Design
    New Book / Kindle: Beginner Database Design & SQL Programming Using Microsoft SQL Server 2014

  • I entered a new calendar event at I cloud on my laptop.  The enent showed up on my I Phone  4S but, the start and finish times on the entry in I cloud was different than the times shown on the I phone calendar.  How do I sync the time in my I Phone with

    I entered a new calender event using I cloud on my laptop. The enent transfered to my i Phone 5 S but, the start and finish times shown st i cloud on the laptop are different than the times shown on the i phone.  How do I sync the times on the i Phone with the times shown on the laptop i cloud calender?

    Turn off time zone support on the phone.

  • Getting the start  and end dates of the week

    Hi,
    I was stuck with a problem in getting the start date and end date of the week,i know the month ,week and year also,with these three values how can i get the start and end dates of a week.please help me
    Thanks

    There is no simple way. It has to be a math calculation.
    There are several ways you can get the dates. First you have to know what day is January 1st and what day is december 31st for a particular year. Second you have to check whether the given year is a leap year or not. Based on the abvove information you should be able to find out what day is a particular date.
    Hope this helps to get you started.
    - Venkat Dhurjati.

  • FM to find week start and end date on the basis of a given date

    Hi Everyone,
    I have a requirement in which I require the week start and end date  of any given date.
    For eg: The given date is Wednesday 24.03.2010, I need a function module to calculate the week start date ie. Monday 22.03.2010 and week end date ie. Sunday 28.03.2010 on the basis of that date.
    Any input to this query would be helpful.
    Thanks,
    Nimisha Agarwal
    Edited by: Nimisha Agarwal on Jul 7, 2010 7:47 AM

    HI nimisha,
    many posts r there for this .
    Kindly check  before posting
    anyways this FM will serve u  r purpose.
    GET_WEEK_INFO_BASED_ON_DATE

  • Get Lastest date of the Work Order confirmation

    Hi experts,
    I want to write a report to get the lastest date of Work Order confirmation.Pls give me some logic solution. How to do?
    I know the work order can be cofirmed partly,So there are maybe several date for work order confirmation,I only want get the latest one.
    Edited by: Bean Dou on Jan 5, 2009 8:24 AM

    SORT BY DATE FIELD
    DATA:CNT TYPE SY-TABIX VALUE 0.
    SORT ITAB BY ERDAT. --->SUPPOSE THIS IS THE DATE FIELD
    LOOP AT ITAB.
    CNT = CNT + 1.
    ENDLOOP.
    READ ITAB  INDEX CNT.
    ****NOW YOU CAN GET THE LATEST DATE ROW******
    ITAB-ERDAT.

  • Scheduled Maintenance basic start and finish date

    Hi Expert,
    I'm using WO type say PM04 for schedule maintenance. In its maintenance plan i'm using prioity "medium" that starts form 7 - 14 days.I also have already set the scheduling type in OPU7 - adjust scheduling into "Do not adjust basic dates, dep. reqmts to order start"
    after run deadline monitoring WO PM04 that generated is resulted as per below:
    basic start date: 13.08.2010
    basic finish date: 13.08.2010
    the basic dates does not reflect the priority "medium"
    pls help how can i configure the basic dates setting that align to its priority.
    Thanks
    Rgds,

    Hi ,
    plz check if the below user exit is helpful or no
    IWO10012 :Maintenance Order: Priority Handling on Central Header
    i think priority does not influence the basic start or end dates for order generated from MP ..
    regrds
    pushpa

  • Want last date of the month as default basic finish date for the Proc order

    For forward scheduling type in process order, irrespective of the start date i want last date of the month as my  basic finish date.
    Ex start date can be 01/10/2009 or 15/10/2009, but the basic finish date should be 31/10/2009.

    Hi Sam,
    sorry to say , its not possible in standard SAP.
    1) If, on order creation, a planned order exists for the production order/ process order, the basic dates are copied from the planned order.
    2)If no planned order exists on order creation, you must specify at least one basic date.
    The scheduling type determines the basic dates that you must specify. and it useses timings from routings for scheduling.
    so may be you need some work around.
    explain your requirement why do you want to fix it for the last day of month and other constraints, may be we can find some way.
    Regards
    Ritesh

  • PM-Work order execution start and finish date

    Hi,
    I'm looking for the SAP PM standard datasources which includes the fields ISDD,ISDZ,IEDD and IEDZ.
    Upon investigation i could find a data structure DIAFRU which includes these fields.
    Can we create a generic datasource on top it and extract the data to SAP BW or else do we have any standard datasource which provides these fields.
    Please advice.
    Regards,
    Surya

    Hi,
    Cross check existing PP Data sources which starts names 2LIS_04_P* and 2LIS_17_I3OPER.
    if above data sources missing one or two fields then you enhance and use it.
    Other wise you can create generic data source on table AFRU as per your needs.
    Thanks

Maybe you are looking for

  • Hyper-V 2012 R2 USB Token for guest

    I have a piece of software that uses a USB token for licensing purposes. I'm attempting to virtualize the server with the software, but I can't get the USB token over to the VM. I've seen guides about mounting USB drives to VMs, but the token doesn't

  • Java.lang.UnsatisfiedLinkError: /s000/oracle/product/db10/lib/libocijdbc10.

    Hi all, I had this error when i create OCI Connection Pool to Oracle Database. My Oracle version is 10g and i set LD_LIBRARY_PATH=$ORACLE_HOME/lib. My OS is Solaris Sparc 9 64bits, and the error show below java.lang.UnsatisfiedLinkError: /s000/oracle

  • Bridge CS 3 Quits

    I'm running Bridge 2.1.1.9 on OS X 10.5.2. It work fine when I navigate files but if I try to use Bridge Home, Meetings, Stock Photos, etc it quits with an error. I've tried deleting prefs, creating a new user and opening it, uninstalling and reinsta

  • Problems with LR 5 CC version

    Hi. I cant finish my downloading process trying to install LR from CC installer, When reaches 43% it crashes with 7 errors during the installation process. Regards

  • Sales Order Setup Table

    Hi Friends, In R/3 : sbiw - 8 hours back I have started job for filling setup tables for sales order, but still it shows zero reords in setup tables for (MC11VA0ITMsetup,MC11VA0HDRSETUP) what could be the reason??? regards, suyash