Schedule InfoPachages for DataScource Text 出错

在执行 schedule InfoPackage 的时候,点start,  显示Data was requested. 进Monitor里面显示
Request still running
Diagnosis
No errors found. The current process has probably not finished yet.
System Response
The ALE inbox of BI is identical to the ALE outbox of the source system
or
the maximum wait time for this request has not yet been exceeded
or
the background job has not yet finished in the source system.
Current status
Not all reported data packets arrived.
返回到Data selection 菜单使用check, 显示Check carried out-ok.
之前在执行 schedule InfoPackage attribute 的时候都是正常的,可是text总出错。
在 Details 里显示
5 Records sent (0 Records received)
 Data Package 1 (? Records): Missing messages
我的原文件是CSV文件,内容如下
ProduktID;Beschreibung;Sprache;
AN01;Flachbildschirm LCD 32;DE;
AN02;Flachbildschirm LCD 40;DE;
AN03;Flachbildschirm Plasma 32;DE;
AN04;Flachbildschirm Plasma 32;DE;
AN05;Anschlusskabel 2m;DE;
请问下各位前辈,有遇到过同样的问题么, 应该怎样做那
小妹在这里先谢谢大家了

多谢回复
问题找到了,应该是date 格式出错。在csv文件里写的是
01.01.2008
02.01.2008
在Stammdatentexte里面设定为Date。预览里面显示为
20.1..20.0
20.1..24.0
请问这是怎么回事呢
已解决,谢谢大家~~~
Edited by: Zlreif on Dec 7, 2009 3:03 PM

Similar Messages

  • Schedule Lines for TATX items

    I know that by default, schedule lines are not active for TATX (text) items in sales documents.
    I'm also pretty sure that this option is not valid even if you activate it in the IMG.
    Can anybody tell me:
    1) Is my statement above correct ?
    2) If so, why are schedule lines not allowed for TATX items.
    3) Is there any way around this limitation ?

    Thanks for your input so far.  Perhaps you'll be kind enouth to stick with me a little more.
    Let me expalin what my user is doing:
    In the IMG configuration of our system, schedule lines were activated for TATX item category, however it still does not work as expected.
    User enters a quantity of deliverable product on line item 1 with item category of TAN.
    User creates a delivery schedule for line item 1 using schedule lines (category CP).
    For line item 2, user wants to send "DOCUMENTATION" for each schedule line.
    "DOCUMENTATION" exists in our SAP system as a material master, but no stock exists.
    User enters a quantity of DOCUMENTATION on line item 2 with item category TATX.
    User creates delivery schedule for line item 2.  (auto populates sched category CT).
    When delivery is created, the first schedule line for both items works fine.
    For subsequent deliveries, line item 1 continues to work, but the line item 2, DOCUMENTATION material does not show up.
    I suspect that we are trying to use the TATX item category differently than it was intended, and that some other method would be a better fit for making deliveries of non-stocked material.

  • IOException: invalid content type for SOAP: TEXT/HTML

    Hi all,
    After the IS received a SOAP request successfully and sent it to the Adapter Engine I get an IOException in my SOAP Adapter (I configured a SOAP communication channel). From my RWB I can see:
    2005-08-12 10:53:17 Success SOAP: request message entering the adapter
    2005-08-12 10:53:17 Success SOAP: completed the processing
    2005-08-12 10:53:18 Success The message was successfully received by the messaging system. Profile: XI URL: http://ecsap:50000/MessagingSystem/receive/AFW/XI
    2005-08-12 10:53:18 Success Using connection AFW. Trying to put the message into the receive queue.
    2005-08-12 10:53:18 Success Message successfully put into the queue.
    2005-08-12 10:53:18 Success The message was successfully retrieved from the receive queue.
    2005-08-12 10:53:18 Success The message status set to DLNG.
    2005-08-12 10:53:18 Success Delivering to channel: J2E_ReceiverChannel_SOAP
    2005-08-12 10:53:18 Success SOAP: request message entering the adapter
    2005-08-12 10:53:18 Error SOAP: error occured: java.io.IOException: invalid content type for SOAP: TEXT/HTML
    2005-08-12 10:53:18 Error Exception caught by adapter framework: invalid content type for SOAP: TEXT/HTML
    2005-08-12 10:53:18 Error Delivery of the message to the application using connection AFW failed, due to: invalid content type for SOAP: TEXT/HTML.
    2005-08-12 10:53:18 Success The asynchronous message was successfully scheduled to be delivered at Fri Aug 12 10:58:18 CEST 2005.
    2005-08-12 10:53:18 Success The message status set to WAIT.
    Please help if possible! Thanks!
    Denis

    hi guys
    this is my soap Reciever CC is showing the Error .
    please suggest me the solution.
    2007-12-21 10:09:27 Error SOAP: call failed: java.io.IOException: invalid content type for SOAP: TEXT/HTML
    2007-12-21 10:09:27 Error SOAP: error occured: com.sap.aii.af.ra.ms.api.RecoverableException: invalid content type for SOAP: TEXT/HTML: java.io.IOException: invalid content type for SOAP: TEXT/HTML
    2007-12-21 10:09:27 Error MP: exception caught with cause com.sap.aii.af.ra.ms.api.RecoverableException: invalid content type for SOAP: TEXT/HTML: java.io.IOException: invalid content type for SOAP: TEXT/HTML
    2007-12-21 10:09:27 Error Exception caught by adapter framework: invalid content type for SOAP: TEXT/HTML
    2007-12-21 10:09:27 Error Delivery of the message to the application using connection SOAP_http://sap.com/xi/XI/System failed, due to: com.sap.aii.af.ra.ms.api.RecoverableException: invalid content type for SOAP: TEXT/HTML: java.io.IOException: invalid content type for SOAP: TEXT/HTML. Setting message to status failed.
    2007-12-21 10:09:27 Error The message status set to FAIL.
    2007-12-21 10:09:27 Error Returning synchronous error message to calling application: com.sap.aii.af.ra.ms.api.RecoverableException: invalid content type for SOAP: TEXT/HTML: java.io.IOException: invalid content type for SOAP: TEXT/HTML.
    thanks & Regards
    Ravi

  • How to put schedule lines for one year  in a schedule line agreement

    dear all
    thanks for the support till now from the forum
    now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
    in my client we are getting open PO so
    we have to make one agreement acording to that PO and thats for one year
    and this one yr will have same quantity to be produced everyday
    means 12nos of material every day for 12 month and this will be for every day
    and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
    please help
    subrat
    Message was edited by:
            subrat panda

    Dear Subrat,
    you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
    1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
    2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
    Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
    It is the only ways, how you can reach your aim. I hope, this information will help you further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Error while scheduling report for SAP users

    Hi All,
    We have SAP authentication enabled in our BO environment. (BO XI 3.1 sp2 FP 2.6 on windows 2003 server).
    There are some webi reports based on BW Bex queries that we are trying to run on behalf of certain SAP end users. This we are doing using "schedule for" option.
    Now what is happening here is if the end user has logged in once in BO system ,it runs fine. But in case user has not logged in to BO (using infoview etc.) ,it throws error saying "incomplete logon data" . Also if user changes or reset his password in BW and if he doesn't login to infoview after that ,system throws another error "Name or password incorrect (repeat logon)".
    Based on these observation, we are suspecting if BO system uses stored SAP users credentials while scheduling report for them based on their last login.
    Would like to mention here that we have checked option "automatically import users".
    Please advice if this behavior is normal or we are missing some setting.
    Thanks in advance,
    Chandra

    Hi All,
    Any pointers or suggestions for this issue ??
    Is there a setting/option avialable in CMC which could resolve these errors.
    Or, user has to login once to infoview in all circumstances to avoid these errors.
    Thanks,
    Chandra

  • Help. I'm trying to create a DTP for 0INDUSTRY texts

    I'm trying to create a DTP for 0INDUSTRY (texts), but when I assign the DataSource (0INDUSTRY_TEXT), it shows me the next error message: "Target 0industry (type IOBJ) is not active".
    Of course I've checked 0industry and it is already active!
    I have the same issue with several characteristics.
    Do somebody knows what can I do?

    Hi,
        Try comin out of rsa1 transaction and then going back in...else login and logoff.  Its generally happens that the changes dont get reflected and it then shows that error.
    assign points if helpful
    Regards.

  • Can you no longer have a background color for the text box in the new version of hp photo creations

    just updated to the new version of HP Photo Creations, used to be able to have a colored background for the text box - is that no longer possible in this new (not better) version????!!!!! Uuuuuuuuuugh

    Hi Lainey.
    Thanks for asking. We're working on bringing back that feature. In the meantime, here's another way to add text backgrounds: Add a placeable graphic and then click the Arrange button to send it to the back, behind the text.
    That approach also gives you more interesting shapes. The new alignment guides make it a snap to align a graphic with a text box. In the example below (it may take a day for the image to show up here), I also used the new Premium Editing Features to change the color of the graphic.
    P.S. — Applying a thick border to an empty text box (also using the Premium Editing Features) is another way to create a background shape. That has the advantage of letting you pick any color for the box. You'll also find several new text styles at the bottom of the new text menu.
    Let us know if we can help further,
    RocketLife 
    RocketLife, developer of HP Photo Creations
    » Visit the HP Photo Creations Facebook page — news, tips, and inspiration
    » See the HP Photo Creations video tours — cool tips in under 2 minutes
    » Contact Customer Support — get answers from the experts

  • How do I make phone vibrate longer for a text message?

    I have an iphone 4s and I am wondering how I can set the vibrate longer for a text message.  I have it turned on.  I have set the vibrate to "Rapid".
    I vibrates long for a phone call, but I want it to vibrate longer than a short burst, which is repeated later, on a text message.
    Can anyone help?

    You can't.

  • I have problem with fonts for my site, i have used "Lucida sans unicode " family for certain texts. it shows perfect in mozilla 3.5 and mozilla 4. But the font not supporting in mozilla 5.0? please help me

    i have problem with fonts for my site, i have used "Lucida sans unicode " family for certain texts. it shows perfect in mozilla 3.5 and mozilla 4. But the font not supporting in mozilla 5.0? please help me

    i have problem with fonts for my site, i have used "Lucida sans unicode " family for certain texts. it shows perfect in mozilla 3.5 and mozilla 4. But the font not supporting in mozilla 5.0? please help me

  • How to make single column scrollable in ALV report (for long Text)

    I have a 20 columns which we need to display in ALV grid, including one column for long text. In long text column currently it showing 40 character. I tried to change output length of field catalog but it's not working.
    Can any one help me ....
    Thanks
    Guru
    Message was edited by:
            gurusharan mandal

    hi,
    pls remeove if u give like this in the layout.
    gd_layout-colwidth_optimize = 'X'.
    rgds
    Anver

  • Report for Item texts in PO

    Hi Gurus,
    Could you please tell  which report (transaction) gives the item text details with respect to PO ??
    regards
    Subbu

    I dont think there is any standard report for the same.  You can however go for an ABAP  development  :
    After entering the item text , save the PO , then go to the PO in display mode and double click on that Text. A new screen will open up for PO text. There in Header Menu select : Goto-> Header . There you will find the text ID and the Text Object which you can pass to tables STXH and STXL and get the texts.
    Raviraj

  • To generate Schedule lines for scheduling Agreement when MRP is run.

    Hi,
    Please help advise on my following requirement:
    When I run the MRP for 'Single Item - Multi level' (MD02) for a material, I want MRP to generate delivery schedule lines for that material in Scheduling agreement.
    Please advise as to how i can go about with this.
    Regards,
    Manju

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

  • Schedule Lines for Sales BoM Material

    Hi All,
    When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?

    Hi,
    "Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually.

  • Schedule lines for outbound process

    hi
    can anyone tell me what is schedule lines for outbound process
    thanks

    thanks charlie for your answer can you pl tell me what does it means configured delivery types, item categories and schedule line for outbound processes.
    thanks

  • Schedule lines for schedule agreement

    Hi,
    I need get all schedule lines for schedule agreement (all schedule lines = all visible in tab analysis u2013 all lines for all forecast dlv. sched).
    I check table VBEP and VBEH and I canu2019t find all items.
    Could you help?
    Thanks in advance,
    E

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

Maybe you are looking for

  • My ipod was formatted for Windows but now I'm buying the Mac G5

    Am I going to be able to re-format my windows ipod to mac? It would be terrible if I bought this new Apple computer and couldn't use my windows ipod.

  • AUTOMATIC SYNCHRO WITH XP AND 7.1.30.8

    The automatic synchro of calendar, notes, contacts doesn't work properly with the last version of PC Suite 7.1.30.8 on a XP PRO système. Initialisation of the synchro doesn't start or the program stops during initialisation. My phone is a 6680 one. I

  • Asset Master and RE-FX

    Our company is looking to implement RE-FX and PM. I am looking to find the link between the Asset Master and RE-FX. More specifically in the Asset Master under Time-dependent tab there is the "Location" field. Does this location field have any link w

  • Where can I find the iPod application for the iPhone?

    My son (3yrs) just deleted the iPod application to watch videos and to listen to music on my iPhone 3Gs. Where can I find the download to reinstall this vital application? The fact that the application is called iPod and there are millions of hits fo

  • Can't download the trial - checksum failure

    I have now tried 4 times to download the trial of iWork 09. I have bought a copy but it hasn't shipped yet so I want to use the trial until I get the package. Each time I have downloaded it has reported a checksum error when checking the DMG. Obvious