Scheduler Configuration
Hi,
I’m just learning how to use BI Publisher and I couldn’t configure the scheduler (JMS doesn’t work).
Is there any tutorial or step by step to follow in order to correctly configure it? Is it necessary to set anything in weblogic or configuring BI Publisher is enough?
Thanks.
check this post please
reg:scheduler
Similar Messages
-
BI Publisher creating two database connection for scheduler configurations
Hi ,
please tell me how to create two database connection for scheduler configurations in BI Publisher
ADMIN -> scheduler configurations
Kind Regards,
MohanHi Saichand,
thank you for your Kind reply !!!!
Already i configured the scheduler configuration(DB) details for project1.Now i want to configure one more scheduler configuration(DB) for project2.
i want to maintain two scheduler config details for two DB.
Kind regards,
Mohan -
PI - Schedule Configuration Task
Good Morning,
In Cisco PI 2.1 I would like to create a scheduled configuration task so that each evening PI saves the running-configuration of a switch to memory. I've created and deployed the template successfully however, I can't find a way to schedule this & I'd prefer not to have to login and deploy the template each day.
Can anyone offer some advise on if this is possible?
ThanksHi Afroz,
your suggestion refers to fetching the device configuration. I think that Michael is asking about scheduling a template deployment to a device. And this is what interests me also. There is no option to reuse a task which was scheduled and to make it run on a daily, weekly basis. -
SSIS package flow based on a scheduling configuration table.
I have a table called Tbl_Scheduler.
This scheduler table contains
scheduler id ,scheduler description,as shown below.
1 ,Runs between 10 th of current month and 20th of current month
2 ,Runs at last day of the month
3 ,Runs at first day of the month
Scheduler Id will come from first task(it is given in a configuration table),
second task should check this scheduler id on scheduler table and
verify whether the current run date is falling under the criteria,which is given as scheduler description.
If it is not,need to stop the package flow.
SSIS package is scheduled from SQL agent job in every 10 mins.Could you please let us know,how I can design the same.
Also please feel free to advise to change the table design.Stopping running packages is a bad idea in general. You must specifically design a package for being stopped any time which isn't always possible, often not at all.
And running a package repeatedly in short intervals is not a SOP either.
To trigger a SSIS package run, the easiest would be via sp_start_job <name> once you have your package set up to run in Agent.
Arthur My Blog -
BI Scheduler configuration for a report
When I schedule a BI Publisher report to send out an email monthly. Where is that information stored in the configuration files? I looked around online and can't find any documentation on where it is stored. Is it stored within the report XDO file itself or in a separate location? Appreciate any input!
Ugh, my bad, too early in the morning. Totally forgot about the Scheduler schema that was built in the DB. Thanks for the quick answer
-
Scheduler configuration in OBIEE-EBS inegrated environment
Hi All,
We currently have OBIEE 10g integrated with EBS. I am trying to configure a scheduler and the configuration is completed and I am able to save ibots. But when ibot is run, I am getting the below error.
++++ ThreadID: 1894 : 2013-02-26 11:36:23.583+
+[nQSError: 77006] Oracle BI Presentation Server Error: A fatal error occurred while processing the request. The server responded with: Odbc driver returned an error (SQLDriverConnectW).+
Error Codes: OPR4ONWY:U9IM8TAC
+State: 08004. Code: 10018. [NQODBC] [SQL_STATE: 08004] [nQSError: 10018] Access for the requested connection is refused.+
+[nQSError: 13024] Successful completion of init block 'Get Oracle EBS Security Context' is required. (08004)+
Error Codes:
+.+
Error Codes: AGEGTYVF
In OBIEE - EBS integration set up, how does security work with ibots.
Any suggestions on what should be done to over come this error.
Thank you,
Krishi
Edited by: Krishi on Feb 25, 2013 11:01 PMKrishi
This is possible, I have it running here.
Oracle may be able to provide the steps to make this happen, which involve using SA System and some code in the inti blocks which will work even when the user is not logged (i.e. the job is running at night)
Adrian -
BI Scheduler configuration after install
Hi,
I am new to OBIEE 11g. I need to configure the Scheduler in a UAT environment in which all the services are already running for a while now, going thru the Oracle docs they say you need to do the scheduler using the RCU, and i believe RCU is done during installation of the environment.
As my environment is up and running want to know how will i configure the Scheduler and how will i create the tables needed and where are the scripts to create the tables.
I am afraid if i start the RCU again it might mess up the whole environment. I am running on LINUX.
Quick help will be appreciated.
Thanks,
AmitCan u login to sqlplus and see this schema exist or not?
DEV_BIPLATFORM
If not u can install now,Not sure the problem pertains.
Thanks, -
Hi,
I have upgraded the analytics environment 7.8 to OBIEE 10.1.3.3.2.
I have configured the OBI Presentation Services to identify the credential store :
extract from instanceconfig.xml :
<CredentialStore>
<CredentialStorage type="file" path="F:\sas78evolData\Web\config\credentialstore.xml" passphrase="password"/>
</CredentialStore>
The I have added the Scheduler administrator credentials to the OBI credential store using the cryptotools utility (in my case Administrator is the scheduler administrator) :
extract from credentialstore.xml :
<sawcs:credential type="usernamePassword" alias="admin">
<sawcs:username>Administrator</sawcs:username>
<sawcs:password passphrase="password">
<xenc:EncryptedData>
<xenc:EncryptionMethod Algorithm="http://www.rsasecurity.com/rsalabs/pkcs/schemas/pkcs-5#pbes2">
<pkcs-5:PBES2-params Algorithm="http://www.rsasecurity.com/rsalabs/pkcs/schemas/pkcs-5#pbkdf2">
<pkcs-5:KeyDerivationFunc>
<pkcs-5:Parameters>
<pkcs-5:IterationCount>1024</pkcs-5:IterationCount>
</pkcs-5:Parameters>
</pkcs-5:KeyDerivationFunc>
<pkcs-5:EncryptionScheme Algorithm="http://www.w3.org/2001/04/xmlenc#tripledes-cbc"/>
</pkcs-5:PBES2-params>
</xenc:EncryptionMethod>
<xenc:CipherData>
<xenc:CipherValue>PPrajfxPlFuEbWiXwtvUtg==</xenc:CipherValue>
</xenc:CipherData>
</xenc:EncryptedData>
</sawcs:password>
</sawcs:credential>
Presentation and Scheduler services start up but when I try to connect to Answers, I get the following error message :
Unable to contact server.
An encrypted password was found in the credential 'admin', but no decryption passphrase has been specified. Please ensure that a decryption passphrase is specified in configuration. See documentation for details on how to configure the credential store.
Error Codes: WUDC2HWW
Thanks for your help,
Best regards
HervéYes I have solved it by rerunning cryptotools utility , and don't encrypt the password. It seems there is a bug in the process of encrypting the pwd. Now it works fine
Rgds -
I am not able to schedule the reports and send it through email. I have done the following. please help me to know what is missed?
Afte login Enterprise manager using Admin user credentials
Went to to Mail tab (Business Intelligence > coreapplication > Deployment>Mail
And entered all the below credenitials
SMTP SEVER: Server IP
PORT OF SMTP SERVER : 26
EMAIL ADDRESS OF THE SENDER: [email protected]
USERNAME : [email protected]
PASSWORD: password of the mail id
Also updated the instanceconfig.xml and biee-domain.xml from the following path respectively
1. BI installation Drive\instances\instance1\config\OracleBISchedulerComponent\ coreapplication_obisch1
2. BI Drive\user_projects\domains\bifoundation_domain\config\fmwconfig
And then created agent and scheduled it. Got a message saying "Agent has run successfully"
But dint get the mail on the recipients mail id.
Further checking found that the instanceconfig.xml from below path is not updated with the updation of biee-domail.xml file
/BI/obiee11ghome/Oracle_BI1/bifoundation/admin/config/OracleBISchedulerComponent/instanceconfig.xml
Part of instanceconfig.xml from above path:-
NOTE:
Values in this element may be automatically updated from the
biee-domain.xml file.
-->
<From>Oracle Delivers</From>
<SMTP_Port>25</SMTP_Port>
<SMTP_Server>localhost</SMTP_Server>
<Sender>[email protected]</Sender>
Let me please know if i missed anything
Many ThanksHi,
Cross check your configuration and delivery profile.
Are you sure have you define the mail id into delivery device.
Please cross check the configuration using the below links.
http://satyaobieesolutions.blogspot.in/2012/06/agent-mail-configuration-for-obiee-11g.html
http://satyaobieesolutions.blogspot.in/2012/06/obiee-11g-agent-mail-configuration-step.html
Hope this help's,
Thanks,
Satya -
BI Scheduler Configuration ---
Hi,
I tried configuring the scheduler and I get this error message. The configuration was successful but when I tried creating an iBot, I get the error message below. From the Job Manager I tried checking the Presentation Server details and it looks okay to me...
Oracle BI Scheduler Error: [nQSError: 68019] Authentication Failed.
Error Details
Error Codes: GYFPI8RN
Any ideas how this could be resolved?
Thanks in advance,
-EstherHi, an update on this issue whereby I wasn't able to save an iBot:
I went through the forums and found this useful link: Unable to save iBot
User 585633 has the following info that helped me save the iBot. I was doing step 1 incorrectly.
1. Open job manager and on the "General" tab give the administrator name as
Administrator and leave the password field blank.
2. Go to mail setup enter the credentials correctly and dont go for "Authenticate against SMTP server".
3. Go to services.msc and restart the oracle scheduler service.
Thanks,
-Esther -
Time Capsule Schedule Configuration
I have a Time Capsule 1Tb, and make a reserve copie each hour.
Is it possible to configure the schedule for example on the 2 or 3 hour per day.
Al ready Thanks
JulzNot necessarily recommended, but Time Machine Editor will allow you to set the backup schedule any way that you like.
TimeMachineEditor -
Cisco Prime Infrastructure Scheduled Configuration Archive not executing
We have a deployment of Cisco Prime Infrastrcuture 1.3 (1.3.0.20).
Configuration Archive is a feature that collects and archives the device configurations i.e. cisco switches.
You have an option to schedule this to run, say daily, weekly etc. Once scheduled you can see it in the "Jobs Dashboard" and with the "next start time" of what you configured. I have a situation whereby the time it is suppose to start - it doesnt - howevere flags the job as a "success". Not newe device configurations are archived and the "next start time" remain the same. Its almost like it is failing to execute, but some other process under the hood thinks that it was been executed correctly?
Any ideas or experience that could help here would be appreciated!Some extra info that has just come to my attention. At one point we were running (we're actually still running) CiscoWorks with LMS3.2 and Cisco NCS 1.x. I merged these two things together into Cisco Prime Infrastructure (upgraded the licensing to get 450 lifecycle licenses to cover the APs + all of the devices coming from LMS3.2). I followed all of the documented procedures to upgrade the NCS appliance to Prime Infrastructure. But when I type "show application" from the CLI of the NCS appliance (now the Prime Infrastructure appliance) I see this:
HQ-NCS1/admin# show application
NCS Cisco Prime Network Control System
Is that normal? Maybe this is my problem. Should this output list "Cisco Prime Infrastructure" instead of (or in addtion to) Cisco Prime Network Control System? When I login to the GUI it shows "Cisco Prime Infrastructure" and the GUI has changed considerably (menus are different) so I'm assuming that the application upgrades I launched from the CLI to go to Prime Infrastructure worked fine. -
9/80 Work Schedule Configuration
We have 9/80 schedules in our organization and they were originally configured in such a way that for the 9/80 day schedules with every other Friday off, the workweeks split at Friday Noon. Even though we do not have clock time, but on Fridays of these schedules the time is actually recorded in clock times 8:00-12:00 and 12:00-16:00 in CATS. This makes time recording, absences etc. very complicated. Is there a better way of configuring the 9/80 schedules?
Assumption based on what I understood from your problem statement: Your work schedule has:
1. Normal working hours from Mon-Thu
2. Fri working hours (if first Friday): normal
3. Fri working hours option 2: first half working only
4. Fri working hours option 3: second half working only
5. Sat and Sun are off.
If my understanding is correct, you can carry out the following steps:
1. Set floating public holidays for all Fridays in your holiday calendar, with Holiday Class (HC) 9 for first-half working days and HC 8 for second half working days.
2. Set 2 variants for your Friday DWS - one with first half working hours and one with second half working hours
3. Set a DWS rule to query the HC and assign the appropriate variant to the appropriate Friday (e.g.: If HC (today)=9 and HC (tomorrow)=0-9 and today = friday, then assign variant A).
4. Regenerate all your work schedules.
This way, your planned working time is set for what you need. Wherever you record actual working times (CATS, Absence recording, etc.), they would be based on this plan. -
HI,
How to configure workschedule........and wat r the pre-requistes to maintain and how to configure ?
if any body found document plz send it to me
Thanks ,
VinayHi,
The following is the config. of work Schedule
IMG --> Personnel Time Management --> Work Schedules --> Define Public Holiday Classes
IMG --> Personnel Time Management --> Work Schedules --> Personnel Subarea Groupings --> Group Personnel Subareas for the Work Schedule
IMG --> Personnel Time Management --> Work Schedules --> Personnel Subarea Groupings --> Group Personnel Subareas for theDaily Work Schedule
IMG --> Personnel Time Management --> Work Schedules --> Daily Work Schedules --> Define Daily Work Schedules
IMG --> Personnel Time Management --> Work Schedules --> Period Work Schedules --> Define Period Work Schedules.
IMG --> Personnel Time Management --> Work Schedules --> Day Types --> Define Day Types.
IMG --> Personnel Time Management --> Work Schedules --> Day Types --> Define Day Types.
IMG --> Personnel Time Management --> Work Schedules --> Day Types --> Define Special Days.
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Define Employee Subgroup Groupings
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Define Groupings for the Public Holiday Calendar.
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Set Work Schedule Rules and Work Schedules.
IMG --> Personnel Time Management --> Work Schedules --> Work Schedule Rules and Work Schedules --> Generate Work Schedules Manually
IMG --> Personnel Time Management --> Work Schedules --> Planned Working Time --> Set Default Value for the Work Schedule.
Hoping this will help you.
Warm Regards,
Kapil Kaushal -
Scheduler Configuration page gives 500 Internal Server Error
Hello,
I have BI Publisher 10.1.3.4.1 installed. Now Scheduler Configuration_ page under System Maintenance is not coming. Giving below message.
500 Internal Server Error
Servlet error: An exception occurred. The current application deployment descriptors do not allow for including it in this response. Please consult the application log for details.
I checked the log (/oc4j_bi/j2ee/home/application-deployments/xmlpserver/application.log), it gives below errors.
at java.lang.Thread.run(Thread.java:595)
12/05/07 19:41:33.80 xmlpserver: Servlet error
java.lang.NullPointerException
at oracle.apps.xdo.servlet.ui.admin.SchedulerConfigPage.getPlatformFromClasses(SchedulerConfigPage.java:1097)
at oracle.apps.xdo.servlet.ui.admin.SchedulerConfigPage.render(SchedulerConfigPage.java:491)
at oracle.apps.xdo.servlet.ui.admin.SchedulerConfigPage.doPost(SchedulerConfigPage.java:206)
at oracle.apps.xdo.servlet.ui.admin.SchedulerConfigPage.doGet(SchedulerConfigPage.java:162)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:743)
at javax.servlet.http.HttpServlet.service(HttpServlet.java:856)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.ResourceFilterChain.doFilter(ResourceFilterChain.java:64)
at oracle.apps.xdo.servlet.security.SecurityFilter.doFilter(SecurityFilter.java:94)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.ServletRequestDispatcher.invoke(ServletRequestDispatcher.java:621)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.ServletRequestDispatcher.forwardInternal(ServletRequestDispatcher.java:368)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.HttpRequestHandler.doProcessRequest(HttpRequestHandler.java:866)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.HttpRequestHandler.processRequest(HttpRequestHandler.java:448)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.HttpRequestHandler.serveOneRequest(HttpRequestHandler.java:216)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.HttpRequestHandler.run(HttpRequestHandler.java:117)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].server.http.HttpRequestHandler.run(HttpRequestHandler.java:110)
at oracle.oc4j.network.ServerSocketReadHandler$SafeRunnable.run(ServerSocketReadHandler.java:260)
at com.evermind[Oracle Containers for J2EE 10g (10.1.3.1.0) ].util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:303)
at java.lang.Thread.run(Thread.java:595)
can anyone help me on this.Hi
Shutdown apps tier, run autoconfig. On database tier run autoconfig. Cleanly shutdown all, restart all in sequence. Error because some of the os processes are hanging. Nothing to worry.
Maybe you are looking for
-
Clean out start up disc I Mac g5
How can I clean out the start up disk. I do not have enough space to import video into I movie on my G5.
-
I am having a small, but frustrating problem in a LV app. I have a waveform chart that has a plot legend that is assigned programmatically. I assign the names with a property node of plot.name. The plot legend names are assigned in numerical order. I
-
Displaying multi valued number parameters on a report.
I need to display the contents of some muti valued parameters on my report. I have received two suggestions neither of which I can get to work. The first suggestion uses the Join function as follows: WhilePrintingRecords; Join({?Parameter}, Chr(10)
-
Printing of normal word document written in black it is coming with plain paper
I m using Hp office jet 6000, recently I have changed its ink from original store. Unfortunately when I print normal word document written in black it is coming with plain paper, however when I order a print in a mixed color the other colors appear i
-
If I have a sub site URL and a user with Site Admin, can I list all users in that sub site that have Full Control at that level? Any C# code sample?