Scheduling Agreement- ANY IDEAS FROM GURUS?

Hai ALL,
            I have a req-
Customer will place order with pre-defined schedule for the next month ( including schedule dates & Qtty).
When User creating Sch.Agreement-VA31,
Enters Material in line item & Total Qtty ( total req for the next month), then this qtty has to be divided equally into next month working days(will get from Factory Calender) into schedule lines.
Is there any BDC, so that whenever user enter material & qtty, schedule lines can be divided into day wise in schedule lines tab?
I have tried this from std, but i couldnt find.So thought of use BDC to split monthly req into day wise.
Any Thoughts
Edited by: SAP Consultant- on Dec 30, 2008 10:52 AM

THanks for your reply,
I have created my own rule by copying from SAP1.
assigned this rule to instructions.
created sch.agreement with Doc type:BL/LZ
assigned instructions in control parameter tab.
still sch.lines not splitting.
can you explain, how splitting works while doing transaction?
Have read SAP Help & customized according to that, But it is not splitting, checked SAP Notes, but nothing solves my problem

Similar Messages

  • On my IPhone 5 with iOS 7, an incoming email is audible even though Do Not Disturb is on, either manually or scheduled.  Any ideas?

    On my IPhone 5 with iOS 7, an incoming email is audible even though Do Not Disturb is on, either manually or scheduled.  Any ideas?

    You have no make sure that the "Silence" setting is on always.
    To do that follow:
    Settings > Do Not Disturb > Silence > Always

  • Totally Effed Up... Any ideas, ipod Gurus?

    _5th gen ipod vid 30 gb_
    I AM A GENIUS!
    I decided it would be a good idea to accidentally put my ipod in a bag with a waterbottle that had a loose cap on it. Luckily, my ipod had a plastic case around it, so any water that seeped in through the plastic case would stay there until it found escapes through the headphone jack and USB port of the ipod.
    In other words... my ipod HAD slight water damage...
    I decided to open my ipod up and clean out some of the water damage. While i was following a guide on how to solve ipod water damage, i *accidentally turned my ipod on*. Following this, my ipod made some screeching noises and crazy flashes came on the screen like that of TV static. I decided to skip this, and continued on opening up my ipod.
    I opened it up, cleaned out the water from the inside.
    Two days later, all of the water that had been on the screen was gone too. My ipod's water damage was cured!
    But now i have a new problem. My ipod won't turn on... not with USB connection, not with a wall charger (even after being plugged in for 30 min) it's obvious that the battery blew out when i turned it on with the water inside, or something like that. I don't really know the technical stuff though...
    So, my question basically is, is it worth trying to get repaired at iresq.com?
    If it's the battery that's ruined... well, then of course it is worth trying to get repaired. But if it sounds like circuit damage, or something techincal and fancy, then is it beyond repair?
    again, is it beyond repair?

    So, my question basically is, is it worth trying to get repaired at iresq.com?
    Yes. It's only $9 fro a diagnosis.

  • BAPI to create Scheduling Agreement of VA31

    Dear gurus,
    I need to find the BAPI or Function Module to create Scheduling Agreement of VA31 from the uploaded data. I know that I can use BAPI_SALESORDER_CREATEFROMDAT2 to create the sales order of VA01. Can I use the same bapi to create the scheduling agreement of VA31? Both of the screens seems to look quite the same but their order types are different. Any suggestion on this?
    Thank you for your help. Have a nice day.
    Best Regards,
    Hedy

    Hi,
    FM
    BAPI_CUSTSCHEDULAGREE_CONFDELV
    Functionality
    You can use this method to make a delivery confirmation in the SD scheduling agreement
    Example
    1. Generating delivery for a scheduling agreement item.
    2. Changing a delivery item.
    3. Posting of goods issue for delivery.
    4. Deleting a delivery item or a delivery.
    Regards,
    Venkatesh

  • BAPI for fetching the list of scheduling agreements

    This is my first post in SDN Forums so pardon me if I commit a mistake.
    My question is: Is there a standard BAPI for fetching a list of scheduling agreements?
    I know that there are BAPIs for creating and maintaining scheduling agreements like BAPI_SAG_CREATE and BAPI_SAG_CHANGE and iBAPI_SAG_GETDETAIL but each of these require the scheduling agreement number. My requirement is to list out all the scheduling agreements that are present in the system.
    I found a BAPI named BAPI_DOCUMENT_GETLIST and BAPI_DOCUMENT_GETLIST2 but I'm not able to find out what documents it is able to display. If I don't specify any selection criteria, it is fetching just two records of document type DRW. No other document of any other type is fetched.
    Another BAPI that I found was BAPI_SALESORDER_GETLIST in which if I specify the Transaction group as "3" (for scheduling agreement), it fetches them but those are related to Sales orders and not purchase orders.
    So, if anyone has any info and can help me out, I would really appreciate it.
    Edited by: rkarthea on Jul 30, 2010 10:44 AM

    Hi Raj,
    As I had said earlier, I need the Scheduling agreements related to purchase orders and not sales orders. The ones in EKKO table (Doc category: L).Will this program fetch this info?
    Also, I need a Java app (that's being developed) to fetch this info, so I'm looking for a BAPI. Is there any or can this program (if it fetches the right Scheduling agreements) be called from an external Java app?

  • Valuation Price error in Scheduling Agreement

    Hello Experts,
    I am getting inflated valuation while doing MIGO for delivery schedule.
    It always comes as more than price of material in scheduling agreement and varies from 1.5 times to 4 times.
    Example
    Material Moving Average price: 3
    stock : 0
    Purchase price: 3.05
    QTY RECEIVED 100
    Value of goods at the time of MIGO has 4.27 price
    I can give few more data
    Pr. Date Cat: 5
    Condition type is not group condition
    Moving average price changes to 4.27.
    This moving average price comes down to 3.05 once I do MIRO. But my , point is, why we getting inflated valuation at the time of GR.
    Please let me know if anybody has come across such issue
    Thanks and Regards
    Gyanesh Kumar Jha

    Allen
    please check the details
    Mater stock zero at the time of creation
    mov avg price 1 at the time of creation
    val class: 3000, price control V,
    scheduling agreement net price: 1.28(1.5 with tax)
    mat doc              mat no          mvt    date                qty   unit   value       Sch Agmt       item no
    5000002301     409031796     103     15.03.2011     100     EA     0.00             7500000075     1
    5000002302     409031796     105     15.03.2011     100     EA     256.41     7500000075     1
    Let me know if you can find any details out of this.
    Thanks and Regards
    Gyanesh Kumar Jha

  • Creation of Transportation lanes during CIF of scheduling agreements.

    Hi,
       Could anyone please let me know the place(CIF Code) where transportation lanes are created during CIF process of scheduling agreements from R/3 to APO system. This scheduling agreements will be created in R/3 and will CIFed to APO(SPP).
      I need to enhance the process where Transportation lanes are created when scheduling agreements are CIFed from R/3 to APO system. The enhancement will be adding a custom planned delivery time value to Means of transport(MOT) of the transportation lane.
    I tried debugging the CIF but in vain.
    Thanks in advance.

    What is the Purchasing Document used - Purchasing Info Records or Contracts? You can CIF any of these to APO to create Procurement Relationships which in turn automatically creates Transportation Lane. You have to assign Means of Transport manually though. Note - T Lanes created with reference to Contract are however not used by SNP for source determination.
    The other option is Special Procurement Key - if assigned in Material Master will automatically create TLane in APO when Materials are CIFed. Downside of that process is no control on TLane Validity Date and / or other Planning Parameters like Lot Size / PDT.
    As for creation of T Lane based on Source List - SAP Help mentions it can be used but have not seen in any live project so cannot comment.
    Hope this helps.
    somnath

  • BADI for Scheduling Agreement

    I have created the BADI ZME_PROCESS_PO_CUST this badi is executed for normal PO's like thru ME21N but when i make the Scheduling agreement thru ME31L the this BADI is not executed is there any other BADI for Scheduling agreement. if so then help me out.
    abhishek

    Hello,
    BADI_SD_SCHDL_AGREE " BADI For Modifying Scheduling Agreements
    BADI_SD_SCH_GETWAGFZ Scheduling Agreement: Read WAGFZ from S073
    Thanks,
    Krishnakumar

  • Scheduling Agreement with Scale

    Dear Friends,
    Pl advise how to go for scale price in GR for Scheduling agreements:
    GR Qty from 1 is rs.15/-
    GR Qty from 1000 is rs.12/-
    GR Qty 2000 is rs.10/-
    How to go about it. What will be the configuration settings. What will be the accounting entries in GR and IV.
    Pl let me advise the full procedure.
    Note: I already refereed SAP NOTE- 401941,But it was 2003 version.So is their any standard settings are available in ECC6 to address this above issue ??
    Regards
    AKS

    Hi,
    Note is also valid for 600 release. see note in details
    Valid releases
    Software Component                        Release
                                              from            to
    SAP_APPL
         SAP Application
                                              600          - 600
                                              500          - 500
                                              470          - 470
                                              46C          - 46C
                                              46B          - 46B
                                              45B          - 45B
                                              40B          - 40B
    In standard, scale prices have been defined for a scheduling agreement
    item. When a goods receipt is posted, the scale price applicable to
    the target quantity of the scheduling agreement item is applied for
    valuation purposes.
    For schedule agreements the SAP standard is to use the target quantity
    for price determination.
    User exit EXIT_SAPLEINR_003 exists using which you can influence the
    quantity and the date of the price determination at the time of the
    goods receipt for the scheduling agreement. However, you need to bear in
    mind that when you call up the user exit, the quantity of goods received
    actually to be posted does not yet exist. The schedule lines are
    available in internal table CETT which can be used.
    In the standard system, the EXIT_SAPLEINR_003 is run when a goods
    receipt is posted for the scheduling agreement or purchase order when
    item has the pricing date (price category) = "5" (goods receipt date).
    For scheduling agreement document type, pricing category is always 5 if
    time dependent conditions are used for that document type.
    BR
    Nadia Orlandi

  • Printout of schedule agreement before Release

    hi all,
    i have created release strategy for schedule agreement at three level EX, MM & GM, problem is that i want to print schedule agreement number thru ME9l after releasing it from EX level. can anyone please tell me that is it possible to print schedule agreement before releasing from all three EX, MM & GM?
    if yes then how? or plzz tell me if any other option to print the same.
    regards saurabh.
    Edited by: saurabh srivastava on May 5, 2009 12:20 PM

    If your strategy is set up so that all three levels must release the agreement before it is final released I do not believe you can generate a printout.
    Regards

  • Planned Delivery time in case of Scheduling Agreement

    Hi All,
    Does system consider the planned delivery time in case of Scheduling Agreement for Vendor like in normal Purchase order and requisition?
    I am doing the MRP run, but system is taken planned delivery time into consideration. I have one material that is Inhouse produced material for plant X and Y Plant needs this material for further making of a finished goods.
    Y plant have scheduling agreement for STO from plant X. After MRP Run required Delivery date in plant X for Material is same as plant Y. but from Plant X to Y, it take 4 days to reach. So Ideally in Plant X this delivery date should be less than 4 days as plant Y.
    Please look into the issue and reply if you have some answers.
    Thanks
    Pavan

    Hope you have maintained different Planned Delivery times in plant X and Plant Y as per your requirement. For procurement in Plant Y the system would consider the planned delievry time maintained in Plant Y. If you want in-house production time to be considered with Basis date sheduling during MRP run in PLant X then enter the in-house production time approprietely. Else if ou want to consider the exact routing times then consider Lead time scheduling in plant X.
    If the above are maintained properly then you should get the desired result.
    Regards
    Ramanujan

  • I can't get acrobat to install on Mac OSX.  anyone have any ideas?

    Hi,
    I purchase Acrobat for my MacBook Air.  Trying to install it, but it just sits there when I try to open Acrobat Installer.  Any ideas from anyone? 

    Hi Markattisha,
    How did you download the Acrobat set up files?
    Please try to download a fresh setup from the link below and check.
    http://www.adobe.com/downloads/other-downloads.html
    Regards,
    Anand

  • How to find Open Schedule Agreements?

    Hello all,
    Can anyone tell me What is Open Schedule Agreements? and from which database table we can get the open scheduled agreements?
    Thanks n Regards
    Maruthi Rao. A

    (VBEP-ABART)
    or
    check tcode ME33
    TABLES EKKO HEADER TABLE
    EKPO ITEM TABLE

  • Macbook Fails to Boot, no Apple Logo, any ideas?

    Hi all,
    I'm not sure if this might be a hardware or OS problem or this is in the right category, but I'm hoping someone can help me out with a problem I'm having with a friend's Macbook.
    When I hit the power button, the chime plays, and the screen turns light gray or white, and then stays there. No apple logo, or spinning gear, no other icons, just gray. I've left it like this for a while and nothing happens.
    If I hold Option to try and get a list of drives (with or without the install cd) it gives me a working mouse cursor, but never gives me any drives.
    If I try safe mode, nothing happens, white screen, no change as long as I try it.
    Same thing if I tried to boot from CD, the CD spins for a while, but then nothing.
    Same for verbose mode.
    If I try to reset the PRAM it does reboot correctly and chime again, but no other change.
    It seems like these options are functioning, but nothing is working after that.
    I've read that the missing logo might mean a problem with firmware, but I can't see any way to fix that without OS X installed.
    Is it possible the HD has failed? Would that also explain the missing logo?
    Any ideas from anyone with a similar problem? I've Google'd different variations of the problem, but can't find anything except problems with the Apple logo present.

    it is possible that is had been dropped. an easy fix you can try is to reseat the ram. to do this is very easy. you may already know how but if you dont here is some instructions. just make sure you take them out as if you were replacing them to inspect them of obvious damage (such as it being cracked) also while you are in there reseat the HDD. who know this may fix it but it is so simple and quick that if it does not work it is not a waste of your time.
    http://support.apple.com/kb/HT1651
    hope i am helping Dean

  • MRP is not generating any schedule line in my vendor's scheduling agreement

    Hello all,
    My question is: why the MRP is not generating any new line in my vendor's scheduling agreement?
    This is the scenario:
    I have created a vendor's scheduling agreement with transaction ME31L
    I have created a customer's scheduling agreement with transaction VA31 and those characteristics:
    - Forecast scheduling lines
    - JIT scheduling lines
    - MRP to DS type assigned to type C: Requirements according to forecast delivery/Deliveries according to JIT
    I have run MRP with transaction MD01
    MRP is generating some purchasing requistions, not purchase orders because we have set up a release strategy which requires 2 approvals, but those purchasing requests are not generating any new line in the vendor's scheduling agreement.
    Any idea why it could be? Please do not hesitate to ask for further explanations. Thank you

    Hi,
    Check if stock is available for the material in that plant.
    Also check the requirement date for the material and compare it with the planning horizon for that plant.
    Check your material master MRP view.
    Create source list(for material and plant in question) with MRP indicator 2.
    Thanks and Regards,
    Maheshwari

Maybe you are looking for

  • Problems with a session of batch input - In processing

    Hello! I have a problem with a depreciation posting Session (AFAB). User has stoped the process of session and now the status is 'In Processing' and we can't run it anymore... ¿How I can process this Session? I've tried to delete the session and re-r

  • URGENT: Issue with hierarchy level keys and report drill down

    Hi, BASIC STRUCTURE: I have created a subject area with 3 facts (FACT_A, FACT_B, FACT_C) and 4 dimesnions (TIME_DIM,DIM_2,DIM_3,DIM_4). Each fact table also has additional aggregate tables aggregated along levels of the time dimension. Also our timw

  • How to disable field Order quantity

    Hi everyone I want to disable field item order quantity at line item level on the transaction VA02, can anybody help me on this? im using the user exit MV45AFZZ to make other modifications in the program, can i use the same user exit or any other alt

  • Referential constraints on XMLType tables

    Hi all, I'm trying to create an XMLType table with a foreign key that references another XMLType table. Shouldn't be a big deal, i thought. CREATE TABLE datasets ( ID NUMBER, XML XMLTYPE ) XMLTYPE COLUMN XML XMLSCHEMA "dataset_schema.xsd" ELEMENT "ro

  • Monitoring changes in form

    Hey all, Got an easy one for you guys. I'm working with the composer to create a bunch of forms. I've got an options screen and I want to know what's the best way of monitoring changes so the OK and CANCEL buttons work accordingly. Cheers.