SCHEDULING AGREEMENT AS FOLLOW-ON DOCUMENT

Hello,
I have an SRM rel 4.0. integrated with R/3.
I have implemented a Plan driven procurement scenarious with auctions and Bid invitations.
I would like to know if is it possible generate, as follow on document a Scheduling Agreement instead of a Contract.
Thank you.
Simone

Hi Simone,
This is very much possible if you have SUS component in place.
You will get all the details on configuration and scenario overview and all other required details.
http://help.sap.com/bp_hightechv1600/HighTech_DE/html/SRM/S61_EN_DE.htm
regards,nishant
Reward full point if this helps.

Similar Messages

  • Document type LPA in schedule agreement

    any one can explain me document type LPA in schedule agreement. I read books as that is document type with release documentation. And what is the diff between LP and LPA?

    Dear,
    Please find below, which I found by search and posted by fellow collegues earlier....
    Default quantity for goods receipt
    In the standard system, the quantity open to date from the last- transmitted SA release is used in the case of scheduling agreements with release documentation (document type LPA). In the case of scheduling agreements without release documentation (document type LP), the open quantity to date is used.
    Document Type of Scheduling Agreement
    As a rule, the APO scheduling agreement in the SAP R/3 system is a scheduling agreement with the document type LP or a scheduling agreement without release documentation.
    If you use scheduling agreements of the document type LPA without confirmation control key then no default quantities can be determined from the release upon goods receipt.
    If you use scheduling agreements of the document type LPA with confirmation control key then the default quantities from the confirmation (shipping notification) are used.
    As a rule, the OLTP scheduling agreement in the SAP R/3 System is a scheduling agreement with the document type LPA.
    A scheduling agreement is a longer trem agreement with a vendor covering the supply of materials subject to predefined conditions.The conditions are valid for a pre defined period and a pre defined total purchase order quantity.
    You can enter the Target value in the header data of the scheduling agreement.You can enter the Target quantity in the item overview for each item
    You can use scheduling agreement with or without release documentation.The advantage of working with scheduliing agreement release documentation is that you always have a record of when you sent which delivery schedule information to your vendor,which you can display at any time.
    Without release documentation(Document type LP)
    The delivery schedule lines have official character-that is to say,they are transmitted to the vendor as they are saved in the system.The system does not document in detail releases aganist the scheduling agreement that have been sent to the vendor.Therefore,in the case of the document type without release documentation,the message control facility should be set up in such a way that a message is immediately sent to vendor if any changes are made to the delivey schedule stored in the system.
    With release documnetation(Document type LPA)
    If you use scheduling agreement with release documentation,the delivery schedule lines are not transmitted directly to the vendor.Intially ,the lines of the delivery schedule stored in the system for an LPA scheduling agreement for an internal information only.A message informing the vendor of your material requirements cannot be transmitted to the vendor until you explicitly create an SA release,that is forecast (FRC) or Just in Time(JIT) delivey schedule.Through this process,you can change the way schedule lines are represented.With release documentation,you can disply the SA releases(delivery schedules) transmitted to a vendor over a certain period of any time.This enables you to trace precisely when you sent which information to vendor.
    Regards,
    Syed Hussain.

  • Stock Trnaspost Scheduling Agreement(Lpcc)

    Hi,
    Pls help me with regard to the following:
    My Scenario:
    This is with regard to stock transport schedule agreement with Cross Company document type (LPCC).
    The process followed for this is:
    Created the schedule line, and created the outbound delivery in the supplying plant and inbound delivery in the receiving plant and then make a GR.
    Planned delivery time (PLD) for the u201CFu201D item in material master and in the Info record, and I do not have any transportation planning and no time is given for the packing and shipment.
    My issue:
    The u201CDelivery date (LFDAT)u201D for the ship-to-party is not considering the planned delivery time (PLD) given in the SA. It is providing the same date as it proposes for the planned goods issue.
    If it will not consider the PLD, then why it is required to give for this type of scenario?
    With Regards,
    Mohan Shastry

    Hi,
    it is the standard system setting i guess, same thing is happings in PO SO caes also.
    Bhima

  • Stock Transport scheduling Agreement (Lpcc)

    Hi,
    Pls help me with regard to the following:
    My Scenario:
    This is with regard to stock transport schedule agreement with Cross Company document type (LPCC).
    The process followed for this is:
    Created the schedule line, and created the outbound delivery in the supplying plant and inbound delivery in the receiving plant and then make a GR.
    Planned delivery time (PLD) for the u201CFu201D item in material master and in the Info record, and I do not have any transportation planning and no time is given for the packing and shipment.
    My issue:
    The u201CDelivery date (LFDAT)u201D for the ship-to-party is not considering the planned delivery time (PLD) given in the SA. It is providing the same date as it proposes for the planned goods issue.
    If it will not consider the PLD, then why it is required to give for this type of scenario?
    With Regards,
    Mohan Shastry

    Hi,
    it is the standard system setting i guess, same thing is happings in PO SO caes also.
    Bhima

  • Goods Receipt for scheduling agreements

    Dear Experts,
      I have created schedule lines through MRP in MD03. But when i tried to do  goods receipt for that scheduling agreement , it is telling
    "Document xxxxxxxxxxx does not contain any items ". I am doing GRN w.r.to that scheduling agreement. How do i do GR w..r .to that scheduling agreement ? I dont have release for sch.agreement. Kindly help me..
    Regards,
    BBR

    Hi,
    Go to MIGO enter the Sch.Agreement number  and do the MIGO
    Please check the following
    1. Whether Delivery date is today date (MIGO date)
    2. Whether Delivery completed indicator is set.
    Regards
    Ganesh

  • How are deliveries automatically created from scheduling agreement?

    How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
    Thanks in advance.

    hi
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Document Types
    To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
    The R/3 System contains the following document types for component suppliers:
    LZ - Scheduling agreement with delivery schedules (no external agents)
    LZM - Scheduling agreement with delivery orders
    LK - Scheduling agreement with delivery schedules (external agents)
    ED - Delivery by external agent (consignment issue)
    EDKO - External agent correction
    RZ - Scheduling agreement returns (no external agents)
    KAZU - Consignment pick-up for external agents
    KRZU - Consignment returns for external agents
    Item Categories
    To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
    The system determines the following item categories for the related document types in
    documents containing materials with item category group NORM:
    Item category LZN for scheduling agreement type LZ
    Item category LZMA for scheduling agreement type LZM
    Item category LKN for scheduling agreement type LK
    Item category KEN for document type ED
    Item category EDK for positive corrections (or the manual alternative EDK1 for
    negative corrections) for document type EDKO
    Item category REN for document type RZ
    Item category KAN for document type KAZU
    Item category KRN for document type KRZU
    Schedule Line Categories
    To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
    The R/3 System contains the following schedule line categories for component suppliers:
    L1, BN, L2, and CN for item category LZN
    E4, E0, E5, and BN for item category LKN
    L2 for item category LZMA (standard for delivery order processing)
    Schedule Line Types
    To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
    Creating Scheduling Agreements
    To create a scheduling agreement with delivery schedules:
    1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
    2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
    relevantorganizational data.
    3. Choose ENTER.
    4. Enter the following data:
    Sold-to or ship-to party number
    Purchase order or closing number
    Material or customer material number
    You can use the Description field to identify the scheduling agreement. For
    example,
    you could enter the model year for a particular production series.
    The system allows up to 35 digits for a customer material number.
    Rounding quantity
    Usage
    Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
    Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
    Planning indicator
    Choose Goto -> Header ->Sales.
    Target quantity
    Mark an item and choose Goto -> Item -> Sales A
    Partners
    For scheduling agreements with external agents , choose Goto -> Header
    ->Partners to enter the external agent as forwarding agent and special stock partner
    on the partner function screen.
    5. Create a delivery schedule
    Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
    schedule>. Enter:
    A delivery schedule number and date
    The cumulative quantity received by the customer
    The last delivery confirmed by the customer
    A schedule line with date, time, and quantity
    To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
    configuration:
    img->SD->Sales->sales document->scheduling agreements with delivery schedules->
    step1: define schedule line types
    schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
    stds are 1. fixed date 2. backlog 3. immediate requirement
    4. estimate
    step2: maintain planning delivery sched. instruct/splitting rules
    The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
    2.1 delivery schedule splitting rules
    2.2 dly schedule instrusctions
    2.3 assign dly schedule splitting rules
    step3: define sales documents type
    step4 : define item categories
    step5: define schedule line categories
    step6: maintain copy control
    PROCESS
    step1:  create scheduling agreement
    VA31
    enter SP,SH valid from, valid to,
    goto ITEM OVERVIEW tab
    enter material, rouding qty
    select ITEM  click on FORECAST DLSCH
    enter different dly dates and qties
    save it.
    step2: create sales order with reference to above
    step3: create delivery
    step4: create billing
    regards
    krishna

  • Link between the Schedule Lines and the GR document

    Hi
    I would like to find the link between the Schedule Lines (of Scheduling Agreement) and the GR document. i.e. which GR has been made against which Schedule Line. I have checked the tables EKET, EKBE, MSEG but there is no link with the Schedule Line, I found the link only with the item number there.
    Thanks
    Prashanth

    Hi
    At the time of posting the GR for a SA you will be not posting this with reference to the Schedule line of the SA item. So system will always update the GR document against the SA item and update qty on the schedule line.
    May be this is the reason we donot have any direct relation ship to material document and Scheclue line
    Thanks & Regards
    Kishore

  • How to insert the new field to standard scheduling agreement script form.

    Hi Gurus,
    how to insert the new fields to standad sheduling agreement script form. its a need for me, i want to display the AEDAT field in scheduling agreement form ,
    The below one is my requirement,
    ex:-   Itu2019s requested the change of Scheduling Agreement printout. Itu2019s requested for this type of   document, the insertion, into the field u201CData Emissionu201D into the print, of the document last modify date instead of the document creation date. (This change will be done only for position change into the Scheduling Agreement). No change into the PO.
    Change SAPSCRIPT printout. Introduction, into the Scheduling Agreement, of last modified  
          document date (field EKPO-AEDAT).
    Thanks & Regards
    chinnu

    open TNAPR table and give the output type you need to modify.... get the print program name and check if some structure already have the date you wanted... if you have it already... then open the form in SE71 tr. and provide the strcuture name - feild in the position you want to have the date...
    se71--->
    &<str. name>-AEDAT&

  • PO - Scheduling agreement

    Hi
    What is the main difference between a purchase order and a scheduling agreement ?
    regards,
    senthil.

    Hi
    Purchase order and schedule agreements both are legal documents.
    Purchase Order does not have validity period, it will have delivery dates, If you have a requirement of 1000 qty at different delivery dates, PO supports that but all these dates are immediately transmitted to vendor.
    Example: Delivery dates 30 May’07: 200, 30 Jun’07: 500, 30 July’07: 300
    All above requirement are transmitted immediately when you transmit purchase order.
    Schedule agreement is a long terms agreement with the vendor with certain conditions like prince and delivery terms etc.
    You will create a schedule agreement for the total quantity required by you, but you will place a separate delivery schedule for the required quantity.
    Example: If you require 200 on 30 May’07, create a separate delivery schedule. similarly for all future requirements
    These schedule line will form as part of history. When we use schedule agreements we have the option of sending firm and trade off quantities to vendors, we can also use JIT schedule with release documentation.
    Thanks & Regards,
    Reward if useful
    regards
    ram

  • Scheduling agreement configuration??

    hii
    Can anybody explain me on below things
    1.Scheduling agreements configuration steps..??
    Configuration steps for below process:
    Without release documentation (in the standard system, document type LP)..??
    With release documentation (in the standard system, document type LPA)..???
    Thnaks
    SAP-MM

    Hi,
    First Define Time Dependent or Not Depenedent  via
    In the case of scheduling agreements and quotations, the document type determines whether time-dependent or time-independent conditions can be created. You can set the Time-Dependent Conditions indicator in Customizing for the document type to enable time-dependent conditions to be maintained in scheduling agreements and quotations.
    Define time-dependency in scheduling agreements and quotations:
    SAP Customizing Implementation Guideu2192Materials Managementu2192Purchasing u2192 RFQ/Quotation or Scheduling Agreement u2192 Define Document Types
    and document type is
    Define document types for scheduling agreement:
    SAP Customizing Implementation Guideu2192Materials Managementu2192Purchasing u2192 Scheduling Agreement u2192 Define Document Types
    For release u can create Release profile
    Create release creation profile:
    SAP Customizing Implementation Guideu2192Materials Managementu2192Purchasing u2192 Scheduling Agreement u2192 Maint. Rel. Creation Profile for Sched. Agmt w. Rel. Docu.
    You can use release creation profiles to define the criteria for the creation of SA releases (you can influence the quantities and delivery dates/times to be transmitted to the vendor, for example).
    Whether or not you can generate both forecast and JIT delivery schedules against a scheduling agreement with release documentation is determined by the JIT delivery schedule indicator in the material master record. In order for you to be
    able to work with JIT schedules, the JIT delivery schedule indicator must be set in the material master record (Purchasing or MRP 2 view) and in the additional data for the scheduling agreement item. No JIT delivery schedules can be created unless this indicator has been set.
    Hope Help U !
    Regards,
    Pardeep Malik

  • About scheduling agreement

    Hi,
    Can anoybody tell me that what is the difference between scheduling agreement with release document and scheduling agreement w/o release document?
    what are the benefits of the scheduling agreement with release document?
    Thanks
    Ashish

    Hi Ashish,
    Release nothing but creating output messages which we will send to vendor ( just like purchase order output message like printouts), by automatically ( without release, document type LP) or depending upon certain criteria i.e with release, document type LPA.
    If you ar using scheduling agreements without release documentation ( document type LP), the message is generated directly. i.e the movement you save the schedule lines the system creates the delivery schedule and sends to the vendor
    If you are using scheduling agreements with release documentation ( document type LPA), you must explicitly generate SA releases ( FRC or JIT)
    The schedule lines of a scheduling agreement release contain finalized information for the vendor regarding quantities and delivery dates. The schedule lines are recorded with the aid of the release documentation and can thus be displayed and verified at any time. The release documentation enables you to see which schedules you transmitted to the vendor during the last two weeks, for example, and check the correctness of goods receipts against the relevant schedule lines.
    In the case of with release (delivery schedules) the output messages are controlled by creation profile.
    Creation profile
    1.     it aggregates the release (i.e. scheduled) dates and quantities
    2.     It generates an SA release in accordance with the creation strategy and the entries on the initial screen for SA release creation.
    3.     The releases (delivery schedules) are transmitted as messages to the vendor
    The advantage of with release is you can create forecast delivery schedule (FRC) and Just in time delivery schedule ( JIT)
    Forecast (FRC) delivery schedule
    Provides the vendor with longer-term data regarding the quantities needed of a material and when delivery is required. In such schedules, the timing of delivery is usually expressed in terms of calendar months or weeks. Note: approximately equivalent EDI terms for the ”forecast delivery schedule” are: ”planning schedule with release capability” (ANSI 830) ”delivery schedule (message)” (EDIFACT DELFOR), and ”delivery instruction” (ODETTE DELINS).
    •       Just-in-Time (JIT) delivery schedule
    Provides the vendor with data on required quantities and desired delivery dates/times covering the near future.In such schedules, the timing of delivery is usually expressed in terms of specific days or even times of the day. Note: equivalent EDI terms for the ”JIT delivery schedule” are: ”Shipping schedule”: (ANSI 862) and ”Delivery just in time message” (EDIFACT DELJIT).
    Thanks
    Janardhana

  • Scheduling agreement: Reference document type is diferent

    All SAP Gurus,
    We have created a scheduling agreemnet with document type SA01.
    Now, we want to create a new scheduling agreement with reference to it (SA01), but its document type is different (SA02).
    So, system is giving an eror message as 'Reference doc. type SA01 differs from doc. type SA02.
    Message no. 06033.
    Are there any configurational settings by which we can create a scheduling agreement with reference to some other document type?
    Regards,

    Hi Sandeep,
    Thanks for the reply.
    But, I'm unable to follow. Can you explain in detail.
    Right now what we are following is:
    Step 1. Going to T code ME31L
    Step 2. Entering the document type with which we want to create the scheduling agreement (in the field 'Agreemet type')
    Step 3. Then clicking on Copying document (Ctrl+F2), and entering reference document number (here the reference document type is different)
    Now, system gives an error as 'Reference doc. type SA01 differs from doc. type SA02.
    Regards,

  • Tables for following scheduling agreements and PR data

    Hi All ,
    Please can you tell me table names if I want the following information
    1. Scheduling Agreement Created By, Amended By, Modified Date, Plant
    2. Req Created by, Released by, Cost center, plant
    Thanks in advance
    Vinayak

    To view the fields listed in a table go to Tcode SE11 and enter the table name and execute
    EBAN  - Purchase Requisition 
    EBKN  - Purchase Requisition Account Assignment 
    Req Created by Table:EBAN Field ERNAM
    Released by- Table:EBAN Field FRGGR
    Cost center- Table:EBAN Field FISTL (Funds Center)
    plant-Table:EBAN Field WERKS
    For Scheduling Agreements following are the tables:
    EKEH    - Scheduling Agreement Release Documentation 
    EKEK    - Header Data for Scheduling Agreement Releases 
    EKET     - Scheduling Agreement Schedule Lines 
    EKETH   - Scheduling Agreement Schedules: History Tables
    You will find the following list of fields in these tables:
    MANDT                          Client
    EBELN                          Purchasing Document Number
    EBELP                          Item Number of Purchasing Document
    ETENR                          Delivery Schedule Line Counter
    EINDT                          Item Delivery Date
    SLFDT                          Statistics-Relevant Delivery Date
    LPEIN                          Category of Delivery Date
    MENGE                          Scheduled Quantity
    AMENG                          Previous Quantity (Delivery Schedule Lines
    WEMNG                          Quantity of Goods Received
    WAMNG                          Issued Quantity
    UZEIT                          Delivery Date Time-Spot
    BANFN                          Purchase Requisition Number
    BNFPO                          Item Number of Purchase Requisition
    ESTKZ                          Creation Indicator (Purchase Requisition/S
    QUNUM                          Number of Quota Arrangement
    QUPOS                          Quota Arrangement Item
    MAHNZ                          No. of Reminders/Expediters for Schedule L
    BEDAT                          Order date of schedule line
    RSNUM                          Number of Reservation/Dependent Requiremen
    SERNR                          BOM explosion number
    FIXKZ                          Schedule Line is "Fixed"
    GLMNG                          Quantity Delivered (Stock Transfer)
    DABMG                          Quantity Reduced (MRP)
    CHARG                          Batch Number
    LICHA                          Vendor Batch Number
    CHKOM                          Components
    VERID                          Production Version
    ABART                          Scheduling agreement release type
    MNG02                          Committed Quantity
    DAT01                          Committed Date
    ALTDT                          Previous delivery date
    AULWE                          Route Schedule
    MBDAT                          Material Staging/Availability Date
    MBUHR                          Material Staging Time (Local, Relating
    LDDAT                          Loading Date
    LDUHR                          Loading Time (Local Time Relating to a
    TDDAT                          Transportation Planning Date
    TDUHR                          Transp. Planning Time (Local, Relating
    WADAT                          Goods Issue Date
    WAUHR                          Time of Goods Issue (Local, Relating to
    ELDAT                          Goods Receipt End Date
    ELUHR                          Goods Receipt End Time (Local, Relating
    ANZSN                          Number of serial numbers
    NODISP                         Ind: Reserv. not applicable to MRP;Purc
    hope this helps!

  • Automatic Document Adjustment for Scheduling Agreements

    Hi all,
    we are usiing automatic document adjustment for purchase orders and it is working fine. If price in the info record is changed the purchase order is updated accordingly as long as no follow on documents are existing.
    I am wondering if scheduling agreements can also be updated as long as no follow on documents are existing. I tried to get them updated but did not succeed.
    Maybe somebody has wver tried it and knows if in general it is possible.
    Thank you for helping.
    Regards
    Carolin

    yes it is possible,
    to get the goal you have to set the Scheduling agreement without time-dependent conditions.
    how?  SAP IMG >Scheduling Agreement>Define Document Types and unflag the time-independent conditions.
    enjoy

  • Scheduling agreement to Delivery Document

    Dear All Gurus,
    I am facing an issue, please advise it is the standard system functionality, if yes tell me the work around.
    I have a schedulin gagreement with two schedule lines for say 23.03.2010 Qty 5, and 24.03.2010 Qty 5.
    As per my business scenario fluctuation occur i deliveries.
    on 23.03.2010 delivery change from 5 to 6 units system process is accordingly.
    but when i see the scheduling agreement system have following satus
    Date            Delivery Qty
    23.03.2010      5
    24.03.2010      1
    when 24th of march still not come, system not only adjust the quantitywith te next date but also transfer the extra quantity to the next date.
    and when i will start delivery for the 24.03.2010 system by default shows me the 4 qty.
    If for the time being i accept it is the standard functionlity, and if some one ask me the qty delivery on 23.03.2010 system shows it 5, but as per senario actual quantity delivred is 6 on the 23rd march.
    I want that system only call the schedule quantity, and if there is fluctuation system cater it against the same delivery date. new delivery date come fresh with its actual as per correct scheduling agreement.
    Requesting you to pls try it from you end, and send me your valuable feedback.
    Might have some issue in my system, or can tell the control area if any where i can cntrol it.
    Looking for the prompt response.
    Regards,

    Dear All,
    Same i have tried to another system, its like standard functionality..
    but, suggest me the work around if any or have any control in customizing....
    Regards.