Scheduling agreement from MM to SUS

Dear Experts,
I have implemented plan driven procurement with supplier integration,when i try to transfer scheduling agreement from MM to SUS , it does get transfer to XI then XI is able to send the XML to SUS system.
When I check the SXMB_MONI for the XML status in SUS,
System give me this message:  No implementing class registered for the interface (ABAP interface, request message DeliveryScheduleNotification_In, request message, namespace http://sap.com/xi/SCMBasis/Global)
Can anyone please suggest if there is any specific config required or missing for scheduling agreement transfer to SUS.
Thanks,
-Devi Swain
Edited by: DEVI NANDAN SWAIN on Apr 15, 2010 9:34 PM
Edited by: DEVI NANDAN SWAIN on Apr 15, 2010 9:42 PM

Resolved..

Similar Messages

  • Scheduling agreement from ECC 6.0 to SRM EBP 5.0

    Hi experts
    is there a way to send from ECC 6.0 to SRM EBP 5.0 all the kinds of scheduling agreements?
    thanks
    regards
    andrea

    Hi Andrea,
    It is not possible to send Scheduling agreements from ECC to EBP.Same is the case with contracts.
    You can only upload backend contracts to SRM. Using GOA you can create either a contract or a Scheduling agreement in R/3.
    As informed by Usman, when you integrate R/3 (MM) with SUS it is possible to send S.As to vendors via SUS.
    Hope this makes you more clear.Clarifications are welcome.
    Award points for helpful answers.
    Rgds,
    Teja

  • Automatic Scheduling Agreement from Purchase Requisition

    Hi All,
    Can we craete a Scheduling agreement automatically from a Purchase requisition? The scenario is like we will be craeting a third party Sales order and through ALE/IDOC system will generate a PR. Now we want to create a Scheduling agreement against the same PR automatically. Is it possible to do this through some customization in SPRO?
    Satisfactory answers will be rewarded.
    Thanks
    Indrashish

    Hi Indranish
    Scheduling agreement is long term contract.There is no need to create SA against each  PR (requirement).Normally SA will be created as a long term agreement with supplier and whenever u need the material u can raise delivery schedules against the SA.These delivery schedules can generated by MRP run automatically.
    I don't understand the your business requirement of each PR to be converted to SA.Can u give so more details of your requirement.If the requirements are continuous, user can raise the requisition with document type RV and same thing can be converted in to Outline agreement.
    Regards
    Ramakrishna

  • Scheduling agreement from backend to srm

    Hi SRM Gurus,
    Can I have the stepup step procedure for a backend scheduling agreement transfer to SRM.
    Means  we have a scheduling agreement in backend but the further process we have to do in SRM like schedule lines generation.
    I suppose we need to have PDP.
    Can anyone suggest?
    Reg.,
    Sridhar.

    Hi
    <b>Please go through the links below -></b>
    http://help.sap.com/saphelp_srm50/helpdata/en/17/303f412124de2be10000000a1550b0/frameset.htm
    Re: BADI for Backend Scheduling Agreement
    try to transfer scheduling agreement in sus
    http://help.sap.com/saphelp_srm50/helpdata/en/da/151241c738f423e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/42/f9a830c2673ee2e10000000a1553f6/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/42/f9a572c2673ee2e10000000a1553f6/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/7d/0a093f7c392e5ae10000000a114084/frameset.htm
    Scheduling agreement in SRM 5
    http://help.sap.com/saphelp_srm50/helpdata/en/38/4cc5376848616ae10000009b38f889/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/fa/8a0d41f0faef23e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/15/c9df3b6ac34b44e10000000a114084/frameset.htm
    Re: Benefits SRM contracts compared to MM contracts
    Re: Transfer contracts form backend R/3 to EBP
    Error in Backend Scheduling agreement Creation
    SRM -ECC: Scheduling Agreement Failing
    Regards
    - Atul

  • Scheduling agreement from a plant of different co. code

    is it possible to create a scheduling agreement to procure items for a plant connected to co.code 1 from a plant connected to co.code 2 ? if yes , how ?

    Hi,
    Since sheduling aggrement is at Plant level, I dont think so we can create a Schduling aggrement for plant connected to ccode1 and other plant connected to  ccode 2.
    Also it shall have other financial impact
    Rrds,
    Shiva

  • Order of delivery schedule line counter at schedule agreements from MRP run

    Currently we are using schedule agreements for our long term external suppliers, but we are facing a problem with the order of new delivery schedule lines created during MRP run.
    Because of master data settings like, lot size, rounding value, plan delivery time and planning time fence to set as firm new requirements, multiple schedule lines are created with no order for schedule line counter.
    Does anyone is aware of a BADI, user exit or customizing control to have this schedule line counter in order?
    Thank you
    Daniel Guillen
    IT
    Skyworks Inc.

    Hi,
    Pls put this query in SD fourms  and get immly help because this is technical fourms.
    Anil

  • Problems in transferring Scheduling Agreements from ECC to APO

    Hi All
    We are facing a strange problem in transferring scheduling agreements to APO.
    When we create the integration model, it shows the selected scheduling agreements and vendors. On activating the integration model in CFM2 or CFM3, we do not get any error.
    But when we check in APO, we do not see any scheduling agreements.
    Can any one tell us what could be problem or where should we check to identify the issue ?
    Best Regards
    Mitesh

    Hi Mitesh,
    Did you try deleting all the integration models in CFM7 and trying again ? You could also try deleting the blocked queues in SMQ1.
    Regards
    Mukundan

  • Stock on hand vs stock required from Scheduling agreement from MRP not MD04

    Hi SAP Guru's,
    1.Currently on 4.6C and client requires a report to view similar to MD04 with capability of multiple materials and vendors and way of summarizing the future requirements and current receipts?
    Right now with MD04 we can see for one material current and future Scheduling aggrements(SA) but does not have a report to tell how many are past due (other than going back to look at SA to view cummulative qty).
    2.Curretly MRP PD is using SA aggrements for the semi-finished mateirals for planning and maintaining Safety stock and Goods receipt date in Material master to control the schedules? as system generated SA quantities vary with high differences - for example weekly requirement for material A is 480 parts from Vendor A and Vendor delivers on plaaning cycle Tue and Thurs and daily end of the day 65-85 Production orders are confirmed and backflush happens and then MRP runs but instead of 240 per schedule it is splitting 360 once and 220 etc i mean the quantities are very high fluctations and vendor cannot delivery these variation of quantities ? needs your input where the issue is happening and also client want to use Reorder point Qty instead which is not in use currently.
    Appreciates everyone time and your help.
    Thanks and Regards,
    Siva Darbha

    No Solution

  • Extracting Scheduling agreements from Sales in SAP BI

    I have been going through various posts, and sap notes, but could not find a concrete answer on how to get this information in SAP BI
    Can some one direct me to some sap notes  or previous discussions, it would be highly appreciated
    Thanks

    Hi,
    All LO data sources we can see at ecc side LBWE, here under Sales application(11) you can check data sources.
    if your familiar with BW LO Extraction then can follow it.
    DataSource 2LIS_11_V_SSL.
    thru data source you can find bw info objects and target by using bi content help.
    Useful note - 1347563
    Thanks

  • Open quantity not displayed in SUS for Scheduled agreement

    Hi,
    When trying to send a Scheduled agreement from R/3 4.7 to SUS using the
    Idoc DELINS, we are getting the open quantity in SUS in column
    Quantity. There is another column as Open which should display the
    available open quantity in the system for the material which is not
    displaying. Plz do let me know what should be done to get the open
    quantity in the column.
    Regards,
    Anand

    Hi
    <u>Seems to be like some OSS note is missing in the system.</u>
    Please refer to the following OSS notes.
    <b>
    865410 SRM50-SUS: Missing follow-on doc buttons in sched agrmnt rel
    807935 SRM40-SUS: Create links do not show all purchase orders
    608760 BAdI for flexible plnd indep. requiremt settlement/reduction
    976264 Archiving enhancements in purchasing for ERP 2005
    806361 Partner ID of the sold-to party in the SUS-MM scenario
    791662 SUS-MM: U.S. postal codes are not transferred correctly
    791006 SUS-MM: Updated IDoc creates new order</b>
    Have you raised any OSS message with SAP on this yet ?
    Regards
    - Atul

  • Scheduling Agreement - Conditions not getting copied from Contracts

    Hi All,
    Requirement: Global outline agreements with scale prices will be created in SRM which will be into ECC as Contracts. Scheduling agreements will be created referecing the Contracts and the conditions with the scale prices needs to be copied into the scheduling agreement.
    Issue: We could create Global outline agreements in SRM and are getting replicated into ECC as contracts successfully. Conditions and the scale prices are not getting copied into the Scheduling agreement from the Contracts.
    Please guide.
    With regards
    Krishna

    Hi,
    I couldnt reach out a solution for this problem.
    SRM Version: SRM 5.0
    Yes. We create Scheduling agreements referencing the contracts.
    With regards
    Krishna

  • ME38 resets Release strategy of Scheduling agreement

    Hello,
    It seems when the users change the delivery date  in the delivery schedule (transaction ME38), the system in some cases resets the release strategy of the scheduling agreement from "Release" to "Not Release".It happened only in some case,release indicator set to "4" in our case.
    I cannot understand why this happens.
    Has anyone encountered such a problem before.
    Thanks
    Sunil

    Below are the (changed) item fields :
    Purchasing Document Item Change Date   AEDAT
    Item Delivery Date   EINDT
    Schedule Line is "Fixed  "FIXKZ
    Below are the (changed) header fields :
    Release Indicator: Purchasing Document  FRGKE
    Release status  FRGZU
    Purchasing document processing state PROCSTAT
    Item and header changes have same "Change document number " and transaction code "ME38" , this happened only in some cases,Rel Strategy is on  document type level ,I am also confused on this .
      Please assist  on this

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

  • Using a JIT call with stock transport scheduling agreement

    Hi,
    I have a requirement to send forecast schedules for a stock transport scheduling agreement from procuring plant to producing plant. Production would be done in producing plant against these forecast schedules. Producing plant would only ship against a JIT call (pull trigger) from procuring plant and not against a forecast schedule line. Is there a way in standard SAP to achieve this?
    Thanks,
    Krishna

    I don't think so.
    You need to transfer the production forecast as demand plan in the production plant. Have a MTS planning strategy (like 10), then manufacturing is triggered by this demand plan, and goods are stocked in the production plant, waiting for the pull call from the sales plant.
    Don't forget to take care of the consumption of demand with STO (I think there's a note on this).

  • Scheduling agreement without usage in MRP / MD04

    Hello,
    i want to use a scheduling agreement which isn't relevant for MRP. I use the standard agreement type LPA (Scheduling Agreement). The storage location for this process is marked as u201Cstock excluded from MRPu201D and the Source list record is also not relevant to MRP. Although I set these parameters, the schedules appear in MD04.
    Is there any possibility like the requirement class in SD? In SD I can set the parameter "Transfer of requirements".
    Regards
    Andreas

    It wont be possible to exclude seperate document type from MRP.
    Excluding a Sloc wont work. MD04 list will show the Scheduling Agreement.
    You can use a Custom 'Z' Logic to supress the Scheduling agreement from MD04. the program can be written in ABAP Code.

Maybe you are looking for

  • Tempro v3.3.3 fails to install on Windows 7 64bit

    Hi, When I try to install Tempro 3.3.3 on Windows 7 64bit it stops after the third step, ends the installation and gives the error: "The installation has ended due to an error" and then the installer exits. Running as admin and/or in 'compatibility m

  • How to make tooltip highlight extra row data on a table

    I have a table in a declarative component. It only has 4 columns but there is a lot of extra data I would like to display when the user hovers over a row. You can see in the 'shortDesc' property I've added this but it doesn't work. Any help would be

  • New window open problem

    hello            here with i attached the vi , The main program named front pannel when i run , one error is coming the error image also attached. i want to display the xy graph as separate window when i called(i want to implement -  button press  )

  • Tree Node In Oracle Forms

    Hell ow my dear Fiends I am the beginner in oracle forms I want to create a tree node below For example Purchase order   Forms           POM1010   Reports           Pom2010   Queries           POM3010 Human Resource Management    Forms           POM1

  • Artwork viewer not showing multiple artwork

    I have a whole heap of tracks with multiple art. With update to iTunes 10.5.1 the artwork viewer no longer shows the little arrows in the bar which allow one to browse the viewer. I have checkd that iTunes "sees" the artwork by doing Get Info and cha