Scheduling for planned order

When I choose leadtime scheduling in MRP RUN then system does forward scheduling always.
Then in planned order change mode when i do manually do scheduling then it does backward scheduling as  per settings in OPU5.
How to get backward scheduling in MRP.??

Dear,
MRP do the backwordscheduling but The system always determines the basic dates for planned orders using backward scheduling.
The system automatically switches to forward scheduling if the determined start date lies in the past.For this you have to maintain 2 settings.
1)In OPPQ - Plant parameters maintain the indicator for start date in the past allow. 2) In OPU3 for your plant & order type , maintain the no. of days for start date in the past.
Hope clear to you.
Regards,
R.Brahmankar

Similar Messages

  • Collective scheduling for planned order

    Dear Gurus,
    i create the planned order using the bapi standard whit the production version , but when create the new planned order the version don't is read in the order, ( BOM + ROUTING ) OF THE version.
    For read the production version you must reschedulling the planned order.
    Are there the methods for read the production version at the creation of the panned order ,
    or the strument for rescheduling collctive?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Dear Gurus,
    thanks for indication of the material master, but we don't  always manage the versions of productions.
    For the production order there are the routing without the production versions, but when i create whit the bapi or whit the transaction MD11 the new planned order manually i need setting the production version , but when i setting the version for the find the version ( bom+routing) i must re-scheduling the planned order.
    Are there the BAPI or alternative soluction for re-scheduling the planned order collective, or for read directly the version present in the BAPI ?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

  • Scheduling for planned order & production order

    Hi,
    I am not using fully routing.
    I have given requirement.
    08.2009--- 100 MT
    09.2009--- 100 Mt
    When I run MRP system always schedule FRom 01.08.2009 to 31.082009 .How to made settings.
    I have maintained In house production date 30 days.Forward scheduling.System always calculates from the current date,If I given oder start in past is activated in customizing take as 01.08.2009 as order finish date.
    Guide me
    Regards
    bhuvan

    Hi bhuvan,
    That is because of your requirement date.
    Which are 08.2009 and 09.2009
    08.2009 means your finish materials should be ready for delivery on 01.08.2009 similar way 09.2009 material should be ready for delivery on 01.09.2009.
    System always schedules the orders to meet the requirment dates.you may find exception msg like rescheduling in(10) or Plan process according to schedule (30) along with those plan orders.
    Regards,
    Dhaval

  • Scheduling of planned order and Production order

    Dear PP gurus,
    I have run MRP , after running MRP, system has created planned order. These planned order dates are  schedule by the system in 2015....I am not able to understand. how? . When i  double click on
    planned order order and try to convert it in production order  those dates get copied into production order.
    DO i need to change the dates thr? or  keep the same dates  which the system is giving>
    I  m going wrong somewhere. please tell me where and   what is config for scheduling for planned order and production order?
    Please tell me step by step procedure
    Regards
    Edited by: Aadi1981 on Apr 1, 2010 9:02 AM

    Thanks for replying,
    I have done the below setting for shceduling. Kindly check and let me know any setting needs ot be changed or incorect
    FOr scheduling  production order , i have configured below settings in OPU3
    In OPU3 ,  
    Detail scheduling tab
    Scheduling and  Generate cap req tab is checked.
    then
    adjust scheduling , adjust dates  tab,    :  adjust basic dates , adjust  dep , reqt to operation date  is selected
    scheduling type is backward.,
    Automatic scheduling tab is  checked.
    In OPU5
    Scheduling of PLanned order
    Scheduling and  Generate cap req box  is checked  (selected)
    Adjust scheduling
    Sheduling level: via  detail  scheduling
    adjust dates:     adjust basc dates , adjust  dep reqt , req to  operation dates
    For capacity  scheduling ;  always  basic dates, dep reqts to operation dates
    scheduling type ; backwards
    apart from this do i need to do update  ca96/ ca97?
    best Regards
    Edited by: Aadi1981 on Apr 3, 2010 7:42 AM

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • MRP-Delivery Schedule for Sales order is not updating in Production order

    Dear Experts,
    I have created Sales order and maintained delivery scheduling, Then Run MRP through MD50,
    We received Planned order then through this we have converted to Prodcution order.
    When we observe the delivery schedule for sales order under assignment Tab in Produciton order which is showing zero instead showing line item of Delivery schedule.
    I am able to see Sales order and Line item but i am not abel to get any delivery schedule line item.
    Please suggest where settings are missing.
    Thanks in advance
    Regards
    Don

    Dear Experts,
    Please provide me solution.
    after Running MD50 transaction against Sales order.
    If I maintained different Scheduling Line Item for First Line item of Sales order.
    The Respective Scheduling Lines should update against Each Production order which has converted from Planned order.
    Thanks in advance.
    Regards
    DON

  • How to connect MAPL and PLPO to derive work center for planned order

    Hi,
    Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
    Please help asap.
    Regards,
    Mitali

    I guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
    1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
    2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
    3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
    Hope it solves ur prob.
    Cheers
    SKC

  • REM scheduling in planned order

    Hi,
    I am using repetetive manufacturing. I have maintained Forward scheduling in transaction OPU5 and selected the selection ID 02 for rate routing for detailed and rate based scheduling.
    Planned orders are created from MRP. When I check the planned order deatails, in the Det.Scheduling tab it shows scheduling type Forward and in the Production rates tab it shows backward scheduling. I have maintained Forward scheduling in OPU5. So the production rates tab shows different scheduling type. How?
    can any one explain this.
    thanks and regards
    murugesan

    HI
    Check the entry parameters for the planning table in OS80 .
    check and revert
    Regards
    Anupam Sharma

  • Masss Scheduling of Planned Order

    Hi
    Is there is any transaction for Mass Scheduling of Planned orders preferabaly at plant level.?

    Dear Mayuresh,
    In my understanding there is no T Code to schedule as set of  planned orders
    This will impact on the other reciepts and only during MRP rescheduling happens.
    But also have a check the FM that Mr.Brahmankar has suggested.
    Dear Rupesh,
    Do u think even if you have an action plan and execute MDAC will it help to schedule the planned
    orders?
    Regards
    Mangalraj.S

  • Creation of Reservation for planned order

    Hi Team,
    Is it possible to create reservation for planned orders after MRP run?
    My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
    How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
    Kindly need ur guidance.
    Thanks
    psk

    Dear PSK,
    In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
    soon a production order is created.But only if the order is released goods movements can be posted against the reservation
    details through MIGO/MB1A for 261 movement.
    It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
    But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
    are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
    for a production quantity.
    Check and revert back.
    Regards
    Mangalraj.S

  • Extractor for Planned order

    Hi Experts,
    I am looking for the stabdard extractor for the Planned order, Basically I need the fields from the table PLAF.
    Please let me know any standard extractor available or any extractor need to enhance.
    Thanks
    sai

    Hi Sai,
    Take a look at 2LIS_04_P_MATNR and see if it is usefull:
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
    Else it seems that you should create a generic extractor directly on the table according to this thread:
    Re: Extractors for Planned orders and Proces Orders
    Hope this helps.
    BR
    Stefan

  • Table For Planned Order Details From PP Module

    In our organisation we are taking Plan Vs Acheivement from Production. So, intialy we taken Plan details from "PLAF" Table and Acheivement details from "S225" Table. But After running MRP at month end. Previous month plan get deleted and new order create.
    how to get history data for Planned order.
    Please help us.
    Regards
    Naga

    I don't think that there is any history in regard to planned orders.  PLAF will get rebuilt according to your MRP parameters and I don't believe that the data is stored.
    Regards,
    Rich Heilman

  • Changing MRP controller for planned order

    Hello experts,
    Is there any way the planner could change the MRP controller of a planned order within MD12 ? We are using ver 4.7 and this field is not enabled. Currently the planners are creating prod orders much in advance and are looking to move to a process where they firm planned order. We are using project stock planning structure so more that one planner may create orders for the same material. So when one planner review the material planning for one project he would firm the planned order and assign it to him for leater conversion.
    Note: I the config I didn't saw any field selection control for planned orders.
    Thank you in advance for sharing your wisdom.
    Francois Paquet BPA
    aeronautive industrie

    Francois,
    Very interesting question. However I never had to change those fields in either planned or prodcution orders.
    Both orders master data fileds are disabled.
    However since your are working with project orders ( or netwrok orders ) system would be giving you specific planner order hard tied to the project order ( similar to Made to order scenario).
    Planner could use MD51 ( project planning ) & MD4C ( option for Netwrok or WBS element ) for monitoring progress of his /her order.
    This way planners do not have to go by MRP controller data.
    Hope this provides some new thoughts.
    Thanks,
    Ram

  • Release status for planned order

    Hi All
          I am running MRP weekly,system is generating the Planned order  once MRP is completed.Here my requirement is i want release status for planned order, at the same time once planned order is released i dont want user to change any data in planned order.
           Somebody explain me about the settings of action control of planned order.
    Regards
    Srinivasan.P

    Hi,
    Sorry to say but there is nothing like system status for Planned orders.
    Check below thread,
    [Release of Plan orders|Planned Order Release]
    Regards,
    Dhaval

  • ATP Rule for Planned Orders

    Hi Experts,
    I have configured the ATP rule for Planned Orders. So I only want to check the component stock and Production Orders when running ATP check for the Parent Material.
    In OPJJ, I only selected the following options.
    Include Safety Stock : Ticked
    Check without RLT : Ticked
    Incl.production orders : X (Take all production Orders into account)
    No other options or boxes have been selected
    Also I have included the relevant Checking group in MRP 3 for the Parent Material (Checking Rule has been assigned to that Checking Group in Config) and also maintain the Plant Parameters for MRP (assign the checking rule to the plant)
    So, For an example :
    Parent : A
    Components : B and C
    Parent Material A has only 5 Planned Orders starting on same day 20.05.2014 each qty 5
    Components B got stock 300
    Components C got stock 1
    When I ran ATP Check for the Parent material A using COHV, qty 1 has been allocated to all the planned orders as committed. Why is this happening ?
    I also checked in CO09 for the Component Material C, and it says ATP Qty is only 1. I expected the system would allocate that stock 1 to one of the Orders but it seems to be not working as I expect.
    Any explanations will be much appreciated and will not hesitate to avoid the points.
    Kind regards,
    Ishara

    Hi DB49,
    Appreciate your reply. Please see the following comments.
    Right now I have been assuming that you have performed an availability check manually for one of the planned orders, and you got the same results (overconfirmation).  Please confirm.
    Yeah I have performed for one order and it gave me the same result.  Also, when I perform for the 2nd Order, it allocates the quantity.
    OK, basic things you should already have checked:
    You have maintained the checking rule for planned orders (OPPQ or OPPR)
    You have maintained the ATP group for the materials (OVZ2)
    You have assigned the ATP group to the Material Master of the components (MM02)
    You have maintained the scope of check according to the rules you mentioned earlier (OPPJ).
    You have no planning strategy in the component material that would have invoked a special ATP.
    I checked everything apart from point 2 (OVZ2). I have maintained that via MRP Group and that MRP Group has been linked to Master Data (MRP 3)
    Really appreciate your support in this.
    Kind regards,
    Ishara

Maybe you are looking for

  • Connection to Smart TV

    Hi there How can I connect my PC to my TV wirelessly? My PC is an HP TouchSmart 600. My TV is a Samsung 6500 Smart TV with wireless receptor. Thanks Pericles

  • FM for tracking the changes in materail master

    Hi Experts, I want to track the changes done to a material ( like if there are changes to materail description and materail group etc., ) for a given date. Is there any FM which can take the maerail number as input and give out these details. I know

  • OracleServiceBus Business Service Endpoints user 9096491

    Question1: I am having 3 business service endpoint with 3 business specifications(WSDL's). But I do not want to create a business service for each business service endpoints. I am creating one business service with end point. how to change the existi

  • Reg: Material Master in BEx

    Hi All, I am working on IS-retail with BI implementation project, we have material master with 150000 records, the issue that I am facing is, in BEx we have 65536 rows so, when I execute a query it is giving me a message "result incomplete" andit wil

  • Where do I find my I tunes synced from my lap tp

    I have synced my I tunes library from my lap top but I cannot find them on my I pad