Scheduling Indicator for Maintanence Stragegy is not changed

Dear all,
I changed schedule indicator from TIME to TIME KEY DATE for related maintenace strategy via IP11 (change maintenance strategy ) but when I generate a maintenance plan (QST01) with this maintenance strategy then still the scheduling indicator is seen TIME.Should I also change another setup to update maintanence plan (stability study record)
Best regards
Murat Erkan

Hello Murat,
I believe you should have addressed this question to PP forum (SAP ERP Manufacturing - Production Planning (SAP PP)) as the current one is for ME application.
Regards,
Alex.

Similar Messages

  • JSX Save PNG for web, quality parameter not changing file size

    Hi
    I have a script that uses this snippet of code to save png files for web. But, no matter what number I change the quality, the resulting file size and image fidelity remains the same.
    I was wondering if I can save pngs for web at smaller byte size with JSX and how to modify the output settings.
    docName = sourceDoc.name;
    NamesaveRef = new File( outputFolder + "/" + docName );
    var NewfileRef = new File( NamesaveRef )
    var options = new ExportOptionsSaveForWeb();
    options.format = SaveDocumentType.PNG;
    options.transparency = true;
    options.blur = 0.0 ;
    options.includeProfile = false ;
    options.interlaced = false ;
    options.optimized = true ;
    options.quality = 3 ;//THIS NUMBER DOES NOT CHANGE QUALITY IF CHANGED FROM 0.1 TO 100
    options.PNG8 = false ;
    sourceDoc.exportDocument(File( NamesaveRef), ExportType.SAVEFORWEB, options);
    app.activeDocument.close(SaveOptions.DONOTSAVECHANGES);
    Thanks for your help.
    Aubrey

    PNG does not have a quality setting. The quality property is used when exporting jpeg. That is why changing that property has no effect with PNG files.
    Photoshop now supports PNG compression but as far as I can tell you have to use Action Manager to save. I don't see a compression option when using saveForWeb.

  • Why change pointers for master data, why not change message?

    Hi Gurus,
    I have one doubt about Idoc.
    When changes to master data has to be sent Change pointers are configured and used. (CDPOS & CDHDR). In case of the transaction data change change idoc is used as is the case with orders (we use ORDCHG for ORDERS message type to send the chnage details to a order which was already sent to other system.
    Why we can't use change idoc or message type whatever, instead of Chnage pointers in case of master data or vice versa in case of transaction data.
    Your valuable input will be rewarded with suitable points!!
    -B S B.

    Change pointers are getting stored in the tables BDCP and BDCPS. As SAP suggests these tables should be as small as possible. And Master data are not much frequently changed data.
    As you compare with the transactional data, you need to change them many times in the real scenario. If we also process the transaction data via chnage pointer, these changes BDCP is getting more and more entries.
    RBDCPCLR is the program used to process the change pointer. If you have much data in the BDCP table, this program will take much time to run.
    So, we use the change pointers for the master data only.
    Regards,
    Naimesh Patel

  • Passcode the same for all phones if not changed?

    I just upgraded my iphone 4s to 6plus.  i assumed my passcode would remain the same. its not. now I am locked out of the 6plus.  I initially used the fingerprint option and now can't get into the phone. Why would the passcode not work on all phones with the same phone number? frustrating.

    The passcode is set up individually on each device. If you enabled Touch ID, you had to enter a passcode. If you do not remember the passcode, you will have to restore the iPhone as new first, then you can restore your backup, if you have made one. See this support document for forgotten passcode. iOS: Forgot passcode or device disabled

  • Schedule lines should not change 3 weeks time from MRP date

    Hi
    Is there any specific customisation required to get following results in case of schedule lines.
    1) MRP should not change/adjust the already send delivery schedule lines  which are lying within 3 weeks time from MRP date
    2) System should not allow to book the GRN unless the messages / print out has been generated from the system in case of scheduling agreement.
    Thanking you
    Shantakumar
    09944009752

    Hi,
    There are 2 possibilities:
         1. use MRP fixing using planning time fences, this is done by putting the relevant settings in the MRP1 view of the material master
         2. use the firming options of the scheduling agreement, these are set per material number that is entered in the scheduling agreement.
    The GR can only be posted for schedule lines that have been processed aka output generated.
    Regards,

  • Schedule line : delivery date not changes

    Dear Gurus,
    When I change delivery date change in delivery documents and sales documents, picking date, pricing date, etc.. changes, but in sales document, schedule line's delivery date does not changes.
    Please help me to change the same and kindly tell me, will it make any problem.
    fyi..
    If I have not created delivery for the respective sales document, then I can able to change the delivery date in the schedule line(sales document).
    I'm just a new born in this area so please feed me...
    Regards
    Viswanthan.G

    Hi Viswanath,
    When you change delivery date change in delivery documents and sales documents, picking date, pricing date, etc.. changes, but in sales document, schedule line's delivery date does not changes.
    This is because the system calculates the dates based on avaliabiltiy check and it picks data from material master as well, based on purchasing processing time, GR processing time, loading time ..etc and it will conclude accordingly.
    Its like system will do backward schdeuling and establishes material avaliabilty date.
    Thanks & Regards,
    Krishna

  • CCM 2.0: Status of items is not changed in Master Catalog

    Hello all,
    when I upload the same items in Supplier Catalog in Master Catalog and Procurement Catalog for items status is not changed from "Approved" to "Not Approved".
    Funny thing is that items need to be approved to go to Procurement Catalog from Master and to publish Procurement Catalog.
    What to do?
    Gordan

    Hello Gordan,
    do you mean that in CAT customizing you have your /ccm/master_catalog with "approved" value and the name of your procurement with "To approve" value?
    Best regards
    Jorge

  • UI language is not changing

    Hi all;
    I have created a new ADDON using UDO. Everything working fine but the only problem is that the UI language for the addon is not changing accroding to company language instead of that is  always showing in English. Please give some solution.
    Thanks
    Surajit

    First of all, B1 does not automatically translate anything, you need to have (for example) a table containing the translations for your addon.
    There is an app event "aet_LanguageChanged" that informs you of the language change.
    The way I have seen it work before was - a global variable, relating to each language, that also relates to the language translations in your UDT. e.g. 1 for English, 2 for French, 3 for German.
    When the language changed event happens, update your global variable to the new language number. Then on every form load, replace your static text with the translated value from the table for that language.
    I'm sure there are other ways to achieve it, but this is just to illustrate the point that there is alot of work involved, B1 does not do it automatically.

  • Email sound does not change

    I've recently upgraded my Iphone 5 til IOS 7.0.3 and I discovered that the sound for new email does not change when I change the setting in the controls.
    Have anybody else experienced this, and what can I do to correct it?
    Aparently alle other sounds can be changed - but not the one for new mail.
    I'm getting very annoyed form the default ring-tone that is played evey time a new email is coming.

    https://discussions.apple.com/message/23673157#23673157
    Check above discussion link here in the Apple support discussions. Hope it helps!

  • Scheduled Program Does NOT Change Times with Guide Changes

    When a program is scheduled from the Guide and then the Guide changes the start and end times, the scheduled program times do NOT shift AUTOMATICALLY with the Guide changes. Frequently the Guide program start and end times for a show move a minute, two, or three, sometimes more. The DVR scheduled program times do NOT keep up with these shifted Guide times but stick to the start and end times when scheduled. The DVR will often throw a yellow triangle up on the program indicating a conflict but the only conflict is with the Guide times. The DVR should AUTOMATICALLY shift the start and end times the few minutes and ONLY flag a conflict when the new times for the scheduled program conflict with another scheduled program, NOT with the Guide. This occurs most often on USA, FX, FXX, TBS programs which are frequently 61 or 62 minutes long. It is very frustrating to miss pieces of a recorded program, usually the end, because of these few minute time shifts.

    Hello Venkata,
    The components item category is TAE, that means the item category for the header item will be TAQ. Also the pricing will be carried out at the header item level only.
    Now for your query:
    The standard item category controls of TAQ will not have any connection between the header & the item level quantities in the delivery. If you change the quantity of the header item in the sales order, the quantity of the compnenets will be automatically adjusted. But this will not happen in the delivery with the normal settings of TAQ.
    Solution:
    Go to transaction code VOV7 - select TAQ - double click - In the Bill of Material/Configuration section , there is a field "Create Delivery Group" - select "X - Form delivery group with one delivery date".
    Save the settings. Now create a new sales order & then create the delivery & try to change the quantity of the header item, the system will automatically change the quantity of the components. (the system may not change the quantity of the components in the delivery of the old sales order - change it manually)
    With best regards,
    Allabaqsh Patil.
    Idhasoft Ltd.

  • SRM PO failed: Indicator for GR-based invoice verification used not allowed

    Hi Friends,
        I have an issue with a specific PO failed to transfer from SRM to ECC. We are in ECS scenario, SRM 5.0 Service level 7.0. We are in process of SP upgrade but this issue occured in Production system which is still in old SP level(SP 7.0).
    when I check the App Monitor, I am see the following errors:  but the status shows Auto_Completed
    1. PO: Indicator for GR-based invoice verification used not allowed
    2. PO: Instance XXXXXXXXXX of object type PurchaseOrder could not be changed
    3.  PurchOrder XXXXXXXXXX: Purchase order still contains faulty items
    4.  PO XXXXXXXX: Indicator for GR-based invoice verification used not allowed
    I can see the PO copied over to ECC. but status in SRM PO shows 'Error in Process'.
      BBP_PD for object PO shows:  Created, complete, ordered, In Transfer to Execute, Change was Transmitted  as Inactive status.    Transfer Failed shows Active, Document completed, created.
    I checked BP Maintain  for the vendor and PO and its no different than other POs and Vendors except Vendor had 'Goods Receipt based Invoice Verification' indicator checked in SRM.
    I tried to simulate the same Material, Vendor with GR-IV indicator both on and off, it works fine. Ofcourse this is in Quality box with SP 15 level.
    So, I am not sure if SP level upgrade might help it or not? If there are any other means to test, please advise.
    thanks
    Rao

    I was wondering how I could liquidate the PO by either creating a new PO or ??.
    What you could do to revive the PO in question is that after the upgrade, and after a round of background jobs run for CLEAN_REQREQ_UP and BBP_GET_STATUS_2, ask the buyer to make a dummy change to the PO (for example, change the description of the PO) and order again. This would trigger the transfer to the backend again. And hopefully this time, no error would occur.

  • Excise base amount is not changing as per the scheduling agreement

    Sub: in migo excise base amount is not changing as per the scheduling agreement type LP ( time dependent ).
    I have created the scheduling agreement type LP with time dependent.
    I have maintained the price value in two validated period i.e
    01/07/08 to 31/07/08 price is 100 rs.
    01/08/08 to 31/08/08 price is 200 rs.
    I have maintained the delivery schedule on
    15/07/08 of quantity 1 nos.
    When I am doing the goods receipts for the scheduling agreement on
    Document date I am giving 15/07/08.
    Posting date I am giving 15/07/08.
    I am giving the posting date in the excise also 15/07/08.
    After item ok.
    When I will the excise base value it is taking 200 and also excise duty is also calculating on 200.
    When I will post the document
    The stock account and GR/IR account is taking 100 only
    And excise duty is posting for rs: 200 only
    Why the excise base value is not changing as per the validity period.
    What setting I have to do the change the excise base value as per the validity date maintained in the time dependent .
    regards
    jrp

    dear sir
    doc date and posting date i have given 15/07/08 and also excise posting date i have given 15/07/08,
    but excise base value it is taking Rs:200 .
    in inforecord price date category 5-goods recepit date i have given
    yes i ahve changed the excise base value it will post , if i will not change the excise base  value i will post rs:200 only and GR/IR clearing account will post Rs100 only.
    why the excise base value will not take based on the time dependent.
    regards
    JRP

  • When I click on Creative Cloud logo, indicator for time passing goes for a few seconds and stops, but app not opening (it used to).  Any ideas?

    I've never used this feature to ask a question.  Pardon not knowing etiquette and such.  When I click on Creative Cloud logo/icon on my desktop, the indicator for time passing goes for a few seconds and stops, but CC app not opening. 
    CC app used to work on this same computer a few months ago.  No changes to operating system.  Photoshop is still working.  Just wanted to download Lightroom and perhaps begin learning it, but to no avail.
    Tried to look for a way to reinstall Adobe CC, but it says I already have it.
    Any ideas?
    Thank you in advance,
    Timothy

    Link for Download & Install & Setup & Activation problems may help
    -Online Chat http://www.adobe.com/support/download-install/supportinfo/

  • R1: tcAPIException: Duplicate schedule item for a task that does not allow multiples.

    Hi,
    I'm struggling with the following task:
    I have to assure an account exists for a given resource. I do provision it with the .tcUserOperationsIntf.provisionObject().
    I've created a createUser task to create the account.
    The task code checks if there is already matching account.
    If no account exists, is is created in the disabled state, and the object state of OIM account is set to 'Disabled' by means of task return code mapping.
    If it exists, it is 'linked' to OIM account.
    The problem is if the existing account is enabled, I have to change the OIM account state to 'Enabled' either.
    To implement this (thanks, Kevin Pinski https://forums.oracle.com/thread/2564011 )) I've created an additional task 'Switch Enable' which is triggered by a special task return code. This task always succeeds, and its only side effect is switching the object status to 'Enabled'.
    By I've getting the 'Duplicate schedule item for a task that does not allow multiples' exception constantly:
    This is the stack trace:
    Thor.API.Exceptions.tcAPIException: Duplicate schedule item for a task that does not allow multiples.\
      at com.thortech.xl.ejb.beansimpl.tcUserOperationsBean.provisionObject(tcUserOperationsBean.java:2925)\
      at com.thortech.xl.ejb.beansimpl.tcUserOperationsBean.provisionObject(tcUserOperationsBean.java:2666)\
      at Thor.API.Operations.tcUserOperationsIntfEJB.provisionObjectx(Unknown Source)\
      at sun.reflect.NativeMethodAccessorImpl.invoke0(Native Method)\
      at sun.reflect.NativeMethodAccessorImpl.invoke(NativeMethodAccessorImpl.java:57)\
      at sun.reflect.DelegatingMethodAccessorImpl.invoke(DelegatingMethodAccessorImpl.java:43)\
      at java.lang.reflect.Method.invoke(Method.java:601)\
      at com.bea.core.repackaged.springframework.aop.support.AopUtils.invokeJoinpointUsingReflection(AopUtils.java:310)\
      at com.bea.core.repackaged.springframework.aop.framework.ReflectiveMethodInvocation.invokeJoinpoint(ReflectiveMethodInvocation.java:182)\
      at com.bea.core.repackaged.springframework.aop.framework.ReflectiveMethodInvocation.proceed(ReflectiveMethodInvocation.java:149)\
      ...skipped
      at Thor.API.Operations.tcUserOperationsIntfDelegate.provisionObject(Unknown Source)\
      ... skipped
    What did I wrong?
    Regards,
    Vladimir

    Hi Vladimir,
    Please select 'Allow Multiple Instance' checkbox for the process task.
    Thanks,
    Pallavi

  • Can not change the ABC indicator in Material master MRP1 View?

    Hi All,
    I could not change the ABC indicator in Material master for material X. Could some one please specify the condition or prerquisit for making chnages in ABC indicator?

    Hi Animesh,
    In Logistics Information system , ABC analysis can being done  and results updated in Material master for ABC indicator by background job run.
    The relevant transaction is MC40  ( Total Analysis) .
    This transaction when run in backgroung with field "Update ABC Ind.in background processing mode" clicked, will update the ABC indicator appropriately.
    You can find different criteria based on which A, B,C is decided.
    I hope this will be useful to you.
    Please check and confirm.
    Regards
    Datta

Maybe you are looking for