Scheduling master recipe

Dear all
When  i am doing scheduling in master recipe (operation tab--menu path -recipe --scheduling -schedule) all dates (earlier start ,latest start,earlier finish,latest finish ) are same and time is also 00:00:00
kindly help

Hi ,
maintain the set up time , machine time & tear down time in resource & inhouse time in Mate . master . Assign the same resorce in the master recipe. & check the plant parameter.
satish
Edited by: satish kapartiwar on Jan 5, 2010 10:34 AM

Similar Messages

  • Earliest/Latest start - Earliest/Latest finish in master recipe scheduling

    Hi everybody,
    I'm struggling here to understand why only phases 0061 and 0071 have different earliest and latest starts and finishes.
    This is a very simple example with all the relevant phases being set for a 1 hr duration.
    This is a sequencial process (0011 - 0021 - 0031 - 0051 - 0061 - 0071 - 0081), except phases 0041 and 0091, which are not relevant for the analysis.
    These are the relations of phase 0061:
    And these are the relations of phase 0071:
    Any idea about what else could I check?
    Regards
    Fernando

    Hi Caetano.
    This example uses backward scheduling.
    What I don't understand is the different earliest and latest start time for phase 0071 and 0061.
    My screenshot shows a example of a master recipe scheduling having as finish date 28/03. So, following a backward scheduling way:
    phase 0091: not relevant (duration = zero)
    phase 0081: duration = 1 hour. Finish = 24:00:00 / Start = 23:00:00 (for both earliest and latest dates)
    phase 0071: duration = 1 hour. But then, latest finish = 23:00:00 and earliest finish = 22:00:00 ...
    back to phase 0051 you can see that this doesn't happen.
    Basically what I don't get is:
    If the operations have a duration of 1 hour each, why latest start of phase 0061 is 21:00:00 and the latest finish of phase 0050 is 20:00:00 and not 21:00:00 ?
    Regards
    Fernando Luz

  • Master recipes operations not getting transfered in SNP PDS to APO from R3

    Hello APO Gurus,
    I am trying to transfer SNP PDS for master receipes from R3 to APO.
    Issue description::
    The operation is not getting transfered correctly , some system default operation "010 generated Operation (from Planned Delive)" is getting generated in APO, also activity and resource capacity is not getting transfered. This situation exist for one plant 1000, for other plant 1100 the SNP PDS created correctly.
    i have following points:
    1. Is there some customizing setting missing on R3 or APO side  for plant 1000 tbefore SNP PDS transfer
    2. What need to be checked on master recipes data in R3,
    i have checked on below points
    1. FG Materials and all the Component Material to be in APO in a Active Integration Model.
    2. BOM & Routing and Production Version setup correctly.
    3. The Routing Operations have to Relevant to 'SCHEDULING'.
    4. Try deleting the existing Integration model for materials & re-create new IM & activate.
    Please help me to send SNP PDS correctly to APO to take heuristic run.
    Regards
    Gajendra
    Edited by: Gajendra_APO on Aug 23, 2011 1:14 PM

    Hi,
    It is good that you have given your already checked points.
    Please check the following things also and try to retransfer the PDS.
    1. Check your resource in ECC, whether you have maintained the Process formula.
    2. Check you have maintained some values in Master Recipe for processing time
    3. Check whether the resource has been transferred for your plant 1000 to APO and an active IM exists.
    4. Also check the type of the resource transferred to APO. It should be a single-mixed/ multi-mixed or bucket resource.
    Hope this will help you to solve the issue.
    Regards,
    Manimaran M.

  • CIF Master recipe get the message Invalid BOM

    Dear All,
    I am CIFing up the master recipe,  but problem is that the CIF keep telling me that I have an in-valid BoM (Message U9107) all the BoM item are APO relevant . MRP type X0 and So on
    Help please
    Cheers,
    Kittichai

    Hi Senthil,
    All the criteria you mention are there in my master recipe,
    1. BoM Status and all the Components, based Quantity are there
    2. Comonent item are with the flow ID (APO) 4, Put product in container at start of activities
    3 all materials have work scheduling screen
    I can get the operation and header material up to APO with no problem, but all the raw materials are not possible to go up, CIF keep reporting that I get the in-valid BOM
    Any thing that i missed. ( additional information, for the PP Bom and routing, i have no problem to do the CIF)
    Thanks,
    Kittichai

  • Does master recipe have function for splitting phase?

    does master recipes that create from T-code C201 have funtion for splitting operation/phase? since i can't find the function splitting in master recipe.
    if it has, could anyone explain me?
    thanks
    kanapon

    Dhaval Choksi
    I'm sorry if my question not clear so splitting that i meant is,
    In routing,for example assumes that only one person/machine will be working on a job at a time. If it takes one hour to make one, and the order is for 10, the system will schedule the job at that work center to take 10 hours. However, if in the operation in the routing, you select "Required Splitting", then you put in "number of splits" as 2, then the system will assume you are having two people/machines work on the job at the same time, hence it will only schedule the job to take 5 hours, not 10
    thanks

  • Operation Spilits on Master Recipe

    I m working on a scheduling formula which can be as Labor Time * Operation Quantity / Base Quantity / Operation Splits / No. of employees. I was not able to find no. of splits sort of field in master recipe. what i guess is that it is for discrete manufacturing and not for process industry although i can use it in formula for process industry and some how it is working perfectly. as per the impact no. of operation split has direct impact on base quantity as in case of change of base quantity if i changed the base quantity with out using no of splits it wont work and if i use it the result is perfect. Can any one explain the phenomena plz.......
    Does no. of Employees has same impact as no. of splits teh only difference is that no. of employees is not affected by change in base quantity.
    Reply.......

    Hi Haque,
    You are correct the No.Of splitting is generally used in Discrete Mfg. It is avl in routing operation detailed screen. where you check the box splitting allowed and enter Number of Splits.
    As you said somehow it is working fine in your scenario could be taking the value as "1 " i.e. anything divided by 1 will be the same number.
    Neither the Base qty Nor the No of employees have any effect on the no. of splits. You can maintain the No.of splits as "1 " it will work fine.
    But I suggest you can create a new formula by removing the Operation Split from the denominator.
    Regards
    radhak mk

  • Master Recipe without material

    Dear PP Gurus,
    I have one query.
    I want to create master recipe without material, i have created the same.
    Now while creating process order it is giving error,
    BOM for material 500000010 does not contain any valid items
    Message no. CO636
    please guide
    thanks in advance
    kailash thakkar

    Hi Kailash,
    What is mean by
    I want to create master recipe without material, i have created the same.
    What's the reason behind it.
    Regarding error CO636,
    - Check your BOM of that 500000010 might be components are missing over here.
    or
    - might be From to To lot size of BOM is not match with your Process order qty.
    or
    - Also check Valid From to To Date of your BOM.
    Regards,
    Dhaval

  • Error while changing the master recipe (C202)

    In transaction C202 (Material master recipe), I am trying to make a change but getting error message :Update was terminated.
    I am trying to change a  master recipe which contains an error. Recipe: A61234 transaction C202.
    Thanks.

    Hope, By this time you must have resolved this issue at your end. Due you know any root cause, If yes, could you please share it with us.

  • Do you know the idoc for master recipe?

    Hi all.
    Do you know the idoc for maintain master recipe?
    I am looking for the idoc.
    I would like to create, update and delete master recipe with idoc.
    I have investigated about idoc,but can't find suitable idoc.
    (I did find it for BOM, but for recipe is nothing.)
    Thank you in advance..
    Satoru

    Hello,
    As far as I can see there are no BAPI's or IDOC's available to upload Master Recipe data.
    A suggestion would be to use the batch input technique to upload the master recipe master data. You find the documentation of the batch input recorder etc. via the menu path System -> Services -> Batch input -> Recorder
    I hope it helps,
    Regards,
    Marcelo

  • Automatic Creation of Scheduled Master Record for Scheduled Master Data

    Hi experts,
    We know that MRU and Portion are Scheduled master data but Scheduled master record is transactional data. So it is obvious that we have to generate scheduled master record in every server wher we transport the master data manually. And we can generate records for a particular time span and after that time we have to generate the records again.
    All I want to know that whether it is possible to get all the records generated automatically after certain period.
    Thanks,
    Arghya

    Hi,
    Scheduled records do NOT get created automatically , altleast not by any sort of configuration, in case you are looking for it.
    Your can always create custom program to do so, but it isn't worth the effort.
    You can create records for upto 7yrs ( do need to check but definitely for a period long enough)
    Hope that helps!!!

  • Mass creation of BOM and Master Recipe for Plants

    My client wants to do Mass BOM creation and Mass Master Recipe Creation from a Generic BOM and Generic Master Recipe for all 10 Plants by just a click of button.
    He does not want to use copy function using CSO1 or C201, and do for plants 'one by one'. He finds it very time-consuming. He wants to copy for all ten plants all at once. Please advice how this can be accomplished in the best possible manner, and if by standard SAP.
    Thanks,
    Sac

    Dear Sir ,
    What is LSMW ?
    I want to Copy some bill of material from another plant .I had used T code CS01 for it but only the header bill of material is copied .
    The copy field in CS01 is only for first level boms the subsequent Boms are not copied .
    so is there any other way to do it ? if possible please give the detail procedure .
    Regards
    Pankaj .
    Edited by: pankaj.001 on Mar 9, 2011 10:55 AM

  • Creation of Process Order without assigning master recipe

    Hi,
    I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
    We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
    Is there any way we can achieve this?
    Regards,

    Hi,
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards
    Kannan

  • In LSMW which method is exactly suits for Master Recipe Creation (TC-C201)

    Hi All,
    I am unable to find which method suits for Master Recipe Creation in LSMW.
    Please send me in detail if any method suits.
    Can any body help me in this.
    Points will be awarded for correct answer which helps me come out of this problem.
    Regards,
    Shobha

    Hi shobha,
    if  there is code u have to do before uploading go for BDC or BAPI,
    it not go for LSMW (recording method) --> in this its very difficult to code.
    Thanks

  • Deleting operations in master recipe of process orders

    Dear Guru's,
           I want to delete the operations in master recipe of process orders. The operation numbers are different in different process orders. This activity has to be performed on bit large number of process orders. Can anyone help me in providing the process for doing this activity in mass. Any suggestions?
    Thanks in advance.
    Regards
    Kalyan

    Dear Kalyan,
    Why do you want to delete the operations(basically phases)at process order level?
    If it's really required to execute the Shop floor activties and if the order numbers is huge in number means then in my
    understanding only a LSMW/BDC can help you,but technically I'm concerned about selecting the operation/phases for deletion
    by passing on the confirmation number or operation number for a particular process order.
    If it would be the latest operation/phase for a product means then make the changes in the master recipe so that the same is
    getting copied into the process orders in the future.
    Check and correct me if I'm wrong.
    Regards
    Mangalraj.S

  • Master recipe Batch-input / Bapi / Fct

    Hi,
    Does anybody have a program to insert data for master recipe ?
    I didn't understand how to use fct MRTRS300_MASTER_RECIPE_SAVE and the Batch-input on C201 have oss note ...
    Rgd
    Frédéric

    Frédéric,
    I tackle the same question, I will let you know when I find something. Please post your findings here as well.
    Regards,
    Serge

Maybe you are looking for

  • InDesign CS4 fails to open PageMaker 6.5 files correctly

    After upgrading to InDesign CS4 this week, I attempted to open a PageMaker 6.5 file. It opened, but the pages were out of sequence. PageMaker 6.5 pages 1, 2, 3, 4, 5, etc., opened in InDesign CS4 as pages 1, 3, 2, 5, 4, etc. I purchased InDesign CS4

  • DBMS_XMLSave.insertXML ORA-01024 error

    DBMS_XMLSave.insertXML ORA-01024 error The following error is being produced when trying to use DBMS_XMLSave.insertXML. The xml datagram was produced from the view using DBMS_XMLQuery.getXML. This works fine for non object nested views. Does anyone k

  • How can you block production for a specific product in SNP planning book

    Hi All, Looking for a way to manually indicate a decision to prevent production in a specific cell for a product in the SNP planning book utilizing the supply planning and capacity leveling heuristics.  For this requirement the resource would have av

  • Problem with Texting

    Recently I have had difficulty sending text messages. It seems that I can only text people who have iphones and even then it is spotty. I will have 4 bars and LTE and it will not send my text. Also, I can no longer send my imessages as text messages.

  • Very lazy to connect to broadband yet shows as being connected on start up

    My Mac mini does not get an internet connection when I log on or first turn on. The router is active, does have a connection (other comp works fine) but the mac mini despite showing as being connected to the network, every time I start it the web pag