Scheduling of Work Center Overload / Work Order Start
I am looking for a setting that SAP only starts work orders when the required capacity is available. Shall mean if the capacity check is not successful SAP will block or postpone the work order.
Has one of you heard about such setting & if yes is it in customizing, a work Center or another setting ?
Hi,
Check with OPJK, for your Plant and Order Type combination.
Here you can set the capacity check.
If you can say that if th capacity is not there do not Crate/release the Order.
This is based on the Business function 1 (Create) or 2 (Release).
Regards,
Siva
Similar Messages
-
All default routing value has to be changed, while changed the work center in production order
Dear friends,
our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
Thanks&Regards
Sabhapathy RHi Rahul,
Thanks for reply. I am maintained in diff value maintained routing , Ex :First routing i have work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
Now I think you get to know what the client requirement, kindly do the need full.
Regards,
Sabhapathy R -
Change Work Center during production order confirmation
Dear All,
I must to modeling this situation:
I created an production order. In routing I used an work center A.
After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
Thank you for your answer!
Regards,
Marianonce a Order is released, the Process order detaisl for that order is frozen.
however if you want to do it, change the order status to CRTD after reversing the Movements done.
Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
if the change is long term.
or
Just manually add the new work center and do the processing. if the change is temporary. -
Change history of work center in Prodn Order
Hi All,
We currently are changing the work center in prodn order via an ABAP program number of times based on various conditions. We would like to know the change history for the work center in prodn order. Is there any <b>transaction or report or function module </b> that we can run for a given prodn order to know these changes. This change info is not captured in AUFK or AFPO or AFKO or logs for Prodn Order.
We have not activated audit trail for this. Please can anyone suggest a soln for this.
ThanksHi Bala,
AFRV table contains Confirmation pool information. But I am looking for change history for the work center in prodn order. Like after creating the prodn order u changed the work center and then again after release of prodn order u changed it to some other work center (for some particular business reason). I would like to see all this change history.
Swapnil -
Mass change of work center in production order
Dear All,
Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
Thanks and regards
ManishHi Manish,
If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
The order will now read the routing with the new work centers, provided the same has been changed.
If you have posted some activities or goods movement done, then its a manual process.
Hope the above answers your query.
Regards,
Vivek
Added
If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
Edited by: Vivek on Feb 24, 2009 12:22 PM -
Report for work center hours , maintenance order wise for SAP 3.1i version.
Hi Team,
We are using older version of SAP, that is SAP 3.1i. Here we don't have any transaction code such as IW47. Is there any other way to get report of work center and work center hours-order wise.
Please respond.
Regards,
KiranHave a look at table AFRU
PeteA -
Dear experts,
I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
another problem is that, for those orders generated by maintenance plan, the work centers in operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
thanks!
WesleyWesley,
Sorry - development is the only way.
Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
PeteA -
Work center wise production order infomation report
Hi all,
i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
i have three operation in production order.
my order scheduled start date - todays date.
In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
Clent want like that (with quantity break) report..
Any standard report ???
If customization.... How it can be mapped in SAP.??
Thanks in advanceHi,
You can use the FM COIS_SELECT_ORDER_DATA_READ.
CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
EXPORTING
iv_prod_order_sel = lv_prod_order_sel
iv_proc_order_sel = lv_proc_order_sel
iv_planned_order_sel = lv_planned_order_sel
iv_rem_objects_only_sel = lv_rem_objects_only_sel
is_objects_to_read = ls_objects_to_read
it_parameter = lt_parameter "General Structure for PARAMETERS and SELECT-OPTIONS
it_status_hdr = lt_status_hdr
it_status_opr = lt_status_opr
it_status_cmp = lt_status_cmp
TABLES
ct_ioheader = lt_ioheader
ct_ioitem = lt_ioitem
ct_iodocl = lt_iodocl
ct_ioopdocl = lt_ioopdocl
ct_iomamo = lt_iomamo
ct_ioconf = lt_ioconf
ct_ioopconf = lt_ioopconf
ct_iosoconf = lt_iosoconf
ct_iogomo = lt_iogomo
ct_ioopgomo = lt_ioopgomo
ct_iosogomo = lt_iosogomo
ct_iogmer = lt_iogmer
ct_ioopgmer = lt_ioopgmer
ct_iosogmer = lt_iosogmer
ct_iosequen = lt_iosequen
ct_iooper = lt_iooper
ct_iosoper = lt_iosoper
ct_ioopcomp = lt_ioopcomp
ct_iooppreq = lt_iooppreq
ct_iosopreq = lt_iosopreq
ct_iooppord = lt_iooppord
ct_iosopord = lt_iosopord
ct_ioopmst = lt_ioopmst
ct_ioopprt = lt_ioopprt
ct_ioopcap = lt_ioopcap
ct_ioopscap = lt_ioopscap
ct_iosocap = lt_iosocap
ct_iososcap = lt_iososcap
ct_ioopsccf = lt_ioopsccf
ct_iososccf = lt_iososccf
ct_ioprodlist = lt_ioprodlist
ct_iomatver = lt_iomatver.
This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
Thanks and regards,
Pradip
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:27 AM -
How to connect MAPL and PLPO to derive work center for planned order
Hi,
Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
Please help asap.
Regards,
MitaliI guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
Hope it solves ur prob.
Cheers
SKC -
Select the work center in sales order
Hello gurus,
When I create a saler order, the system create automatically a service order with the corresponding data which are reported in transaction OISD for the service material. The key of this table only permits a work center for one material service and plant. And it is impossible to add more work centers for the same service material and plant.
So I need to be able to choose the work center when I generate the sales order. How can I get it?
Thanks in advanceDear Venkat,
Try These tabels:
MARC Plant Data for Material
/BEV1/RBVBAP Sales Document: Item Data
COER Sales Order Value Revenue
VBAP Sales Document: Item Data
VSVBAP_CN Version: Sales document: Item data
VVBAP Sales Document: Item Data
GLPPC Profit Center Accounting: Plan line items
GLSPC Profit Center Accounting: Line Items
Regards,
Naveen. -
Block production work center during maintenance order
Dear Experts,
iam trying to do the integration between PM and PP, I want to block the production work center from any production order when there is any maintenance order opened for a certain equipment which is inside this work center ,
till now i did the following:
1) the production work center is now inside the equipment location tab
2) when i open any maintenance order i put system condition as zero
now what i only achieved ,
- in transaction CM25 the capacity is black for the period of the maintenance order
BUT the work center is not blocked and any production order can be created without any error
please help and much thanks in advance
Best RegardsHi,
Till time you have performed right things to integrate PP-PM & system is also responding according to setting.
Showing block capicity in CM25 against the Maintenance Order.
If you want to block production order as well, you need to do one more setting.
go to t- code OIOI, selection Production order types (those you want to block) & in capacity Availabilty choose Collect conversion as 3 : No creation if there is insufficiant caacity.
i hope this will definately solve your problem.
- Yatharth -
How to manage work center in Production order
Hi,
I am producing a material having one operation (suppose cutting), which I have mentioned in the routing. I have also mentioned the work center in routing on which cutting operation will be performed. When I make the Production order of 1000 pcs there comes only one work center. But practically, they are producing these 1000 pcs on two different work centers ( 500 on one and 500 on second). How to manage this in SAP.
Kindly help me.
Thanks and Regards,
Yogesh SinglaDear ,
What is the individual capacacity of the Work Centre -CR02-Header -No of Individual Capacity ?
I think you must be using similar kind of work centre of 2 no 1000 pc .Now , when you are creating routing for this , you should hit Required Spilliting in Routing Operation -Select Operation line item and then Double click -Select Spilitting and enter splitting No 2.
At the same time in CR02-Work Center -Capacity Tab -Hit the Header -In the Bottom of the Detail Capacity Header -Avaialabile Capacity -Include 2 as Number of Inidvidaul Capacity and SAVE.
Now based on thr required spilittinga and invidual caapcity , it will consider the Work Centre Load .
Other wise , you can enter one more operation line in routing with similar Labor hrs , work center and control key in routung for production of 1000 pc .
Hope it clarifies
Regards
JH -
Work Center in Maintenance Order.
Hi ,
Due to Process Change some maintenance work centers become obsolete.
Can it possible to hide or work center do not see in F4 help in Maintenance order.Dear Ashu
Jogeswara Rao Kavala input is the most suitable in your case however another work around would be :
If you are using the "Person Responsible" for your work center, then remove the entry from the person responsible for such obselete work center as they will not be used any more and no person will be responsible for their maintenance and co-ordination. This will help in all other reports selection and analysis also.
While searching for work center(F4 Screen), default the tab "Person Responsible".Now when you select any work center based on person responsible, automatically that work center will be excluded from your selection screen.
Pre-requisite: You use Person responsible assignment in ALL work centers....
Other way would be to set deletion flag to this work center so that even if they are included by user without looking into F4 help, system will prevent those work center from including in the work order for further processing.
Hope this helps
Regards
Murad.. -
Work center for Production order
Hi,
In my report I need to link the production order to work center. I have got all the information for the production order from AFKO, but I am unable to find a way to link it to the work center?
Thanks
VamsiHi Vamsi,
Refer value AFKO-AUFPL, Use AFVC-AUFPL to fetch the operation details of an order. Fetch AFVC-ARBID for AFVC-AUFPL, use CRHD-ARBID to get Work center details.
Regards,
Prasobh.
Award your marks, if this has helped you. -
Replace Main work center for maintenance order
hello
I have to change the work center maintenance orders to 1000.
Is there a standard transaction to make this change in mass?
or I'll have to create a LSMW?
thanks
Paulo PicarraHi Paulo
though you have closed this thread I would like to tell you that In standard T- code IW38 there is a carry out mass change option available through which you can change many data including Main Work center. Pl check the following steps
Select the orders through IW38 & click on order (at the top menu) & select carry out mass change (or CTRL+F11)
you will get a popup screen for selection of fields to be changed.
Pl check & give feedback
Regards
Shakti
Maybe you are looking for
-
LG G2 kitkat SEVERE battery drain and performace issues
After updating my LG G2 to kitkat the other day, my phone performance and battery life have been absolutely awful. Previously I could go 24 hours on a charge with moderate use, and now I'm lucky if I get 4 hours with it sitting on my desk unused wit
-
Transfer of data from old mac to new macbook pro..
when I connect my firewire to my old macbook to transfer data to new macbook pro during installation set up, do I click on option for transfer from another mac or transfer from time machine or other disk? Old mac will be set up in target disk mode..
-
Just to give you a little background on myself: I graduated with a BSCS degree last year and have been developing web applications using Cold Fusion ever since. I'm looking to return to my roots in object-oriented application programming and have sta
-
Moving Tracks Up Or Down?
Is it possible to move a track up or down? I have a video with many tracks and I've been using the fact that the top-most track has precedence. Now I want to make a track lower on the list the top-most. Is it possible to move it to the top or does on
-
Why is lightbeam not supported by android ?
Why is light beam not supported for android version of firefox ?