Scheduling Period  mandatory in maintenance plan  PM module

Dear Friends,
Please let me know,how scheduling period,maintenance activity categroy can be made  mandatory in maintenance plans.
Thanxs in advance
Jyotish Kumar
9810170091

hi
upto my knowledge i think it is not possible to have your fields mandatory in maintenance plan,you think of using Tcode SHD0 which is used for Transaction and screen variants
regards
thyagarajan

Similar Messages

  • Making Activity Type Mandatory in Maintenance Plan

    Hi PM Gurus,
    Can someone please let me know how to make the field "Activity Type" and "Planner Group"  mandatory (Required Entry) in Maintenance Plan at screen level.
    Cheers
    Deepal

    Hi ,
          If you do not want to go for user exit then you can also get it using transcation variants via tcode SHD0 ... for IP41 /IP02/IP42/IP43 Tcodes ..
    Search this forum for steps as it was discussed many times ..
    regrds
    pushpa

  • Maintenance Planning - Fixed Weeks

    Hi all.,
    We have a scenario here where the frequency of the plan is 1 year. There is an operation that needs to be done on 10th, 24th & 36th week of every year.
    How do we configure this...? will the option of using Configuable task List solve this issue...
    Please help me with a solution...
    Regards,
    Ajai

    hi
    check with maintenance strategy. you can create the strategy as 10 , 24, 36 th seek, but the process will be repeating. if you want to just create once for one year. do not specify the scheduling period in the maintenance plan .
    but you have manual schedule the plan every year
    regards
    thyagarajan

  • BI content for Maintenance Plan and Maintenance Item

    Dear community,
    we use in OLTP the transaction IP06 (Maintenance Item) and IP03 (Maintenance Plan) in module PM.
    Can anyone tell me the matching BI content in BW system 7.0 to import most of those fields from ERP?
    Not only master data, also transaction data (e.g. like scheduling list).
    I've already searched help.sap.com but didn't find a matching datasource.
    Regards

    Dear Srinivas,
    I've already run a systemtrace to find out the tables:
    The following tables are involved: MPOS, MMPT, MPLA and MHIO, MHIS.
    In BI-Content I just find MPOS in the DataSource 0PM_MAINTPOS_ATTR and 0PM_MAINTPOS_TEXT. That is ok for master data.
    The other tables I couldn't find in BI-Content.
    But maybe the BI-Content does not use these tables. Maybe there is used a view which I don't see in the trace.
    Regards.

  • Set field selection in maintenance plan

    Please help me where i can set or remove the  Equipment field as a mendatory in maintenance plan in SPRO
    R.S Raghav

    Hi R.S Raghav,
    If the field Equipment is already mandatory in maintenance plan, then check in transaction OIAO, this is for notifications, (the equipment field may be made mandatory for Notification). You can make that as optional entry.
    Check and revert back with your observations.
    Regards,
    Praveen

  • Scheduling period in Maintenance plan

    Hi
    If I enter scheduling period 365 days & my cycle is 3 months.Once I schedule the maintenance plan, in IP10 I can see planned date only upto 365 days.How can I populate the planned date after crossing 365 days ?
    rgds
    rajib

    Hello Rajib,
    You are getting planned dates for one 365 days because you have entered 365 days as the scheduling period. If you want to have the same for say 5 years, then first change the unit of scheduling period to 'YR' and make scheduling period as '5'. Then schedule the plan and see the planned dates for next 5 years. Maximum you can do ti for 999 YR.
    You may choose unit as Week or month also.
    It is recommended to use IP19, setting With Further Dates. flag.
    Hope this will help you. Please revert for any clarification.
    Regards,
    Vaibhav Mishra
    Edited by: Mishra_Vaibhav on Apr 29, 2010 2:18 PM

  • FM to find out schedule calls and their statuses for a Maintenance plan

    Hi,
    Please let me know if there is any FM to find out all schedule calls and their statuses for a Maintenance plan.
    Regards,
    Vimal

    Hi Vimal
    Below function module will serve your purpose.
    ZPM_GET_SCHEDULING_STATUS
    Regards
    Anil Kumar

  • Maintenance Planning & Scheduling of calibration order

    Hi
    I have to schedule calibration inspection of a few equipments in such a way that system automatically create inspection lot & calibration order daily.
    Whether user enter calibration result or not, inspection lots in future should be created automaticallly.
    I created a single cycle plan using IP41 and start the schedule using IP10, the system created first inspection lot automaticaly but always require me go to to scheduling and save the plan again if I want to create next inspection lots. How can I configure/set the system in such a way that it creates inspection lots/calibration order automaticaly
    Plz also tell after taking usage decision of inspection lot whether I need to do some act on calibration order such as technical completion or business completion.
    Thanks in advance

    Dear Chris,
             In maintenance plan go to Maintenance plan scheduling parameter & put Schedule Period '360' Days in sub screen under Call control parameter.
    Then Go to IP10and make automatically scheduling it will make plan for whole yera.
    Regards... Rakesh Saxena

  • Certain Maintenance Plan not getting scheduled in the background job

    Hi Gurus,
    I am facing an issue here.
    A weekly background job (RISTRA20) runs every weekend and schedules the maintenance plans.
    But we have noticed that some maintenance plans are not getting scheduled. i.e no orders or schedule is getting generated.
    When I run IP30 manually for these plans then the schedule gets generated and orders get called.
    I have checked up the background job and it is running fine.
    Also, i have noticed a similarity in all these plans which are not getting scheduled. There schedule has been restarted (through IP10) at somepoint or the other.
    But i don't see any direct impact of this?
    Can any of you provide some help on this?? Points will be rewarded.
    Thanks and regards,
    Nitin Saini

    Hi Narender,
    Thanks for replying.
    The message number for 'Groups don't match' is ME303.
    I think this does not have anything to do with the restart as i have done further investigation.
    Whenever I run IP30 with sortfield input as AS02*, i get the error as mentioned above for a certain number of maintenance plans while the remaining plans get scheduled.
    If i run IP30 for any other sort fields, it runs fine and i don't encounter the error
    mentioned above.
    If you send me ur email address, i could forward you screen-shots of the issue.

  • BAPI for Maintenance Plan Scheduling with EHP5

    Hello.
    In documentation for LOG_EAM_CI_4 mentioned that: [API functions have been developed for the scheduling of maintenance plans. These APIs provide the same functions as transaction IP10: the creation of maintenance calls or the changing of existing maintenance calls|http://help.sap.com/erp2005_ehp_05/helpdata/EN/33/46AC67364447A3BA2F4EFA65B8C014/frameset.htm].
    We have activated EHP5 and all LOG_EAM_CI* business functions in our system, but still can't find this "magic" BAPI.
    Does anybody know its name?
    BR,
    Pavel
    Edited by: Pavel Nedvijaev on Nov 7, 2011 5:37 PM

    Maheswaran.K thanks for your reply, but as i wrote above we have activated all LOG_EAM_CI* including LOG_EAM_CI_3.
    Version of software components SAP_APPL, EA-APPL is 605 as it needed.

  • Update was terminated error while scheduling maintenance plan

    HI Friends,
    I created a maintenance plan.I scheduled the order and i saved.
    Now when i tried to see the schedule i am getting a message
    "Update was terminated"
    the detailed error is
    Update was terminated
    System ID....   DEV
    Client.......   XXX
    User.....   XXXXX
    Transaction..   IP10
    Update key...   49041E2C02935CCCE10000000AFA0209
    Generated....   30.10.2008, 17:22:18
    Completed....   30.10.2008, 17:22:19
    Error Info...   00 671: ABAP/4 processor: SAPSQL_ARRAY_INSERT_DUPREC
    Can anyone tell me why this error is coming and how to rectify.
    Thanks in advance
    Vivek
    Edited by: vivek mankad on Oct 30, 2008 1:38 PM

    Vivek,
    Talk to your ABAP/Basis team
    PeteA

  • Sort Field to be made mandatory while creating maintenance plan(IP42)

    Hi Experts,
    Please suggest me the way by which i can make the field "Sort field" mandatory while creating maintenance plan (IP42).
    Regards,
    Vivek

    Vivek,
    There is no std config to acheive this. Please use IPRM0004 Maintenance plan/item: Customer check for "Save" to accomplish the same.
    Mahee

  • Making task list field mandatory in creation of maintenance plan?

    Dear All,
    I need your help in configuration of Making task list field mandatory in creation of maintenance plan. I checked with sceen variant config but that also not giving me any option to make the field mandatory.
    Is there any note or user exit for it?
    Regards,
    Kaushal Rai

    Dear,
    Pls check the exit IPRM0004:Maintenance plan / item: Customer check for time "SAVE".
    Regards
    Sunil

  • Problem regarding scheduling of maintenance plan

    Dear Sap Gurus,
    I am facing the problem during the scheduling of maintenancepan thruough IP10 follwing error is coming
    "Planned date for maintenance plan 124 was scheduled for 00.00.0000"
    Planned date for maintenance plan 124 was scheduled for 00.00.0000
    Message no. IP889
    Diagnosis
    During scheduling of the maintenance plan, the planned date was set to 00.00.0000.
    This error can occur, if, for example, the cycle for the planned schedule is too big (offset) means that the planned date is actually after the 31.12.9999.
    Procedure
    Check the master data of the maintenance plan to ensure that no date is calculated after the 31.12.9999.
    If necessary, check the counters used and the annual performance.
    I explore all the things in SPRO also also check the setting parameter for the plan but i didnt get any breakthrough for my above problem.Plz guide me whats the exactly problem with scheduling of of maintenance plan.
    points are sure
    Regards
    Rakesh

    Summary
    Symptom:
    In the scheduling of a multiple counter plan, the system
    1. generates message IP889 "Planned date for maintenance plan &1 was scheduled for 00.00.0000" or
    2. terminates with CONVT_NO_NUMBER.
    Other terms
    Scheduling, IP10, IP30, maintenance plan scheduling, maintenance plan, multiple counter, BADI IPRM_MCP_SCHE_CHANGE, CONVT_NO_NUMBER, SAPLIWP2, LIWP2F19, MCP_PREPARE_RESCH_CALLED_CALLS, LV_ABNUM
    Reason and Prerequisites
    This problem is caused by a program error.
    Solution:
    Implement the attached source code corrections.

  • Get latest order for a scheduled maintenance plan

    Hi experts,
    I have a requirement where i have to get the order id for a scheduled Maintenance plan.My scenario is explained as below:
    A maintenace plan is scheduled and as a result of it an order will be created automatically  by system. Now i have to write a Report program which will be running daily and this report has to pick only those order which are NOT complete and these order will come from the above scheduled maintenance plan.
    Therefore i have to pick incomplete order based on scheduled maintenance plan.Any idea how to achieve this requirement?
    In case of any doubt please let me know.
    Regards,
    Abhishek

    Thanks for reply. But my requirement is a bit differen.
    I need a BAPI which can take Maintenance Plan as input and it can return the latest created incomplete order which is created due to scheduling of Maintenance Plan.
    Regards,
    Abhishek

Maybe you are looking for

  • Request GX630 bios unlock overclock menu with fn and ctrl key swap.

    anyone out there know how to unlock the bios for GX630 so you can manual config the overclock ? thanks

  • Printing double sided A5 flyers ?

    this is so complicated. it may well be my printer canon MX850 doesn't do this , the option for 2 sides is there but greyed out. I have designed on pages a flyer, exported it to PDF then copied 2 pdf onto A4 pages then saved as template and exported i

  • E52 Different ringtone for each number(dual sim ca...

    Hi,is it possible to set in E52 different ringtone for  each number line?I have TWO number lines in ONE sim card.Also can i see in which number they call me on my screen,is there a setting for that?Thanks

  • Illustrator 10 installation woes

    Hi, I just installed Illustrator 10 on my windows 7 x64 PC. The installation went smoothly & s/n accepted without error messages. Unfortunately, when I go to run the program, I see the initial splash screen for a split second, and then nothing. The p

  • ScriptException Occured. An unexpected exception occurred in the script

    Hi all, I am working on OATS 8.5(e-Load). I have recorded the application in OpenScript tool which is having Authentication Code and able to run successfully and script was passed. Authentication code in the script is http.addAuthentication("_http://