Scheduling planned order of semi finished

Dear all,
I have the following scenario finished product A is made of semi finished product B , when making a plan for A to be delivered say 1\6\2010 the system schedules a planned order for A to be delivered on 1\6\2010 at 7:00 AM and start on 25\6\2010 at 14:00 PM therefore for semi finished B a planned order should be scheduled to be delivered on 25\6\2010 at 14:00 PM .
the problem os that B is scheduled to be delivered on 25\6\2010 7:00 AM not 14:00 PM . known that no schedule margin key is used and the start time of the plant is 7:00 AM. is it configuration or SAP standard?
Regards,
Ahmed Sobhi

Dear  Mr.Ahamed ,
Basically , if you have Capacity Requirement Profile active , when you dipsatch the operation system will ask you to review  the Work centre  ,  Operation  , Timing  before depatch based on the capacity load  .I am not sure wether u are utilising that functionalty or not
However , Convert the Planned Order to Production Order for B .Goto Operation Over view .How many operations are there in  B? .You can change the time , if you dispacth( Select the line itme - operation AT HEADER -DISPATCH )  , select the line Operartion line item and double click , goto Date , here you can change the Date , Time (Set up, Processing , Teardown , Move Time , Wait Time ) .Basically u should deal with Operation Execution time (Set up , Process , Teardown ) .
We generally  change the timeing like this in our shop floor  in our business process.
Secondly , at configuration level , you can goto -OPJN-Select the Scheduling Type -Mark the option With Time  so that you can enter the timing also when to start and end  at planned order as well production order .
Try and revert back
Regards
JH

Similar Messages

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Planned order start date & finish date

    Dear All ,
    I am running MRP for finished material ,
    But i am getting Planned order start date & finish date are coming same (todays date ). But when i am converting the order then proper scheduled dates are coming .
    Why for the Planned order the scheduled dates are not coming ?
    Regards

    Hi Venky,
    Pls try to understand how MRP works
    After MRP planned orders are created for the requirement(in house)
    In the planned order stage -basic dates are deteremined
    For the determintaion of basic dates system check the in house production time/replenishment lead time maintained in the material master
    For your requirement you maintain lot size dependent in house production data in the work scheduling view & check
    You have to key in data in set up time,processing time ,base qty etc
    Hope it is clear
    Rgds,
    SVP

  • Scheduled planned orders

    Hi,
    My MRP run gives me 10 planned orders for a material because of lot size. But all these orders are coming on the same day. Can I get these orders on different dates based on the capacity available?
    I have about 1000 finished materials. Can MRP run give scheduled planned orders for these materials i.e starting on different dates? I do not have any floats.
    Thanks and regards,
    Raghu

    Hi Raghu,
    I think you should use Lead Time Scheduling - Backward scheduling to plan those finished product. Use Capacity Planning functionlity so that Lead time scheduling would create capacity requirements.
    Once these are in place, convert those planned orders into production orders Now, these orders would be made on different dates as according to capacity situation.
    So, please check and revert..
    Regards,
    Thomas

  • Scheduled Planned Order

    Dear gurus,
    Any one can explain what is meant by Scheduled Planned Orders and not scheduled planned orders.
    I observe this in T.Code MF51.
    Srini

    Hi,
    Here is the extract from the help.sap.com.
    ==========================================================================
    Select Only firmed orders if you only want the system to display firmed planned orders and production orders in the list.
    Select Only assigned orders if you only want the system to display planned orders and production orders that have been assigned to a production line.
    Select Only dispatched orders if you only want the system to display planned orders and production orders that have been dispatched in the capacity planning table.
    Select Only scheduled orders if you want the system to display planned orders and production orders that have been scheduled.
    ==========================================================================
    Refer below link for further details.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5a7c24adc11d189740000e8322d00/content.htm
    Hope this helps..
    Regards,
    Siva

  • BAPI for Scheduling Planned Order

    Hi,
    Please tell me if there are any BAPIs for Scheduling a Pllaned Order and for Deleting a Planned Oredr.
    Thankes & Regards,
    Rahul

    BAPI_PLANNEDORDER_CHANGE       Change planned order
    BAPI_PLANNEDORDER_CREATE       Create planned order
    BAPI_PLANNEDORDER_DELETE       Delete planned order
    BAPI_PLANNEDORDER_EXIST_CHECK  Planned order existence check
    BAPI_PLANNEDORDER_GET_DETAIL   Get details for planned order
    BAPI_PLANNEDORDER_GET_DET_LIST Get detailed planned order list
    All bapi's related to planned order processing
    BR
    Manthan.

  • Purchase Requisition & Planned Order link to sales order

    Dear Gurus,
    please help me to find the link between
    - sales order item
    and
    - ( purchase requisition & Planned orders for semi-finished )
    that created from running the MRP.
    dispite we can see all these data in one screen
    in TCode (MD4C) or (MD09)
    thnak you .
    Edited by: Alvaro Tejada Galindo on Feb 5, 2008 10:50 AM

    Hi,
    For third party order, either you can create the material master with item category group as BANS, so the system will automatically pick TAS in the sales order for the material or you can change the item category manually to TAS in the order.
    This will trigger a PR, based on the PR a PO will be generated.
    Defining Item Category Group
    IMG ® Sales and Distribution ® Sales ® Sales Documents ® Sales Document Item ® Define Item category groups
    Defining Item CategorySales and Distribution ® Sales ® Sales Documents ® Sales Document Item ® Define Item Categories
    Item category TAS
    Description 3rd party with SN CM
    Item type Blank
    Completion rule Blank
    Special stock Blank
    Relevant for billing B
    Billing plan type Blank
    Billing block Blank
    Pricing X
    Statistical value Blank
    Revenue recognition Blank
    Delimit. start date Blank
    Business data item X
    Sched. line allowed X
    Item relev. for delivery Blank
    Returns Blank
    Weight/Vol.- relevant X
    Credit active X
    Determine cost X
    Aut. batch determ. Blank
    Rounding permitted Blank
    Order qty = 1 Blank
    Incomplete proced. 28
    PartnerDetermProced T
    TextDetermProcedure 01
    Item cat. status group 1
    Screen seq. group N
    Status profile Blank
    Create PO autom. Blank
    Config. strategy Blank
    Mat. variant action Blank
    ATP material variant Blank
    Structure scope Blank
    Application Blank
    Value contract material Blank
    Contract release ctrl Blank
    Repair procedure Blank
    Billing form Blank
    DIP profile Blank
    Assigning Item Category
    IMG  Sales and Distribution  Sales  Sales Documents  Sales Document Item  Assign Item categories
    Creating Material
    MM01
    1. On the screen Create Material (Initial Screen) enter the material number if External.
    2. Choose Select View(s). (Basic View 1&2, Sales Views, Purchasing views and accounting views).
    3. Enter the relevant data and save the material. Use material group BANS in the item material group field.
    Creating SD Pricing Conditions for material
    VK11
    Creating Vendor Master
    XK01
    Regards

  • Why the basic finish date is not adjusted in planned orders

    Hi, all.
    Can anybody help me to understand:
    "Why the basic finish date is not adjusted in planned orders during
    forward scheduling, but in production order basic finish date is adjusted?
    It is look like non-coordination between groups of developers.
    And lead to situation, when planner don't see in MD04 when he can really wait material receipt. He must go to planed order and check production data there, it's unusable."
    Am I right, or SAP have it's own logic.

    Hi,
    Production orders are different story. Since production order is a constant element, they are not created in the course of MRP, basic dates can be adjusted. In production order basic finish date is adjusted, but you won't see for the upper level materials', basic dates of the planned orders adjusted according to the prodcution order you create. Production order is consistent within itself in terms of date and is not dependent to other elements of MRP, but planned orders are not like that.
    MRP creates planned orders whose basic finish dates are calculated by subtracting goods receipt time from production start date of the source of requirement. MRP works backwards without changing directions. Meanwhile if any production finish date is calculated different than the basic finish date due to forward scheduling, in order not to violate the alignment between the basic finish date and source of requirement's start date, basic finish date is not adjusted. If it was, dates of all the planned orders calculated so far at the upper levels of the BOMs had to be recalculated, otherwise all the consistency of all the dates is violated. This cannot be done because changes in any level affects all lower levels.

  • Planned order scheduling mass update

    Hello all,
    Is there a way I can change the scheduling dates for the planned orders collectively. (not MD16) ?
    Thankyou

    Hi,
    check the following
    Mass Changes of Planned Orders (Action Control)
    Use
    You can use this function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    In connection with an action, you can always change planned order data, for example; order quantity, dates or production version.
    The function module also enables you to program further customer-specific actions.
    You can execute the actions for several planned orders simultaneously.
    You can create action chains, that means, have the system execute several actions in a single operation.
    Activities
    Define your own actions and program a report that includes these actions. As an example of this, the transaction MDAC Execute action for planned order (MRP ® Planned order ® Execute action) is available.
    In this example action, you can use actions only for individual planned orders. Nor can you form action chains, only simple action transitions are possible.
    Determine an action key and action controls in Customizing for MRP in the IMG activities Define action key and Define action control. An action key describes the actions that can be executed for a planned order. Action controls determine which actions are allowed and in which sequence they are to be executed.
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Regards,
    nandha

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Posting of semi finished products

    Hello Everyone,
    I had an issue regarding posting of semi finished products. Earlier during production, Production executives had created some production orders for semi finished products and had not transferred the corresponding quantities to the store. Still production continued for the top level finished products and GR has occured for the same. Later these production orders for finished products were also set the status TECO.
    Now upon analysing the system still shows the production orders open for the semi-finished products. Now its practically  impossible to trace back against which superior level order this semi finished order is raised.
    Moreover since these orders are still open, the system does'nt raise additional orders for the corresponding quantities wheras these orders were raised earlier for previous orders.
    I would greatly appreciate any help to tackle this issue.
    Sincerely,
    Aji Kurian Mani
    Edited by: Aji Kurian Mani on Jan 11, 2010 6:48 AM

    Hi,
    Pls run the optimiser with prod = A and Loc = A+B
    It should work fine. Also in the t code /sapapo/mvm, check if the check box for 'No planned orders without source of supply' is clicked or not. If it is clicked, then you need to maintain a PPM for prod A at loc B. If it is unchecked, optimiser will create planned orders for A at loc B even without a PPM.
    Pls let me know if this helps.
    Regards
    Manotosh

  • Mass creation of planned order

    Hello,
    is there a way to mass creat a planned order for a finished product? having same FG mat, plant and prod version.
    Thanks

    Dear
    1.Goto MD61 with User parameters like Plant , Requirement type , Version and Planning Date .Then Select the Material Radio Buttion with FG item code .
    2.Enter the FG qty as required in each month as demand
    3.GotO MD02-Single Item ,Multi Level with indicator : NETCH , 2,1,3,3,2   and Execute the MRP to create the Planned order  for FG
    4.Check the result in MD04
    There is no SAP Standard Traction to Mass creation of  Planned Order .That is possible in Demand Creation and MRP run .
    Regards
    JH

  • Exception message during planned order creation

    I am coming across a situation wherein am creating a planned order for Semi-fininsh good, but the problem is that am getting an exception msg "15" against the planned order created whihc states that "Reschedule out". Can somebody tell me the significance of this message, when am reviewing the overview tree for that order am not  seeing any message for the downlevel components. Expecting a positive response.
    Regards,
    J K Tharwani

    Hi Jitendra
    Logic behin EM 15
    It means to postpone the operation i.e. reschedule out the process if the receipts lies before my requirement.
    Rescheduling horizon is also linked to it. Check in OPPQ
    It defines the period for bringing the reciepts inwards i.e. prepone the receipts which are required to be considered for rescheduling.
    If your receipts come before your requirements system will give this EM 15.
    Opposite to above is EM 10 i.e. if receipts lie after your requirements
    Go the dates of your planned orders and compare it with your receipt date. U will get idea
    Rgds
    Edited by: Vicky Khabrani on Mar 5, 2008 7:38 AM

  • Transfering Semi finished products

    Hello Everyone,
    I had an issue regarding transferring of semi finished products to stores. Earlier during production, Production executives had created some production orders for HALB and had not transferred the corresponding quantities to the store. Still production continued for the top level finished products and GR has occured for the same. Later these production orders were also set the status TECO.
    Now upon analysing the system still shows the production orders for open for the semi-finished products. Now its impossible to trace back against which superior level order this semi finished order is raised.
    Moreover since these orders are still open, the system does'nt raise additional orders for the corresponding quantities wheras these orders were raised earlier for previous orders.
    I would greatly appreciate any help to tackle this issue.
    Sincerely,
    Aji Kurian Mani

    Hi,
    A suggestion:
    Since you mention the children were not issued to the parent orders, but yet the parent orders were completed & TECO'd in the system, run COOIS report by selecting Components as the list option & entering the components for component & tick the checkbox reduced reading for which you're facing this issue.
    Now using filters, exclude components which are deleted & issued completely. This should give you a finite list of orders for which these components havent been issued. Now you will know to which orders these components need to be issued. Having said that, before proceeding to post these components to the SFO's check with your finance personnel as many of these SFO's could have already been settled.
    Regards,
    Vivek

  • Mass T-code Of Planned  Order Deletion

    Dear All
    Is there any mass T-code  For Deletion of bulk planned order. An PIR.
    Rgds
    Pankaj Agarwal

    Hi,
    You can use function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    <b>Delete planned order</b>
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    This is in the foll link...
    http://help.sap.com/saphelp_470/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    Use T.code md75 to delete PIR.
    Regards,
    Senthilkumar SD

Maybe you are looking for

  • Sum Aggregation Error in Physical & BMM Layer in OBIEE 11g with Essbase 11

    Hi everyone, I'm using OBIEE 11g with Essbase 11 as the data source. I'm using Sample Basic database from the Essbase as my data source. If I'm using the hierarchy for the measures (so I don't flatten the measures), and when I changed the aggregation

  • Need to turn off iMessage, but my iPhone is broken

    Need to turn off iMessage, but my iPhone is broken. No way at all to turn the phone on at all, it fell in a pool, i switched to a droid but when people with an iphone text me, it uses imessage. I cant recieve imessage on a droid. so how do i turn it

  • I am unable to copy files from my macbook pro to my external hard disk.

    I am unable to copy files from my macbook pro to my external hard disk. I tried to copy a movie 800mb in size to my EDD and  it shows the loading box and it says zero kb loaded out of 800mb and sometimes it loads a a few kb of the file, then after a

  • Htaccess, cannot get to work on mac os x lion server

    I've enabled mod_rewrite.so in httpd.conf I've updated the apache2/httpd.conf to... Code: DocumentRoot "/Library/WebServer/Documents" <Directory />    Options Indexes MultiViews FollowSymLinks    AllowOverride All    Order deny, allow    Deny from al

  • Can you hide the "unique tracking number" in the email subject line?

    I noticed that if I use the "New Activity -> Email" function from the CRM toolbar in Outlook, it appends the subject line with a CRM:XXXXXXX unique tracking number.  I'm not sure that my customers would react very well to knowing that I am tracking t