Scheduling plant maintenance

Hi
I need for information about how to create or scheduling plant maintenance.
Schedule preventive, predictive & corrective how can maintain in PM module.
Ram Rathode

Hi,
In preventive maintenance scenario following are the things :-
1) Creation of task list (for Equipment or Functional Location or General).
2) Creation of maintenance plan (for Equipment or Functional Location or General).
3) Attaching maintenance task list to the maintenance plan created.
4) Scheduling of the maintenance plan for creation of maintenance orders (Call Objects).
5) Maintenance/Breakdown order proceeding ( notification,planning,scheduling,execution,completion)
There are following types of maintenance :
1) Single cycle maintenance planning.
2) Strategy plan ( Time based & Performance based )
3) Condition based maintenance planning.
4) Project based maintenance planning etc.
Regards,
TRB

Similar Messages

  • Scheduling and external scheduling in plant maintenance

    hi expert ,
    can you explain the scheduling in plant maintenance step by step beside external scheduling and how to made the external scheduling in IDS system also i read the sap help links about external scheduling and add the external scheduling in the order type pm01 and add the:
    Function Module PM_ORDER_EXTERN_SCHED_DIALOG in Configure Communication in the (D: For scheduling in dialog with external scheduling) should be dialog box Scheduling agreement appears after the order has been scheduled and this is not appear and information message (Link to the scheduling system could not be built) is appear.
    is any configuration missing.
    thanks sadin

    Hi,
    I understand you want to practice in IDES.  But to work with external scheduling you need a third party system that performs the scheduling. The idea of this type of scheduling is that the SAP ERP system interfaces with this other system (for example Click Software). It is this interfaced system that calculates the scheduling dates and passes them back to SAP.
    Without such a third party system you cannot perform external scheduling. You error does indicate that it cannot communicate with such a system:
           (Link to the scheduling system could not be built)
    -Paul

  • Plant Maintenance Schedule Calls not creating Maintenance Order

    Hi,
    I have created a maintenance plan that is schduled on a weekly basis. This worked fine initially but now calls are not being generated and therefore no orders are also being generated. The process I used is:
    1. Create Equipment
    2. Create Task List
    3. Create Maintenance Item
    4. Create Maintenance Plan
    5. Schedule Maintenance Plan
    Can you help?
    Also can you tell me which program you use to create orders for an entire maintenance planning plant, I know IP10 can be used for maintenance plans? For example you schedule your maintenance plans but I assume a periodic job must run to actually create the orders

    Hi Gary,
    I had an issue with calls not being generated and was browsing similar issues when I came across yours. I note that you also asked how you could create orders for a whole maintenance planning plant.
    This can be done by using the sort field on a maintenance plan. You need to define sort fields (config) for the maintenance plans for each of the plants required and then insert them on each plan. You can then use the sort field as a selection when scheduling.
    Hope this helps.
    John

  • Pur Req via Plant maintenance order

    Hi,
    When Non stock item is assigned to a Plant Maintenance order, A purchase requisition is created automatically for that item.
    During the creation of purchase requision it is required to enter goods recipient and unloading point( few fields are made mandatory)
    Issue: At this stage we are giving planne delivery time and GR processing time.
    But when we check the Purchase req for that item, Only GR processing time is considered not Planned delivery time.
    Please provide your suggestion, why planned delivery time is not considered for scheduling of purchase req.
    Thanks and regards,
    Nataraj

    Hi!,
    I think you should check the operation control key you are using. Whether that key allows 1. Externally processed opearation 2. allows the scheduling of externally processed operation. If both are true then it will take the standard values defined for that opearation for scheduling. if 2nd is not true then it will schedule as per planned delivery time.
    I think this will solve your problem.
    Regards,
    Uday

  • Plant Maintenance Reports & Report Writer/Painter

    Has anyone ever used Report Painter or Report Writer to produce SAP Plant Maintenance Reports?    If so, what was your experience in using this tool and how difficult is it to produce reports?
    The report that needs to be generated is for overdue PM orders (PM09) ....these are scheduled preventive maintenance orders.
    We need to be able to determine if they are completed and if they are on time. This report needs to have the flexibility to choose the following
    Functional Locations
    Equipment
    Plant sections
    Main Work Center
    Basic finish date / Planned Date / Overdue date  (to be determined)
    Maintenance Plan
    Maintenance Activity Type
    Group
    We need to be able to run a chart from this data to show how many PM's are behind, how many were completed on time compared to the requirements, and any other chart that would be available (i.e. pie, line, bar etc.).
    Thanks
    Ruthie

    Hi,
    the fields that you want in  ur report must be available in ur operating concern data structure,,,
    pls check if the characteristics and the value fields that you require is available in the data structure,,,
    check KEA0 transaction..
    Reward points if useful

  • Plant maintenance dout

    hi
    Iam new to plant maintenance i know only the basics
    that is
    1)create equipment
    2)create functional location
    3)assignment of equip to functional location
    4)create bom for euipment spares
    5)create maintenance stratergy (time based)
    6)create tak list in that main opration & sub operationcre
    7)create maintenance item (assign equipmnt to task list)
    8)create maintenance plan (assignment maintenance item to task list & scheduling data)
    9)scheduling plan
    10)deaadline monitoring ip30 through which we get notification & order
    11)confirm order
    12)settle order
    Up to this is fine even i know basic flow of break down notification here
    i want to know
    1)what is measuring document (measuring tab in equipment)
    2)what is the serial number
    3)warranty in equipment how to map where in master data
    4)insurance cost of equipment
    too much pls guide me
    0
    0
    5

    hi Navin,
    I will explain u measurement document.
    there are there steps
    1. cerate, change ,display characteristics (trxn ct04 )
    2. create ,change display measuring point ik01,ik02.ik03.
    3. create,change ,display measurement document  ik11, ik12, ik13.
    in characterstics u define data type ,unit of measure , status and all other details.
    you can assign number of measuring point /counter in master data of equipment
    by selecting goto>measuring points/counter.
    Or directly through traxn ik01 by specifing equipment number.
    if it is measuring counter do not forget to tick checkbox "measuring pt is counter"
    in mesurement document u will enter actual reading taken.
    e.g. for hydraulic pressure of an pump
    characteristics is pressure
    measuring point is hyd pump
    and in measurement document u will enter pressure reading in time to time.
    Regards,
    prasad

  • Plant Maintenance - Doubts in Task List Creation

    Hai,
    This is the first time that I am doing some configuration regaring Plant Maintenance Module.
    Scenario:
    There is an equipment which has a Plan for maintenance. Support there are 8 maintenance activities which have to be carried for that equipment in an year. Each of this activity will be carried out in different periods. Some of them will have to be done once in a year. Some may be done once in 6 months.
    But all the acitivities will not be carried out at the same time.
    Can anyone tell me how this can done?. Should we create separate Task Lists for all the 8 activities and subseqently create a Maintenance Plan for each of them or Create one single Task List which has all the 8 activities by giving Operation nos. In th second case how to create Maintenance Plan for each of the individual Line item in a Task List and how can it be linked.
    In the first case can a single Task list be incremented by a Group Counter which can have the individual operation so that a Maintenance Plan can be created for individual Task List incremented by a Group Counter.
    In both the cases can someone give me the procedure.
    Please throw some light on this subject.
    Regards,
    R. Vijayakumar

    Dear Vijaykumar,
    Jus follow the below steps..
    Step-1 
    T-code IP11, Create maintenance Startegy with all required frequencies like 1, 2 3 4 u2026 12 months
    Step-2
    In T-Code IA01, On general header view  screen .Enter the datas like Work center, usage, status. Select ur required Maintenance Strategy which u already created.
    GO to  operation tab , enter ur list of operations one by one (all 8 operations).
    Select all operations and click Mntpack icon on bottom of screen , On package overview screen u can able to select different operation at different frequencies jus tick box and save
    Step-3
    In T-Code IP42, select the maint strategy which u have assigned already and fill required details and select Task list which u have created in previous step (link is available in bottom screen) & Save.
    Step-4
    In T-Code IP10, schedule the  Maintenance Plan
    Now you will get the Maintenance orders automaticaly  based on package u defined and schedule date.
    Revert back me in case if u have any doubt on this cycle. Else close this thread.
    Regards,
    Gunak

  • Calibration results in Plant Maintenance

    Hi Guru's
    We want to record results in Plant Maintenance thru T-code QA32 for printing of calibration certificates. Please proivde process for the same.
    Regards
    Param

    Hi
    I will try to explain you in simple ways...
    Create Equipment using IE01 Tcode.
    Create a Task list using IA01 or IA05,maintain the Characteristics which you want to check
    create a Maint plan using IP01
    Now schedule equipment through IP10
    This will create a Inspection lot of 14 Type.
    Now carry out Result Recording for each char' through QA32
    Click on Inspection results printout.You will get the results recorded
    You can also use QGp1 or QGP2  etc for the same.
    Re: CALIBRATION
    printing of calibration certificates is not standard fumctionality in SAp.You have to customize the program for the same.
    Calibration
    Regards
    Sujit

  • Plant Maintenance Feature / Module

    Does Apps have any module on Plant Maintenance covering or does Apps cover Plant maintenance including:
    a. breakdown reporting with reason and categorisation into recurring & nonrecurring
    b. preventive maintenance schedule
    Please revert back ASAP.
    Thanx
    Ganesh

    Dear All,
    Can anyone share some links or materials regarding the PM module.
    I have checked the help.sap reference. but since I dont have experience & practical knowledge regarding this module I am finding a bit difficult to follow. So please advice how to start with ?
    Materials with the basics structure & Process flow in PM  Or if someone can explain the PM process flow like the PR-LIV flow in MM it will be really very helpful.
    Also if you can provide details regarding the SDN forum i.e related to PM module where I can find PM materials & threads it will be highly appreciable.
    Expecting your valuable replys.
    Regards,

  • CATS for plant maintenance

    Hi Guys,
    I need your advice:-
    We are on ECC 6 environment, the time system is running on 3rd party and payroll is on r/3, now the management decided to Implement CATS for plant maintenance (Activity based cost). So let me know is there is a feasibility to do so. If so, Please advice, your help will be greatly appreciated.
    Thanks,
    Babu

    What type of time evaluation do you do ? PM
    CATS are very much feasible with PS and activity types and you can transfer costs against activities, orders, networking elements and WBS elements. --Understandable
    You said Time is captured by third party, which sub system is this? Legacy
    CATS doesn't have any relation with 3rd party, ---Understandable. My? Can we make two process same time. Legacy and CATS ( My concern is about IT007 and Work schedule)
    CATS users are different from swipe card users: Understandable
    it depends on your design and requirement to comment on the feasibility at your end.
    but on a general scale , CATS is feasible in transferring activity based cost and post it into FI and CO: Understandable
    Requirement: 
    Need to implement CATS, to get work order, Time, and Employee name etc.
    My question is where in SAP I can store the data enter through CATS, If I use IT0007, I may redundant the data at HR side which is using 3rd party data to run payroll, or using 2001, 2002 and 2005.
    So,  How can I use CATS Independently. Please advice. Thanks

  • AMC in plant maintenance

    Hi Friends
    I want to map AMC (Anual maintenance contract ) in plant maintenance . During AMC I want to avail the services at every month. And every month i will pay to service provider against service sheet / invoice
    Regards
    Shashikant

    Dear salunke
    Please Follow the below steps ...
    1     Create a Maintenance Order with service required for Maintenance     IW31
    2     Enter the services in MO     IW31
    3     Release PR     ME54n
    4     Create the PO against the PR     ME21N
    5     Create a Maintenance Plan (With plan Category Service Procurement)     IP01
         Mention the PO no in Maintenance Plan     IP01          
    6     Mention the cycle when services are required     IP01(1 Month)
    7     Give the proper call horizon     IP01
    8     Schedule the Plan with proper start cycle     IP10
    9     Check the service entry sheet in Scheduling Overview     IP24
    10     Check the MO for Actual & Plan cost     IW32
    11     TECO the MO      IW32
    12     Settle the MO order     KO88
    Regards !
    Ajaysingh

  • Doubts in plant maintenance

    what are the business process in plant maintenance.
    what are oraganisational level inside sap-pm.

    From a broad stroke, the business processes in plant maintenance are as follows:
    Maintenance Processing - This includes corrective and breakdown maintenance
    Preventive Maintenance -  This is where you set up the system to generate a maintenance order, notification or service entry sheet at a set schedule so that regular routine maintenance may be performed.
    The organizations levels in plant maintenance are as follows:
    <b>Maintenance Planning Plants</b>: This is where the maintenance work is planned my the maintenance planners for the work centers in the maintenance plants.
    <b>Maintenance Plants</b>: Where maintenance work is performed in/out of... These are tied in IMG Configuration to the Maintenance Plants. A maintenance plant can have only one planning plant assigned to it but a planning plant can be assigned to more than one Maintenance Plant.
    <b>Maintenance Planner group</b>:  Also assigned to the planning plants in configuration. These are the people who plan the work... also called maintenance managers, supervisors, foremen, etc. in the various industries.
    <b>Maintenance Work Center</b>: These are the people that actually perform the maintenance work. This is master data and they are created in relationship to a maintenance plant.
    I hope this helps clarify some doubt.
    Regards,
    Joe

  • SAp Plant MAintenance certification test questions

    Hi all,
    I am due to take Plant MAintenance certification  this march.It would be greatful if I can get some sample question before I appear for this exam.

    The examination questions are based on the functionality and features of the SAP PM.  The possible topics covers are:
    1. Organizational Units and Master Data in Plant Maintenance
    Organizational Units
          - Maintenance Plant and Planning Plant
          - Work Centers
          - Storage Locations  Functional Locations
          - Structure Indicator
          - Reference Location and Functional Location
          - Creation Options
          - Data Transfer  Equipment
          - Installation/Dismantling at Functional Locations
          - Equipment Hierarchy
          - Change Documentation
          - Equipment Category  Material and Serial Numbers
          - Serial Number Profile
          - Goods Movement and Warehouse Stock
          - Valuation Batches  Bills of Material (BOM)
          - Assemblies
          - BOM Categories
          - Item Categories
          - Change Documentation  Additional Functions
          - Configuration
          - Classification
          - Measuring Points and Counters
          - Partners and Addresses
          - Document Link
          - Status Management
          - Permits and Warranties
          - Data Transfer
    2. Maintenance Processing
    Breakdown Maintenance
    Preventive Maintenance Processing
          - Notification Types
          - Objects and Object Information
          - Catalogs and Catalog Profiles
          - List Viewer for Notifications and Orders
          - Order Type
          - Object List
          - Operation List
          - Relationships
          - Material List
          - Availability Check
          - Order Release and Printing
          - Material Withdrawal
          - Completion Confirmation in Time
          - Technical Completion Confirmation
          - Technical Completion
          - Action Log and Document Flow  Processing External Services
          - External Services as Individual Purchase Order
          - External Services with External Work Centers
          - External Services with Service Entry Sheets  Processing Refurbishment Tasks
          - Valuation Type and Valuation Category in the Material Master
          - Refurbishment Without Serial Numbers
          - Refurbishment with Serial Numbers
          - Inventory Management and Controlling  Processing Maintenance Projects
          - Planning and Executing Maintenance Projects
          - Completion, Settlement, and Monitoring of Maintenance Projects  CATS - Cross-Application Time Sheets
          - Data Entry Profile
          - Data Entry Sheet
          - Data Transfer  Capacity Planning
          - Scheduling
          - Work Center and Available Capacity
          - Capacity Leveling
          - Employee Assignment
    3. Controlling Functions in Plant Maintenance
    Plant Maintenance in the Organizational Structures of Accounting
          - Budget Planning and Monitoring
          - Cost Estimation
          - Planned/Actual Cost Determination
          - Order Settlement
          - Logistics Information System (LIS)
          - Plant Maintenance Information System (PMIS)
          - Enhancement Options
    4. Preventive Maintenance
    Task List Management
          - Task List Types
          - Profile and User Fields
          - Component Assignment
          - Task List and Order  Single Cycle Plan
          - Structure
          - Scheduling Indicator
          - Deadline Monitoring  Strategy Plan
          - Maintenance Strategy
          - Task List and Maintenance Strategy  Performance-Based Maintenance Planning
          - Counters and Measurement Documents
          - Maintenance Plan Scheduling  Maintenance Planning with Several Counters
          - Cycle Sets
          - Link Type 
    (Referece: SAP-IMG.COM)

  • Creating Z report for material stock (plant maintenance module)

    hello,
    we are implemented Plant maintenance module (SAP PM)  in our organization.
    our requirement is to create a stock report which will incldue
    followings:-
    1)material number
    2)plant number
    3) storage location
    4) material type
    5)valuation type
    6)Opening Stock 
    7) OpValue 
    8)Received Stock  
    9)   ReceiptValue      
    10)   Issue Stock          
    11)  IssueValue        
    12)  Closing Stock      
    13)  Closing Value
    we want above details in ALV grid format.
    to gert all the details for perticular material, we calcute closing stock and closing value in following manner:-
    opening stock + received  stock - issue stock = closing stock
    opening value + recipt value - issue value = closing value
    we are unable to find table name for  accessing  opening stock,  received  stock , issue stock  & opening value ,recipt value , issue value from system. please suggest table name information for getting above details  for creating Z report

    Dear friend,
    Before to make a decision to bulid a custom report make sure you have checked out the following standard transactions:
    MB5T Stock in Transit
    MMBE Stock Overview
    MD04 Stock/Reqs list
    MB53 Plant Stock Availability
    MB52 Warehouse Stock
    MB5M Expiration Date list
    MB5B Stock for Posting Date
    MB5T Stock in Transit
    MBBS Valuated Special Stock
    MBLB Stock with Subcontractor
    The possible tables are:
    MARA, MARD, MARC, VBEP, VBAK(VBAP), EKKO(EKPO), EKBE, EBAN, EBEW, MSEG, MKPF,...
    Good luck!

  • Unable to create a order in plant maintenance

    Hi,
    I  have deployed BUSINESSPACKAGEs of ERP5 for  PLANT MAINTENANCE,  after deploying i have assigned the roles and configured sso when i go to role maintenance execution and click on create order i can open the screen. but when click on notification and click on create order i could not able to create the order
    The error throughing is iview "maintenance_order" not available.
    Could you please tell for the above iview which BUSINESS PACKAGE is used.
    Regards,
    jagadish

    You need to have Business Package for Common Parts to create manitanance orders, please check these links:
    http://help.sap.com/saphelp_erp2005/helpdata/en/3e/5dd2416d9c1c7be10000000a1550b0/content.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/fe/5bd2416d9c1c7be10000000a1550b0/content.htm
    Thank you,
    Shyam

Maybe you are looking for

  • Urgent- production order error- ERTR status

    Dear PP Gurus i have an urgent production issue, we have full fledged WM implemented and production order components are issued automatically when order is released via a Pick list  Now the problem is that the BOM components are NOt correctly staged

  • HT204053 Why can't I sign into icloud on my ipad?

    Why is icloud, Messages, FaceTime, Twitter, Facebook, Flickr and Vimeo grayed out in Settings on my ipad?  Currently using version 7.0.2

  • ALV grid on TABSTRIP- Subscreen

    Hi, How to display ALV grid screen on Tabstrip- Subscreen. Please send sample code. Thanks in advance. -Mohan

  • Having trouble disabling PHD (mobile accounts)

    Hi, I'm using SL server and clients, with a 'magic triangle' configuration. I created a group in Worhgroup Manager with some mobility preferences assigned (create mobile account, sync home folder on login, log-off and background) I wanted to turn thi

  • Approval templates don't fire when updating document

    I'm running trials in my test database and it appears that approval templates only work on new added documents?  SAP Business One version 8.82  I am testing a query that calculates certain criteria against the business partner's credit limit.  If the