Scheduling profile

Hi...
        Can any body tell me what is the important of "Producton scheduling profile"
"Production schedular" in SAP PP.
Thanks in advance!
Nilesh

SAP help
production scheduling profile
In this step you can create production scheduling profiles for specific plants.
In a production scheduling profile, you can
specify that in a production order or process order particular business transactions are carried out in parallel
order release on order creation
generation of document link from material master on order creation
generation of document link from BOM on order creation
printing on order release
scheduling on order release
generation of document link from material master on order release
generation of document link from BOM on order release
specify that only partial quantities are to be confirmed in an availability check
specify that automatic goods receipt should take place
enter an overall profile for capacity leveling
specify how the capacity requirements of operations should go into the basic load
specify when finite scheduling is carried out in the capacity availability check
specify that for the confirmation
no deficit quantities are updated
no surplus quantities are updated
neither deficit nor surplus quantities are updated
an adjustment of the operation and component quantities to the actual values takes place
make various specifications in the area of batch management:
automatic batch creation on order creation
branch to batch classification on changing a batch
extended batch classification via Customer Function Call
specify that only transport requirements are created if transport requirements can be generated for all components in the operation
specify that when transport requirements are generated either the committed quantity or the required quantity are taken into account
specify that the creation of transport requirements takes place automatically
specify which order type is proposed depending on the business process (make-to-stock, make-to-order, engineer-to-order, order without material)
You can assign a production scheduling profile to a
material (work scheduling screen in material master)
production scheduler (Customizing)
The assignment to the material has a higher priority.
The production scheduling profile is copied to the production order or process order on order creation.
Activities
1. Create the necessary production scheduling profiles.
2. Assign the profiles to the appropriate materials or production schedulers.
Production Scheduler
Define production scheduler
In this step, you define the production schedulers for your plants. In addition to this, you can assign a control profile to each production scheduler.
By assigning production schedulers to materials within the application, you can define responsibilities for a materials within production activity control.
Actions
1. Create your production schedulers.
2. If necessary, assign profiles to your production schedulers.

Similar Messages

  • Prodcution Scheduling Profile for without material process order

    Hello Gurus,
    I am creating process order without material and assigning Production Scheduling Profile in assignment tab. Production Scheduling Profile  has release on creation activated in configure, but when I save process order its not released, it remains as CRTD.
    When I am creating process order with material as you know Production Scheduling Profile is copied from material master and when I save process order, its automatically released.
    I am assigning same Production Scheduling Profile which I am using for second case listed above.
    Any ideas?
    Thanks
    Bhavesh Patel

    Dear Patel,
    I Already told, once , you are in order  screen, system status will set as CRTD, after that if U assigned, the PSP, It won't work,  In case of COR1, material have PSP, If you convert planned order to production, release is triggered in background before the status is created.
    If you have still doubt
    Create a order in COR1, When you enter the quantity and start date finish date then release is carried out and the status is set as CRTD
    in CORO
    It is not possible to  maintain PSP before entering the qty and Dates
    Once U entered the dates, Sytem set the status as created, After you assigna PSP, It won't work
    Regards,
    Sundaresan
    Edited by: Sundaresan . E. V on Sep 14, 2010 7:01 PM

  • Production scheduling profile for production order type 10 does not exist – SAP Message No.10085

    When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
    In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
    How to check whether production scheduling profile is maintained for relevant order type 10.
    To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
    Also, pls explain about  “Order Type 10” and how it is linked with material and order execution.
    Looking for a detailed explanation with screen shots , since i am new to SAP.
    Thanks With Regards,
    Dinesh Kumar V.

    Hello Dinesh,
    Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
    Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
    Production order have Order category as 10  Process Order  40 in standard SAP you can check this in OPJH.
    Best Regards,
    R.Brahmankar

  • Printing setting in Production Scheduling Profile

    Hello Guys,
    In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
    I used this setting.
    But I could not print the production again.
    I want to re-print the production order.
    How do I enable re-printing the production order?
    Thanks
    George King

    Hi George,
    the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
    Did you get any error? Are you able to print when you push the print button manually?
    Settings in OPK8 are correct ?
    Regards,
    Sabine

  • Same material with diff. Production scheduler profiles

    Hi,
    I am working on PP-PI, where the same material is being manufactured using separate order types.
    To be  more specific, one order type for the  regular manufacturing & another  with Re-work order type. The  requirement is  such that the  Order type  dependent parameters & production scheduler profile are different in  both the cases. Since my master  has the prod. scheduler for  regular manufacturing on the material master, even if i select the  Re-work order type the system is considering the Settings of the  regular manufacturing order.
    I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
    master due to various  reasons. At the same  time system should consider the  settings for Re-work order only when the specific order type is  manually selected during order creation.
    Appropriate solution would be of great  help, thanks in advance

    Hi,
    Try using user exit. change the production scheduler profile during order save  based on  the order type.
    check with your technical team.
    hope this helps.
    regards
    CSN

  • Production scheduling profile

    Dear Experts,
    Can i have multiple scheduling profile ?
    Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
    Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
    I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
    Please help me to solve the issue.
    Amit

    Hi,
    I am unable to figure out from your query what you exactly need.
    But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
    If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
    However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
    So hope the above clarifies, if it does not, then please explain with an example, it would be better.
    Regards,
    Vivek

  • HOW TO CREATE PRODUCTION SCHEDULING PROFILE

    PLEASE
    TELL ME HOW TO CREATE PRODUCTION SCHEDULING PROFILE
    EXPLAIN IN STEPS
    THANKS

    Hi,
    Check the below link and the screen shot:
    http://wiki.sdn.sap.com/wiki/display/ERPLO/Production+Order+Type+Selection
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Auto GR with Control Key or Prod.Scheduling Profile

    Hi PP champs
    As we can use both i.e. Control key and Production scheduling profile for activating the Auhto GR for prodcution order confirmation ..Can some one help me which is the more <b>preferred</b> or  which is considered first by the system if we have both in <b>material master and routings respectively</b>.
    I have gone thru the documentation but couldn't get clearity as in both its mentioned as if its not activated in scheduling profile control key will take over and same thing for control key that if its not mentioned in control key system will check for production scheduling profile...
    BR
    Sumit

    Sumit,
    Generally Production scheduling profile is the prefered option, as most of the clients also prefer using to control certain auotmation at the time of order creation and release.
    To me i dont see a big difference between using control key or scheduling profile to define auto GR.
    As far as priority is concerned Control key is first checked by the system, if not available checks for scheduling profile.
    Regards,
    Prasobh

  • Production scheduler & profile configuration

    Dear SAPper,
    When i create production order, the production scheduler is automatically flled (ex.101) and then
    the production scheduler profiles is automaticalled filled too.
    I don;t maintain production scheduler & production scheduler profile in work scheduling in material master?
    where did system pic thatt value??
    Best regards,
    Freddy Ha

    Hi,
    For your order type,
    Please check if in OPL8 "Assignment" area - "substitute scheduler" field is defined.
    This scheduler is picked up as default if not defined in material master.
    If a PSP is attached to this defualt scheduler in OPJ9, then that will also be picked up in the order.
    Hope this helps.
    Regards,
    Ashok

  • Production Schedule Profile & shop floor paper printing.....

    Hi there ,
                   If we set the Execute Printing checkbox in the T-code <b>CORY</b>for a production scehedule profile....... then when we will release the order along with the other shop floor paper do the Transfer Order will also get printed if the material is warehouse managed.........
    Please enlighten me .....
    Thanks & Regards
    Kaushik

    Hi there ,
                   Thanks for your reply...... I am aware of the fact that the shop floor paper will be printed once the order is relased & the relevant config is done in the Production schedule Profile.........
    But in case of the material which are warehouse managed the Transfer requirement will be created & the further the Transfer Order........... I wan tto know that these will also Print the Transfer Order doucment for the warehouse managed material .......
    Thanks & Regards
    Kaushik

  • Production scheduling profile for production order type 10 does not exist

    Kindly suggest me how to resolve this error
    Production scheduling profile for production order type 10 does not exist

    Hi Archana,
    Go to material master-work scheduling view and check what is the production scheduling profile maintained for the same materisl -plant combination.
    then go to OPKP and check if production scheduliong profile is maintained for relevent order type 10 in custmizing. If not maintain one and it should resolve the error.

  • Difference mpr controller and production scheduling profile (exact)

    hi gurus
    wht is difference between mrp contoller and production scheduling profile. and which will come first at the time of planning.
    thanks in adavance
    avinash.pegarlawar

    Hi,
    MRP controller
    MRP Controller is the person responsible for a group of materials in MRP in a plant or company.
    Material that takes part in material requirements planning must be assigned to an MRP controller.
    Production scheduler
    Scheduler responsible for a material in production activity control.
    Example
    The production scheduler determines how capacity requirements are calculated for a material during a scheduling run.
    MRP Controller comes into Planning first which you need to assign in MRP-1 View in material master while production scheduler you need to assign iin Work Scheduling View in Material Master.
    Hope this helps clearing your doutb.
    Revert if still any query.
    Regards,
    Tejas

  • In production scheduling profile(opkp)

    hi,
    in opkp, material availability check --- confirm available partial quantity.
    can any one tell me how it'll work in production(co01), what's the use of it.where it'll effect.
    thanks/regards
    vish

    When you have set this indicator, if only a partial quantity can be committed for one component, then only partial quantities will be committed for all components during an availability check.
    That means least committed components percentage set for all rest components.
    So that out of remaining quantity of rest components other orders can move ahead.
    Ex: Order Qty: 100 PC
    Required Compo Qty         Available Qty   %Availability
    200                                     200                   100%           
    100                                       40                     40%
    50                                         20                     40%
    B & C have only 40% of components availability so that A also allocated with 40% i.e. (80 qty)
    You can use 120 qty of A for rest orders.
    Chintan

  • Error in scheduling parameters for production orders

    Hi Guys,
    Greeting for the day u2026u2026u2026.
    I am trying to create production orders creation for own order  type ex MM01, but I am getting error message as u201C scheduling parameters are not defined for the order type u201C even though I have maintained following parameters as below,
    Production scheduler      -
    xxxxx,
    Detailed scheduling -
    check box of scheduling ticked,
    Rough cut scheduling    --- scheduling id u201301, scheduling and generate capa requi,, boxes     ticked,
    Adjust scheduling  -- requi to operation  date,
    Scheduling control for detailed scheduling ---backwards and check box of auto scheduling ticked
    Operation segment ---setup,
    All operation in order will be reduce
    Do not reduce,
    Could any one light on this issue,
    Thanks in advance,
    Mohan

    Hi,
      This error will come if you have not maintained Define scheduling parameters for production orders.
    Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
    And in Define production scheduling profile - OPKP, link your order type in the page below.
    In material master work scheduling view, input production sch profile or prod scheduler.
    Regards,
    Dharma

  • Error in scheduling aggr for GIT

    Hello All,
    We have a requirement wherein we need to uncheck the IR and give net price as 0 for scheduling agreement.We are doing a dummy GR(for Goods in Transition).For this the user wants to unchekc the IR indicator and give net price as 0 but the system is giving error
    'No delivery costs allowed without invoice receipt'.This is more of CIN releated.please help me find a solution.
    Thanks,
    Rakesh.

    Hi,
      This error will come if you have not maintained Define scheduling parameters for production orders.
    Check this order type whether linked with respective plant in OPU3.*And give production scheduler * mark ie, all.*
    And in Define production scheduling profile - OPKP, link your order type in the page below.
    In material master work scheduling view, input production sch profile or prod scheduler.
    Regards,
    Dharma

Maybe you are looking for

  • N8 MFE google calendar multiple calendar sync

    Hi, I have 2 stk nokia n8. One for me and one for my wife. We are using google calendar to sync/share our schedule between us. I have set up MFE on both and it is syncing both my calendar and my contacts with no problem. In our gcal/gmail account I h

  • Internal hard drive stops working (OS 10.6)

    Hi all, I was working on my 2009 MacBook Pro (MacBook Pro, 2.53 GHz Intel Core 2 Duo) with a number of windows open (Chrome, Word, Mail, Preview), but nothing really heavy. All of a sudden all the pages in Chrome went blank, Word documents would only

  • InDesign CC 2014 crashes on startup, can I get CC back?

    Hi, I discovered on the last update of my CC that I also acquired the 2014 versions. I didn't realise that I was now running 2 versions of InDesign, Photoshop and Illustrator. My mac is old, (that last of the 17" ones), but up until this update and a

  • Can I use a USB3 device on a IMAC27 from medio2010

    can I use a USB3 device on a IMAC27 from medio2010

  • Watching downloaded movies on TV

    I've been experiencing a problem when watching downloaded movies from my iTouch on my tv. Everything downloads okay and I can see and hear the movie, but the movie is too big for the screen. Is there anyway to adjust the movie to fit the tv screen? I