Scheduling with route

Hi Every one
Help me out in Configuring Delivery scheduling, Transportation scheduling & Route determination. Hope I maintaind all the things but still i am unable to get. So i would like to check it out with ur suggestions.
Thanks & Regards

Hi Srinivasa rao
ROUTE DETERMINATION
Step: 1
Maintain Purchase Organization
Path: Spro—Enterprise Structure—Definition—Materials Management—Maintain Purchasing Organization.
Step: 2
Create Purchasing Group
Path: Spro—Materials Management—Purchasing—Create Purchasing Group.
Step: 3
Maintain Transportation Planning Point to Company Code.
Path: Spro—Enterprise Structure—Definition—Logistics Execution—Maintain Transportation Planning Point
Step: 3A
Assign Transportation planning point to company code.
Step: 4
Assign Purchasing Organization to Company Code.
Path: Spro—Enterprise Structure—Assignment—Materials management—Assign Purchasing Organization to Company Code.
Step: 5
Assign Purchasing Organization to Plant.
Path: Spro—Enterprise Structure—Assignment—Materials management-- Assign Purchasing Organization to Plant
Step: 6
Create Vendor Account Group
Path: Img—Financial Accounting—Accounts Receivables and Accounts Payables—Customer Accounts—Vendor Accounts—Master Data—Preparations for Creating Vendor Master Data--Define Account Group
Step: 8
Create Vendor
T-Code: XK01
Step: 9
Define Modes of Transport
Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Define Routes—Define Modes of Transport.
Step: 9A
Define Shipping Types
Path: Under the Same Menu path---Define Shipping Types
Select New Entries and Assign the Shipping Type (e.g. Road or Train) and Assign Mode of Transport (Mdtr) and Assign Shipping type Procedure group.
Step: 9B
Define Transportation Connection Point
Path: Under the Same Menu path--- Define Transportation Connection Point.
Step: 9C
Define Routes and Stages.
Path: Under the Same Menu path--- Define Routes and Stages.
Select the New Entries and Enter the Details
Then Select the Routes stages and define
Step: 9D
Maintain Stages for all Routes.
Path: Under the Same Menu path---Maintain Stages for all Routes.
Step: 10
ROUTE DETERMINATION
Define Transportation Zone
Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Route Determination—Define Transportation Zone.
Step: 10A
Maintain County and Transportation Zone for Shipping Point.
Path: Under the Same Menu path--- Maintain County and Transportation Zone for Shipping Point.
Select the Shipping point and enter the Country and Transportation Zone
Step: 10B
Define Transportation Groups.
Path: Under the Same Menu path---Define Transportation Groups
step: 10D
Maintain Route Determination
Path: Under the Same Menu path--Maintain Route Determination.
Select New Entries and Define the Route Determination.
SHIPMENTS
Path: Spro—Logistics Execution—Transportation—Basic Transportation Function—Shipments
Step: 11
Define Shipment Types
Path: Spro—Logistics Execution—Transportation—Basic Transportation Function—Shipments—Define Shipment Types.
Select the New Entries and define Shipment Type
Step: 12
Go to Customer master data.
In Address of General data. Enter the Transportation Zone id. and save
U will get the route.
If u want in detail with screen shot, provide ur mail id. i will send it to u.
ROUTE SHEDULING
1.Scheduling With Route Schedule For Shipping Point
Route schedules (previously referred to in the system as delivery phases in this step) describe the periodic delivery of goods from a shipping point to different ship-to parties and their unloading points.
Here you specify per shipping point whether this sort of periodicity is generally required.
Requirements
f you want to define route schedules, you must perform the following activities:
1. Define routes
2. Activate delivery scheduling
Standard settings
The control function without determination of route schedules is delivered with the system.
Further notes
Route schedules can be determined for deliveries, orders and stock transfer orders.
2.Scheduling With Route Schedule For Sales Document Type
Route schedules describe regular outgoing delivery of goods from a shipping point to different ship-to parties and their unloading points.
This is where you configure whether you want this to apply to a given sales document.
Requirements
If you want to define route schedules, you must complete the following activities:
1. Define routes
2. Activate shipping dates
Standard settings
Controlling without determination of route schedules.
Further notes
Route schedules can only be determined for deliveries.
3.Scheduling With Route Schedule For Delivery Type
Route schedules describe regular outgoing delivery of goods from a shipping point to different ship-to parties and their unloading points.
This is where you configure whether you want this to apply to a given delivery type.
Requirements
If you want to define route schedules, you must complete the following activities:
1. Define routes
2. Activate shipping dates
Standard settings
Controlling without determination of route schedules.
Further notes
Route schedules can only be determined for deliveries
Reward if it is useful to u.
Message was edited by:
        narendran vajravelu

Similar Messages

  • Scheduling with route schedule

    Hii frnds i have defined routess,,,,,,,worked on route determination  but now I would like information n Scheduling with route schedule ...if anyone has snapshots or information regarding the same plss forward it to
    [email protected]
    Regards
    Maddy

    Chk this thread, hope will be useful.
    https://forums.sdn.sap.com/click.jspa?searchID=4197732&messageID=3437969
    Regards
    AK
    Reward points if helpful

  • Calculation of goods issue date in scheduling agreements with routes

    Hello together,
    i have a problem with the calculation of goods issue date in scheduling agreements when we use route, because the system ignore the days of transit.
    Example:
    We had customized the route 4711 with a transit time of 3 days. This route would be related to a scheduling agreement. But this setting has no influence to the calculation of the goods issue date for the schedules. The same happens with loading date and so on.
    Can anyone give me a tip, which setting is additional necessary?
    Regards
    Andreas Walter

    Hi,
    check the following settings
    1, Route determination Path : IMG>sales and distribution>Basic function>Routes>Route determination
    2, Activate the route Determination for your sales document type in following path :IMG>sales and distribution>Basic function>Routes>Route Schedule Determination-->Schedule with route schedule for sales document type
    3, Maintain Delivery scheduling and transportation scheduling in the following path:IMG>sales and distribution>Basic function>Delivery scheduling and transportation scheduling>Maintain Duration
    Regards
    Senya

  • Scheduling in Routing..

    Hi all ,
    i am facing a problem scheduling in Routing  ,
    When i am doing scheduling in routing (CA02 ) as :
    Menu EXTRA  --> Scheduling
    here i am entering start Date : 30.09.2008 scheduling type Forward
    and lot size then the system is carrying the scheduling , the problem is with Earliest Start Time it is haphazardly(16:10:00) taking rather than that of the start time maintained for the first operation Work center, capacity header ,  which is there as 07:00:00 .
    From whr the sytem is picking / calculating this Earliest start time ?
    I haven't maintained interoperation times wait , queue time etc .
    Regards
    Venky shree
    Edited by: venky  shree on Feb 13, 2008 6:23 AM
    Edited by: venky  shree on Feb 13, 2008 6:33 AM
    Edited by: venky  shree on Feb 13, 2008 6:45 AM

    Res sir ,
    yes , i have assigned shift schedule for the work center :
    S1     SHIFT 1     01.01.2007     31.12.9999     07:00:00     15:00:00     7.00     BRK1
    S2     SHIFT 2     01.01.2007     31.12.9999     15:00:00     23:00:00     8.00
    S3     SHIFT 3     01.01.0001     31.12.9999     23:00:00     07:00:00     8.00
    and BRK1 is defined like :
    BRK1     0     Lunch Break               6.00     1.00
    in OP4A .
    is it affected by the same .???
    Regards

  • SCHEDULER with using dbms_job.submit package

    i want to use a procedure in SCHEDULER with using dbms_job.
    How i use this procedure in SCHEDULER
    Plz, Help me
    Message was edited by:
    Nilesh Hole

    Hi,
    For 10g and up you should be using dbms_scheduler for scheduling. Some examples are here
    http://download.oracle.com/docs/cd/B28359_01/server.111/b28310/scheduse.htm#i1033533
    and the homepage is at
    http://www.oracle.com/technology/products/database/scheduler/index.html
    Here's an example that runs daily at 2am
    begin
    dbms_scheduler.create_job('myjob',
        job_type=>'plsql_block',
        job_action=>'dbms_lock.sleep(10);',
        start_date=>null,
        repeat_interval=>'freq=daily;byhour=2;byminute=0',
        enabled=>true , auto_drop=>true
    end;
    /Hope this helps,
    Ravi.

  • Open STO reports with route determination

    How to get  Reports for open STOs with route determination.

    ME2N will find the open STO's but I agree finding them based on route is not standard
    or even vl10g can be used to find STO's needing deliveries
    after delivery creation data based on route can be found in many way's
    hope that helps

  • Messing with routing now eth0 borked

    I have two network interfaces (wlan0 and eth0) well I was messing around with routing issuing command like such "route add -host 255.255.255.255 dev eth0" and now eth0 is completely borked. It is not  a hardware issue because it works completely fine under Windows XP and always has but after i issued that command and messed around with some Network Manager I get this
    [root@ZuraJack sean]# ping 192.168.0.1
    PING 192.168.0.1 (192.168.0.1) 56(84) bytes of data.
    From 192.168.0.2 icmp_seq=1 Destination Host Unreachable
    From 192.168.0.2 icmp_seq=2 Destination Host Unreachable
    is there any way I can just delete all my routes and start over?
    75.13.41.***    *               255.255.255.252 U     304    0        0 wlan0
    192.168.0.0     *               255.255.255.0   U     0      0        0 eth0
    default         adsl-75-13-41-### 0.0.0.0         UG    304    0        0 wlan0
    that is my route output

    I have done both. So I guess you can assume it is an issue with something else. It is not an issue with hardware as it works in windows and no conflicts with wlan0 as when disabled I still get the Destination Host Unreahcable. Anyone else got any ideas thanks for the input thought Mektub it is greatly appreciated!
    **EDIT**
    Does anyone have any idea on what in Linux could be causing this issue. It is not a networking address or hardware issue as it works in Windows is there anything short of me starting over from scratch because I am not a huge fan of having inoperable PC
    Last edited by Sean-Der (2010-03-16 01:25:33)

  • Query on Topology for working with Routing Server

    Hi,
    We have just started working with Routing Engine. We have a sample street data. For working with routing server, whether we need the topology to be built?
    If we have a topology can we use with routing server?
    In this request for un-geocoded addresses
    <start_location>
    <input_location id="1">
    <input_address>
    <us_form1 street="4001 E Bay Dr" lastline="largo, fl" />
    </input_address>
    </input_location>
    </start_location>
    What does this street and lastline mean. Which table its referring?
    Can you help me out in this problem?
    Thanks and regards
    Aravindan

    The routing engine requires data in a particular form. It does require a node and edge table as well as oher information.
    In appendix c of the 10g Release 2 documentation is a description of the tables and the XML elements (such as us_form1, street, lastline, etc) required for the routing engine. If you have data that can be massaged into this format then you can do the massaging and load and use it.
    Hope this helps,
    d

  • Where can I get E60 or E50 + how good with Route 6...

    I want to get an E60 (or E50 if I can't get the E60)?
    Someone told me I can pick one up for about £80 on PAYG.
    I've searched: and there aren't many places that sell the phones.
    E60: nothing out there... and only 3 for sale on eBay.
    E50: available on eBay... but I can't find a retailer that sells them.
    The *only* reason why I want to buy: to use with Route 66.
    Can someone tell me: how good are either phones with the software?
    Thanks.
    OM

    As keith alluded to if you stay with SL and get a version of Aperture that runs on it you will be locked into that. There will be no more updates for Aperture or the Raw Camera bundle.
    So if that version of Aperture supports your camera and you have no plans to change cameras to something that is not supported in that version then you will be fine.
    If you think you might be getting a new camera at some point then you might just want to bit the bullet and do the upgrades now.
    regards

  • When the sale order  creting with  route

    when iam creating the sale order with route is coming automatically with route determination. but this specific order i did nt want route so deleated and save and is ove my problem. but with ref the same order i am doing it wail not appearing the route in order so pl help me

    Hi,
    If you have mainatined route determination, the route will be picked automatically in the order, if you dont want u can remove the route in the order itself, now if you are creating delivery wrt order the route will not be picked in the order as u have removed the route frm the order.
    But if you create a order again the route will be picked if you have not deleted the route determination in the SPRO.
    I was not clear as what u r asking, so if i hav not answered u completely, [;z explain wat u want to know
    Noopur

  • Create input schedule with several dates

    Dear experts,
    I need to create an input schedule with the following layout:
    jan10 | fev10 | .... | nov10 | dez10 | jan11| ... | dez11 | jan12 | ... | dez12
    jan10 and fev10 must show real values.the rest of the months for 2010, 2011 and 2012 must be available to be planned.
    How do I accomplish this using BPC? how do I do this?
    Thank You
    Inê

    Hi,
    As per my understanding you wanted to have -  jan10 | fev10 | .... | nov10 | dez10 | jan11| ... | dez11 | jan12 | ... | dez12
    etc.,members, wherein it should show the values in "jan10 | fev10" , and rest of the months should be for Planed right?  So in Time dimension you please create the members as you wanted (like  jan10 | fev10 | .... | nov10 | dez10 | jan11| ... | dez11 | jan12 | ... | dez12), then come to BPC Excel load the real values for for  jan10 | fev10 |, and send the data through Input schedule.
    Then prepare one more Input Template including all months....then it will display the values for those  jan10 | fev10 | months and remaining will be kept open to accept  the data.  Even you can put those 2 months ( jan10 | fev10 |) in Actual category, remaining months you can put them in Plan category.  In member set you can concatinate both the categories and you can have all in one template.  These 2 months ( jan10 | fev10 |) will display the data in Actual, and remaining months can be shown as Plan and they are ready to accept the inputs.
    I hope you might have understood.
    Regards,
    Raghu B.S.

  • Multiple delivery schedule (with same delivery date) for same PO line item

    Hi All,
    In a STO, for a PO line item say for 10 quantities. I have been receiving 3 delivery schedule with the same day with quantities say 5 3 2. I would like to know the what would be possible reasons for this.
    Regards,
    PSS

    Hi PSS,
    I had the similar issue there is a report which gives you the reason for delivery split
    Please refer to the following thread
    Multiple deliveries created
    Thanks
    Diwakar

  • Using BOE Enterprise Scheduler with Sap BODI?

    Hi,
      I am under the impression that you can use the BOE Enterprise Scheduler to schedule BODS jobs. Can you also use the BOE Enterprise Scheduler to schedule BODI jobs? Is there someplace I can get some documentation on how to integrate the BOE Scheduler with BODI and/or BODS? I haven't been able to find any yet...
    Thanks in advance!
    Mike

    you can open the technical manuals from Designer
    or from the following location
    %LINK_DIR%\Doc\Books\en\DITechnicalManuals.pdf
    navigate to following section from the PDF doc (left pane will display the doc Map)
    Data Integrator Management Console: Administrator Guide
    -Batch jobs
         -Scheduling jobs
              -Scheduling jobs in BusinessObjects Enterprise

  • Delivery schedules with outline purchase agreement

    Can somebody tell me how to automatically result delivery schedules with outline purchase agreement through MRP running?

    Priyanka.P thanks for your reply.
    The following is how I process:
    1.I use auto po indicator at VMR
    2. I tick Auto PO indicator and source list indicator at MMR
    3.I have made schedule agreement(type LP) and assign it in source list as fix vendor(1000) and with the MRP indicator 2(Record relevant to MRP Sched. lines generated automatically)with the proper validity periods in IDES.
    4. In MD03, I use the create schedule as 3
    5.There is Dependent reqmt.
      When I finish my MRP running I find a Purch.Req with Exception 30( Plan process according to schedule (08.11.07/08.11.06)) generated. however I hope a  vendor Delivery schedule.

  • Using Tivoli Work Scheduler with ODI

    Hello,
    I have a customer who is looking to use Tivoli Work Scheduler with ODI.
    Are there any references, best practices or general advice how to use TWS with ODI. Alternatively, if there is another recommended approach then i'd be interested to know.
    Regards,
    David

    Is this item supposed to be compatible with the 2nd gen nano?
    I ask because the dock connector on the second gen nano is not in the same place as the other iPods (the first gen nano for instance) and this may be your problem.
    There have been posts here before about 2nd gen nanos not working with accessories that accommodate the first gen.
    Best bet would be to contact the manufacturer.

Maybe you are looking for

  • Can't save....

    guys....i am running a mini (LION) , power mac (Leopard), MBW(M/Lion) and a Windows 7.....all of these machnes (except for the mini &MBW)  are coneccted via an ethernet cable to a router. The router has an exeternal drive connected to it....which i u

  • No HD on my PowerBook G4?

    The hardware requirements for iMovie HD (or iMovie '06) state: High definition video requires a 1 GHz G4 processor or faster and 512 MB of RAM. Well, I'm running a 1.25 GHz PowerBook G4 and it's loaded with 1 GB of RAM. But whenever I try to create a

  • Applescript auto-reply in mail updates???

    Hi everyone! Some time ago I posted a question about how to get an auto-reply set up in Mail using rules and applescript. I was told there was a bug and I'm just curious does anyone know if this has been fixed in 10.5.5? I made some tests and it seem

  • Fatal Alert

    We have been receiving this error message several times a day: A fatal alert was generated and sent to the remote endpoint. This may result in termination of the connection. The TLS protocol defined fatal error code is 10. The Windows SChannel error

  • Web Traffic Crawls through CX Module

      Hello,   I recently reverted from 9.2.1.2-50 to 9.2.1.1-48 because 9.2.1.2-50 introduced a bug that was crashing my data plane. After the code rollback traffic was very sluggish through the CX. It appears that the more traffic being sent to it the