Scrap and rework qty stock

Dear ALL,
IN MY SCENARIO I AM DOING THE PRODUCTION CONFIRMATIONS IN CO11N USING MAIN OPERATION IN THE ROUTING.I AM USING AUTO GR FOR HEADER MATERIAL(101)MOVEMENT IN THE FINISHED GOODS LOCATION OF THE CONCERNED SHOP & GI FOR THE COMPONENTS AS PER BOM FROM THE RAW MATERIAL LOCATION OF THE SHOP.BUT I AM UNABLE TO SEE THE STOCKS OF THE SCRAP AS WELL AS THE REWORK QUANTITY OF THE HEADER ITEM.PLEASE HELP ME SO THAT I CAN UPDATE THE STOCK OF SCRAP & REWORK QTY.IN THE SYSTEM IN THE BLOCK LOCATION OF THE SHOP.
THANKS IN ADVANCE
R SEHGAL

Hi Rakesh,
There is no standard report for scrap quantity. We have to develop Z report with the help of tables like AUFK-AUFM and AFVV.
The best way is get the details of scrap from table AFRU (field XMNGA) and download to excel with order type or with material/plant combination.
If you are having rework orders for scrap then you can display this rework quantity from COOIS transaction.
If helps reward points and close this thread.
Regards
TAJUDDIN
Message was edited by:
        TAJUDDIN MOHAMMED

Similar Messages

  • I need a user exit to restrict total qantity of yeild, scrap and rework on

    Hi friends
    I need a user exit to restrict total qantity of yeild, scrap and rework on CO14 (Confirmation of Production Order Detail) not more then total qantity field in CO03 (Production Order Display). Please also mention if what I am asking is theoratically right and if possible please explain a bit from the functional point of view.
    Regards,
    Anurag Jain

    I resolved it

  • In process Inspection and Rework Qty Issue

    Hi,
    There is Production Order for 100 qty.  There are 5 in process operations like 0010 Cutting, 0020 Welding, 0030 Inspection, 0040 turning, and 0050 Inspection
    (1)0010 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (2)0020 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (3)0030 operation: Quality inspected and entered results as 25 as yield and 25 as rework. For defects Q3 notification is
         triggered.( ie CO11N transaction is called in QM)
    (4)Production opened rework order CO07 and confirmed the rework operation and booked material and labor cost on cost
         center instead of orginal order.
    (5)0040: Operation production could confirm only 25 qty as earlier 0030 operation of inspection  yield was only 25 qty.
    (6)Inspection already in 0030 operation 25 qty  was entered as rework. Now after rework how results recording will be done 
         and qty will be posted in yield. Unless yield is entered under 0030 operation for 25 qty , production cannot confirm the 0040
         operation for pending 25qty.
    (7)Business requirement is what ever the qty production manufactures it has to be entered in system. Based on quality
         inspection incentive will be paid to only qty which is passed by quality.
    Settings Made:
    (a)100 Free Inspection, No Qty Relation, Quantity Valuation and Confirmation in Production for only inspection work center
         without any cost capturing.
    (b)Confirmation parameters settings with error for over and under delivery tolerance, error if inspection sequence not adhered,
         error message if no inspection results exists
    Any suggestion or any other way of handling this requirement.
    Thanks & Regards,
    RSR

    Hi RSR,
    Your way of mapping is absolutely fine, few points to be clear...
    03 inpection type and enable inspection characterisitics for operation 030
    04 inspeciton type to be enabled and operation 050 shall be eliminated if possible, material stock posting will be done from 04 inspection lot for 25 nos.
    let me know if you have questions..
    regards,
    Lenin. A

  • Received qty valuated stock(0RECVALSTCK) and received qty total stock(0RECTOTSTCK) for 0IC_C03

    Hi Team,
    What is difference between received qty valuated stock and received qty total stock?
    According to me received qty total stock would be entire stock ie.received qty - block stock , received qty into consignment stock etc
    Please revert
    Regards

    Hi Phani,
    Thanks for the reply.
    Yes total stock would be consignment +quality inspection+blocked stock etc....
    But valuated would be something where there is costing or valuation ie we will have GL account hit.
    For eg Returnable material would be in total stock but not in valuated stock.
    Thanks

  • Delivered qty and put in stock qty not updated after GR reversal

    Hi,
    We encountered a strange issue while making a 102 movement for a production order.
    Planned order qty  - X
    Production order qty  - X+Y
    Confirmed Qty  - X
    GR posted for Splits of Qty X
    GR Posted for Qty Y
    At this time Quantities in Production shows like
    Planned Order   X
    Order               X+Y
    Delivered          X+Y
    Commited        X
    As wrong posting has been done for Qty Y, GR reversal has been carried for Y. After Reversal
    Deliveried Qty and Put in Stock qty still shows X+Y.
    This is an issue as settlement can not done as it has difference in quantities. This issue was nver observed earlier.
    Looked for any available SAP note for this issue and couldn't get one. Any help to fix this issue or reference to any SAP note is appreciated.
    Regards,
    ppcon

    Hi,
    Look into the Transaction : COGI.
    If the entry is there act upon the entry.
    If this is the case, suggested is to schedule the Program : "CORUPROC" in thr regular intervals.
    Hope this helps..
    Revert for further discussion..
    Regards,
    Siva

  • SAP Recepits and Issue Qty

    Hi,
    what you mean by Receipt qty and Issued qty in SAP.Explain and Advise Me.
    Regards,
    Jeevan.S

    You can check detail in SAP help :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/4d/2ba31643ad11d189410000e829fbbd/frameset.htm
    Goods Receipt   Locate the document in its SAP Library structure
    Purpose
    You use this component to post the receipt of goods from an external vendor or from production. A goods receipt leads to an increase in warehouse stock.
    Features
    The system distinguishes between the following types of goods receipt:
    ●     Goods receipts with reference to a reservation
    ●     Goods receipts with reference to an order
    ●     Other goods receipts
    Goods Issue   Locate the document in its SAP Library structure
    Purpose
    Using this component, you can post a material withdrawal, a material issue, or a shipment of goods to a customer (without the involvement of the SD Shipping component). A goods issue leads to a reduction in warehouse stock.
    Features
    The Inventory Management system supports the following types of goods issues:
    Withdrawal of material for production orders
    Scrapping and withdrawal of material for sampling
    Return deliveries to vendors
    Other types of internal staging of material
    Deliveries to vendors without the involvement of the SD Shipping component

  • Subcontracting Purchase order-With scrap or extra qty.

    Dear Experts
    How we can define the Scrap  or extra Qty in subcontarcting purchase order, suppose PO qty is 10500 , and we want to receive 10000 only then how we  can take care about the  500 qty and there mantioned BOM.,we want to give the material of 10500 .
    Rgds
    Pankaj Agarwal

    Hi,
    it is common scenario that when u give material to sub contractor,off cuts will get generated.
    so u cant get the 10500 qty in the material mentioned in the BOM for that,
    u can overwrite the value at the time of GR for consumtion.
    for 543 movet type.
    means if as per BOM for 1000 qty material requirement is 1000 but actual consumption is 1050 qty.
    then overwrite the 1000 by 1050 at GR for 543 movt type line item
    regards,
    sujit

  • Diff between valuated stock and storage loc stock

    Dear guys,
                  What is difference between valuated stock and starage loc/ batch stock?
    Regards
    Jay

    Hi,
    the stock which shown at MMBE at storage location level /batch is valuated stock.In order to identify the differrance , the stock which is taken in will be with stock types likes unrestricted,quality etc.If batch management is active for the material , material willbe procured in batches and will be kept in storage location, with differrant stock types.Stock types may also be like sale order stock etc.If the material is procured against a account assignment , the value of the stock will be costed against theaccount assignment.
    The qty multiplied with the price is the value of the material and this valuated stock will be stored in the storage location under a batch if batch management is active.
    Again valuation can be at company code level or plant level.
    Also non valuated and non stock materials also in existsance which will be depend upon the material type and will be procured against a account assignment.
    Regards,

  • Operation scrap and expected yield variance

    Hello guys,
    I have a question on the operation scrap and the expected yield variance.
    I have a product which has four operations, and on one of the operations (2nd operation) the operation scrap of 10 % is maintained.
    So, I have created a production order for 100 Pcu2019s.
    For the confirmation, I confirm first operation with the total order qty (100Pcs). After the confirmation the expected yield of variance of 10 Pcu2019s is set on the order.
    I just wanted to understand why the expected yield variance is set with planned operation scrap. According to my understanding, the expected yield variance is only set if a scrap value is mentioned in the confirmation.
    I am having a problem because my 4th operation is a milestone operation ( I confirm 2Nd, 3rd and 4th operation at a time.
    I donu2019t use the back flushing option coz I do my GR in MIGO.
    So here is the situation.
    I created and order for 100 Pcu2019s and I confirm the first operation for 100 Pcu2019s
    Second milestone confirmation (2nd, 3rd, 4th ops) for 40 Pcu2019s u2013 GR is done after that.
    Third milestone confirmation (2nd, 3rd, 4th ops) for 40 Pcu2019s u2013 GR is done after that.
    Fourth milestone confirmation (2nd, 3rd, 4th ops) for 15 Pcu2019s but I can only receive 10 Pcu2019s because of the operation scrap and expected yield variance.
    Thanks,
    sashi vardhan

    Dear Shashi,
    Since you have maintained 10% as operation scrap system considers that 10% of your total qty in the opration is scrap material and hence system allows only confirmation of 90 components only.
    This is std SAP behaviour.
    Regards
    Suri

  • Scrap and To sample usage to make grey

    Dear Sir/Mam
    In T-code QA32,Usage Decision screen,tab inspection lot stock,user has posted the stock to scrap iwant to bring that stock back to Quality stock.
    Even now i want to make this scrap and To sample usage and To reserve field grey as that we have not mapped to put the stock in any of this field so please guide.
    regards
    kunal

    Hi
    Ans 1:
    1) Please activate the inspection type 05 in the QM View of material master,
    2) Use MB1a trx with mvt type 554
    3) Use the same cost centre as earlier
    4) Material document will be genrated and because inspection type 05 inspection lot is created. and stock is updated in QI stock
    5) clear the Inspection lot by taking UD , so Stock is transfer from QI stock to unrestricted.
    I think your problem will be solved .
    Ans 2:
    In Plant level setting of SPRO
    QCC0--->Basic setting ->Plant level setting->select plant>Inspection completion>remove the cost centers for detroy also remove strorage location of reserves
    With regards
    Sujit

  • Difference between pick qty and delivery qty

    Hi,
    My delivery qty is 5 pcs. However while making transfer order from within delivery, the Transfer order is being made automatcially for 17 pcs and so the pick qty is 17 pcs. Due to the differenc ein delivery qty and pick qty, I cannot do PGI in the delivery.
    When I use LT0G, and give the delivery and warehouse no and movement type 999, the system does not allow the transaction and gives a message that, function not yet supported for Handling units. But I do not have handling units in my delivery. Neither the system allows me to cnacel the Transfer order thru LT15.
    How to correct the above situation so that the TO does not pick up the qty greater than the delivery qty or what other alternatives are there. Also how to ensure that TO is made of qty which is equal to delivery qty.
    Iam not aware of WM module, so kindlyu tell in detial pls.
    regards
    sachin

    In IMG>LE>WM>Master Data> Define storage type.
    Check In stock removal control whether "Full stock removal reqmt act" is active.
    If this is active it will try to pull the total quant irrespective of your requirement.
    Reward if useful.
    Regards
    EDWIN.

  • Report for open and shipped qty

    hi,
    any standard report to show open and shipped qty by SO no.?
    pls advice. thanks

    Hi jojo
    For list of open orders t.code is VA05
    Incomplete delivery - V_UC 
    Reward if useful
    Regards
    Srinath
    Edited by: sri nath on Apr 16, 2008 10:31 PM

  • Open Qty and Delivered Qty  remains same even after Return

    Hello
    After making return, the open qty remains the same and its not reflecting the return qty.
    for e.g.
    I have made a Sale Order of 100 qty
    I delivered 20
    In sales order my Delivered Qty is 20 and Open qty is 80
    Now I made a Return of above 20 Qty
    But after that the Order is still showing Delivered 20 and Open Qty 80
    The Open qty should be 0 at this stage.
    Regards
    Indrajit

    Hi Indrajit ,
    Your doubt is genuine .
    The Open quantity of SALES ORDER , at item level (row) does not increase by returning the goods.
    Once you have delivered the goods it will reduced from the Open quantity .
    .You have to create a new Sales Order for further Open quantity
    Thanks
    Ashish

  • Open Qty and Received Qty for Open Purchase Order.

    How to Fetch the open qty and received Qty of every Open purchase orders in EKPO table where ELIKZ = SPACE OR LOEKZ = SPACE. What are the table and field used? Kindly help me.

    Hello Senthilramkumar,
    Use ME2L/ME2N/ME2M with selection parameter WE101.
    Hope this will help.

  • Order qty and confirmed qty mismatch

    Dear friends,
    My requirement is System should not allow to go further if the sale order qty and confirmed qty(after avaialbility check) mismatch is there.Pls suggest.
    Now currently system will check the availability qty and will show the information of confirmed qty in the another screen.and if we say continue the process, we can go ahead and save the document.but the document will be in open state.
    So pls suggest the way i can go ahead for this requirement.
    Regards
    Mahendar.

    hi,
    If u want to allow user to create SO as much as available qty..? means  system sud create SO for order qty is equal to availble qty ...? if yes
    then go the availbality check  and find out availability check and checking rule..
    and again go to OVZ9 remove the check box check with out RLT from rep.lead time tab
    Resul is: If u enter in SO a10 qty ,and if you have only 5 qty in hand or in plant ,then system after checking the items it will change the order qty in SO(i e 5) automatically,
    Caprin

Maybe you are looking for

  • Trying to import Entourage Emails into Apple Mail

    I recently purchased a new Mac (Mountain Lion) and am trying to import the emails from my old Mac. I was previously using Entourage but I want to import them into Apple Mail. My old Mac will not restart but I have a copy on time machine. I think I ha

  • Need help! My mp3 player cannot be detected by my laptop as connect

    Hi friends,In my previous laptop, i have no problems sync-ing my Creative Zen V Plus to it. Then i have a new laptop and?installed all the Creative programs as i have previously done. Now that i connect my mp3 player to the new laptop, it wouldnt rec

  • Programmed tween affecting buttons

    I am using Flash CS3 targeting flashplayer 9. I have created a menu that has 5 simple buttons in it. I use a actionscript tween to move the menu from off the stage into view and back again. For some reason when the menu comes on the stage the hittabl

  • Need to parse text

    I'm trying to parse some text, and don't know which class to use. I was going to use StreamTokenizer, but can't find any documentation on it. Please don't tell me to search for it, I've done that. The text consists of a word, followed by the slash "/

  • FF4, can't connect per link click-thru, probs with hulu/utube vids, per no advert thing

    I've GOT to get this fixed ASAP. Needing to make an order from website where you have to click link to get to another website to get percentage off purchases. Never had any issues with this process/website before. Not one. This started after download