Scrap  posting in rem

Hai gurus,
i am working in rem scenario, currently i want to post 100 nos during final confirmation using T.C. - MFBF,
out of this 90 is accepted and 10 is scrap, how to post the same.
when i did it only accepted qty is posted as i had first given the scrap as 10 nos and given all the detail
like pld order number,plant,sto.loc etc and i had given the yield qyt as 90 and given the other detail like pld
order,plant etc , while doing so , it is accepting only the last given yield qty 90 nos and not the scrap qty,
so the pld order with 10 nos as un consumed remains after MFBF.
kindly give me the solution for the same.
with regards,
sekar chand.

Hai Mr Anupam,
Thanks for your reply, but the point is when i confirm both , first 10 nos as scrap and second 90 nos
as accepted the system accept only 90 as confirmed qty, but the scrap qty is not taken into account,
if the system has taken into account of the 10 nos as scrap ,the scrap qty could not be traced in stock list
(MMBE).
How to do confirmation when i have both scrap and accepted qty during assembly or while component
production.
waiting for your reply.
regards,
sekar chand

Similar Messages

  • REM MFBF Scrap posting not reflecting in MD04

    Hi All,
    If I am doing yield posting from MFBF i can see reduced quantity in MD04.
    If I am doing scrap posting from MFBF quantity is not getting reduced from MD04.
    how can i achieve it via ABAP coding. pleae help with any exit or sample code.
    Thanks,
    Chinna

    Hello Chinna,
    Please refer below thread for your issue
    Scrap rate is set in bom but can't be consumed in REM
    I hope this information helpful to you
    Regards
    Umesh Mali
    Message was edited by: Caetano Almeida

  • Scrap posting in CO11N

    Dear all,
    This is a requirement regarding scrap posting in CO11N.
    When some qty is entered in scrap field , the qty shd be moved/posted to with a scrap matl code to a scrap storage location through 531 movmt type.
    Which user exit wil be suitable for this application?
    pls suggest.
    Regards,
    Sheik

    Hi,
    Check with your abaper which of the below can meet your need.
    User Exit
    CONFPP01  PP order conf.: Determine customer specific default values
    CONFPP02  PP order conf.: Customer specific input checks 1
    CONFPP03  PP order conf.: Cust. specific check after op. selection
    CONFPP04  PP order conf.: Customer specific input checks 2
    CONFPP05  PP order conf.: Customer specific enhancements when saving
    CONFPP06  PP Order Confirmations: Actual Data Transfer
    BADi
    WORKORDER_CONFIRM
    WORKORDER_GOODSMVT
    Regards,
    Vivek

  • Scrapping posting scheme

    Hello gurus,
    when scrapping an asset with T-code ABAVN I get the following posting scheme if the asset is not fully depreciated:
    APC Acct C 100
    DEP Acct  D 95
    P&L Acct  D 5             
    For consolidation purposes (movement type detail for depr. account) i need the following posting scheme:
    APC Acct C 100
    DEP Acct  D 100
    P&L Acct  D 5
    DEP Acct  C 5
    Does any one of you have a solution to modify the standard posting scheme?
    Thank you in advance for your help
    Best regard
    Pascal

    Hi Blaz,
    Thank you for this first answer,
    I know the way of modifying the standard posting scheme using the program RAVCBUZSM but I am afraid that this tool will not help me for this specific requirement: I think that I cannot split the account KTNAFB-Ordinary depreciation into debiting and crediting amounts? (In my example, the debit side would be the APC value and the credit side the Net book value).
    I tried to assign the indicators 17 & 18 to account KTNAFB without success...
    I am afraid that the only way of changing the posting scheme for the ordinary depreciation is to activate one of the FI-AA enhancements?
    Could you please confirm my thought or please help me fining another solution,
    Thank you in advance for your help
    Best regards
    Pascal

  • Scrap posting

    Dear All,
    in Discrete manufacturing confirmation screen i enter 20 units as yield and 2 as scrap.where system willl post these quantities, i mean yield will go to unrestricted stock if i m using auto goods receipt.
    and where scrap quantity will go.
    also in rep. manufacturing, where yield and scrap will go

    Hi,
    If the scrap code is maintained in the BOM as by-product, then it will appear in the goods movement screen.
    As per standard SAP, the operational scrap is not considered by the system. It simply evaporates from the system.
    If you need to post the operational scrap, you wil have to use the concept of by-product and post it with Movement 531.
    For yield it will get posted as explained in the above post, it will go to the FG store location with 101 movement.
    For further clarifications pls revert.
    Hope that helps too.
    Regards,
    Rohit.

  • Dump due to negative scrap posting

    Hello All,
    there is a prod order in which during confirmation co11n, negative scrap was entered and saved.
    now when try to open the operation overview in that order, dump error is coming.
    dump error also comes if the particular operatiton is opened in co14
    how to solve this..
    Thanks in advance...,
    regards
    Ranjit

    Hi
    In CO11n negative Yield/Scrap qty will not accept..
    The system prompts you "Qty should not be smaller than 0"  then how you have saved the confirmation.
    Please check and come back..
    Regards,
    MSH

  • Asset Scrap & posting.

    I have the following scenerio.
    on 15 April our one asset dameged with the value of 1000 USD & the same amount covered by Insurance company. we also executed the depercition for the period of may, june also.
    our accountanted made the entry for  income received from Insurance company. Bank Dr & other In come Credit.
    now the auditor made objection  & want decrease the value of asset,also three period depericition .other income must also decrease
    he want entry should be.
    other Income  dr 1000
    Asset Credt   1000
    also
    Accumalted deperction  debit  20
    depercition expense credit      20

    do partial retirement to teh extent of 1000 usd and then run depreciation.
    The difference in depreciation is posted in the current period.

  • Scrap posting in Discrete

    Dear all,
    Scenario is as below:
    I have 3 operations. After confirming 2 operations, i move onto last operation, which has a control key allowing auto GR.
    Now, in this case, for the last operation, during confirmation, i enter some quantity as scrap; lets say 100 pcs. So what happens to this 100 pieces??
    Does any movement happen? Where does it go? And what would be the material code for that?
    Kindly clear the doubt.
    Shrenik

    Hi
    We can not view any business wrong just because we do not know the same.
    SAP has been built to take care of the business processes around the globe.
    In that we can build any  work arounds depending upon the business process.
    Just because we do not know, we can not say that particular principle is wrong.
    we should be open for the ideas then only we can learn.
    Coming to the present process:
    If we want to take scrap as by product we should accordingly built our costing process also.
    Normally if we want to take the scrap as by product the cost should be taken as nominal.
    The following is the scenarios where we have to stock the scrap also.
    In flourescent tube manufacture there is a stage where we have to inject mercury.
    By chance after this stage the product gets rejected.
    Then that scrap is material of hazardous nature.
    Then we have to stock & dispose off to the satisfaction of stutory authorities.
    In this case we have to stock the scrap.
    The method what I suggested is one of the method  pertaining to  that scenario.
    This  I have suggested keeping this in view.
    Some body else can implement some other  work around as he thinks fit.
    I hope it is clear.
    The method what I suggested is one of the work around.
    Regards
    YMREDDY

  • Assembly scrap in REM scenario

    Hi Experts,
    My scenario is relevant to REM, during back flush in transaction MFBF am posting the assembly scrap by selecting assembly scrap radio button and in the scrap posting screen with reason of variance, as per logic the quantity of the plan order should be reduced by scrap quantity, am able to see the goods issue document but the plan order quantity is not getting reduced.
    Are there any specific setting needs to be done for posting of assembly scrap?
    Please help to explain the complete process of assembly scrap in case of REM.
    Regards
    cs

    Hi Anupam,
    I have checked the process as per your advise and it is working fine, but here am having an issue as if am scraping through quality it is scrapped with movement type 553, which is booked as loss.
    But actually we are retrieving the components from these 5 units and reusing them in another FG.
    As we are working with REM we are using CO07 production order without material for rework purpose in that case the scrapped assembly is issued to production order and components are retrieved with 531.
    Is there any possibility that the scrapped assembly can be shown as stock and issuance can be done?
    Or how can we address this scenariou2026
    Regards
    Chandan

  • To reduce quantity to be confirmed by posting scrap in process order

    Hi Experts,
                       Is it possible to use MQC such that the planned quantity in each phase keeps reducing by the quantity of scrap posted in COR6N in the earlier phase. That means if planned quantity in phase 20 is 100 and i post a scap of 10 then in next phase (say 40) system should offer a quantity of 90 in the "yield" field of COR6N screen.
    Regards
    Sm.

    Hi Rupesh,
    Can you please assist for below issue
    The planned quantity in each phase should  reduce by the quantity of scrap posted in COR6N in the earlier phase. That means if planned quantity in phase 20 is 100 and i post a scrap of 10 then in next phase (say 40) system should offer a quantity of 90 in the "yield" field of COR6N screen.
    eg:- Process order 100 qty
    Phase 20 Confirmation
              Yield 90 & Scrap 10
    Phase 40 Confirmation
              Yield should be populated as 90 . (But here system is suggesting Yield as 100 )
              Can you gurus throw light here , where am i going wrong ?? , Why instead of 90 qty yield in 2nd Phase /operation to be populated it is appearing as 100 qty ?
    & how to use User Exit also if required for Use Exist XCOM0001 EXIT_SAPLCOML_001

  • Movement 551 of header Material in MFBF in REM

    Hi,
    I am having an issue, In REM scenario there is a planned order of 10 Qty. I am using MFBF trx to confirm 5 qty as scrap by using assembly scrap. In this, system posting 261 mvt for components but there in no 551 mvt of Header material, Can anybody tell me what kind of process exactly happening? (There is not any change in planned order after this trx)
    Regards,
    Pankaj

    Hi Anupam,
    As per my thinking in assembly scraping Mvt for header material is 551 & for its components it should be 261, But when I am doing MFBF, there is not any mvt for header material happening but 261 happened for components.
    I have question that why 551 mvt of header material not posted & there is not any effect on planned order against which I have done assembly scrap posting.
    After doing MFBF only 261 mvt doc posted only I expect 551 for header which is not posting.
    I need to know is mvt 551 for header material happens in assembly scrap in MFBF. Also if not happens then for the componets against which 261 mvt posted, where that qty goes then.
    Regards,
    Pankaj

  • REM process

    Hi experts,
    I have gone through the post regarding REM and just want to clear my doubts and confirm with you people.
    1. you cannot track the production with respect to planned order.  Than how to track the past production which date how much and what we produced.In md62 we can see the bal qty to be produced.
    2. we can confirm in MFBF the produced qty, activity and component, Is it the same we do in discrete in CO11N and cost is updated. Do we have to define the STD value key for the production line .
    3. What will be the method of tracking in REM for different material planned order, like in discrete we have different order type and No range . but here all the production is carried out with order type PE. SO from user point of view what will be thing so that they can understand what manufacturing is going on by seeing the planned order etc,like in discrete we have different no range and order type to identify.
    please answer my querries and correct me if I have understood something wrong.
    Regards
    Mona

    Hi Monalisa,
    1. you cannot track the production with respect to planned order. Than how to track the past production which date how much and what we produced.In md62 we can see the bal qty to be produced.
    Ans: You can use transaction MF12 to check for documented backflushes. You can also check LIS transactions like MCP8 ( for GR analysis ect..) check EVALUATION section in SAP EASY ACCESS MENU in REM.
    2. we can confirm in MFBF the produced qty, activity and component, Is it the same we do in discrete in CO11N and cost is updated. Do we have to define the STD value key for the production line .
    Ans: Yes MFBF does basically same activaities as of CO11n. Cost is updated to product cost collector instead of  prod order. yes you still have to define STD value key.. thats how activity's can be costed.
    3. What will be the method of tracking in REM for different material planned order, like in discrete we have different order type and No range . but here all the production is carried out with order type PE. SO from user point of view what will be thing so that they can understand what manufacturing is going on by seeing the planned order etc,like in discrete we have different no range and order type to identify.
    Ans: you can use planning table MF50 to analyse the planning and porduction situation. You can not distinguish based on planned order number but you can distingusih based on production line in planning table.
    check and revert.

  • Stock Of component scrap

    Hi all,
    I want the scrap stock of the component. After the confirmation of first operiation some components get scraped so i want to create stock of the scrped components
    how can i do this in SAP
    thanks
    ramakant

    Hi Ranakant,
    Create a seperate storage location for the scrap materials and when you do the scrap confirmation from MB1A with movement type 551 then maintain this storage location in "to storage location filed".
    Now you can check the stock in this storage location from MMBE transaction after scrap posting.
    Any questions please inform.
    Regards
    TAJUDDIN

  • Scrap costs in production

    Hello,
    Is there any possibility to post scrap costs during production against the standard costs until the scrap occured without using a special material for making the scrap posting?
    For example:
    Standard cost production: 1000
    No of operations: 4
    St cost Op 1: 300
    St cost Op 2: 100
    St cost Op 3: 400
    St cost Op 4: 200
    Suppose that scrap occurs at Op 2. In the confirmation we confirm the scrap and want to have the costs posted in FI and CO at 400 per piece.
    Which settings do we have to maintain in order to make this possible (without creating new materials).
    Thank you for the information in advance
    Regards,
    Johan

    If you do not want to consider the scrap qty. in operations but want to consider it only for costing purpose, then create a costing BOM i.e. usage 6. In this BOM you can maintain the scrap. Also ensure the costing variant which you're using has a priority of costing bom over say production bom or universal bom.
    Discuss this with your costing person as well.

  • Scrap reduction in MFBF

    Hi All,
    Can anyone explain Scrap scenario in REM using MFBF transaction
    1) if scrap is not maintained in Material master/BOM  then by using MFBF scrap option can we do it?
    2) REM Confirmation type  - Activity backflush  usage  or scenario
    plz explain
    thanks
    Ather

    I've been using Creative Cloud since last September and been paying AUD $37.99 + AUD $1.14 exchange rate fee (yes I am bitter about that), however I just looked at my account and it shows my monthly subscription payment is now $29.99.  I guess I'll need to wait until 28 Feb (invoice date) to see what gets charged to my credit card.
    Cheers, Peter

Maybe you are looking for

  • New Macbook Air stopped transmitting to overhead projector

    Hello, Up until last week, I was successfully using 2 different overhead projectors with my MacBook Air (purchased around 2008 or 2009). I've just bought a new MacBook Air, and it has stopped projecting. I use the same connector (VGA?). Seems like it

  • Question on defining taglib in  web.xml

    I am using netbeans to develop a j2ee5 web application. I created a web application project using the wizard. When I defined a <taglib> in the web.xml, it detected an error. cvc-complex-type.2.4.a: Invalid content was found starting with element 'tag

  • Nokia 701 lock slider problem

    Hi guys, i bought my 701 a month ago and i'm experiencing an annoying problem with the screen lock/unlock slider at the side of the device (probably after updating to Belle FP1) sometimes when i lock/unlock the screen it repeats the action twice, for

  • Managing Runtime Attachments Using the GP API

    Hi All, I have a requirement to read the files which are attached to a process  at GP Runtime,  through GP API. For this i am trying to get the resolveAttachmentInfo method from IGPAttachmentSourceHandler class. I have imported both the packages GPAt

  • Add on connection timed out

    what is the meaning of Add on connection timed out error and how to solve this error? Edited by: Neetu Dhami on May 30, 2008 5:36 PM