Scrap quantity

Hi,
   we doing cofirmation in co11 with auto goods receipt(last operation).
   Is it possible to get production order list which having scrap quantity in COOIS
thanks in advance

Dear,
Once you have entered scrap in CO11N no material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order. The order costs would increase since you would have posted goods issue for input material without goods receipt for finished goods
Now you want to realize the value of the scrap produced then you would have to do a goods receipt of the scrap as a by-product using movt type 531 in MB1C for the scrap material number
In COOIS,I dont think you will get all your required details.
In case if you want to confirm scrap then enter only scrap qty and confirm the production order,
the production order show the status as
REL CNF DLV.
Regards,
R.Brahmankar

Similar Messages

  • No Data in Field Scrap quantity (AMGLG) after Append DataSource 2LIS_04_P_COMP (Component View from PP/PP-PI)

    Hi experts,
    we enhanced the BI Content standard DataSource 2LIS_04_P_COMP "Component View from PP/PP-PI" with the field AMGLG (Scrap quantity) per maintenance of the relevant extract structure MC04P_0COM via LBWE:
    The enhancement of the extract structure worked fine.
    Unfortunately the enhanced field is not filled after the Statistical Setup of the LIS Application 04 "Production" (t/code OLI4BW).
    RSA3 -> 2LIS_04_P_COMP:
    Any ideas or experiences?
    Many thanks in advance and regards,
    Michael

    Attached one example:
    BW DataSource 2LIS_04_P_COMP:
    ERP Summarized BOM Multilevel (t/code CS13) Component 456:
    ERP Summarized BOM Multilevel (t/code CS13) Component 301:
    Any ideas why there are no values for the field AMGLG extracted?
    Thanks and regards,
    Michael

  • Fixed Scrap Quantity In Production

    Im using SAP ECC 6.0 now.
    Is there any place I can set a fixed scrap quantity in BOM or PP related?
    The situation is like this: While producing Semi-finishegoods A we alway need extra 10 Raw-mateiral B for scrap.
    That means 100 A needs 110 B ; 10 A needs 20 B;
    How can I configure it so that when I create the procution Order for 10 A, it will put 20 B in the components automatically;
    I can only find scrap ratio in percentage.
    thanks alot for looking into my problem.
    Edited by: Liang Shi on Aug 25, 2010 7:08 AM

    Hi
    As you rightly mentioned ,  to my knowledge, as of now in standard SAP
    All the SCRAPS are maintained in %  only.
    1) Component Scrap >>>>> Maintained in MRP4 in % & also in BOM General data tab
    2) Assembly Scrap >>>>>> Maintained in MRP1 in %
    3) Operation Scrap >>>>>>Maintained in BOM item detail  General Tab in %
    Regards
    BRSR

  • Fixed Scrap quantity

    Hi Experts,
    We have "Fixed Scrap Quantity" field group in the opeartion details of routing in SAP Mill Products.
    Can any body please explain the siginificance of Each Length, First Length and Last Length.
    Regards,
    Jejesh

    This option works with APO only

  • Scrap Quantity component  in the production order

    Dear gurus,
    in the material master of a component i insert the scrap % ( view mrp4) = 10 %.
    The field is read by planning Mrp and explosion of bom , but when i inseert this component in the production order manually the system don't read this % and the field "scrap quantity in the component detail of the production order is blank.
    Are there a setting for uograde this field ( in the production order ) when i insert MANUALLY the component in the production order?
    Example:
    1) material master of the component  > scrap % (view MRP4 ) = 10 %
    2) production order created
    3) insert this component quantity 100 pc and the system after read the material master  insert 110 pc , and upgrade the field automatically 10 % (as material master)?
    Thansk a lot
    Daniele Pistilli
    PP TEAM

    Hi Danielepistilli,
    Well there is a lot of difference is there: see you are creating production order for header material which is FG. If you maintained component scrap in material level it will be dependent on BOM quantity which you maintained for the header material.
    For example say component x quantity is 50 in BOM. How it will calculate when you run the MRP.
    component scrap % is 5% then:
                                     ===>            (5/100) * 50 + 50
    Formula is: Percentage of scrap quantity x original quantity + original quantity
      So                           ===>           52.5 quantity should be come for component
    So, the order quantity for the header material will not take this quantity or scrap but if you see individually in MD04 screen for X material you can find this quantity ok.
    I hope it clears your doubt and helps you any queries please revert me back.
    Regards,
    Madhu.G

  • Calculation of scrap quantity in multilevel BOM

    Hi Gurus,
    Can some one explain me how the system calculates the Scrap quantity in multilevel BOM.
    Thanks in advance.

    Answered.

  • Scrapped quantity and malfunction breakdown time

    Hi SAP Gurus,
    How can I determine the scraped quanity and Malfunction breakdown time for the order number in production planning?
    Suppose I have the order number and I need to search for the scrapped quantity and from TCODE IW29 I need to determine from MALFUNTION BREAKDOWN TAB.
    Please throw some light on this....
    Regards,
    Hemal

    Hi,
    In IW23 for the display notification, in maintainace data tab page check the required date and time is entered. if so remove that and save it.
    now u see in iw29 the down time.
    Thanks & regards.

  • SCRAP QUANTITY IN ORDER CONFIRMATION

    Hi,
        When i confirm an order there is a field called scrap quantity. Supposse there is an order for 10 qty. Now while confirming the order i give in the yield field as 10 & 10 in scrap quantity where will it effect...
    Will it effect costing of the order.
    Can i do like this because my order is for 10 quantity & i am confirming & scarping the same quantity.
    Please guide as i want to use the same field..
    I am in go live satge.Please help.
    regards
    jimmy

    Hi JIMMY 
    As per your question smiltensly you can't book both as yield and scrap with same order quantity.Either you book 10 in yield or in scrap or total of this yield and scrap is equal to production order quantity.That means if order quantity is 10 then you may book 6as yield and 4as scrap.Once you have entered scrap in CO11N no material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order. The order costs would increase since you would have posted goods issue for input material without goods receipt for finished goods.
    Now  you want to realize the value of the scrap produced then you would have to do a goods receipt of the scrap as a by-product using movt type 531 in MB1C for the scrap material number.
    It can also automate posting of this if a percentage scrap is know. You can do this in BoM by specifing a negative qty against the scrap material number. Then if the backlash is activated every time confirmation is done the 531 movement line will come automatically in goods movements screen. If no scrap arises then you have to delete that line and post the confirmation.
    Hope this helps ...if so reward points and close this thread.
    regards
    Rajesh

  • Scrap quantity to be minus with operation sequence is not check in co01

    hello!
    PP experts
    i have problem in confirmation of production order.
    suppose i have production order  of 15 qtys.with four operation to be confirmed (co11).
    operation  qty.yield  srcap qty.
    0010          1 5              0
    0020          14              1
    0030          14              0
    now, in 0020 operation i have 14 yield & 1 srcap quantity & when i go for 0030
    operation for confirmation it will show the default quantity of previous operation,0020 qty. i,e 14 qtys.but if i put the quantity 15 in this operation (0030)
    its allowing to confirmed 15 qtys. because the plan qty is 15.but i want to minus the 1srcap qty. from 15 plan qty. & system should allowed only 14 qtys
    (15-1=14) for confirmation.plus i want the flexibility of operation sequence not to checked.
    i set operation sequence - error when operation sequence is not adhered to in OPK4,its minus the scrap qty. but not allowing the flexibility of operation sequence
    confirmations.
    please send me the setting for the above query in the confirmation (co11)
    regards,
    mangesh
    thsnks

    Mangesh
    1) you have confirmed yield qty14 nos in operation 020 , scrap Qty 1
    2) Automatically in during confirmation of operation 030, in yield qty field 14 nos is coming
    3) If you want to change that operation 030, yield qty into 15, system giving error message
    4) you want the system to accept the 15 nos in operation 030
    Pl state whether my understanding is right

  • Scrap quantity to be minus with operation sequence is not check in co11

    hello!
    PP experts
    i have problem in confirmation of production order.
    suppose i have production order of 15 qtys.with four operation to be confirmed (co11).
    operation qty.yield srcap qty.
    0010 1 5 0
    0020 14 1
    0030 14 0
    now, in 0020 operation i have 14 yield & 1 srcap quantity & when i go for 0030
    operation for confirmation it will show the default quantity of previous operation,0020 qty. i,e 14 qtys.but if i put the quantity 15 in this operation (0030)
    its allowing to confirmed 15 qtys. because the plan qty is 15.but i want to minus the 1srcap qty. from 15 plan qty. & system should allowed only 14 qtys
    (15-1=14) for confirmation.plus i want the flexibility of operation sequence not to checked.
    i set operation sequence - error when operation sequence is not adhered to in OPK4,its minus the scrap qty. but not allowing the flexibility of operation sequence
    confirmations.
    please send me the setting for the above query in the confirmation (co11)
    regards,
    mangesh

    Hi,
    The same  question was asked few days before by MR Gowri Sankar. The same question you are repeating
    check in OPKP Production scheduling profile in the confirmation Tab
    Enable the check box Adjustment quantities in order to actuals and then try
    in CO11n.
    Also you need to set the overdelivery tolerance as warning message in opk4.
    Regards,
    nandha

  • Scrap quantity to be minus from yield qty. in the confirmstion(co11)

    i have problem in confirmation of production order.
    suppose i have production order of 15 qtys.with four operation to be confirmed (co11).
    operation qty.yield srcap qty.
    0010 1 5 0
    0020 14 1
    0030 14 0
    now, in 0020 operation i have 14 yield & 1 srcap quantity & when i go for 0030
    operation for confirmation it will show the default quantity of previous operation,0020 qty. i,e 14 qtys.but if i put the quantity 15 in this operation (0030)
    its allowing to confirmed 15 qtys. because the plan qty is 15.but i want to minus the 1srcap qty. from 15 plan qty. & system should allowed only 14 qtys
    (15-1=14) for confirmation.plus i want the flexibility of operation sequence not to checked.
    i set operation sequence - error when operation sequence is not adhered to in OPK4,its minus the scrap qty. but not allowing the flexibility of operation sequence
    confirmations.
    please send me the setting for the above query in the confirmation (co11)
    regards,
    mangesh

    Hi Mangesh,
    If QM module is active let quality people decide whether it should be scraped or not?
    dont use scrap in Co15
    Thanks
    Bala

  • Scrap quantity-where can i view my scrap quantity

    Hi Dear Experts,
    We have maintained assembly scrap for FEERT as 10% in mrp1 view.
    pir=200.
    During order confirmation of 200kg,I entered yield as  200kg and scrap 20kg.
    Then after confirmation , both the movements we exicuted successfully i.e., 101 n 261.
    Now In MD04, I can see only my finish matl qty=200 kg , but where can i view my scar qty?
    Please can any one explain in detail?
    thanks in advance.
    Regards
    jeyakumar

    Dear,
    In MCRE , you will get goods issued versus component in BOM comparision or try MCRE.
    Try MB51 , input 261 for consumption and 101 for viewing confirmation .
    or
    Try COOIS select confirmation as layout
    Regards,
    R.Brahmankar

  • Does JDE-E1 Captures Scrap/Damaged Quantity at Component Level

    Hello: I was looking if anyone could point out if JDE-E1 would be able to capture the scrap quantity of component issued to a work order—I do see that the quantity scrap is available in the Work Order completion module for the finished goods items—but don’t see the option to enter the same in the component level transaction. Any insight in this regards is highly appreciated—Thanks, in advance.

    Yes it does. The material issues program P31113/Component Scrap P31116 will do this. You have to issue first, before you can scrap.

  • Quantity of components issued for scrap

    Dear All,
    Is there any t-code (solution) for define quantity of components issued for scrap confirmation in the determined time period.
    Any hint will be greatly appreciated.
    Artur

    Hi
    There is no standard transaction to give the required output.
    You need to create a program with following logic.
    You can get list of production orders, corresponding operations for which scrap is made, scrap quantity etc from table AFRU with input parameters as Posting date, confirmed scarap(XMNGA) not blank, plant.
    then pass on production order, operation number in RESB table with Quantity Withdrawn not blank and get components, and corresponding quantities.
    Above  logic will work only for Planned component consumption.
    Regards,.
    Krishna Mohan

  • Can SAP take scrap into account with determining open production order qty?

    SAP appears to completely ignore scrap on production orders.  This isn't working for us.  What we would like is something like this:
    If the production order is for 20, we've confirmed scrap of 2, and confirmed 10 good, then the open quantity should be 8.  The next time MRP runs, it should re-schedule the 2 for a later date.
    I didn't see any way to accomplish this through settings on the order, or through configuration.  Can anyone recommend a user exit I can use to accomplish this, or did I miss a setting somewhere?
    Thanks,
    Randy

    Hi Randy,
    The scrap you are confirming is basically unplanned scrap...That is basically for consuming the components for the scrapped quantity ...but not to affect the total production.
    In your case you can maintain assembly scrap in material master...so that system will plan extra material while the MRP..
    For ex , if u want toa chieve a final qty of 100 & ur scrapping pattern is 20% ..syatem will plan for 12 % so that u can achieve 100 at the end of production.
    Regards
    Mahesh

Maybe you are looking for

  • ITunes suddenly refuses to open

    I'm looking for some help with my iTunes. I have windows 7 and have been running iTunes on it for months now. Just today I attempted to open iTunes and a few messages came up saying that I'm missing CoreVideo.dll, CoreAudioToolbox.dll, that there are

  • Controling wheelchair by speech command using Neuron Network in labview

    Hi all, I'm doing project about "controling wheelchair  by speech command using neuron network in labview". I found some informations about controling whelchair combine with function microsoft speech recognition in window or something like that but t

  • BPM: percentage growth in table monitoring

    Hello all, I wanted to know whether it's possible to monitor a table in BPM with percentage growth values e.g. I get an alert when the table grows 10% or more per day. I only found the growth monitoring by absolute values like 100.000 records inserte

  • ODBC - why so much overhead?

    I want to connect to an Oracle (10g) database through MSAccess to give some non-techie (remote) users a really simple UI to insert/update data for a short period of time. It's not economical to write an interface for them, and they don't have the mac

  • Zen V Plus Driver Prob

    Hi Guys, i've bought a MP3 Player and everything fine, good player, nice aspect. Ive installed the sotware, restarted the computer and when i connect the usb to the player it cant install me the driver. It gives a error in MTP dri've saying: A error