Sdconfigeration for new plant

Hello All
My client has purchased new plant ,which is not having SAP.Now he wants operations for this plant to be done in SAP, as SAP is available with client.
Pls let me know what all the confirgeration has to done from SD perspective for the new plant creation.
Thanks a lot in advance.
Regards
T.Srikanth

Dear Srikanth,
-->First you need to define the Plant with MM people in the IMG through this path
SPRO>IMG>Enterprise structure>Definition>Logistics General-->Define, copy, delete, check plant
-->Plant need to be assigned to the existing company code
SPRO>IMG>Enterprise structure>Assignment>Logistics General-->Assign plant to company code.
-->As SD consultant you need to assign the new plant to the existing sales organisation and distribution channel.
SPRO>IMG>Enterprise structure>Assignment>Sales and Distribution-->Assign sales organization - distribution channel - plant.
-->Maintain the shipping point determination for the new plant through OVL2 transaction.
-->You need to extend the material to the new plant if you want to do the activities from the new plant with already existing material.
-->If your business involved Excise process then you need to the CIN related settings to your new plant.
SPRO>IMG>Logistics general>Tax on goods movements>India-->Basic settings.
I hope this will help you,
Regards,
Murali.

Similar Messages

  • Roll out for new plants

    Dear All,
    I would like to know what are the steps taken to roll out a running SAP project for new plant ?
    Regards
    Mohan

    Check this:
    http://www.open.hr/hiz/hrusko/RolloutPresCASE3.pdf
    http://software.silicon.com/applications/0,39024653,39167631,00.htm
    http://help.sap.com/saphelp_sm40/helpdata/en/45/5af1f3e5f81dece10000000a155369/content.htm
    Thanks..
    Shambhu

  • Error when I create the New material Master (MM01) for New Plant.

    Dear experts,
    I got the error when I create the New material Master (MM01) for New Plant.
    Error:  Valuation Area 2800 Not yet productive with Material Ledger.
    So Pl send me the solution asap.
    Venkata Raju Khottari

    Hi,
    Have u assinged Plant to Company code?
    If u say no, use T.code OX18.
    Regards,
    Murali
    Assign points if it is useful.

  • Roll out for new plant need some informations

    Hi,
    We are going to roll out for our 2nd plant. So I need your help.
    I am explaining the scenario,
    Current scenario is: we have two manufacturing plants (ex:-one in noida and another in gurgaon) and in both plants we have six product line (in A plant=3, in B plant=3).
    For both plants we are using one Company code (1000). and we are not using the business area.
    But now the problem is this, that management wants separate reporting (P&l statement and Balance sheet) Plant wise and Product wise.
    We decide to create a separate co- code for 2nd plant and six business area for product lines.
    (In this regards I need your suggestions that how can we define the enterprise structure)
    Please tell me
    1. what new configurations we need to be done for new co-code?
    2. In which areas business area will be affected and how and where we will assign the business area?
    3. As we are doing transaction in sap since last year and we are doing this roll out in mid of 2008 so what will be the impact on the business.
    4. How we will transfer the transactional data from one co-code to another, because data of both plants lies in previous co-code(1000).
    Data like:- A. Transfer of General ledger balances
              B. Transfer of open line items of General ledgers
              C. Transfer of asset and accumulated depreciation from one co code to another.
              D. Controlling transfer postings.
              E.  Customer / Vendor open items and balances transfer posting. Etc
    If someone knew about something more to be taken care of, please guide so that we can successfully complete the roll out.
    Please advice me, its urgent. if any one can give me his mobile to make me understood i can call to him .
    Thanks and regards
    Kuldeep singh

    if they want to a seperate P&L and B/S the why dont you make them as profit centers where you can take a P&L n B/S. at this level

  • Create/extend materials for new plant with new profit centers

    Hi.
    We have created a new plant and want to create/extend the materials from an existing plant to the new plant (with new profit center). Can this be done via MM17?
    Regards,
    Kjettern

    Hi Kjettern,
    To extend the existing material to a new Plant/Profit centre, pls follow the following steps: -
    1. Copy down the material number (i.e XYZ) you want to extend.
    2. Go to t-code MM01.
    3. Enter the material number (i.e. XYZ) you copied from (1) into the Material field and hit ENTER.
    4. You will get an information on the bottom that "the material type XXX and the industry sector YYY has been copied from master record".
    5. Pls note that Basic Data 1 & 2 is not changeable as the same set of material data will be used when a material is extended.
    6. Hit ENTER again. To change other details other than Basic Data 1 & 2, select the views that you want.
    7. You will be prompted to enter a Plant. Here you must enter the new Plant that you want to extend the material to and hit ENTER.
    8. You will get a confirmation stating that the material already existed and will be extended (to the desired Plant u entered in (7)).
    9. Ensure that all the data in all the important tabs are maintained, for the right Storage Location, Warehouse Num, Moving Average Price, Standard Price etc. before proceed further.
    10. Hit Save. You will get a msg that "Material XYZ created".
    Now you are able to use this material number in the new Plant you created.
    Hope this helps.
    Rgds.

  • CO Activities for New Plant

    Dear Experts,
    I am an FI consultant and involving CO module also working for a Roll out Project.
    We already created a Co. Code, one Plant for New production (EOU) unit.    Now we are planning one more plant with Direct Sales activity.
    I want to prepare a Project Plan for CO.
    Can anybody give me gudelines, if a new plant created what is required for both FI & CO activities.
    Thanks in advance for your help.
    Regards,
    SS

    Hi,
    The main important things you need to configure regarding new plants are mentioned below:
    1. Standard Hierarchy - Profit center & Cost Center accounting
    2. The Automatic account assignments for Manual Posting ( this is a bit time consuming)
    Hope it helps.

  • Update for MIC - Qn / Ql for new plant

    Dear Experts,
    I need one clarification.
    we have created one new plant in quality inspection side, till not created any code group and selected set
    for the particular new plant.
    But already having the code group and selected set for the existing plant.
    It is possible for use the existing plant code group and selected set in new plant.
    or
    It will be created in new code group and selected set in new plant.
    What is the way for update in single item  and mas  update procedure.
    through any t.code or LSMW?
    I am waiting for yours valuable feedback.
    Thanks with best regards,
    N.Umapathy

    Hi,
    these all variants which are not transportable...you can directly do test in quality and production...
    Kuber

  • Release Strategy for New Plant

    Dear All,
    I have a Release strategy in my 3 Plants  and it is working fine.
    Now I want to add one more plant under the same release strategy.
    I tried to add the new Plant in CL24N. System allows me to add the same in this but the RS is not working in this new Plant.
    waiting for reply

    hi,
    you follow the following steps to insert new characteristics value in your release procedure.
    1. define the new characteristics value plant4 in your characteristics.
    2. assign the same characteristics value plant4 in classification of release strategy.
    3. run the release simulation and comes out.
    4. now create PO for your requirment and save it.
    5. u can use me22n/23n to view your release status of po.
    hope it helps....
    manoj singh

  • Core Interface for new plants

    Hi All:
    We created new plants and have all the other transaction data.  But when I created the IM for these plants and activated the model, I do not see these plants data in APO.  I tried it a few times.  I checked if the connectivity between APO and R3 was an issue.  It is not.  What are the things I can look for?  Transaction /SAPAPO/C3 gave me one message 'Incorrect import parameter for method /SAPAPO/CL_CURTO_DB=>SAVE_DATA.

    Sorry... I send the message before I completed the message.....
    Hi All:
    Looks like the new locations has been CIFed already.  Then I created an IM for some specific materials and some of these plants.  I could activate the model, I do see these material plant combo in the active IM (CFM2). But they are not in APO (RRP3 or MAT1). 
    I checked the following transactions in R3 (SLG1 and CFG1) and (/sapapo/C3).  I dont see any log for these.
    I checked the queues both in R3 and APO and they are not blocked.  But there are many other logs in APO that are greyed (not red, not green) which tells me that they have not been processed yet.  My suspicion is if are processed at all. 
    I checked the connection (changed a factor in an existing material plant and they flow).
    Can anyone help pl?

  • For new Plant should we have to create a new sales organization?

    Hi Experts,
    I am going for one roll out project. In that we have to create new plant, so should i have to create new sales organization or else we can use the same. And also tell me what are the benefits & disadvantages of that.
    Thanks & Regards
    Chavi Patle
    Edited by: chavipatlesd on Jan 30, 2011 8:33 AM

    hi
    i will say only one logic here.
    if you define the plant or new plant you need to extend all the other organisational units for it right.
    then i there is no need for creation of new SALES ORGANISATION on the same.
    please take the advice of your PM in this regard he might be having different views from reporting perspective and might be your roll out project needs a new sales orgn or not.
    if you ask us thre is no need for creating a new sales organisation on the same.
    advantages:
    if there is a really need for creating a new sales orgn as wellas plant this mihgt be for reporting perspective only & analysis will be very clear.
    disadvantages:
    this is not a disadvantage but from Enterprise Structure point of view master data will increase ofcourse this master data is needed for smooth processing of SYSTEM
    hope this clears your issue.
    balajia

  • Config for new plant

    Hi,
    Scenario: We already have the entire config details for a certain plant (xyz). now the company has come up with a new
                    additionl plant wherein all the PM related configurations has to be the same has the exixting plant.
    How do we do this? Is their an option for copying the entire set of config data
    Thanks
    Arun

    Hi Arun,
    If you have already done the PM configuration for the other plants then in that case, you have to first assign the new plant to the company code under which the new plant should be. This process will be exactly the same as the way the MM Organisational Structure is created SPRO-> Enterise Structure-> Definition-> Logistics General->Define Copy Check plant. This way you can define a new plant. Next if you need this plant as the maintenance plant then in that case you will have to Maintain the maintenance planning plant , which will be to create a same maintenance plant as the plant you created. Got to SPRO-> Enterprise Structure-> Definition-> Plant  Maintenance- > Maintain Maintenance Plant. In the next screen press new entries and select the plant you created from the drop down in the first field called planning plant. This way you will create a maintenance planning plant. This will be followed by the assignmnt of the plant to company code SPRO-> Enterise Structure-> Assignement-> Logistics General->Assign plant to Company code. Next you will have to assign  the maintenance plannign plant to Plannign plant which is done by SPRO-> Enterise Structure-> Assignement-> Plant maintenance and Assign Maintenance plannign plant to mainetnance plant.
    This will complete the organisational structure for the new plant, this can be followed by all other setting and configuration which you must have already done for other plant.
    I hope this was helpful.
    Regards
    Anoop

  • Error while extending material for new plant

    Dear All,
    We have created new plant  through  copying old plant.
    But when I try to extend the material to the newly created plat system giving error message
    Tables TCURM and T001w inconsistent : notify your system administrator
    Msg no M3820
    Diagnosis
    Valuation is at plant level. However, inconsistencies have arisen because of the way in which the plant was configured in Customizing or because plants have not been assigned to a company code.
    kindly help me out to over come this issue as early as possible.
    Regards,
    murali.

    hi
    check following links
    [link1|Tables TCURM and T001W inconsistent; notify  your systems administrator;
    [link2|Tables TCURM and T001W Inconsistent;

  • Abap dev for new plant

    Dear all,
    We acquired new plant, and we are inegrating that new plant which is not in sap, into our sap system.
    and lots of customizations have to be done.
    I understand that on the mm front new plants creation, assignments to cocode, BA etc happen.
    I am quite sure about abap front.
    What developemnts would be needed on abap front:
    like extension of all teh materials to the new plant.  I think this can be handled through LSMW.
    what else abap developments do i expect.

    This will depend on, when and where the data related with plant is required.
    As per my understanding the ABAP development which summarize the data at plant level will be impacted.
    In case , you have hardcoded values on the basis of plant , then you have to consider the new plant also.
    Get all the Z reports related with plant information and check. Its will be easy if you view the modification log and naming convertion.Hope it help you.

  • 2LIS_03 Extractors for new Plant and Company Code

    Hi Gurus,
    I would like to seek for your help regarding 2lis_03 inventory extractors.
    - May I know the sequence of initialization for 2lis_03_bx, 2lis_03_bf and 2lis_03_um? How about the dependencies of each?
    - How about if there are new Company Code or Plant to 2LIS_03_UM, should I do the reinitialize again of the 3 extractors? or the delta would take all the new records regardless of the plants that were maintained from the first init?
    Your response is very much appreciated

    Hi Ethan,
    Please have a look at Re-initialization of the Material Stocks/Movements cube (0IC_C03) with 2LIS_03_BF, 2LIS_03_BX and 2LIS_03_UM in BW 7.x.
    Reinitialization is not necessary if you did not enter any plants or company codes explicitly in the selection criteria.
    Best regards,
    Sander

  • Excise not picked in SO for new plant

    Hai gurus,
    Excise is not picked up while creating a sale order for a newly created plant. If I use a existing plant , Excise is picked in SO. I have maintained the condition record for the newly created plant also.
    Can U say where I would have gone wrong.
    Points will be rewarded.......
    Regards,
    vimal

    Dear Vimal
    I have already answered this question and your problem is solved.  Can you please close this thread also if so.
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • Some sites cannot be accessed after Mountain Lion

    Since I have downloaded Mountain Lion I cannot access the sites of my employer anymore (www.superiorenergy.com) Also I cannot access our portal for the intranet and not receive my email via Outlook and webmail. It seems that always when "superiorener

  • OSX 10.4.6 / Adobe CS2  Install conflict?

    I'm trying to install Adobe CS2 Premium. I've installed from this disk set on a number of G5's in our office successfully in the past. However, this was prior to OSX 10.4.6 I've attempted this install on 3 computers in my office. All PowerMac G5's ru

  • Can't export to TIFF or JPG in CS3

    I'm working on a project and trying to export a 8.5 x 11 image out of CS3 to a JPG or TIFF. It keeps telling me one of two errors, first that the image size exceeds the limit for rasterization OR error memory insufficent to complete. I am working on

  • Location field is worthless

    I want to enter a location of a meeting as:  Building Name, building address and then the city.  Location field refuses to accept this and keeps defaulting to Building address, city AND THEN Building Name.  Excuse me Apple, but I know exactly how to

  • HT4009 Cancel In-App purchase monthly subscription

    How can I cancel an in-app monthly messaging service that I used to subscribe to? I've deleted my account from the app, deleted the app from my phone, yet I'm still charged the monthly messaging "pro" feature, for $10/mo. I can't find ANYWHERE on app