Seeking a capacity planning consultant

Xpede is an financial services application service provider based in
Oakland, CA, seeking an capacity planning consultant for an short term
(under one week) initial engagement, with possible on-going consulting work.
Please send resume, qualifications, hourly rate or a fixed price bid to
[email protected]
Capacity Requirements Plan (2-5 days)
The Plan concentrates on the responsiveness, scalability, and throughput of
our middleware infrastructure through investigation, analysis, and a formal
report. This service is conducted as a pre-deployment evaluation. The
consultant will work with our staff to identify or establish our capacity
requirements in quantitative terms, which express the requirements for an
application and architecture, and will encompass both current and future
timeframes. Performance metrics may take the form of expected transaction
rate (workload), response time, growth factor, user capacity, database size,
and others. The time invested in this phase can be reduced when such
information already exists and can be provided to BEA.
- Performance Assessment Management Reports
- Benchmarking
- Performance bottleneck identification and resolution
- Performance tools (such as workload generators) to be developed
- How to interpret metrics
- How to gather metrics
- What metrics to gather
- Reference architecture on Solaris platform (build-out)
Qualifications
3-4 experience on Weblogic platform, with over 20 projects. In-depth
understanding of BEA technology, able to plan and design the architecture of
middleware projects. Able to design architectures using associated
technologies (Java, Object-Oriented Design and Analysis, Solaris, Veritas,
Netscape/iPlanet, Oracle). Experience with large-scale, full life-cycle
projects. Able to share technical and business knowledge with others.

thnx for the  reply, Alex.
in the application tier, i would like to have  2  boxes:
1) service applications only like MMS, UPSA in one box
2) can i include  search service appln in second box which is also a   search  query server? or
i need to create/configure search serv.appln in the first box itself?
i have created a farm topology as  shown above:
 would like to know whether its correct or not:  

Similar Messages

  • Seeking a Weblogic capacity planning consultant

    Xpede is an financial services application service provider based in
              Oakland, CA, seeking an capacity planning consultant for an short term
              (under one week) initial engagement, with possible on-going consulting work.
              Please send resume, qualifications, hourly rate or a fixed price bid to
              [email protected]
              Capacity Requirements Plan (2-5 days)
              The Plan concentrates on the responsiveness, scalability, and throughput of
              our middleware infrastructure through investigation, analysis, and a formal
              report. This service is conducted as a pre-deployment evaluation. The
              consultant will work with our staff to identify or establish our capacity
              requirements in quantitative terms, which express the requirements for an
              application and architecture, and will encompass both current and future
              timeframes. Performance metrics may take the form of expected transaction
              rate (workload), response time, growth factor, user capacity, database size,
              and others. The time invested in this phase can be reduced when such
              information already exists and can be provided to BEA.
              - Performance Assessment Management Reports
              - Benchmarking
              - Performance bottleneck identification and resolution
              - Performance tools (such as workload generators) to be developed
              - How to interpret metrics
              - How to gather metrics
              - What metrics to gather
              - Reference architecture on Solaris platform (build-out)
              Qualifications
              3-4 experience on Weblogic platform, with over 20 projects. In-depth
              understanding of BEA technology, able to plan and design the architecture of
              middleware projects. Able to design architectures using associated
              technologies (Java, Object-Oriented Design and Analysis, Solaris, Veritas,
              Netscape/iPlanet, Oracle). Experience with large-scale, full life-cycle
              projects. Able to share technical and business knowledge with others.
              

    Hi,
    What should be the Heap size cannot be determined by the RAM size 32GB or 64GB. It depends on the Application...Application Functionality, How many Long living objects it creates , how many JNI calls it makes, How many Jars/Classes it loads, How many users requests your application at peak load, what kind of Caching you are using...etc
    Above things are the points which can be used to determine the required Heap Size and the JVM tunning options.
    There is no standard calculation or Formula available...The only option to determined the required Tunning parameters and JVM settings is...Load Testing and Performance Testing.
    Thanks
    Jay SenSharma
    http://middlewaremagic.com/weblogic/?page_id=2261  (Middleware Magic Is Here)

  • VoIP and Video capacity planning

    For 1000 users, what is the bandwidth for backbone to run VoIP and video?
    Thanks

    the above link is very good as it pertains to 'per call bandwidth consumption'
    you may need to use a little more to find your answer such as a capacity planning procedure(s). since you have voice and video, this will be two part.
    (minding that video if used for all users will require much more capacity than the voice; possibly upto 50 - 100 times more depending on your use/needs)
    some decent capacity planning providers, case studies and best practices are as follows:
    42U - obtain a free capacity planning consultation.
    http://www.42u.com/proj-eval.htm
    nice case study by cisco on capacity planning:
    http://www.writtenright.net/Portfolio/WrittenRightCaseStudy.pdf
    (for do it yourself)
    a very good 'best practices handbook' by wainhouse:
    http://www.wainhouse.com/files/papers/wr-best-net-vnvoip.pdf

  • Purchase Requistion,Purchase Enquiry, Sales Enquiry,Capacity Planning & Sch

    Hi All,
    I am working in SAP business One for quiet long time as Functional Consultant and i am very much aware with its design. And Now SAP is bringing SAP HANA also for Mid Size Company or you can say in SAP Business One.
    BUT ...............
    In any industry vertical there is always requirement of Purchase Requistion (Department Wise) , Purchase Enquiry and sales enquiry is Must to buy or sell the Item.
    Why dont SAP is providing three different FORMS like sales Quotation , (Sales Enquiry) , Purchase Quotation (Purchase Enquiry) and Material Indent or Purchase Requisition (Dept. Wise) This i am spcifically asking just because the requestor doesn't knnow the Suppliers Name.
    And This functionality is in SAP ECC .
    This will reduce ADD ON
    MRP is enhanced so beautifully in Latest Version but only Capacity Planning & Sceduling is Missing.
    Capacity Planing and Sceduling if possible then I think Maximum Industry accross the World will consider SAP Business One
    I hope by this forum i am Just Pointing this. So that we can get in near future
    If anyone  gets any clue on this please let me know.
    Please Join hands if this feature what i discussed is really required .
    Thanks & Regards
    Ashish Gupte

    Hello Friend,
    I am very much agree with your suggestion
    But every one know that ECC is not for SMB sector so it is full flesh ERP compare SAP Business one and may be these form will part of SAP business one road map.
    Because SAP has added some rich process for MRP but after get suggestion from form and these link form http://forums.sdn.sap.com/forum.jspa?forumID=265&start=0
    and these given above link also is a good place for your question
    Thanks
    Manvendra Singh Niranjan

  • Capacity planning for inspection

    Hi,
         I would like to plan for capacity required to complete inspection lots at our labs. This should include inspection types for 01, 03, 04 and 08. Is there a way I can do this in SAP ? I am planning to use an enhancement and create a planned order for every inspection lot (1:1 relation). But I don't know how that will work. Does anyone have any ideas ?
    Thanks

    Hi GS,
    I think that's a good question, might not have been explored much.
    I think, you can try to utilize the potential of "Quality Work Center" attached to inspection operations, and activate Machine and Labor as capacity categories, use relevant formulas and try the standard Capacity planning process for PP.
    For more details, please go through the links -
    1. http://scn.sap.com/community/erp/manufacturing-pp/blog/2013/10/23/capacity-planning-or-scheduling-leveling-maybe-sequencing
    2. Capacity planning - ERP Operations - SCN Wiki
    3. Capacity Planning (PP-CRP) - SAP Library
    4. http://scn.sap.com/docs/DOC-49431
    Please do further search on this subject and work with PP consultant to use this functionality. Finally share your results once you are done
    Thanks,
    Arijit

  • Capacity planning issue

    Dear all
    My customer has two actor types: project managers PM and 7 work center managers WCM, with strong antithesis: PM looks at project quality and productivity; WCM looks at his resources capacity planning.
    Every PM defines wbs basic start / finish dates with appropriate, large and comfortable time lag. Into this time lag, during the capacity planning, the WCMs can set definitive activity start / finish dates, by their needs (and with user status communicates to PM the happened choice) .
    The generic project is composed of more wbs elements and 7 networks: all activities of a generic network are assigned to only one work center. Every lowest wbs element has only one activity.
    Every PM plans dates (large and comfortable) and efforts on network activities; schedules via bottom up and copies wbs scheduled dates on basic dates. After, CP sets the top down scenario and save the project. In IMG, network profile, the type of checking during top-down time scheduling is u201CEu201D:  exit with error (transaction code OPUU).
    Every WCM using transaction code CM01 doesnu2019t see the WBS constrains. So doesnu2019t know the wbs dates range. Moreover the WCMs donu2019t like a dashboard like CM01 because it is not user friendly. They prefer a graphical dashboard. 
    My personal idea to resolve this issue is use transaction code CM21 or similar with the display of wbs time lag. Is it possible?
    Is there anyone who could help me, please? I am also interested in other technical solution.
    Thanks in advance.
    Salvo50

    Venky,
    1) Sales order when enter in the system can perform the capacity availability check ?
    Not in ECC/R/3.  However, in APO this is possible.
    2) The delivery dates & confirmation in the sales order is on what basis?
    Depends on how you have configured your availability check.  There are a number of possibilities.  Many companies confirm MTS orders to Total Replenishment Lead time in the Material master.  Other companies leave the orders unconfirmed until Planning has created supply elements (production orders).  
    As far as the delivery date is concerned, it can also start with the confirmed material availability date as calculated by ATP, and then additionally schedule in the warehouse pick-pack-load times, and route transit time (the time it takes to move the shipment from your loading dock to the customer's location.
    In 'Assemble to order' (a special version of Make To Order) it is possible to confirm to the scheduling time of the supporting Finished goods production orders combined with the availability of the components of the FG production order.
    In R/3, some companies will confirm the MTS sales order to a date that is farther into the future than the actual estimated process time including capacity backlog.  Then, they run MRP to create planned orders.  Then, they run Capacity leveling.  Then, they run BackOrderProcessing (rescheduling) of the sales orders to re-confirm to the planned or production orders that have been capacity leveled.  In this way, Sales orders are indirectly confirmed to capacity.
    Consult with your local SD and PP ATP experts to discover the options available.
    Rgds,
    DB49
    Edited by: Dogboy49 on Jan 6, 2010 10:37 PM

  • Capacity planning 9iAS/Portal and/or 9iAS

    I've looked all over metalink and otn, and can't find any good info on capacity planning for 9iAS/Portal, or 9iAS in general. #CPU, RAM, etc.
    This is the closest I've gotten so far:
    http://technet.oracle.com/products/ias/install-faq.html
    http://otn.oracle.com/products/forms/pdf/6iscalability.pdf
    Does Oracle just refers customers to their www.oracle.com/consulting ($?) group for this information, or is it documented somewhere that customers can see?
    I understand that for a complex large scale enterprise Portal deployment that it would be necessary to hire consultants for hardware sizing and architecture, but there have to be some free guidelines that would be useful for customers with smaller requirements?
    Thanks,
    Eric D. Pierce
    Information Technology Consultant
    [email protected]
    (916) 278-7586

    This was posted the day prior to our offline discussion. Am still interested in continuing our conversation (via this forum if you'd prefer).
    Have you had a chance to look at the cacheability report that I had sent to you?
    Aside from server clock issue I'd like to know what etags are used and generated by the portal infrastructure.
    This is an important issue for our globalization project.
    Many thanks and hope you're traveling safe!
    Jyotika

  • Operations are not getting despatched in capacity planning table

    Hi Experts,
    I am using capacity planning table (Graphical) to level the capacities and sequence the process orders. The start date of my orders are very well in future and sufficient capacities also is available in resources. But when I go to CM25 and select one order and click on despatch, system is not despatching it. This is the case for almost all the overall profiles.
    The surprising factor is, this function was working fine earlier without any issues. I havent done any changes in configs which will affect capacity planning.
    What can be the reason for this? Any thoughts please?.
    One more thing. Is there any option to avoid the capacity planning step if Iam using R/3 and manage it by some other way?
    Appreciate your earlier reply
    Thanks & Regards
    Prathib

    Most likely you didnt define the rowsource key properly. Please look under <install>/errors folder for any file there.
    Also, please read the documentation. There is information there about how to troubleshoot a loading problem. Please always read the documentation and we would appreciate feedback on the documentation.
    http://download.oracle.com/docs/cd/E17236_01/epm.1112/iop_user_guide/frameset.htm?launch.html

  • Machine capacity planning and efficency

    Dear Guru,
    I have number of machines and i want there individual capacity and efficency can we see that by any report or any tcode to see all capacity of machine.What is capacity leveling.
    Is thee any configuration for capacity planning.
    Thanks in advance

    Hi, the following configuration steps involved in the capacity planning: SPRO --> IMG --> PRODUCTION --> CAPACITY REQUIREMENT PLANNING Capacity Requirements Planning: 1) Define time units 2) Define Capacity Category 3) Set up Capacity Planner. 4) Define parameters 5) Define Standard value key. 6) Define Move time matrix. 7) Define Setup matrix. 8) Define Control Key. 9) Define Shift Sequence. 10) Define Key for performance efficiency rate. 11) Define Formula parameters. 12) Specify Scheduling type. 13) Set up Production scheduler group 14) Select Automatically. 15) Define Scheduling parameters for Production orders 16) Define Scheduling parameters for networks. 17) Define Reduction Strategies planned/ production orders. 18) Define Reduction Strategies for network/process orders. 19) Define Control Profile. 20) Define Selection profile. 21) Define time profile. 22) Define Evaluation profile. 23) Define Strategy Profile. You can follow these above configuration steps in capacity planning Yes you need to active your all work center for the finite scheduling at the bottom of capacity view. Use all standard SAP configurations, Capacity Leveling Profile. Define time profile in OPD2. Define the strategy profile in OPDB Define the Overall profiles in OPD0. Then only you need to to active your all work center for the finite scheduling at the bottom of capacity view in work center.(CR02) Then run MRP with scheduling- 2 Lead time scheduling and capacity planning.(MD02) You will get your capacity requirement in CM01, or CM25/CM21. In rem you can use MF50. -
    OR refer below steps Capacity Planning Evaluation: Use this procedure to Evaluate the Capacity of a Work Center (Resource). The same transaction will be used for finding out the Capacity Overload on the Work Center Select Logistics -> Production -> Capacity Planning -> Evaluation ->Work Center View ->Load and go to the Capacity Planning Selection screen (CM01) Through capacity planning : Standard overview :System will show week wise overload in Red Color. If there is no overload then system will show in the normal color. Date wise Capacity can be overviewed. If there were capacity overload, system would show with Red Color indication and Percentage overload can be viewed. Through capacity planning : Standard overview: Details: Date wise, planned process order wise capacity requirement. Through capacity planning : Standard overview: Graphical: Yellow Color indicates capacity lying un-used. Red Color Bars is the indication for Capacity Overload and Blue Color Bars indicate for Capacity available Use this procedure to Level / Schedule the Capacity of a Work Center Capacity Planning - Levelling/Scheduling: Select Logistics ->Production->Capacity Planning -> Levelling -> Work Center View and go to the Planning Table (Graphical) screen (CM21) Key Points u2022 This would be used for Shop floor production scheduling u2022 Capacity Scheduling is mandatory for correct results of Master Production Schedule and Material Requirement Planning For settings: Define formulas for resources: (OP54) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formulas for resources. For formula parameters for Resource/workcentre:(OP51) IMG -> Production Planning For Process Industries -> Master Data ->Resource->Capacity requirements planning->Formulas for resources->Define formula parameters for resources-> Standard Value u2013 Define Parameters (OP7B) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Parameters Define standard value key(OP19) IMG -> Production Planning For Process Industries -> Master Data ->Resource-> General Data -> Standard value -> Define Standard Value First configure the below settings in the capacity Planning. 1) Define time units Path : SPRO ->Production-> Capacity Requirements planning ->Master Data-> Define Time units (OPCF) 2) Define Capacity Category Path : SPRO ->Production ->Capacity Requirements planning->Master Data-> Capacity Data ->Define Capacity category. 3) Set up Capacity Planner. Path : SPRO ->Production ->Capacity Requirements planning -> Master Data->Capacity Data -> Set up Capacity Planner 4) Define parameters Path : SPRO->Production ->Capacity Requirements planning -> Master Data ->Work Center Data->Standard value ->Define Parameters (OP7B) 5)Define Move time matrix. Path : SPRO -> Production-> Capacity Requirements Planning -> Master Data-> Work Center Data -> Define Move time Matrix (OPCN) 6) Define Setup matrix. Path : SPRO -> Production ->Capacity Requirements Planning -> Master Data -> Routing data -> Define Setup Time Matrix 7)Define Control Key. Path : SPRO-> Production-> Capacity Requirements Planning -> Master Data ->Routing data -> Define Control Key(OPCG) 8) Define Shift Sequence. Path : SPRO -> Production-> Capacity Requirements Planning -> Operations -> Define Shift Sequences (OP4A) 9) Define Key for performance efficiency rate. Path : SPRO-> Production -> Capacity Requirements Planning -> Operations-> Available Capacity-> Define Key Performance Efficiency Rate (OPDU) 11) Specify Scheduling type. Path : SPRO ->Production ->Capacity requirements Planning->Operations->Scheduling ->Specify Scheduling Type (OPJN) 12) Set up Production scheduler group. Path : SPRO ->Production->Capacity requirements Planning -> Operations -> Scheduling -> Set up Production Scheduler Group (OPCH) 13) Select Automatically. Path : SPRO -> Production -> Capacity Requirements Planning ->Operations->Scheduling ->Task List Type-> Select Automatically (OPJF) 14) Define Scheduling parameters for Production orders. Path : SPRO -> Production ->Capacity Requirements Planning-> Operations->Scheduling -> Define Scheduling Parameters for Production orders (OPU3) 15) Define Reduction Strategies planned/ production orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies->Define reduction strategies planned-/production order 16) Define Reduction Strategies for network/process orders. Spro-> Production->Capacity reqirements planning->operations->Scheduling->Reduction strategies-> Define reduction strategies for network/process order 17) Define Selection profile. Spro->Production->Capacity requirements Planning->Evalution->Profiles-> Define selection profiles Hope clear to u. Regards Alok

  • Capacity planning and schedulng production order based on availabe capacity

    Hi Gurus,
    I am trying to use capacity planning, when the production order is created it takes the order start date as the requirement date. Then when i do he capaity check it says capaity not available. After finite scheduling again it proposes to shift operations by certain days.
    I need the capity to be check in MRP and the palled orders to have start dates based on aviable capity, currenty all the palled orders are starting on the requirement date irresptive of avaiabe capaity. I tried using finite scheduling option in MD02 still it does not take in to account exsting production orders for giving dates of the planned orders.
    Regards
    Abhi

    Dear Abhishek,
    1) This is Std SAP of MRP, only material Av check will be carried out in MRP & create procurement
    Proposals
    2) Capacities will not Checked  ( consider ) in MRP in Std R/3
    3) Your Need can be only met through APO
    Regards
    Madhu

  • Bandwidth Utilization Avg or Max for capacity Planning best practice

    Hello All - This is a conceptual or Non-Cisco product question. Hope you can help me to get this best industry practice
    I am doing a Capacity planning for the WAN Link Bandwidth. To study the last month bandwidth utilization in the MRTG graph, i am seeing  two values
    Average
    Maximum.
    To measure how much bandwidth my remote location is using which value i have to use. Average or Max?
    Average is always low eg. 20% to 30%
    Maximum is continuous 100% for 3 hour in 3 different intervals in a day and become 60% in rest of the day
    What is the best practice followed in the networking industry to derive the upgrade size of the bandwidth by using the Utilization graph
    regards,
    SAIRAM

    Hello.
    It makes no sense to use average during whole day (or a month), as you do the capacity management to avoid business impact due to link utilization; and average does not help you to catch is the end-users experience any performance issues.
    Typically your capacity management algorithm/thresholds are dependent on traffic patterns. As theses are really different cases if you run SAP+VoIP vs. youtube+Outlook. If you have any business critical traffic, you need to deploy QoS (unless you are allowed to increase link bandwidth infinitely).
    So, I would recommend to use 95-percentile of maximum values on 5-15 minutes interval (your algorithm/thresholds will be really sensitive to pooling interval, so choose it carefully). After to collect baseline (for a month or so)  - go and ask users about their experience and try to correlate poor experience with traffic bursts. This would help you to define thresholds for link upgrade triggers.
    PS: proactive capacity management includes link planning for new sites and their impact on existing links (in HQ and other spoke).
    PS2: also I would recommend to separately track utilization during business hours (business traffic) and non-business (service or backup traffic).

  • Setting needed for Capacity Planning.

    Hi PP Gurus,
    I want to know what setting we have to do for capacity planning.
    what I know is:
    1. W/C should be set for finite scheduling.
    2. In scheduling parameters for process order tick "Generate capacity Requirement".
    This both setting are made in my scenario, but it is'nt loading the work center fot that week.
    Any other setting nedded?
    Thanks, in advance.

    Dear ,
    You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
    1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
    2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
    1.Automatic Scheduling check box should be marked
    2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
    3.Scedulinga and Generate Capcity should be ticked .
    3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
    4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
    6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
    6.Period Profile : SAP___P001 -Weekly period
    7.List Profile : SAPSFCI001-Production Planing
    Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
    Refere the below theread for farther reference :
    Capacity problem in production order
    capacity planning
    Hope this will be useful .
    Regards
    JH

  • How to go about capacity planning for storage ?

    Hi Experts,
    How to go about Capacity Planning? For  instance if clients wants to upgrade to new server and new storage and asks us how much additional storage do you need for next 5 years, how can calculate the amount of storage.
    I don't have any baseline info about the server of past years. Where can I start and any scripts you guys use for doing capacity planning?
    Appreciate your help.
    Thank you.
    Sam

    Please see this link:
    SQLAuthority News – Storage and SQL Server Capacity Planning and configuration...
    T-SQL Articles
    T-SQL e-book by TechNet Wiki Community
    T-SQL blog

  • Planned order splitting during capacity planning

    Hello,
    anybody plese help me during the capacity planning in T.code.CM31 i want to split a planned order and want to assign alternative sequence. how can i do this and the capacity should be reschedule automatically to my requirement date. i am using backward scheduling.
    plese suggest immediately
    Thanks and reagards
    Bhakta

    Dear Bhakta
    MRP does not perfom any Capacity Requirement Planning .While  you are executing MRP with Lead Time Scheduling , MRP proposes Planned Order Dates based on the Routing Operation Timing not based on the Work Centre available Capacity because in SAP Std R/3 we did not have scope to check the finite scheduling and capacity requirement chek .MRP assume that Work Centre has infinite available capacity .
    In MRP run , it will give you Detail scheduling of the Operation in Planned Order -Detail Scheduling tab  and copied the routing , BOM as master data .When you convert that Planned order to Production order , it will copy the Routing details based on the Order Type denpendt Parameters -OPL8-Routing -Alternative sequnce  and Automatic selection -3 option
    Thats why we have Capacity Requirement Planning  for Detail Capcity check and production order scheduling  .
    Note : Earlier to my first  reply , please note that you have option in CM21  enter sequence number  at order level which may applicable to you .CM21-Work Centre -exectute -Select the Order from order pool -Goto Order -Sequence number maintainence
    This number( sequence number operation /order )  that can be assigned to production orders or planned orders at the level of the task list header and is therefore valid for all the operations in an order.
    Hope this is clear .Revert if you nees farther help
    Regards
    JH
    Edited by: Jiaul Haque on Jul 5, 2010 3:32 PM
    Edited by: Jiaul Haque on Jul 5, 2010 4:01 PM

  • How to use parallel sequence in capacity planning.

    How we can use parallel seq in capacity planning?we have two machines which can be run parallel for production ,now how  to distribute capacity load? suppose for the production of 100 km,we required 1000 min when it is produced through only one machine.Now if 2 machines are used simultaneously we required 500 min.How to see this in capacity planning?

    Dear,
    For calculating Available capacity you have options like minimum capacity, normal capacity and maximum capacity. You can select this option in work center-capacity tab for individual capacity category.
    With parallel sequence and with both machines you can select maximum capacity option and plan your capacity.
    Hope this is helpful.
    Regards,
    Prasad