Selection of Operation on Work center

Dear all,
In repair order ,when iam performing Repair Auction i need to activate Operation selection using work center setting.
Where can i activate this Functinality *so that i can choose from pop-up screen of particular  the Work center and its Operations.
Thanks in Advance
Regards
raj.

Hi,
Have you selected the Operation selection at the given node,
Plant Maintenance and Customer Service -> Maintenance and Service Processing -> Maintenance and Service Orders -> Functions and Settings for Order Types -> Default Values for Task List Data and Profile Assignments
Then try processing. Hope it will solve your issue.
Regards,
N.Nagaraju

Similar Messages

  • Shift operator in work center

    Our plant works in 3 shifts. for every shift there are total six persons working on it. 2 in each shift.
    we need to assign the name of person working on the particular machine. Where can be the assignment  of the actual person working on the workcenter be made.
    thanks and warm regards.
    Edited by: pankaj lade on May 8, 2008 12:32 PM

    Hi,
    One information required..
    Why you wanted to have the operator names to be attached to your work centers?
    You can have the Operator Names at the time of Confirmation of the Operation (This is what you wanted for Tracking purpose?)
    1. Have the Operator Name or No. in Personal Number Filed in CO11N (you need to actvate the HR Transactions)
    2. Activate a Stadard Value key with Operator and during confirmation the relevnt operator can enter their name or No. there
    3. in CO11N text field as the operator to enter their name..
    Hope this helps..
    Regards,
    Siva
    Edited by: Siva Kumar M on May 8, 2008 4:22 PM

  • Work Center Required on Selection Screen

    Dear All,
    My client has required work center as selection criteria on usage decision screen.
    Thanks to all.

    Dear,
    Try to use the QE01, QE505, here maintain the required operation and work center and give the USage decision.
    Please check and revert.
    Thanks,
    Hrishi

  • [HELP] - CM21 Rescheduling work center.

    Hello SAP Gurus,
    I have a problem with transaction CM21 when I try to change an operation from work center to another. The scenario is:
         - WC01 (Work center)
            - CC01 (Cost center)
               - Activity A
               - Activity B
         - WC02
            - CC02
               - Activity C
               - Activity D
    In my production order I have WC01 in the operation 0010, I release order and save. Then I go to CM21 and I schedule the operation 0010 to WC01 and save, until now everything is good.
    I change my mind and I go to CM21 and I change from WC01 to WC02 and I save.
    When I make the confirmation in CO11N for operation 0010 the system shows a message of wrong cost calculations because I have changed the original work center in the CM21, and the Cost Center and the Activities Types are not updated...
    Little help please...
    Thanks in advance,
    Adelmo Silva

    Dear,
    Check whether the Standard Values used in WC 1 &  WC 2 are alike, if there is any difference in the standard value unit of measure of WC1 & WC2 or any differences in the activity types UOM then it may cause some inconsistencies in the cost calculation leading to error.
    Thanks & Regards,
    Vijaya Bhaskar A

  • Active version in work center

    Hi Gurus,
    We have maintained various versions in SPRO under production-basic data-work center-capacity planning-active version of available capacity.
    For a particular main work center we enter the active version in capacity header tab in the work center.
    If I create a maintenance work order for that particular work center then
    Do this active version gets copied to maintenance order ? ( currently it is not getting copied )
    Do we have settings where in we can make this as a default value in maintenance order ? ( whatever set in work center will be copied to maintenance order )
    My client have to enter version in every maintenance order created. The quantum is very large.
    So client would like to have this active version copied from work center to maintenance order,  like wise master data from an equipment gets copied to notification or order while being created.
    Kindly reply at the earliest.
    regards,
    Maneesh

    Hi ,
           In standard SAP there is no field in maintenance order operation or order that captures Active version of Work Center capacity .., In which field ur currently entering manually ?
    If u have defined any custom field in order operation to capture this data , then try to use user exit  : IWO10016 PM Order: Cust. enhancement to check operation user fields   to get this data automatically  in Order operation from work center ..
    regrds
    pushpa

  • Update Routing data after change in Work Center

    Hello All,
    I have just modified the Costing Data for 100 Work Centers CR02, setting a new "Activity Type" and "Activity Unit".  But the Routing Data CA02 does not get updated correspondingly.  I would like to ask is there any standard program which can help me to do the mass processing as to update the data to the corresponding routing?
    Thanks.

    1) You can change as per Mr Anupam sharma Said
    or
    2) YOU can also Update the data IN CA85N
    In selection criteria enter the respective work center and Plant
    and In new Value Give
    Same work center, Plant,  activity value , Unit  and activity type
    execute
    select the all the work center  and then click mass change
    Edited by: Sundaresan . E. V on Nov 12, 2010 10:25 AM

  • Dyanmic work center selection in production order based on material

    Hi ALL,
    We’ve a business requirement to support the following functionality.
    There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
    However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
    In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
    In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
    In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
    Please provide your valuable feedback to support the above requirements.
    Regards,
    Satya.

    Hi Satyanarayan,
      Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
    Resource Classification in Master Recipe for Planning
    Regards
    Kalyan

  • Operation number and work center

    I'm looking for the link between inspection plan/recipe header and operation at table lavel.
    Reason: I have two inspection plan number with same group number but both has different counter and each has 4 operation and each operation has different work center.
    Now I can get header info in PLKO and operation level info in PLPO table. From PLKO I can pass PLNTY and PLNNR in PLPO table but this gives me 8 entry in PLPO table (4 for 1st group counter and 4 for 2nd counter).
    So my question is how to differentiate 4 operation of each inspection plan header. Even same issue facing at recipe level.
    I can't find any table. Do we have any BAPI?

    Detailing the above reply through SQVI.
    The Join.
    Selection Screen
    The output
    If you need you may have Header table (PLKO) also in the join to have more details.
    Jogeswara Rao K

  • How to create operations without entering a performing work center

    How to create operations without entering a performing work center ? which control key should i select ?

    Hi
    QM01 is control key used for all the task lists of Quality.
    there is no such a configuration associated with control key &  usage of work center.
    Work center is used for the activity capturing perpose & control key is to control operations.
    I hope this is clear.
    Entering a work center is totally depends on the scenario & not control key.
    Regards
    Sujit

  • More than one work center for one operation

    Hi Experts,
    Is it posssible to assign more than one work center to one operation,in a maintenance order?
    for example if head fitter and helper has executed maint.activity,how we can do this
    Thanks in advance
    Regards
    Prashil

    Dear,
    You cannot assign more then one workcenter to a one operation.
    But you can assign to a sub operation,i.e to operation one workcenter and to suboperation anotherworkcenter.
    For Sub-operation:
    Go to task list change >>> Operation tab.
    Let say your first operation number is 0010. Then below it for next operation change operation number to 0010 and next to it there is field for sub-operation give there number 0001 or 0010 as per your requirement. Select suitable control key and work center, give description and press enter. your sub operation 0001 will be created for operation 0010.
    I hope it will solve your query,
    Thanks,
    Mohit

  • Urgent : Automatic Selection of  work center

    Dear All,
    Good Morning,
    please provide me valuable input to accomplish the business scenario,
    the scenario is
    1.There are 16 NC T-Bending Machine with different capacity.
    2. The Client wants to select the workcenter automatically if the 1st workcenter is overloaded i.e 2nd workcenter should be selected by the system
    Again,if 2nd workcenter is overloaded then system should select 3rd workcenter and so on..
    How I can make it possible.
    I am trying the Alternative sequence ,will it works to achive the requirement .
    please give ur valuable inputs.
    Thank in advance,
    Vijay Mankar

    In capacity leveling transaction, enable "date entry when dispatching".  Then, every time you dispatch operations, you will get a pop-up for date entry.  Luckily, this pop-up also has a field for work center - so you can change work center also (with or without date changing).
    We are using this method extensively.  Start transaction with all the work centers that you want to be considered.  Then, just select all the orders and dispatch.  In pop-up, change work center to the next in list.  So, some orders will get dispatched to that work center, and after its capacity is fully booked, the balance orders will fail to dispatch.  Once again, select all orders (left in the order pool) and dispatch, and change work center in pop-up.  You will have to do this as many times as the list of work centers OR till all orders are dispatched (whichever occurs first).  Takes just about a minute per work center and works perfectly.
    - Chetan

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • PM Order - Change operations Work Center to Main Work Center

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi,
         The work Center entered by default comes in operation work center, u can do validations while saving the Order :-using user exit : IWO10009 PM Order: Customer Check for 'Save' Event.
    regards
    pushpa

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

Maybe you are looking for

  • The installer does not create /etc

    Trying to install Arch but the installer won't create any /etc folder on the mount... (/mnt/etc). So when I get to the point where I'm supposed to edit all the settings, none of the files exist... Anyone have a solution? -X-

  • Problem with ECC6.0 version.

    Experts,               I find that in a standard program RSSTATDA there is a field RSYSTEM which is declared of type long_inst which is CHAR of 39 size.                    But the same field is declared in 4.7 & lower versions of type short_inst whic

  • Downloading photos from Z1 Compact

    I'm having difficulty downloading photos I have taken on my phone to my PC.  When I connect the phone to the PC, there is no sign of the photos in any of the folders that are accessible, eg. the DCIM folder appears to be empty.  But the photos are de

  • How insert a new material in between through me22n

    hi, I am not sure whether this is right forum or not to ask this question. But in quest of searching a solution to my problem I am putting my question: how to insert in between two material line-items a new material to keep sequence of ordering stock

  • Keynote for iOS Bullet Alignment Bug?

    Does anyone know how to solve this issue: Image bullets in Keynote for iOS have a bug related to vertical alignment of the image. For the first line of text, the bullet image is correctly aligned in the vertical center of the line. For all other line