Selecttive data loadibg from ECC 6.0
We are in BI projet. We use SAP NetWeaver 2004s.
We have four cube : PT, PAPA, Payroll and PAOS.
We have to prepare test system with with data that we have to upload from our source system ECC 6.0 based on selective list of PERNR (not all PERNR).
Please give us some help.
Thank you in advance.
Best Reagrds,
Hi Mourtadi Hassan,
You can give the selections in the Data selections Tab of InfoPackage if the correseponding IO for field PERNR is available in it.
If it is not available then add that IO in the Data selections tab by marking(check box) in the selections of DS in fields tab. Then give the necessary selection in th Infopackage & load the data.
Hope it helps!
Regards,
Pavan
Similar Messages
-
Reference Data Imports from ECC
All of a sudden our reference data imports from ECC to ESourcing are failing with this error.
"is either unknown data type or it is missing the required DataType(..) declaration"
They used to work. Can someone point me towards the place to check for the issue? There is a DataType Declaration at the top of the data file (see example) and the data file format has not been changed.
#DataType(masterdata.Currency)
"DISPLAY_NAME","DOCUMENT_DESCRIPTION","IN_EURO","DISPLAY_PRECISION","STORAGE_PRECISION"
"ADP","Andoran peseta" "","0","0"
Thanks,
Keith
Edited by: Keith Wendel on Nov 11, 2009 11:50 AM
NOTE - I changed brackets to parantheses in the two indented lines above to make them stop appearing as html links.Turned out that there were unprintable characters at the front of the files...caused by the encoding used in the source ECC system ABAP program.
-
How to delete Master Data transferred from ECC to APO via CIF
Hi, all
I'm connecting SCM 5.1 with ECC 6.0 via CIF.
When activating Integration Model in ECC, the following error occurred;
"Location 0001 of type 1001 (BSG 592BUSGP) already exists in APO"
This is because Location 0001 was already transferred from different ECC client via CIF, and not cleared.
I'm now trying to initialise master data transferred from ECC to APO via CIF, but in vain.
I suppose I have to first delete all master data CIFed from ECC in APO, or have to execute initialisation of APO master data with ECC data in ECC.
Please tell me how to do this.
For details, please read the followings;
I connected APO client with ECC client 590.
I transferred Plant and Material Master from ECC to APO via CIF.
After that, I wanted to change ECC client from 590 to the other.
I created the other client (592) by client-copying from 590 with SAP_ALL copy profile.
I deactivated Integration Model in ECC 590, and activated the same in ECC 592.
Here, I faced the problem.
The initial data transfer failed due to the duplicate of data.
Now I'm wondering how I can initialise master data in APO and transfer initial data from ECC.
Due to testing purposes, I have to change ECC clients from one to the other this time, but I cannot initialise master data in APO and cannot tansfer initial data from different ECC client.
thanks in advance,
HozyHi all,
Thank you very much indeed for lots of your replies.
Thanks to all of your advices, I'm getting to understand what to do.
Well, I'll say I have to create one more client for testing with other ECC clients or I have to rebuild the client by client-copying from 001 and implementing all transportation requests, for marking del flags to each master data and running del programme sound like tough work, and sound like odd ..
Then, I've got next issue here.
In SCM-APO, I use BI objects, and , if I have to create several clients for testing, I have to set up clients where you can use both BI objects and CIFed master data.
I suppose I have to change 'BWMANDT' in RSADMINA and make RSA1 accessable in other SCM clients and implement tests.
Also, I have to register BI System for newly created SCM clients in RSA1-SourceSystem.
Well, if you have any experiences on this kind of use, and if you have any advice on it, please give me any tips.
Particulary, I'd appreciate very much if you give me advice on which way you have chosen; creating several clients or rebuilding the one client in SCM-APO when you use both BI objects, CIFed master data and Demand Planning.
Thanks in advance.
Hozy -
Best practice data source from ECC 6.0 for legal consolidation in BPC NW7.5
Hi there,
after scanning every message in this forum for "data source" I wonder if there isn't any standard approach from SAP to extract consolidation data from ECC 6.0. I have to say that my customer is not using New g/l so far and therefore the great guide "how to get balances from ECC 6.0 ..." does not fully work for us.
Coming from the old world of EC-CS there is the first option to go via the GLT3 table. This option requires clever customization and the need to keep both GLT0 and GLT3 in line. Who has experiences regarding maintenance of these tables in a production environment?
We therefore plan to use data source 0FI_GL_4 which contains all line items to the financial documents posted. Does this approach make sense or will it fail because of performance issues?
Any help is appreciated!
Kind regards,
DierkHi Dierk,
Do you have a need for the level of detail provided by the 0FI_GL_4 extractor? Normally I would recommend going for the basic 0FI_GL_6 extractor, which provides a much more manageable data volume since it only gives the periodic activity and balances as well as a much smaller selection of characteristics. Link: [http://help.sap.com/saphelp_nw70/helpdata/en/0a/558cabb2e19a4db3097b81bba4fd0e/frameset.htm]
Despite this initial recommendation, every client I've had has eventually had a need for the level of detail provided by the 0FI_GL_4 extractor (or the New G/L equivalent - 0FI_GL_14). Most BW systems can handle the output of the line-item extractors without much issue, but you should test using production data and make sure your system sizing takes into account the load.
The major problem you can run into with the line-item extractors is that if your delta somehow gets compromised it can take a very long time (days, sometimes weeks) to reinitialize and this can cause a large load in your ECC and BW system. Also, for the first transport to production, it is important to plan time to initialize the delta.
Ethan -
Issue in Temp table creation in PCM Databridge and data migration from ecc to PCM using databridge
Hi,
we are working on mapping SAP PCM table structure data and the data which is coming from ECC.
We are using Databridge tool to upload the data for the same,upload from databridge involves
using Specification file to upload the data into SAP PCM.
The problem we are facing is that
The responsiblity center(cost center) in ECC and SAP PCm are different.There is one to many relationship between them
eg 1 ecc cost center-->many SAP PCM cst center,we need to split the line item vale of one ecc cost center into many SAP PCM cost centers
eg C1 cost center from ECC has value 4000 to be split across PCM1,PCM2,PCM3,PCM4 cost centers in SAP PCM
we need to automate using the databridge ,we are stuck up in this task.
Please guide us.
Also we are trying to create temporary table usinf Table temporary command in SPE file of databridge.The purpose of this is to put the ECC data in temp table as per our req and then use the temp table as data source for putting data in PCm as per our requirement.
Please advise us on this approach
Regards
Shrirang
9552334897Schema's SYS,CTXSYS, MDSYS and ORDSYS are Not Exported using exp/expdp
Doc ID: Note:228482.1
I suppose he already installed a software 12c and created a database itseems - So when you imported you might have this "already exists"
Whenever the database is created and software installed by default system,sys,sysaux will be created. -
No master data upload from ECC to GTS
Hello together
today I have opened an OSS Note regarding a problem at our client side.
We implement SAP GTS 7.2 SP08 but I`m not able to upload any master data (customer and/or material) from ECC to GTS. This is my third implementation project. On both projects in the past, I didn`t had such a trouble with this topic in the past.
I searched the whole forum and tried every hint - everything without any success. ;-(
Unfortunately, the OSS Note is in German. But I hope that anyone could help me to find an solution. Thanks to all very much.
Here is the OSS Note:
Keine Initialüberleitung von Kunden- und Materialstämmen OSS-NOTE: 0000637481
Alle notwendigen Supportpackage-Stände für R/3, PlugIn und GTS sind eingespielt gemäss MasterGuide.
R/3 client:-
- RFC Destinationen korrekt eingestellt. Laufen sauber
- Methodenaufrufe korrekt eingestellt
- ALE Verteilmodell korrekt eingestellt
- Änderungszeiger global aktiviert
- Änderungszeiger korrekt eingestellt (siehe unten)
Customer master /SAPSLL/DEBMAS_SLL
Vendor master /SAPSLL/CREMAS_SLL
Material master /SAPSLL/MATMAS_SLL
- Ànderungszeiger den jeweiligen Funktionsbausteinen zugeordnet (siehe unten)
/SAPSLL/DEBMAS_DISTRIBUTE_R3
/SAPSLL/CREMAS_DISTRIBUTE_R3
/SAPSLL/MATMAS_DISTRIBUTE_R3
- Nummernkreise für Änderungszeiger angelegt
GTS client:-
- Logische Systeme angelegt und Gruppen zugeordnet
- RFC Destinationen korrekt eingestellt. Laufen sauber
- Methodenaufrufe korrekt eingestellt
- Partnermapping eingestellt
- Organisationsstrukturen angelegt und Buchungskreis bzw. Werken aus
Vorsystem zugeordnet
- Nummernkreise angelegt
Beispiel:
1. Kundenstamm im Vorsystem hat keine PLZ in den Stammdaten. Bei Übertragung nach GTS wird im GTS-System ein Überleitungsprotokoll erzeugt, mit dem Hinweis, dass Kunde nicht übertragen werden konnte aufgrund fehlender PLZ. Korrektes Systemverhalten.
2. Kundenstamm wurde entsprechend im Vorsystem gepflegt. Bei erneuter Übertragung wird angezeigt 0 von 1 Partner übertragen. Ein Überleitungsprotokoll in GTS wird nun nicht mehr erzeugt.
Auch unter Transaktion SLG1 wird im Vorsystem kein Anwendungs-Log
geschrieben. Ebenfalls gibt Transaktion SM58 keine Fehlerhinweise.
Edited by: Andreas Drees on Jun 29, 2009 3:35 PMHi Sameer,
thanks very much for your instructions. We created the variants and debugged it. Now fe found out, where the error occurs.
The call function for calling GTS "/SAPSLL/API_1006__SYNCH_MASS" gives us following message:
"Not just yet all adress numbers are collected."
Then on the other hand the SAP Basis suppors gaves us a possible solution. They told us:
The problem occurs, because the tables TBD24 and TBD62 are not filled correct.
Please use the following steps to correct this:
- Transaction BD53
- Select Message type (/SAPSLL/CREMAS_SLL, etc.), change mode
- Choose segment (mark an unmarked segemnt)
- save
- Delete the activated segment
- Activate change pointer
- in TA BD60 set up the function module correct (/SAPSLL/DEBMAS_DISTRIBUTE_R3)
The tables should filled correct after these steps. You can check it with report /SAPSLL/PLUGIN_CHECK_R3.
So I we went through these steps - but without any success. I`m getting crazy. ;-(
Regards,
Andreas -
Data import from ECC to MDG via MDMGX tool for CC group and CC hierarchy
Hello,
We currently in process of importing data from ECC to MDG (co-deployed).
The MDMGX guide we follow mention about Accout (ACCA), Cost Center(CCTR) and Profit Center (PCTR).
While doing DIF, it shows above 3 domains but didnt mention about how cost center group(CCTRG), Cost center hierarchy (CCTRH) and same with profit center group (PCTRG) and profit center hierarchy (PCTRH) will be imported to MDG?
is there seperate process to bring hierarchy data from ECC to MDG?
Thnx in advance
SahilHello Sahil
With MDMGX you can load individual master data but for group and hierarchies, you have to use the old procedure. If you ask me, then the MDMGX takes longer time rather that downloading the data in file from tables directly and upload it in MDG.
Go through this document and load the hierarchy and group data.
How to upload Finance data in MDG - Hub
Kiran -
Hi All,
I have got a issue when iam loading data from ECC(SAP R/3). There are some 40 lakhs record in R/3 when i checked in extractor checker, But when its getting loaded into BW upto PSA the request is automatically showing the status green and data is not fully loaded its showing something around 20 lakhs odd.
Iam loading full repair full request and i dint face any problem when i have loaded earlier, the data was getting perfectly matched with the ECC system(RSA3).
I am bit confused why the system is behaving like this.
Please suggest.
Regards
Vikas.Hi,
Please check any fileter in you infopack level Manually or using any ABAP code.
Thanks and Regards,
Venkat. -
PO data extraction from ECC to BI in Classic vs extended classic scenerio
HI guyz,
In my project, we are using exteneded classic scenerio for our srm implementation where we fetch shopping cart, purchase order and confirmations data from srm system and invoice data from ecc system BI. also its succesfully running in production system till now.
but a requirement came where for one country we need to use classic scenerio only i.e. we need to fetch po data from ecc system to bi.
please suggest.
regards,
raps.Hi
please use 2lis_02_hdr, itm and scl for po information and filter the infopackage by country.
Thanks
Krishnan. -
Handling Network failure during data transfer from ECC to PI
Hi,
We have created a custom program in ECC to push invoice header information to PI using the proxy call.
We're able to successfully now push these data to PI without any issues.
However, there is a comment from client like if there is an unexpected error such as system or network failure during transferring data from ECC to PI, then how is it being handled from ECC side?
I'm left with no answers. I know the messages will be stucked in SMQ2 or SMQ1 but we need to find out how can resend those data to PI in case of such failures. Documents in ECC are either posted or parked or payment totally based on real time process and based on each ECC event such as parked or posted or reveresed, we are sending one message to PI respectively. But how can we resend these invoices incase of an unexpected error?
If we go with an ad hoc process, how do we implement this process for each document which is being created or rejected.
Thanks,
ShamimHi,
The queue will automatically restart if the problem was connection issue. In case of system failure you need to check and start them manually.
check http://help.sap.com/saphelp_nw04/helpdata/en/f3/df5f3cb0decb09e10000000a114084/content.htm
To check for any problems you can use CCMS monitoring.
check http://help.sap.com/saphelp_470/helpdata/en/52/12f73b7803b009e10000000a114084/content.htm
Hope this will help you.
Regards
Vinit -
How to transfer Material Master data information from ECC to CRM
Hi ,
Changes to the Classification data of Material master for the class type-001 and Custom
ZFIELDS on mara will trigger the Interface functionality. Any changes to the
custom zfields and classes or characteristic values on Material Master must transfer the information from ECC to CRM. By using RFC .
Regards,
PavanHi,
You need to use change pointer to do this. Go to transaction SALE,
expand MODELLING AND IMPLEMENTING...
expand MASTER DATA DIST...
expand REPLICATION OF MODIFIED DATA
You may need to maintain distribution model in SALE.
Cheers.
Reward if useful -
How to reflect the Master data changes from ECC to MDM
Hi Experts,
We need to reflect the master data changes of company code and cost center groups from ECC to MDM.
what methods available and which would be best in performance.
kindly let me know if you need further information for better undrstanding.
Thanks in anticipation
looking forward to hear from you all,
with regards,
Chandhan.SHi,
You need to use change pointer to do this. Go to transaction SALE,
expand MODELLING AND IMPLEMENTING...
expand MASTER DATA DIST...
expand REPLICATION OF MODIFIED DATA
You may need to maintain distribution model in SALE.
Cheers.
Reward if useful -
Reagarding Master Data loading from ECC
Hi i want to activate Master Data for Customer and Material from ECC ,Can any one give me the clear steps ,and also i want to know what is the source for these Material And Customer in ECC.
Hi
The datasources are 0CUSTOMER_ATTR and 0MATERIAL_ATTR you can find these in RSA6 if activated under SAP-R/3->LO->LO-IO.
Assign these to 0CUSTOMER and 0MATERIAL infoobjects in BW for a direct update or you can use the following infosources for flexible update
0CUSTOMER_ATTR
0MATERIAL_ATTR
Also use texts datasources 0CUSTOMER_TEXT & 0MATERIAL_TEXT
If the above mentioned datasources are not activated (NOT VISIBLE IN RSA6), use RSA5 transaction code to activate them.
Hope you are familiar with BW and good luck
Regards -
SEM-BCS data extractor from ECC general ledger table(s)
We are a utility company working on an SEM-BCS implementation and use the FERC solution. We do not use the new GL. We are trying to extract the transaction data from ECC to a BI virtual remote cube. We cannot use the profit center extractor (0EC_PCA_3) as the profit center tables do not contain any ferc data. We need to be able to extract the transaction data from a general ledger table. We have run into several issues with various extractors we have tried because they donu2019t allow direct access (0FI_GL_4) or are at a summary level and we canu2019t extract group account, trading partner, and transaction type detail (0FI_GL_1). Would you have any suggestions on how to extract general ledger data with the detail information required from ECC to be able to load to a BI virtual remote cube?
We are going forward with getting the natural account detail data using the profit center extractor 0EC_PCA_3, and getting the ferc summary data using the general ledger extractor 0FI_GL_1. With our testing so far, this combination will provide us the data we need in BCS.
-
Error while doing Transaction data loading from ECC to BW
HI,
I faced error in data records so i corrected it manually by going PSA Maintenance. then now when i am trying to schedule data laod by going to that Data source then right click on Manage then select Request which i have updated with correct records. then Again right click-->UPDATE WITH SCHEDULER .now next screen is SCHEDULER(PSA SUBSQUENT UPDATE) here i am not getting any Data Target means data target field is disabled so i cannot schedule it for load.
Any solution for this error.
Thanks
Nilesh PathakHi,
I guess you have not deleted the request from the InfoCube 'Manage' Screen. If the request is already updated to your InfoCube/ODS ,then it will not show the Data Target in PSA Scheduler.
You can try to re-load the data using 'Only PSA' in the InfoPackage and then correct the errors and load the data using Update option from the Manage screen.
Thanks
Maybe you are looking for
-
Dynamic Receiver file name in AS2 adapter
Hi Experts, How to get dynamic receiver file name in AS2 adapter. We need receiver file name same as of sender file name. We tried selecting dynamic attributes file name but we are getting followin error in CC. Message processing failed. Cause: javax
-
How to run 300w of video cards with precision tower 5810 685W power supply?
I have a precision tower 5810 with 685W power supply. In the Tech Specs it says. Support for two PCI Express® x16 Gen 2 or Gen 3 graphics cards up to 300W (total graphics in two slots with 685W PSU) So you should be able to run two 150w video cards
-
Saving to png changes to 72 ppi
I have the orignal PSE, and can not seem to save my 300 ppi, as 300 ppi. I understand it still saves at a printable quality, but the site I am working for needs it to say 300 ppi. Is there anyway to do this in PSE?
-
Having problem running Lightroom 5 with my MacBook Pro
A salesperson from Bestbuy told me if I get a macbook Pro 13" with 2.5Ghz i5 and 4 GB RAM, I would be able to use Lightroom 5. I used the trial version, but it was slow on my Mac. Does that mean I need to upgrade my RAM?
-
The Time Machine utility seems to be backing up correctly. The backups appear when I open the backup disk, however, when I try to restore a backup, the utility correctly identifies any disks which contain Time Machine backup files, but when that disk