Self life of material
Hello SAP gurus,
I have an outbound number and for that the remain shelf life of material 43281 is defined >30 days for customer group X and Y. The material has been delivered with a shelf life less than 30 days. How is it possible when we donu2019t change the customer group.
Could some one please help me on this?
Thanks
Sha
real shelf life managment can only be done with batch management.
Then you have to setup the batch search strategy accordingly to only pick batches that meet the requirment.
Similar Messages
-
Dear Mates
In my case system picks the Self expired batch with warning.How can I convert warning into error message and system picks the next batch(based on self life)As I understand you re speaking aout shelf life in sales...in tis case you can solve your problem via batch determination:
http://www.renet-web.net/2008/09/05/sap-batch-determination-made-easy/
Some useful OSS notes: 33396, 78235, 120319,, 72771
Regards,
Csaba -
Requirement to develop New report to display material self life details
Hi,
I have a requiement to develop a report to find material Expiry date susing total self life:
My selection screen:
warehouse number
storage location
storage type
material
material type
total shelf life
My list should display the material number, description,material type, material group, storage unit, total stock, goods receipt date, expiry date.
Please tell me what are the table to be used to fetch these details.
Thanks,Hi,
For your requirement use the below Table,
material number : MARD-MATNR
description : MAKT-MAKTX
material type : MMARA-MATKL
storage unit - MARD-LGORT
Total stock - MARD-LABST
goods receipt date MSEG -DATE
expiry date MSEG - DATE
Regards
Thiru -
Pls anybody tel me what is self life / ageing report in mm
hi all,
i have to develop self life ageing report.
pls anybody tel me what is self life / ageing report in mm.
pls send me template and code.
regards
vikasHi
vikas
there is standard report RM07MMHD.,,, and the transaction is MB5M
regards
karthik
reward point sif useful -
Shelf Life Expired Material will automatically be transferred to block stk
Hi,
We have purchased a material, RM u2013 XYZ, Qty u2013 5000 kg, Mfg date u2013 01.06.2010 and Expire date is 30.09.2011. The material was received on 25.06.2010. Presently the stock of material is lying as unrestricted type.
I want to know that when the shelf life of the material will be expired, the material will atomically be transferred to block stock. How do I configure the same?
Further, is there any standard alarming system as to know the shelf life of material is going to be expired?
Regards,
AmitThe problem is that the section of the program (QA07) that blocks the stock runs first. Therefor all "expired" stcok within the time frame specified is moved. When the program runs the section to create inspection lots, it will only take into consideration stock that is in unrestricted stock. Since the stocks have already been moved to blocked stock, there is no stock in unrestricted inventory and hence no inspection lots.
In your case, in the section "Batch status change when expiration date is reached" you need to untick the "Block batch" and remove and values iin "Initial run in days" in this section.
In the section above that tick on "Block batch at inspection date" and maintain a value in "Initial run in days".
This will have the effect of creating lots when the next inspection date falls within the window specified and will move the material to blocked stock on the inspection date.
Keep in mind that this is all working on the "Next Inspection Date" of the batch. Not the expiration date. So you should have a process to keep the next inspection date and the expriation date in sync.
To cover yourself and make sure that batches are blocked if the expriation date is reached, set up QA07 to run again immediately after the above job. In the varinat for this run, tick back on the "Block batch" and set a value in the "Initial run in days". This will then block any stocks missed in the inspection lot creation process above.
Also see the folowing threads which explain the deadline mointoring program. There is a lot of info on this process on the net.
http://sapfans.com/forums/viewtopic.php?f=27&t=334825&p=1016796&hilit=Deadline+monitoring#p1016796
http://sapfans.com/forums/viewtopic.php?f=27&t=250686&hilit=+deadline
FF -
STO delivery should not happen for shelf life expired material
Hai all,
When we are doing PGI for STO-PO. shelf life expired material should not do the delivery.The system should give the error message. but in our system when we do PGI the shelf life expired material is deliverying.
how do we maintain the error message when we doing PGI.
Edited by: hemanth s on Sep 12, 2008 9:37 AMHi,
In Inventory management there is a which helps you "Set expiration Date Check". This allows you to make sure that the shelf life of the material is checked before delivery.
In Material master, you would need to enter relevant information in the "Plant Data/Stor. 1" tab page (Min remaining shelf life, total shelf life). Also in IMG settings, you need to activate the check for both Plant and movement type. The path is as follows:
IMG Settings > Material Management > Inventory Management and Physical Inventory > Goods Receipt > Set Expiration Date Check. TCode: OMJ5
Cheers.
Edited by: Sowmya Mohan on Sep 15, 2008 8:43 AM -
Self life of Li-Ion battery on new but old Apple laptop stock?
Just bought a MBP MD101LL/A. It is brand new. Because it is a 2012 model, I am concerned about the Li-Ion date of manufacture. If the DOM was 2 years ago will apple replace it? Li-Ion is reported of having a service / self life of based on age and not just cycles (Professor Jeff Dahn of Dalhousie University). Depending on how the battery is stored the self life could be as low as 1 to 2 years.
http://en.wikibooks.org/wiki/Battery_Power/Lithium_Ion_Batteries."I am concerned about the Li-Ion date of manufacture. If the DOM was 2 years ago will apple replace it"
Yes this would be a problem. You should talk to the manager of the Apple store where you purchased the MBP and ask him to address your concern. -
Shelf life from material master not flowing into purchase order
Hai friend
I have set a shelf life value in material master ( both minimum & Total shelf life).
But while creating purchase order, values are not flowing from material master to purchase order.
The field is empty.
How to configure, please help.
Regards
Rammohan1.activate batch management
2.to calculate SLED production date/date of goods receipt is mandatory during GRN
3.Maintain characteristic for production date MCH1 - LFWRT
4.assign this to class
5.Maintain this class to material
6.Now do GR ,it will prompt for production date .based on this ,sytem will calciulate SLED
hope it helps -
Dear Experts,
My one mateiral total shelf life is 360 days ( from date of manufacture to exipary date ) what setting I fill in material master and in receving if this material expiry is pending only 10 days . I fill the manutature date in migo.
RCu fill the sled data at nMigo means u already configured the SLED config.
now mat master is plant data/stor 1 - Total shelf life 200 days as per ur req.
now do the Gr date , the staem will check GR - sled manufc date u mentioned and 200 days to find the xpiry date .
reports are there to gethe details 50 days pending list , 100 days pending list etc
regwdz -
Any Config Option to Remove Shelf Life from Material Spec Summary Tab?
Hi All,
We are on PLMv6.1 and have been using a custom section for Shelf Life for both Trade and Material specs to meet our business needs while we were on 6.0. At this time, we would like to remove the "internal" Shelf Life section from Material Trade specs Summary tab and not have it included in eQ. We have found that having two instances of Shelf Life confusing for users. Is there any method for us to config the Material Shelf Life Section "Off" as there is in the Trade Spec?At this time, there is no config to turn this off. You may want to consider submitting an enhancement request. you could try utilizing section level editing to disable it, however, it will still be visible. this would not affect eQ, however.
-
Hi Experts,
System should not allow the 6month of expiry date (Goods Receipts)
Business query as below.
Query:If user entered the more than 6 months then what action to be taken.
System should allow to post the Goods Receipt *** Inspection Note
Query: If user enter the less than 6 months then what action to be taken.
This is applicable only at the time of posting of GRIN(Goods Receipt inspection note) and not a the time of posting of GRN/MIN. System should not allow to post the Goods Receipt *** Inspection Note and give u201CREDu201D error message. Please provide authorization only in one ID where system should allow to post GRIN if SLED less than 6 month as a special case
Please suggest how we can go about this issue.
Regards,
HanumanHi Experts,
We are using the Multiple account assignment functionality. while doing the goods receipt account document generated but while doing invoice verification t.code: MIRO system not displaying the amount and quantity.
Please help me.
Regards,
Hanuman -
HI All ,
To maintain stock of material based on SLED , check the following :
a ) Remaining shelf life in PO
b ) SLED in PO
c ) SLED at GR
regards
deepuHi,
To maintain SLED
1)Activate for the plant and m,ovement type
2)Maintain remining self life in Material master plant stock view
3)Must be maintained in PO
4)Enter the expiry date or date of production in GR
Regards -
SLED field is missing in ECC 6.0
Hello!!!
we're upgrading from 4.6C to ECC 6.0.
I have a problem with SLED field in MIGO transaction in ECC 6.0
For not batch-managed materials, the SLED check is activated.
1)In Custimizing, the plant and movement type are actived.
2) remining self life in Material master plant stock view -> 0 Days
3)The PO -> 0 Days
4) Info record -> 0 Days
WHen we enter the MIGO transaction, in Material tab, the SLED field is missing, so we can't enter de SLED. If I maintain in PO or material, more than 0 Days, the field is open, but It doesn't work with 0 Days...
In 4.6C version, the SLED filed is open, and It's OK.
I don't find the solution...any idea???
Thanks ins advance.
Best regards
María.Hello,
thank you so much.
I think that there is not soultion. SAP told me:
Dear Maria ,
You have set the Maximum period, Minimum remaining shelf life and
Total shelf life as zero. I tested this on our internal test system
and when these are all set to zero the fields PROD & SLED are not
visisble in the Material tab in tcode MIGO.
The shelf life is only checked when you enter a goods receipt if the
following prerequisites are met :-
1.The minimum remaining shelf life is maintained in the material master
record or in the purchase order. The minimum remaining shelf life is theminimum number of days for which the material must keep for the goods
receipt to be accepted by the system.
2.The shelf life expiration date check is active for the plant and
movement type in Customizing for Inventory Management.In the
transaction SPRO,if you check in SAP Reference IMG
Material Management > Inventory management and Physical Inventory
> Goods Receipt > Set Expiration date Check,the SLExp/prDt field
is checked for plant and material movement
Regards -
Dear ALl
System should not allow to issue a material whose shelf lie is expired?
Can you suggest any soultion for this?
Pl update ASAP
ManojHi,
During creation of Material in MM01.....In Gen Plant data/storage 1 view, Maintain required values in the Field of .....Total Self Life ( lets say 90days) and in Min. Remaining shelf life ( is 60days).....
When you do GR for this material the System will ask for Date of Production of material( u enter here0 ...from that the system automatically calculates it SLED....and it checks the Remaining shelf life Expiry Date also...and if it falls earlier than that...the system will give you Error message and will not allow you to Post the GR...(example:1, If ur receiving today ie..27.03.2008 and production date is 29.01.2008{ falls within 60days, then system will post GR, example:2, If ur receiving today ie..27.03.2008 and production date is 12.01.2008{ not falls within 60days} , then system will not post GR.
Regards,
Biju K -
Hi friend,
i have issue regarding mandatory self life field (SELD/BBD and Date of manufactor)in migo for Batch Tab for particular Material start with '1' Series and material type.
i want to make mandatory above field during GR from migo..any one let me know exit or badi for that to full fill this goal..
Regard's,
shaikh Khalid.Hi Shaikh
First of all Thread is not closed seconldy as a good practice if you have resolved your issue kindly document it here so that it may help someone in future
Nabheet
Maybe you are looking for
-
Hi - just using the new iMovie for the first time - apparently there should be a sidebar containing tools like "Content Library". Not on mine - even in Window view, Content Library features like text etc are all greyed out - obviously it's me - anyon
-
10.7.4 client mobile log in spinning on 10.6.8 server
Issue: 10.7.4 Client Macbook (Uni-body) When logging into mobile account "spinning beach ball / you can see desktop but no menu bar or dock" Currently tired new Image pushed out through Deploy Studio. ( no resolve) **Also to note did not change any o
-
Frame outline showing with overlaid graphic item
I have a logo that I overlaid on an image box. The logo was previously extracted from a white background using pixilmator. The ghost frame shows up when published. In other words, a thin line frame around the extracted logo. It's a png image. Driving
-
Adobe Uploading form error unknown file forma
Hello, I am working on adobe form. I want to upload an form from another system using tranaction SFP and process menu 'UTILITIES UPLOADING FORM OBJECT'. I download the form from a environnement ECC6 in XML FILE. (by process downloading SFP transactio
-
RDMSRealm And wlpsadmin invalid username/password
I've using wlpsadmin servlet and the default RDBMSRealm in "out-of-box configuration" . For adding new users , anybody knows if this uses an weblogic.jdbc.Datasource to access to database ? I have in weblogic.properties this configuration : weblogic.