Sending Material for Final packaging.
Dear Experts,
Greetings of the day!
Scenario:
At times we have some finished products, which we need to send to a vendor for making promotion packs- In simple terms, suppose we have finished material - A, B and C, and we want to get all together shrink wrapped. (3 in 1).
No. of Promotional Packs: 100, each containing (materials A,B &C in the ratio of 1:1:1)
Material
Quantity
Batch
A
100
100001
B
100
100002
C
100
100003
Batch management is active.
Process AS-IS:
1.Create Purchase request (MB51N); with item category -L
2.Create Purchase order (ME21N);
3.Issue material against purchase order by 541 Movement;
4.Create inbound delivery against Purchase order;
5.Receive material By MIGO, with movement type 107;
6.Release GR Blocked Stock by MIGO with movement type 109;
7.Create TO against material document generated from 109 Movement.
8.Confirmation of TO for final put-away to respective storage bins.
Problems:
1. When we receive partial quantities from the vendor, we can make GRN (107) against the inbound delivery for the partial quantity by changing the quantity in the inbound delivery number; but we are not able to release GRN (109) as it is showing an error , which asks for complete receipt needs to be done.
2. I have reversed 107, by doing 108, and then if I am trying to make GRN against the same inbound delivery by movement type 107, the system reflects an error as " Delivery note data already Exits".
Scenerio II: Promotion Packs : 100, each containing materials (A,A & A in the ratios of 1:1:1)-Pack of Three (Same Material)
Material
Quantity
Batch
A
100
100004
A
100
100005
A
100
100006
Purchase request looks like : (B'coz at the time of making purchase request we don't know which batch will be picked by the system)
Material
Quantity
A
300
Similarly Purchase order will look same, as it has been created from the PR, and inbound delivery number also same (Only one line item).
Problems:
1. At the time of GRN (107), how can we split the material into different batches, since we want to receive with the same batch.
Hope the scenario's are clear!
Regards,
Malik Abrar Altaf.
Hi,
So many issues are identified when using two step procedure with inbound delivery. The notes 1373027 - Problems w/ 2-step goods receipts using inbound deliveries and 1225077 - GR with inbound deliveries in (valuated) GR blocked stock explains the same.
If you have different batch numbers for GR, then you have to split to different line items with respect to batch.
Regards,
AKPT
Similar Messages
-
Pls send material for idocs in ECC 6.0
Pls send material for idocs in ECC6.0
Hi sitaram s ,
IDoc
- IDoc (for intermediate document) is a standard data structure for electronic data interchange (EDI) between application programs written for the popular SAP business system or between an SAP application and an external program. IDocs serve as the vehicle for data transfer in SAP's Application Link Enabling (ALE) system. IDocs are used for asynchronous transactions: each IDoc generated exists as a self-contained text file that can then be transmitted to the requesting workstation without connecting to the central database. Another SAP mechanism, the Business Application Programming Interface (BAPI) is used for synchronous transactions.
A large enterprise's networked computing environment is likely to connect many geographically distributed computers to the main database. These computers are likely to use different hardware and/or operating system platforms. An IDoc encapsulates data so that it can be exchanged between different systems without conversion from one format to another.
IDoc types define different categories of data, such as purchase orders or invoices, which may then be broken down into more specific categories called message types. Greater specificity means that an IDoc type is capable of storing only the data required for a particular transaction, which increases efficiency and decreases resource demands.
An IDoc can be generated at any point in a transaction process. For example, during a shipping transaction process, an IDoc may be generated that includes the data fields required to print a shipping manifest. After a user performs an SAP transaction, one or more IDocs are generated in the sending database and passed to the ALE communication layer. The communication layer performs a Remote Function Call (RFC), using the port definition and RFC destination specified by the customer model. The IDoc is transmitted to the receiver, which may be an R/3, R/2, or some external system.
Archiving Processed IDocs
IDoc archiving is a two-step process:
1. Archive the IDoc.
2. After that another job will be generated. You can see in your SARA for your trigger to delete those archived IDocs.
Have a look at transaction WE47, set "Archiving - Possible" for all statuses to be archived. Use transaction SARA with object IDoc to archive. If the above is set then all IDocs are archived the same way.
Transaction SARA works in the following way:
On the main screen enter IDoc as the object. Click on Customising -> Technical settings. This shows the logical filename (configured via transaction FILE & SF01) that will be used to get a filename when writing the archive files. It also shows the document type (that links to an archive via transaction 0AC0) or the archive, depending on SAP version. You can also set the size of the archive files and whether the deletion and storage jobs should execute automatically or not.
On the main screen there are, amongst others, buttons for ARCHIVE, DELETE and MANAGEMENT. When you click on ARCHIVE you will go to a screen where you can create variants, and set the parameters for the archiving job. The EXECUTE button will schedule this job. If the "start automatic" tic for the deletion program was not set in customising, you will need to go to the DELETE button on the main screen to schedule the deletion jobs, after the archive job has finished. This schedules a job per archive file. In MANAGEMENT you will be able to see the statuses of each archive run.
SAP Integration Using ALE(Application Linking and Enabling)
- IDOCS -
http://www.thespot4sap.com/Articles/SAP_ALE_IDOCS.asp
Updating IDoc data in segments,Changing a control record of an IDoc,Getting IDocs linked to Application documents,
Displaying and IDoc in a report,Read IDoc from Database,Creating and sending an IDoc,Update IDoc status on the database
ALE Inbound Pre-Processing
http://www.erpgenie.com/sapedi/idoc_abap.htm
cheers!
gyanaraj
reward points if u find this helpful -
Sending material for Packaging to Vendor & receiving while GR
Dear All,
Kindly help in resolving below issue.
I have to procure material from vendor in the container sent by me to him. However I dont want to use item Category L / Subcontracting for the same. We wll not maintain BOM as well. Please tell is there any other way round for the same. The stock of the container in my plant is non valuated.
Regards,RTP is a material master of material type LEER or LEIH.
more can be read here:
http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b921143ad11d189410000e829fbbd/frameset.htm
Regards
MK
Edited by: Manmeet Mohan Karandikar on Mar 9, 2010 9:49 AM -
Sending material for subcontract vendor two times
Hi,
I have a requirement, we create the subcontract PO as per BOM 10 different types of raw materials are required now initilaly at the time of MB1B only 8 items are ther in the system so we do the trasnfer posting for 8 items then subcontract challan create ref. to MB1B document number now later we recd the remaining two items in our system now how to issue that two material aganist the challan.
regards,
zafarHi All,
Thanks for your reply, I per above reply I try one in development server,
Subcontract Po created for one FG material Qty : 1, the Finish good BOM contain 2 raw materials
Finish Material : FG1
BOM Comp. : RM1
BOM Comp. : RM2,
when I have done the transfer posting posting first time I have transfer only RM1 to vendor with 541 movement type, then ref. to that document number I have created Subcontract challan with J1IF01 so as per Transfer posting doc. in challan only RM1 come, then without transfering the the RM2 when I am making GR for FG material system is posting both RM1 and RM2 to consumption even for this challan i have not transfer the RM2 to vendor, so withotu saving the GR then I have trabsfer the RM2 to vendor against the same PO with MB1B movt. 541 now both the RM1 and RM2 are transfer to vendor but with different document now when I made the GR both the RM1 and RM2 are posted to conusmption but when I ma doing reconcilliation for the challan and GR system is giVING ERROR MESSAGE
Material 229 is not assigned fully, short by 1.000 NO
Message no. 8I574
as this material I have transfer in secodn document and this is not there in the challlan so is there any other method so this.
regards,
zafar -
Exporting .Mov files at 24fps for Final Cut Pro 5
I work at an animation production house and we're trying to export .mov files from QT 7.1.2 at 24fps so they won't have to be rendered in a FCP project which is a 720p project with a frame size of 1280x720, we're experimenting with two codecs. We're using Motion Jpeg A and Photo Jpeg, selecting 24fps but for some reason they import into FCP 5 at 10fps. It's as though QT isn't outputting accurate 24fps .mov files. When I export .mov files from FCP they import back into FCP without having to be rendered. What's the difference between the ones exported from QT vs. the .mov files exported from FCP. We're using the exact same settings and files....? The reason we need to use QT to do this is because it needs to be a somewhat automated process (lots of stills to work with) and our PA's are working on Windows with QT only.
You should post your inquiry at Final Cut Pro section for better support. Anyway, Final Cut Pro does not always recognize the frame rate correctly, depending on which application (and possibly which codec) you used to compress video. For example, Snapz Pro X and Adobe After Effects don't get along with Final Cut Pro in this respect. Furthermore, compressing video in H.264 will be a bad idea. So simply adjust the size of Canvas so that it won't cover the whole screen. In this way, you can even replay video on Canvas and even send it for final production.
-
Project stock material for subcontracting
Hi,
I want to send project stock material (special stock with 'Q') for subcontracting vendor. Pl elaborate the procedure.
Subcontracting PO is with account assignment category 'Q'.
Pl revert.Hello Sachin
We had similar requirement but in a different way. i.e sending material for subcontracting work for materials returned by customers getting it reworked bringing the reworked material back to plant stock and then sending to customer.
We had used alltogether different transactions ADSUBCON is the transaction code. Prerequsite is you will have to implement BADI BADI_ADSUB_MVT_TYPES of enhancement specefe ES_BADI_ADSUB_MVT_TYPES.
Regards -
IDOC for sending material data including classification data?
Hi everyone,
I'm just looking for an IDOC to send to an external system all data of certain materials but including classification system data, variant configuration data...
I have checked MATMAS0x but I am not sure if those IDOCs match with my requirement.
I would be very grateful if someone could please help me.
Thanks in advance and best regards,
BenHi Ben
Kindly follows the below steps and trasaction screens, I believe you will be able to send the mat data incl. classification data to other external system through IDOC.
Steps:
Create material master record in SAP
Enter T.Code BD10 to send material master data from SAP to 3rd Party Logistics Provider
Enter Material,Logical System and click Execute(F8)
Press ENTER to continue
Press ENTER to continue
Enter T.Code WE09 to check the status and content of the Idoc created
Enter Idoc Segment name in Search in Segment, Field name in Search in Field, Material No in "for Value" and press F8 to execute
Double click on the Idoc number to check the content and status of the Idoc
Expand the Status records to check the STATUS of the Idoc
To check the fields in the Idoc, expand Data records and check the Mandatory fields in each Segment
Transaction Screens:
Transaction / Screen
MM01
BD10
BD10 Screen
BD10 Screen
BD10 Screen
WE09
WE09 Screen
WE09 Screen
WE09 Screen
WE09 Screen
Expected Result:
Expected Result
Material Master Record Created
Send Material Screen appears
A popup window appears with a message "1 master Idoc(s) set up for message type MATMAS"
A popup window appears with a message "1 Communication Idoc(s) generated for message type MATMAS"
Send Material Screen appears
Idoc Search for Business Content screen appears
Idoc corresponding to the material no is displayed
Idoc along with the 3 records(Control Record,Data Record,Status Record) appers
Final STATUS should be 03(Data passed to port OK)
All Mandatory fields must be populated with correct data
If it is useful reward points
Thanks
Saravana -
T.Codes for Sending material outside..?
HI gurus
Can anybody explain me , what are all the T.codes available in STA SAP related to Sending materials to outside like Drillngm/c, grinding m/c,..etc
To do the some customer service work.. materials are not consumable, we wil use the material for some service work at customer place and get back to my company.
Pls explain me the abt the T.codes
Thanks
sap-mmHi,
There are two ways of handling your scenario. If the material which you are sending is a valuated material, then please create a "Z"movement type with the valuation option unchecked, so that you can issue against a cost center, by treating customer as a cost center. This causes a decrease in the stock of the material. Again when you want to bring the material back to the stock, you can verywell reverse the earlier transaction. Apart from it, you can have a development unlike the delivery challans (DC's) in the legacy in SAP and send the materials on the same.
IF the material is non-valuated, you can send them on "201" mvt type only, which does not affect the value of the stock at any stage.
Hope this answers your query. -
I want to send Net Weight for all packages to Requisite
HIo All Abapers,
Currently the Each is the only package that has the true net weight. The net weight for the other package levels contains the gross weight. So Users are manually setting the correct net weight.
Here I want to Change the interface program to send the net weight for all packages not just the sales unit (Each).
So can any body tell me, what i need to do here..
points will be given..Firefox doesn't do email, it's a web browser.
If you are using Firefox to access web mail, you need to seek support from your service provider or a forum for that service.
If your problem is with Thunderbird, see this forum for support.
[http://www.mozillamessaging.com/en-US/support/]
or this one
[http://forums.mozillazine.org/viewforum.php?f=39] -
Refurbishment order for sending material to external vendor
Hello everyone
We have the requirement like the material is partially refurbished internally with the available resources and then we will send the same material to the external vendor for further processing(subcontracting).
The cost of the both (internal + external) should be settled to the material.
Thank for your inputs.
Regards
SantoshHi Santosh,
Below steps may help you, Anyway please check with your MM consultant as well
MIGO Send material to stores , Good Issue , Movement Type 202
ME54N Release PR : Order which you have raised.
ME21N Create P O
ME29N Release P O
MIGO Transfer posting to vendor, Transfer Posting to Vendor,Movement Type 941.
And After return Movement type 942 and 201.
Hope this will help you.
Riyaj -
Delivery item for HU Packaging Material
Hi all,
I have a problem in Packing (LM46) using HU management. When I pack the HU to a delivery it creates another line item (900001) for the packaging material used in the HU. I have not set this functionality for the delivery type (LF). Can't figure out why this is happening, does anyone know what else I should check for ?
Thanks in advance,
D.Hi,
a delivery item is also generated for the packing material, if a plant was determined/added for the packing material and an item type was determined for it
you should check
- transaction 0184 for the item type determination and
- transaction vhar for the plant determination
(the other case is if
-an item type was determined for the packing material -> 0184,
- the delivery item creation for packing material is set for the delivery type -> 0vlk and
- delivery item creation is also set for the packaging material type -> vhar)
note 831204 describes these two cases when a delivery item is generated for the packing material
I hope I could help you.
Regards,
Ely -
Sending material outside for repair
All SAP Gurus,
We want to send some material outside our company premises for maintenance work.
For this I have made a service PO.
Now, how to send this material out (which mvt. Type to be used)?
And after wards how to take it back
Regards,Hi Rajan,
Please go thru the link Provided below:
http://www.sap123.com/showthread.php?t=52
I have gone thru the link but Fortunately i havenot found any information regarding sending material outside for services.
If you want to use Service po then you have only two options:
Either Send the material using MB1B 541 Movement type (If Negative Stock are allowed because for service items you may not found stock)
Or Handle the Scenario out of SAP. That means Send Directly to the Service Provider without using SAP.
Regards,
Ashok -
Hello,
The resource filled his/her timesheet in PWA.
Now :
What are the differences between Turn in Final Timesheet
and the other option: Send Progress for Selected Tasks?
ThanksYou are partially correct and partially wrong.
Turn
in Final Timesheet sends
the timesheet to the Timesheet Manager for Approval
but task update always goes to Status manger of the task. Taks manager you can see in MPP(insert status manager field then check)
Yes
after approval progress will be available in MPP as well as in Projectweb app as % complete .
Send
Progress for Selected Tasks
Send progress of selected task to status manager after approval update will be available in both MPP and Projectweb
app as % complete.
In Send
Progress for Selected Tasks Timesheet
Manager doesn't receive anything in his Approval center
because all the update directly go to Status manager Approval center.
Here you have to understand
that there are two role Timesheet Manager(for timesheet approval) and Status manager(for task
actual approval)
kirtesh -
Plz send me material for version change for 4.5 to ecc6.0
hi experts,
currently i am working in upgradiation project from 4.5 to ecc6.0,
i am new for this one plz send me some material for version change,
and give me suggestions what r the main changes from upgradiation from 4.5 to ecc6.0
regards
madhuHello Madhu,
I have started by our upgrade project with this links:
[Unicode Technology|http://service.sap.com/unicode@sap] (SAP Service Marketplace; PW necessary)
[ABAP Development in Unicode|http://help.sap.com/erp2005_ehp_03/helpdata/EN/79/c554dcb3dc11d5993800508b6b8b11/frameset.htm]
Peter -
Hi Can body send links & Material For Bapi, Badi,User-exits
Hi Abapers,
Can body send links & Material For Bapi, Badi,User-exits, This is my mail id [email protected]
With Regards
Bhaskar rao.MHi Bhaskar,
User Exit
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sapgenie.com/abap/code/abap26.htm
http://www.sap-img.com/abap/what-is-user-exits.htm
http://wiki.ittoolbox.com/index.php/HOWTO:Implement_a_screen_exit_to_a_standard_SAP_transaction
http://www.easymarketplace.de/userexit.php
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sappoint.com/abap/userexit.pdfUser-Exit
http://www.planetsap.com/userexit_main_page.htm
http://wiki.ittoolbox.com/index.php/HOWTO:Implement_a_screen_exit_to_a_standard_SAP_transaction
USER EXITS
https://forums.sdn.sap.com/click.jspa?searchID=672084&messageID=312792
https://forums.sdn.sap.com/click.jspa?searchID=672084&messageID=1320078
https://forums.sdn.sap.com/click.jspa?searchID=672084&messageID=2669896
BADI(Business Add-In) is the object oriented method of user exits...
Each BAdI has a definition and more than one implementation. The definition means the methods(in class concept) that are used for performing various functions. The BAdI definition can be viewed in SE18 transaction(for standard ones) and user-defined BAdIs can be created in the same transaction as well.
When you create a BAdI definition, an class interface will be automatically created and you can define your methods in the interface. The implementation of the methods can be done in SE19 transaction
Check these links for info about badi..
BADI's
BADI's
http://help.sap.com/saphelp_erp2005/helpdata/en/73/7e7941601b1d09e10000000a155106/frameset.htm
http://support.sas.com/rnd/papers/sugi30/SAP.ppt
BADI's
BADI's
BADI's
http://help.sap.com/saphelp_erp2005/helpdata/en/73/7e7941601b1d09e10000000a155106/frameset.htm
http://support.sas.com/rnd/papers/sugi30/SAP.ppt
http://www.sts.tu-harburg.de/teaching/sap_r3/ABAP4/abapindx.htm
http://members.aol.com/_ht_a/skarkada/sap/
http://www.ct-software.com/reportpool_frame.htm
http://www.saphelp.com/SAP_Technical.htm
http://www.kabai.com/abaps/q.htm
http://www.guidancetech.com/people/holland/sap/abap/
http://www.planetsap.com/download_abap_programs.htm
http://help.sap.com/saphelp_nw04/helpdata/en/c8/1975cc43b111d1896f0000e8322d00/content.htm
/people/thomas.weiss/blog/2006/04/03/how-to-define-a-new-badi-within-the-enhancement-framework--part-3-of-the-series
/people/thomas.weiss/blog/2006/04/18/how-to-implement-a-badi-and-how-to-use-a-filter--part-4-of-the-series-on-the-new-enhancement-framework
http://www.esnips.com/web/BAdI
http://www.allsaplinks.com/badi.html
New to Badi
Intro.....
http://help.sap.com/saphelp_nw04/helpdata/en/e6/d54d3c596f0b26e10000000a11402f/content.htm
diff betweem badi n customer exits........
http://www.sap-img.com/abap/difference-between-badi-and-user-exits.htm
BAPI
BAPI
http://help.sap.com/saphelp_46c/helpdata/en/9b/417f07ee2211d1ad14080009b0fb56/frameset.htm
http://searchsap.techtarget.com/originalContent/0,289142,sid21_gci948835,00.html
Checkout !!
http://searchsap.techtarget.com/originalContent/0,289142,sid21_gci948835,00.html
http://techrepublic.com.com/5100-6329-1051160.html#
http://www.sap-img.com/bapi.htm
http://www.sap-img.com/abap/bapi-conventions.htm
http://www.sappoint.com/abap/bapiintro.pdf
http://www.sapgenie.com/abap/bapi/example.htm
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCMIDAPII/CABFAAPIINTRO.pdf
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFABAPIREF/CABFABAPIPG.pdf
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCFESDE8/BCFESDE8.pdf
List of all BAPIs
http://www.planetsap.com/LIST_ALL_BAPIs.htm
http://www.sappoint.com/abap/bapiintro.pdf
http://www.sappoint.com/abap/bapiprg.pdf
http://www.sappoint.com/abap/bapiactx.pdf
http://www.sappoint.com/abap/bapilst.pdf
http://www.sappoint.com/abap/bapiexer.pdf
http://service.sap.com/ale
http://service.sap.com/bapi
http://www.planetsap.com/Bapi_main_page.htm
http://www.topxml.com/sap/sap_idoc_xml.asp
http://www.sapdevelopment.co.uk/
http://www.sapdevelopment.co.uk/java/jco/bapi_jco.pdf
Regards,
Priyanka.
Maybe you are looking for
-
AIR app seems to become unresponsive after sitting idle
I built a straight forward info kiosk using Flash AS3 and used AIR to distribute it. The main items of the file: Straight ahead navigation with buttons that jump to frame markers. It has a 3 minute timer which returns it to the start page if it is no
-
Problem with multiple counter plan containing running hrs and no of months
Hey gurus, In my project the preventive maintenance of compressor is such that it is performed after 500 hrs or 6 months whichever comes first. Now i ve created a cycle set cosisting of 500 hrs and 6 months. In the multiple counter plan i ve assigned
-
How to upload photos from iPad to eblogger
I have photos on my ipad 2 that I would like to upload to my eblooger blog...how does this work? Is it even possible? There doesn't even seem to be a media browser to search for photos.
-
Setting uplink/downlink speed for QoS on WRT300N
I've setup QoS on this router to give my 2 voip box's high priority, http/email/video traffic medium priority, and bittorrent low priority. The problem is, there is no place to tell the router how fast my connection is.. uplink/downlink speed isn't a
-
Service object in material master
hi using service object in material master to attach document, however, how can i find out this material master had already attached a document. As now, i have to click several steps so that i know this material master with attch document, pls advice