Sending material for Packaging to Vendor & receiving while GR

Dear All,
Kindly help in resolving below issue.
I have to procure material from vendor in the container sent by me to him. However I dont want to use item Category L / Subcontracting for the same. We wll not maintain BOM as well. Please tell is there any other way round for the same. The stock of the container in my plant is non valuated.
Regards,

RTP is a material master of material type LEER or LEIH.
more can be read here:
http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b921143ad11d189410000e829fbbd/frameset.htm
Regards
MK
Edited by: Manmeet Mohan Karandikar on Mar 9, 2010 9:49 AM

Similar Messages

  • Pls send material for idocs in ECC 6.0

    Pls send material for idocs in ECC6.0

    Hi sitaram s ,
    IDoc
    - IDoc (for intermediate document) is a standard data structure for electronic data interchange (EDI) between application programs written for the popular SAP business system or between an SAP application and an external program. IDocs serve as the vehicle for data transfer in SAP's Application Link Enabling (ALE) system. IDocs are used for asynchronous transactions: each IDoc generated exists as a self-contained text file that can then be transmitted to the requesting workstation without connecting to the central database. Another SAP mechanism, the Business Application Programming Interface (BAPI) is used for synchronous transactions.
    A large enterprise's networked computing environment is likely to connect many geographically distributed computers to the main database. These computers are likely to use different hardware and/or operating system platforms. An IDoc encapsulates data so that it can be exchanged between different systems without conversion from one format to another.
    IDoc types define different categories of data, such as purchase orders or invoices, which may then be broken down into more specific categories called message types. Greater specificity means that an IDoc type is capable of storing only the data required for a particular transaction, which increases efficiency and decreases resource demands.
    An IDoc can be generated at any point in a transaction process. For example, during a shipping transaction process, an IDoc may be generated that includes the data fields required to print a shipping manifest. After a user performs an SAP transaction, one or more IDocs are generated in the sending database and passed to the ALE communication layer. The communication layer performs a Remote Function Call (RFC), using the port definition and RFC destination specified by the customer model. The IDoc is transmitted to the receiver, which may be an R/3, R/2, or some external system.
    Archiving Processed IDocs
    IDoc archiving is a two-step process:
    1. Archive the IDoc.
    2. After that another job will be generated. You can see in your SARA for your trigger to delete those archived IDocs.
    Have a look at transaction WE47, set "Archiving - Possible" for all statuses to be archived. Use transaction SARA with object IDoc to archive. If the above is set then all IDocs are archived the same way.
    Transaction SARA works in the following way:
    On the main screen enter IDoc as the object. Click on Customising -> Technical settings. This shows the logical filename (configured via transaction FILE & SF01) that will be used to get a filename when writing the archive files. It also shows the document type (that links to an archive via transaction 0AC0) or the archive, depending on SAP version. You can also set the size of the archive files and whether the deletion and storage jobs should execute automatically or not.
    On the main screen there are, amongst others, buttons for ARCHIVE, DELETE and MANAGEMENT. When you click on ARCHIVE you will go to a screen where you can create variants, and set the parameters for the archiving job. The EXECUTE button will schedule this job. If the "start automatic" tic for the deletion program was not set in customising, you will need to go to the DELETE button on the main screen to schedule the deletion jobs, after the archive job has finished. This schedules a job per archive file. In MANAGEMENT you will be able to see the statuses of each archive run.
    SAP Integration Using ALE(Application Linking and Enabling)
    - IDOCS -
    http://www.thespot4sap.com/Articles/SAP_ALE_IDOCS.asp
    Updating IDoc data in segments,Changing a control record of an IDoc,Getting IDocs linked to Application documents,
    Displaying and IDoc in a report,Read IDoc from Database,Creating and sending an IDoc,Update IDoc status on the database
    ALE Inbound Pre-Processing
    http://www.erpgenie.com/sapedi/idoc_abap.htm
    cheers!
    gyanaraj
    reward points if u find this helpful

  • Sending material from one subcontracting vendor to another vendor

    Hi Experts
    we have a scenario we have more than one subcontracting vendors.so the unused raw material should be send to one vendor to another.so how can we configure it.please give me feedback.
    Thanks in advance...

    Hi Madhu ,
    What do u mean sending unused material from one vendor to another ?
    In subcontracting u can send material to only one vendor at a time.
    Regards
    Ramesh Ch

  • Reference material for Packaging

    Hi all,
    I've created a reference material for packaging: material 100
    There is a packing instruction (POP1) and determination record (POF1) for this reference material.
    In the material master, I have also assigned reference mat 100 to 2 other materials:
    material 101  --> reference mat = 100
    material 102 ---> reference mat = 100
    However when I try to pack these material, I get the error:
    No packing instruction could be found for material 101
    No packing instruction could be found for material 102
    How can I resolve this?
    Thanks,

    Hi friend,
    Please find the below link
    No packing instruction could be found for material "X"
    Thanks
    Dasaradha

  • IMessages notification for every message I received while away.. annoying.

    Whenever I turn on my computer after being away for awhile, Messages likes to update/sync the iMessages I received while away. This is all well and good, except I get a notification for almost every single message while it syncs, thus resulting in about 20 little "Blips" and notification updates. Is there a way to set it up so I only get ONE notification when coming back and it syncs?
    ie. "You have 56 new iMessages" vs "You have 2 new iMessages... you have 5 new iMessages... you have 8 new iMessages"

    Hi,
    You could put the computer to Sleep when you were about to leave.
    Then when you Wake it you would get  the "you have 56 new Messages"
    10:26 PM      Thursday; September 13, 2012
    Please, if posting Logs, do not post any Log info after the line "Binary Images for iChat"
      iMac 2.5Ghz 5i 2011 (Lion 10.7.2)
     G4/1GhzDual MDD (Leopard 10.5.8)
     MacBookPro 2Gb (Snow Leopard 10.6.8)
     Mac OS X (10.6.8),
    "Limit the Logs to the Bits above Binary Images."  No, Seriously

  • Sending Material for Final packaging.

    Dear Experts,
    Greetings of the day!
    Scenario:
    At times we have some finished products, which we need to send to a vendor for making promotion packs- In simple terms, suppose we have finished material - A, B and C, and we want to get all together shrink wrapped. (3 in 1).
    No. of Promotional Packs: 100, each containing (materials A,B &C in the ratio of 1:1:1)
    Material
    Quantity
    Batch
    A
    100
    100001
    B
    100
    100002
    C
    100
    100003
    Batch management is active.
    Process AS-IS:
    1.Create Purchase request (MB51N); with item category -L
    2.Create Purchase order (ME21N);
    3.Issue material against purchase order by 541 Movement;
    4.Create inbound delivery against Purchase order;
    5.Receive material By MIGO, with movement type 107;
    6.Release GR Blocked Stock by MIGO with movement type 109;
    7.Create TO against material document generated from 109 Movement.
    8.Confirmation of TO for final put-away to respective storage bins.
    Problems:
    1. When we receive partial quantities from the vendor, we can make GRN (107) against the inbound delivery for the partial quantity by changing the quantity in the inbound delivery number; but we are not able to release GRN (109) as it is showing an error , which asks for complete receipt needs to be done.
    2. I have reversed 107, by doing 108, and then if I am trying to make GRN against the same inbound delivery by movement type 107, the system reflects an error  as " Delivery note data already Exits".
    Scenerio II: Promotion Packs : 100, each containing materials (A,A & A in the ratios of 1:1:1)-Pack of Three (Same Material)
    Material
    Quantity
    Batch
    A
    100
    100004
    A
    100
    100005
    A
    100
    100006
    Purchase request looks like : (B'coz at the time of making purchase request we don't know which batch will be picked by the system)
    Material
    Quantity
    A
    300
    Similarly Purchase order will look same, as it has been created from the PR, and inbound delivery number also same (Only one line item).
    Problems:
    1. At the time of GRN (107), how can we split the material into different batches, since we want to receive with the same batch.
    Hope the scenario's are clear!
    Regards,
    Malik Abrar Altaf.

    Hi,
       So many issues are identified when using two step procedure with inbound delivery. The notes 1373027 - Problems w/ 2-step goods receipts using inbound deliveries and  1225077 - GR with inbound deliveries in (valuated) GR blocked stock  explains the same.
       If you have different batch numbers for GR, then you have to split to different line items with respect to batch.
    Regards,
    AKPT

  • Sending material for subcontract vendor two times

    Hi,
      I have a requirement, we create the subcontract PO as per BOM 10 different types of raw materials are required now initilaly at the time of MB1B only 8 items are ther in the system so we do the trasnfer posting for 8 items then subcontract challan create ref. to MB1B document number now later we recd the remaining two items in our system now how to issue that two material aganist the challan.
    regards,
    zafar

    Hi All,
       Thanks for your reply, I per above reply I try one in development server,
    Subcontract Po created for one FG material Qty : 1, the Finish good BOM contain 2 raw materials
    Finish Material : FG1
    BOM Comp.     : RM1
    BOM Comp.     : RM2,
    when I have done the transfer posting posting first time I have transfer only RM1 to vendor with 541 movement type, then ref. to that document number I have created Subcontract challan with J1IF01 so as per Transfer posting doc. in challan only RM1 come, then without transfering the the RM2  when I am making GR for FG material system is posting both RM1 and RM2 to consumption even for this challan i have not transfer the RM2 to vendor,  so withotu saving the GR then I have trabsfer the RM2 to vendor against the same PO with MB1B movt. 541  now both the RM1 and RM2 are transfer to vendor but with different document now when I made the GR both the RM1 and RM2 are posted to conusmption but when I ma doing reconcilliation for the challan and GR system is giVING ERROR MESSAGE
    Material 229 is not assigned fully, short by 1.000 NO
    Message no. 8I574
    as this material I have transfer in secodn document and this is not there in the challlan so is there any other method so this.
    regards,
    zafar

  • Booking a material  for Service (NCAMC) Vendor / Contractor

    Dear SAP Gurus,
    How to issue the Material to Service vendor to rectify the equipment in AMC contract & how to reconcile the same in SAP?
    We know issue movement is 941 & booking movement is 943, but how to do the process & what is the procedure?  We are having Material code for the same item.

    Hi,
    Generally, Repair of Materials are handled via concept of Gate Pass (Returnable & Non-Returnable). But, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Try the below suggested procedure as a work around process;
    Repair Process via Returnable Gate Pass: -
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    It's not necessary to have materials as Non-Valuated always, it depends on your requirement.
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511) - Only if Stock of Material is not available.
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Note: - If PM Module is implemented then use PM Order as origin of the Repair Process. If it is not then follow the above process.
    Else use Service Process Cycle: -
    1. ME21N - Create Service PO (With Item Category D and Account Assignment Category K )
    2. ML81N - Create Service Entry Sheet w.r.t. Service PO
    3. MIRO - LIV for Service Charges w.r.t. Service PO or Service Entry Sheet
    For Service Process, refer following link;
    [SAP External Service Management|http://www.sap123.com/showthread.php?t=52]

  • Sender Service for Client Proxy in Receiver Det step ?

    Hello guys : just to check will the sending business system for receiver det step in ,client proxy to file ,will be the name of R/3 Business system (where the client proxy is configured) ?
    Please confirm
    Krishna

    Hi Krishna,
    Yes,
    Sender Business Service/System in ABAP proxy->XI->File scenario is Application system(R/3) where proxy has been generated/created.
    Thanks,
    Moorthy
    Message was edited by: Krishna Moorthy P

  • RfcAdapter received a synchronous message. Trying to send sRFC for SALERT_C

    Hi All,
    I am receiving the message  'RfcAdapter received a synchronous message. Trying to send sRFC for SALERT_CREATE' in my receiver RFC channel used to trigger alerts from PI to ECC. no emails are getting generated.
    Please advice.
    Regards.

    public class O_struct implements Serializable {
    // writing
    ObjectOutputStream oos = ...;
    O_struct struct = ...;
    oos.writeObject(struct);
    // reading
    ObjectInputStream ois = ...;
    O_struct struct = (O_struct)ois.readObject();
    I will be sending 1000s of these byte arrays, and I'm sure having to create a new Double or Float on both ends will hinder this.
    I am worried that having to create new objs every time it is sending a byte array will affect my application.
    That's the wrong way to approach this. You're talking about adding complexity to your code and fuglifying it because you think it might improve performance. But you don't know if it will, or by how much, or even if it needs to be improved.
    Personally, I'd guess that the I/O will have a much bigger affect on performance than object creation (which, contrary to popular belief, is generally quite fast now: http://www-128.ibm.com/developerworks/java/library/j-jtp01274.html)
    If you think object creation is going to be a problem, then before you go and cock up your real code to work around it, create some tests that measure how fast it is one way vs. the other. Then only use the cock-up if the normal, easier to write and maintain way is too slow AND the cock-up is significantly faster.

  • Project stock material for subcontracting

    Hi,
    I want to send project stock material (special stock with 'Q') for subcontracting vendor. Pl elaborate the procedure.
    Subcontracting PO is with account assignment category 'Q'.
    Pl revert.

    Hello Sachin
    We had similar requirement but in a different way. i.e sending material for subcontracting work for materials returned by customers getting it reworked bringing the reworked material back to plant stock and then sending to customer.
    We had used alltogether different transactions ADSUBCON is the transaction code. Prerequsite is you will have to implement BADI BADI_ADSUB_MVT_TYPES of enhancement specefe ES_BADI_ADSUB_MVT_TYPES.
    Regards

  • Need to send PO email to multiple vendors

    HI SAP Guru,
    I am currently sending email for PO to vendor. However, my user now wants to send the same PO to multiple email address for the same PO.
    How can I configure it?
    Do I need to customized the sapscript printing for email?
    Thanks in advance

    Hi
    Use function CONVERT_OTFSPOOLJOB_2_PDF.
    to convert your smartform spool request into  PDF format
    then you can mail it to multiple people using mail function
    SO_NEW_DOCUMENT_ATT_SEND_API1
    i have tried it same way.
    Gaurav Sood

  • Material Procurement from many vendors

    Hi friends,
    I am working in a process industry where raw material is supplied from nearly two thousand vendors.I put all vendors in a source list. I want to create purchase requisitions at a time for all vendors for same material. How can I create it?
    Please guide me.

    Hi,
    For this you need to follow the "Quota Arrangement" Process.
    Go to MM02 - In "Purchasing" view, enter "Quota arr. usage" as '4" and save.
    Also maintain MRP views of the material master.
    Now go to OMI4 - here for MRP Lot Size (For e.g. EX), activate "Splitting Quota" for Short-term as well as Long-term planning both and save.
    Now go to MEQ1 - here for material master and plant and press enter, here maintain valid to date and pres enter and double click on this
    Here enter Procurement as "F" (External Procurement), also enter all the vendors and enter Quota as "1" for all the vendors.
    Prerequisite for Quota Arrangement is Purchase Info Record and Source List must exist for the material.
    Now maintain Planned independent requirement for material in MD61 and then run MRP for the material in MD02 and check system will generate the PRs for the material for all the vendors maintained in MEQ1.

  • Refurbishment order for sending material to external vendor

    Hello everyone
    We have the requirement like the material is partially refurbished internally with the available resources and then we will send the same material to the external vendor for further processing(subcontracting).
    The cost of the both (internal + external) should be settled to the material.
    Thank for your inputs.
    Regards
    Santosh

    Hi Santosh,
    Below steps may help you, Anyway please check with your MM consultant as well
    MIGO     Send material to stores , Good Issue , Movement Type 202
    ME54N     Release PR : Order which you have raised.
    ME21N     Create P O
    ME29N     Release P O
    MIGO     Transfer posting to vendor, Transfer Posting to Vendor,Movement Type 941.
    And After return Movement type 942 and 201.
    Hope this will help you.
    Riyaj

  • Goods Receipt for packaging material - Item cat. ELP

    Hi expert,
    I am facing a problem regarding receive Packaging Material Item i MIGO via inbound. Problem detail as below hope you can advise me:
    1. I create PO order 1pc of Throttle
    2. In Inbound Delivery Screen I do Packing for Throttle by using Handling Unit Function, packaging Material is Carton Box.
    3. After Pack complete, Item for packaging material is auto generated in inbound screen:
    - Item Cat. of Throttle = ELN
    - Item Cat. of Carton Box (Packaging Material) = ELP
    4. When i do MIGO via Inbound: there is only 1 item for Throttle is displayed. How to do Goods Receipt for Carton Box item? Do i Miss any setting for that?
    Thanks.

    i thnk u sould maintain material master with two units one is throttle and second is cartoon.
    u shud maintain that how many throttle is equal to 1 cartoon.
    this u can maintain directlt in PO (In condition tab, with these two field : OUN and UN). in PO as a OUN ,give throttle n UN , give cartoon in item overview as well as condition tab.
    and during delivery change the unit in cartoon. then while migo, material will show in cartoon.
    hope it will be helpful.