Sending material for subcontract vendor two times

Hi,
  I have a requirement, we create the subcontract PO as per BOM 10 different types of raw materials are required now initilaly at the time of MB1B only 8 items are ther in the system so we do the trasnfer posting for 8 items then subcontract challan create ref. to MB1B document number now later we recd the remaining two items in our system now how to issue that two material aganist the challan.
regards,
zafar

Hi All,
   Thanks for your reply, I per above reply I try one in development server,
Subcontract Po created for one FG material Qty : 1, the Finish good BOM contain 2 raw materials
Finish Material : FG1
BOM Comp.     : RM1
BOM Comp.     : RM2,
when I have done the transfer posting posting first time I have transfer only RM1 to vendor with 541 movement type, then ref. to that document number I have created Subcontract challan with J1IF01 so as per Transfer posting doc. in challan only RM1 come, then without transfering the the RM2  when I am making GR for FG material system is posting both RM1 and RM2 to consumption even for this challan i have not transfer the RM2 to vendor,  so withotu saving the GR then I have trabsfer the RM2 to vendor against the same PO with MB1B movt. 541  now both the RM1 and RM2 are transfer to vendor but with different document now when I made the GR both the RM1 and RM2 are posted to conusmption but when I ma doing reconcilliation for the challan and GR system is giVING ERROR MESSAGE
Material 229 is not assigned fully, short by 1.000 NO
Message no. 8I574
as this material I have transfer in secodn document and this is not there in the challlan so is there any other method so this.
regards,
zafar

Similar Messages

  • Project stock material for subcontracting

    Hi,
    I want to send project stock material (special stock with 'Q') for subcontracting vendor. Pl elaborate the procedure.
    Subcontracting PO is with account assignment category 'Q'.
    Pl revert.

    Hello Sachin
    We had similar requirement but in a different way. i.e sending material for subcontracting work for materials returned by customers getting it reworked bringing the reworked material back to plant stock and then sending to customer.
    We had used alltogether different transactions ADSUBCON is the transaction code. Prerequsite is you will have to implement BADI BADI_ADSUB_MVT_TYPES of enhancement specefe ES_BADI_ADSUB_MVT_TYPES.
    Regards

  • Pls send material for idocs in ECC 6.0

    Pls send material for idocs in ECC6.0

    Hi sitaram s ,
    IDoc
    - IDoc (for intermediate document) is a standard data structure for electronic data interchange (EDI) between application programs written for the popular SAP business system or between an SAP application and an external program. IDocs serve as the vehicle for data transfer in SAP's Application Link Enabling (ALE) system. IDocs are used for asynchronous transactions: each IDoc generated exists as a self-contained text file that can then be transmitted to the requesting workstation without connecting to the central database. Another SAP mechanism, the Business Application Programming Interface (BAPI) is used for synchronous transactions.
    A large enterprise's networked computing environment is likely to connect many geographically distributed computers to the main database. These computers are likely to use different hardware and/or operating system platforms. An IDoc encapsulates data so that it can be exchanged between different systems without conversion from one format to another.
    IDoc types define different categories of data, such as purchase orders or invoices, which may then be broken down into more specific categories called message types. Greater specificity means that an IDoc type is capable of storing only the data required for a particular transaction, which increases efficiency and decreases resource demands.
    An IDoc can be generated at any point in a transaction process. For example, during a shipping transaction process, an IDoc may be generated that includes the data fields required to print a shipping manifest. After a user performs an SAP transaction, one or more IDocs are generated in the sending database and passed to the ALE communication layer. The communication layer performs a Remote Function Call (RFC), using the port definition and RFC destination specified by the customer model. The IDoc is transmitted to the receiver, which may be an R/3, R/2, or some external system.
    Archiving Processed IDocs
    IDoc archiving is a two-step process:
    1. Archive the IDoc.
    2. After that another job will be generated. You can see in your SARA for your trigger to delete those archived IDocs.
    Have a look at transaction WE47, set "Archiving - Possible" for all statuses to be archived. Use transaction SARA with object IDoc to archive. If the above is set then all IDocs are archived the same way.
    Transaction SARA works in the following way:
    On the main screen enter IDoc as the object. Click on Customising -> Technical settings. This shows the logical filename (configured via transaction FILE & SF01) that will be used to get a filename when writing the archive files. It also shows the document type (that links to an archive via transaction 0AC0) or the archive, depending on SAP version. You can also set the size of the archive files and whether the deletion and storage jobs should execute automatically or not.
    On the main screen there are, amongst others, buttons for ARCHIVE, DELETE and MANAGEMENT. When you click on ARCHIVE you will go to a screen where you can create variants, and set the parameters for the archiving job. The EXECUTE button will schedule this job. If the "start automatic" tic for the deletion program was not set in customising, you will need to go to the DELETE button on the main screen to schedule the deletion jobs, after the archive job has finished. This schedules a job per archive file. In MANAGEMENT you will be able to see the statuses of each archive run.
    SAP Integration Using ALE(Application Linking and Enabling)
    - IDOCS -
    http://www.thespot4sap.com/Articles/SAP_ALE_IDOCS.asp
    Updating IDoc data in segments,Changing a control record of an IDoc,Getting IDocs linked to Application documents,
    Displaying and IDoc in a report,Read IDoc from Database,Creating and sending an IDoc,Update IDoc status on the database
    ALE Inbound Pre-Processing
    http://www.erpgenie.com/sapedi/idoc_abap.htm
    cheers!
    gyanaraj
    reward points if u find this helpful

  • Is it possible to create a BOM  for ROH material for Subcontracting

    Dear Guru's
    As per my knowledge BOM is needed only for HALB & FERT material even if for subcontracting purpose. So is it possible to create a BOM for ROH material for Subcontracting?. Pls help me to get a soln ?
    Regards
    Ragesh

    Ragesh,
    When you are subcontracting the material, the Std SAP says that the material type should be HALB and not ROH.
    But if client requires for any reason that the material should be ROH only, there is no problem in chaning the settings.
    Sumeet

  • Re: imported material for local vendor.

    Hi guru's,
    Our requirement is to get imported material for local vendor, for this excise postings should not be allowed (posted) when requirement is raised to local vendor.
    what are the settings to be done for no excise capture.
    replies awaiting.
    tuljasingh.

    HI,
    First way: - Don't take excise able tax code in purchase order.
    Second way:- Maintain vendor excise detail >> maintain tax indicator as 3 in J1ID.
    Regards,
    Mahesh Wagh

  • Refurbishment order for sending material to external vendor

    Hello everyone
    We have the requirement like the material is partially refurbished internally with the available resources and then we will send the same material to the external vendor for further processing(subcontracting).
    The cost of the both (internal + external) should be settled to the material.
    Thank for your inputs.
    Regards
    Santosh

    Hi Santosh,
    Below steps may help you, Anyway please check with your MM consultant as well
    MIGO     Send material to stores , Good Issue , Movement Type 202
    ME54N     Release PR : Order which you have raised.
    ME21N     Create P O
    ME29N     Release P O
    MIGO     Transfer posting to vendor, Transfer Posting to Vendor,Movement Type 941.
    And After return Movement type 942 and 201.
    Hope this will help you.
    Riyaj

  • How to send finish material for subcontracting ?

    Dear all ,
    I per our client requirement finish materaila has to send for the drilling to the subcontractiong .
    Shall i use subcontracting method in which material which i will send & which i will receipt will be same plz reply me .
    abhay

    Dear,
    It depends on your requirement
    If the material is going and comming back after a perticular operation, and vendor is with in the company primises (no excise gate pass) then you can configure it as a external operation in a production order, but in system will not show the material sent to vendor for subcontarcting vendor, this informatoon you will get it in Production order only, not in inventory
    I this is the case, system will create a SC PR during Production order release. Then you can convert it to SC PO and send the material to vendor. It is like a servive PO...
    If you want to send component 1 and 2 to vendor and he will assemble and give it back to you and vendor is siyuvated outside your primises(excise gate pass involved), then you need to create a SC PO.
    In this case you issue (541 O ovement) raw material to SC vendor ans system will show in inventory managmenet that the raw material is with SC vendor in MMBE. When you recive the assembly from SC vendor (using 101 mov type), system isues raw material to SC PO.

  • External Material for Subcontracting

    How do you manage material from customer that you just add a process to it?
    Right now we do not enter the material in our stock and just make a service sales order type?
    Is there a best practice process for this scenario?
    Thank you,
    Carlos

    Hi sumit,
    In subcontracting the material has to return within 180 days otherwise it will be
    treated as exciseable goods.
    when we do GR for external po's we receive only the operation to be performed
    so conversion cost to the vendor shall be paid
    when ceate Production order  system will create planned order only which is unfirmed as the procurement type ' X ' and procurement key for subcontracting you need to define MRP 2 under procurement.
    after ensuring GR is done order confirmation of operation ( external ) has to be done here only system capture the quantity ( subcontracting material ) and also valuation of the material in production order. As order settlement is order based .
    pl reward points ,
    regards,
    vimal balaji

  • Purchase requisition created only for the vendor lead time

    Hello MRP experts,
    I have a requirement that the purchase requisitions should be created by MRP only in the vendor lead time and rest of them should be in planned orders. Can this done and if so how. Thanks in Advance and due points will be awarded.

    Hi,
    As per my understanding there is no standard settings to achieve this requirement.
    Regards,
    Manish

  • Sending material for Packaging to Vendor & receiving while GR

    Dear All,
    Kindly help in resolving below issue.
    I have to procure material from vendor in the container sent by me to him. However I dont want to use item Category L / Subcontracting for the same. We wll not maintain BOM as well. Please tell is there any other way round for the same. The stock of the container in my plant is non valuated.
    Regards,

    RTP is a material master of material type LEER or LEIH.
    more can be read here:
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b921143ad11d189410000e829fbbd/frameset.htm
    Regards
    MK
    Edited by: Manmeet Mohan Karandikar on Mar 9, 2010 9:49 AM

  • Sending Material for Final packaging.

    Dear Experts,
    Greetings of the day!
    Scenario:
    At times we have some finished products, which we need to send to a vendor for making promotion packs- In simple terms, suppose we have finished material - A, B and C, and we want to get all together shrink wrapped. (3 in 1).
    No. of Promotional Packs: 100, each containing (materials A,B &C in the ratio of 1:1:1)
    Material
    Quantity
    Batch
    A
    100
    100001
    B
    100
    100002
    C
    100
    100003
    Batch management is active.
    Process AS-IS:
    1.Create Purchase request (MB51N); with item category -L
    2.Create Purchase order (ME21N);
    3.Issue material against purchase order by 541 Movement;
    4.Create inbound delivery against Purchase order;
    5.Receive material By MIGO, with movement type 107;
    6.Release GR Blocked Stock by MIGO with movement type 109;
    7.Create TO against material document generated from 109 Movement.
    8.Confirmation of TO for final put-away to respective storage bins.
    Problems:
    1. When we receive partial quantities from the vendor, we can make GRN (107) against the inbound delivery for the partial quantity by changing the quantity in the inbound delivery number; but we are not able to release GRN (109) as it is showing an error , which asks for complete receipt needs to be done.
    2. I have reversed 107, by doing 108, and then if I am trying to make GRN against the same inbound delivery by movement type 107, the system reflects an error  as " Delivery note data already Exits".
    Scenerio II: Promotion Packs : 100, each containing materials (A,A & A in the ratios of 1:1:1)-Pack of Three (Same Material)
    Material
    Quantity
    Batch
    A
    100
    100004
    A
    100
    100005
    A
    100
    100006
    Purchase request looks like : (B'coz at the time of making purchase request we don't know which batch will be picked by the system)
    Material
    Quantity
    A
    300
    Similarly Purchase order will look same, as it has been created from the PR, and inbound delivery number also same (Only one line item).
    Problems:
    1. At the time of GRN (107), how can we split the material into different batches, since we want to receive with the same batch.
    Hope the scenario's are clear!
    Regards,
    Malik Abrar Altaf.

    Hi,
       So many issues are identified when using two step procedure with inbound delivery. The notes 1373027 - Problems w/ 2-step goods receipts using inbound deliveries and  1225077 - GR with inbound deliveries in (valuated) GR blocked stock  explains the same.
       If you have different batch numbers for GR, then you have to split to different line items with respect to batch.
    Regards,
    AKPT

  • Scrapping the material at subcontracting vendor

    I request your inputs for a particular scenario in which
    A material is sent to the subcontacting vendor for repair. If the material can't be repaired it is scrapped at the vendor location itself without sending the material back to the plant. Is there a partiular movement type or way in which the material can be scrapped at the subcontracting location without taking it back in the plant . 
    Thanks

    Hi,
    Use MB1A 551 O
    Regards
    Merwyn

  • Issue material for Subcontracting with reference to PO for multiple batches

    Hi All,
    Issue: I want to issue 5-6 materials with reference to PO which have multiple batches. How can that be done?
    Thus, if my raw material in stock are:
    mat X   Batch 1    50 nos
    mat X   Batch 2    40 nos
    mat X   Batch 3     30 nos
    mat Y Batch 6    10 nos
    mat Y Batch 7    10 nos
    mat Y Batch 8    10 nos
    mat Y Batch 9    10 nos
    i f for semi finished material A, sub contractor order 45000009 is created, where raw material required are:
    Mat X      100 nos
    Mat Y      30 nos
    then how can I issue the raw materials wrt PO, and select multiple batches at the same time, without user entering the material again and again.
    I have gone through the SDN multiple times to see the probable solution exists, but I have not received any solution.
    Regards,
    Ankush

    DO MB1B transaction, with Movement type 541,
    Enter the material with different Batches for required qty. as different line items.
    e.g
    line item 1 : mat X Batch 1 50 nos
    line item 2 :  mat X Batch 2 40 nos
    line item 3 :  mat X Batch 3 10 nos
    line item 4: mat Y Batch 6 10 nos
    line item 5 :  mat Y Batch 7 10 nos
    line item 6 :  mat Y Batch 8 10 nos
    Edited by: sudhansu satapathy on Oct 21, 2011 7:29 PM

  • Clint requirement manual payment for maultiple vendor ata time through f-53

    Hi experts
    I have a queiry,  the client requirement is he has to pay vendor payments for manuvaly, but the requirement is at a time he want to pay multiple vendors with the use  of manual payments.
    clint is not using app?
    Thanks
    madhu

    ok
    we have chance to pay manualy single shot multiple payments
    when the useris posting use f-53, he maintain date, c.code, cur,
    bank a/cxxxxxxxx, total payment of openitem value
    when come tovedor deatils  just select the OTHER ACCOUNTS.
    sys will papulate one sreen then u need to main tain all vendor and co.code,doc type later u can select the proces open iltems.
    it wiil dispaly the all open line items than we can clear
    thanks
    madhu

  • Alerts for events showing two time zones? Alerts happening at odd times.

    I just set a new event for later today using the calender app. I set two alerts, one for 30 mins before, and one for 15 minutes before. It is currently TWO hours until the appointment, but my phone just gave me the alert saying "*event name* in 30 minues (6:30, 5:30 ADT)"
    Why is my phone suddently telling me when my events are happening in ADT? (That means Atlantic Daylight Time... I think!) And why is it giving me the alert 2 hours before, rather than the set 30 mins?
    Message was edited by: Sarah CMac

    It just happened again! I wrote down exactly what it said.
    the current time is 5:00
    the message said:
    " Table Viewers
    Today at 5:30pm (6:30pm ADT)"
    The event is set to happen at 6:30.
    What the heck is going on??
    (Table Viewers: I am selling a table set. People are coming to view it)