Sequence dependent setup (setuo matrix) with pooled capacity

Hi all,
We are facing a problem in the sequence dependent setup. We have a pooled capacity in ECC on which we want sequence dependent setup happening in APO. In APO orders are required to be scheduled on this resource and this resource is the primary resource. When I am trying to do the Detailed scheduling the time from the matrix is the one in which there is no predecessor.
Is sequence dependent setup not possible with pooled resource.  Is it the standard system behaviour or am I missing something here.
Thanx for the help.

Insted of making pooled capacity you better try with alternate sequence.
system is behaving properly.

Similar Messages

  • ASCP with sequence dependent setup resources

    Hi,
    we're implementing Oracle ASCP in our company based in Italy.
    Currently we're not using MAnufacturing Scheduling.
    We also use Discrete Manufacturing in a constraint based plan enviroment.
    We have a painting department with a painting machine used to paint many different items but with only 3 colors.
    I would like to now if it's possible to let the ASCP schedule work orders for this department, considering that the resource PAINTINGMACHINE has sequence dependent setup (white, black, gray).
    We don't want the ASCP to plan work orders in the following way:
    for tomorrow, make 3 pieces of item A white, 2 pcs of X black, 1 pc of C white and so on...
    we would like to have this kind of situation:
    make 3 of A white, 1 of B white, 10 of C white....5 of T white....then 10 of X black, 15 of Y black and so on....
    If we configure the PAINTINGMACHINE resource with 3 different setup type and we add some CHANGEOVERS with PENALTY factor,
    will the ASCP plan the work orders considering this parameters or not?
    We don't want to use Manufacturing Scheduling module, cause we are a not so big company and we would like to have the Planning Manager, plan/schedule the production.
    Excuse for my english.
    Thanks in advance,
    Giacomo Poleschi.

    No, ASCP does not support this today. You would have to use Manufacturing Scheduling to get the sequencing you desire. This is, however, a candidate for release 12.
    Scott

  • Pooled capacity greyed out

    Dear PP gurus,
                           I am trying to activate pooled capacity.
    I have created a capacity in cr11 with pooled capacity ticked and capacity category person
    but when i try to create a work center in cr01, in the capacity tab capacity pool is greyed out
    I gave capacity category , then also it is greyed out .
    Do I have to do some configuration setting?
    (I have got a tab called HRMS in the capacity tab - does that affect pooled capacity?)

    Dear,
    Create the pooled capacity using transaction CR11, and in the capacity header, "Pooled Capacity" check box is to be activated.
    and then assigned to the work-center capacity tab - Pooled Capacity field.
    Now Create/Change Work center - Capacity Tab page:
    If your default work center/default capacity does not allow the Pooled Capacity then go to Edit and Delete the Capacity.
    Now again Edit--> New Entries, Enter the Capacity Category and Pooled Capacity just now created.
    In the Capacity Over view you will get the Pooled Capacity Checked and new capacity for you.
    Hope this helps to create the pooled capacity.
    You can assign this pooled capacity in the work center creation in CR01,under capacity overview ,just below to the capacity category.
    Please refer my reply from this thread,
    Re: Available capacity
    Regards,
    R.Brahmankar

  • Sequence dependency between two different operations

    Hi
    we start setup sequence dependency.when in from and to operations we have
    same operations with different Item class setuo time is showing in ASCP .but
    when we have different operations in ascp setuo time is not collected.please
    help us
    regards

    Chaining Value Chain Planning - EBS

  • Pooled capacity, machine work center can have labour?

    Dear All,
    1) We have eg. a common pool of welders for Location A and Location B welding work centers.  How do we setup the pooled capacity and assign to them?
    2) We have eg. 2 CNC machining work centers (Vert and Horiz) but we have labour support to do machine setup, labour related jobs etc.  If we need to perform labour capacity planning in this machine-based work center, is this done by maintaining a separate work center for this labour support and assigned to the same Cost Center?  Or for machine-based work center, labour capacity planning is not required?
    Thank you for contributing.

    Dear
    We have eg. a common pool of welders for Location A and Location B welding work centers. How do we setup the pooled capacity and assign to them?
    There is no differnce between pooled capacity and available caapcity .Only thing is you can utilised this capacity pool for various work centre level.
    To do that , Goto - SPRO-Production -BAsic Data-Work center-Capacity Planning-Define Capacity categories -Create Capacity Categoery for common pool of welders  , Create Capacity in CR11 and assing them into Work cetre Capaicty tab-Pooled Capacity Catogeries and maintian No of indivuial caapcity in Capacity Header -Standard Available caapcity-Indivual Capacity ( Total Number of welders with working timing , utilisation ) .
    Quest2 : To address this issue  , you can select Setup , Labour and Machine in Defalut tab of  same Work centre with proper Standard Value Key .Now , as they are all part of the Production activity , so you can keep the same Cost Centre ( Production Cost Centre )  in the Work centre tab with Formula Key of Labour ,Machine and setup .Goto CR02-Default Tab and Costing tab .
    Hope this is clear
    regards
    JH

  • Sequence dependent lot-size planning as a basis for PP/DS blocks?

    Hi ,
    I consider the following system setup for a Mill Products planning implementation .
    1) In SNP one performs SOP planning with common goals to adjust sales plan, establish equipment maintenance plan, transportation plan, etc. The first month of the SNP plan is supposed to be in daily buckets. Using the SNP optimizer is a good option since the business goal is to use equipment more efficiently, let's say to minimize setup costs, and there are warehouse limitations for semifinished products as well.
    2) In PP/DS we are going to use CDP and block planning since it is the best practice.
    3) SNP planned orders can be used as a basis for PP/DS blocks on the resource, upon the condition that the configuration of SNP product - kmat variant and block requirements match.
    In SNP i  see that the SNP PDS has a duration of 1 day (that's fine), but the sequence dependent lot-size planning requires a bucket of at least 1 week long (1 month in my case) since the SNP orders are sequence-optimized only inside of one bucket. The result of such an optimization are additional counters assigned to SNP orders according to their sequence  minimizing setup costs. However, orders are not scheduled according to the sequence.
    So far it looks like such a combination is not useful as
    - Orders in monthly buckets are not scheduled on days and cannot serve as a basis for block dates proposal for PP/DS block planning.
    - If a product production volume is less than 1 day, SNP cannot create any more detailed block in principle since the minimal time bucket is daily bucket.
    I searched over forums on these or similar topics, however no definitive answer so far for the question in the subj.
    Could anyone bring more  light on this ? Maybe I am missing something in the setup or sequence dependent lot size planning was designed for other purposes/industries?
    Best regards
    Vladimir

    Hello Asim,
    Issue one
    in product selection for propagation range you can set your selection criteria which selects the products dynamically. You just have to change your report variants for planning run. Do I misunderstand your concerns?
    Issue two
    Changing to planning procedure 1 will not delete the PFE but will prevent APO to create a new entry after any MRP-relevant changes happen or heuristic SAP_PP_020 (which creates the initial entry and does the low level code determination) is run.
    In some cases procedure 1 will still create a PFE. Please check customizing for details. Thats why I would recommend to create a new planning procedure with "no reactions".
    As soon as you prevent APO from creating new PFEs you can just once delete the PFEs in /SAPAPO/NETCH by just setting the first column for these materials blank (select your materials, mark column, delete indicator).
    Corresponding table to MDVM is /SAPAPO/PEGKEY. Indicator for PP/DS is NETCH_RRP.
    If material is not planned in APO you do not need a PFE in APO.
    Issue 3
    Maybe utilize table /SAPAP/PEGKEY
    As I said if you prevent creating the entry you just have to delete (set indicator blank) once.
    Hope that helps.
    Regards,
    Uli

  • Pooled Capacity

    Hello all,
    At a client site am using Pooled capacity at Work centers(SAP resources) to help capacity planning with some pooled resources. So during planned order scheduling or in production(process) order the time required to complete the operation is higher than the Recipe(Route) time.
    Eg: - Recipe time for operation at a Pooled Resource =10 min
    Planned order or Production order time at that operation shows as 15 min
    So the question is how does SAP read 10 min Recipe processing time & calculate 15 min as actual required time in Production( Process ) order.
    I could not find any relevant SAP writeup on the pooled capacity concept & detailed sheduling being done.
    So if anyone has been able to find more explanation from SAP on this will be appreciated.
    Also please share your experience on scheduling using pooled capacity.
    Thanks,
    Ram

    HI,
    Assigning Pooled Capacities
    Prerequisites
    You can assign a pooled capacity to a work center
    Pooled capacities can only be created independently from the work center in capacity maintenance. If you want to make a work center independent capacity a pooled capacity, set the Pooled capacity indicator in the General data section of the screen and then choose Enter
    Procedure
    Enter in the required capacity category in the capacity overview of the work center the name of the pooled capacity.
    If the default capacity of a work station does not intend pooled capacities to be assigned, you can do this nonetheless:
    Delete the capacity category by choosing Edit ® Delete.
    Create a new capacity category by choosing Edit ® New entries.
    Maintaining Scheduling Data
    From any work center screen choose Goto ® Scheduling.
    The Scheduling screen appears.
    Enter the capacity with its capacity category whose execution time you want to use for scheduling. This can be either a work center capacity or a pooled capacity.
    The capacity data must have already been entered in the work center.
    Maintain formulas for operation segments (for production orders) or for internal processing time (for networks and maintenance orders).
    If you do not enter a formula for an operation segment, the execution time of this segment is set to zero.
    If you do not enter a formula for internal processing time, the duration in the network or maintenance order is used.
    Via Extras ® Formula you can assign a formula constant a value and an unit, display a formula and test formulas
    Maintain queue times and if necessary the dimension and units of measure for work in internal processing operations.
    Hope this helps.
    Regards,
    Tejas

  • How to setup Slingbox AV with Linksys E2500

    I just purchased a new Linksys E2500 and I am unable to setup internet viewing with it.  I have went in and done the port forwarding and still I have not had any success.  I would appreciate any helpful information.

    So the concern that you said is the configuration of the Router ( E2500 ) at home.. So could please inform us the name of the ISP( Internet Service Provider )... So it all depends upon the ISP( Internet Service Provider ) setup...
    If you want to configure the router with the help of the CD so for that you need to unistall the existing Cisco Connect Software from the computer...
    Reset the Router and power cycle the network...Make the following connectivity:
     Modem ----> Router -----> Computer
    They all should be connected with the Ethernet Cable... Then install the Cisco Connect Software... It will help you in configuring the Router...
    As far as Slingbox is concern you did port forwarding but until and unless you are not online it would work....

  • CRP on Pooled Capacity

    I have successfully been able to create and assign a pooled capacity to a work center. I am wondering, however, how to review requirements against that pooled capacity. (similar to CM50 with work centers) Is there a way to review pooled capacity requirements which are loaded from multiple work centers, or must you review a specific work center and then check capacity by the capacity category? Any help would be much appreciated. thanks

    Hi,
    you'll check with the transaction CM03-POOL, CM25-CAPACITY LEVELING and CM25-CAPACITY EVAULATION.
    your problem will match & resolve your problem to these tcodes.
    regards,
    Mohan R

  • Pooled Capacity Not updating in Work center

    Hi All, I want to update pooled capacity in Work center. But when i delete the existing capacity it is giving error that " Capacity still being used". Can any one suggest,how to tackle this problem? I want to give solution to Client. Thanks in Advance..!

    HI,
    Capacity Utilisation rate = Actual Capacity / Theoritical Capacity
    Theoritical Capacity= Shift period * No. of machines available
                                 = 8 hrs * 2 = 16 hrs
    Actual Capacity value depends on how the company decides it. Say if the break 30 mins has to be considered, then the actual capacity will be 15 hrs for 2 capacities and hence,
    Capacity Utilisation rate = 15 / 16 = 93.8%
    So, decide the utilisation rate based on the Company's requiremnt.
    Hope the above gives you an idea.
    -Thaila Shree

  • Pooled Capacity in Scheduling

    HI All,
    I have created the independent capacity and activated as pooled capacity which is a group of labors,
    Now I have the Work Center which is a machine work center, this group of labors are used in diff work centers, so I assigned them to these work centers in capacity Tab of WC.
    I have capacity formulas assigned to Machine capacity and pooled capacity is assigned to labor capacity  which is created in WC, 
    Do in need to assign this pooled capacity in Scheduling tab, using Capacity category as Person ?
    OR it is sufficient to assign pooled capacity in capacity tab page?
    In my scheduling, part I wanted to have scheduling on the maximum time consumed in operation. But in planned order scheduling tab, I cud see both machine and labor.
    Where am I getting wrong.
    Please suggest
    Regards
    raghu
    Edited by: raghu m on Nov 26, 2009 12:04 PM
    Edited by: raghu m on Nov 26, 2009 4:11 PM

    Hello Mr. Bramhnakar,
    Thanks for your reply,
    Yes i have tried the settings you mentioned.
    My doubts are :
    Should the Pooled capacity be getting calculated in Scheduling.
    Since I gave capacity formulas, for both capacities in Work Center,
    and scheduling formula in scheduling tab.
    In routing i gave 12 Hr machine and 16 Hr in Labor (Pooled),
    In Planned order, I can see the Both Taming, But after converting it to Prod Order, In Operation details tab->dates, i cansee the scheduling on the Machine Time, for which i gave formula in WC--Scheduling tab. This is confusing for me since in Planned order i cud find both but in Production order i found One,
    In Routing i have activated Req. Overlapping.
    One more query sir,
    Is their any problem if i use Splitting indicator with count of available capacity in WC,
    I did this bse  the all order were followin in diff dates.
    Regards
    Raghu

  • Why different Overall requirements value between labor and pool capacity

    Hi all,
    I create a PM Order with using a PP work center and this PP work has 3 Capacity category: machine, labor, pool.
    after I check the PM Order with CM35
    and i find out, that Overall requirements value are different between labor and pool capacity. Is this normal?
    In my opinion,labor and pool should have same amount requirements of capacities.
    thanks&regards

    Hello,
    Please refer the Link [http://help.sap.com/saphelp_47x200/helpdata/en/b1/c03662439a11d189410000e829fbbd/frameset.htm]
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Aug 17, 2010 9:42 AM

  • The battery in my MacBook Pro 17 requesting assistance only after 277 cycles with a capacity of 9444 mAh

    the battery in my MacBook Pro 17 requesting assistance only after 277 cycles with a capacity of 9444 mAh, Is it possible?I performed the calibration, but nothing changes.
    MacBook Pro (17 pollici, Half 2010)
    MacBookPro6,1
    Intel Core i5
    2,53 GHz
    Memory 4 GB

    Batteries will vary in how long they last. Apple will say that for machines built in the last 4 years that the battery may last up to 5 years approximately. However this depends on usage.
    You can have someone who never ever uses the battery and only ever runs the computer from the mains and the battery will fail as it never gets used and the cycle count will be very low.
    To put things in perspective. I have a 15" Macbook Pro with Retina Display (Late 2013). I've had it for probably 8 months and I have 128 cycles on my battery, approx. half yours in a quarter of the time. So if you're not always use the battery it can be affected in other ways.
    You can try to see if calibrating the battery helps. Look at http://apple.com/batteries for information on how to do this or try an SMC Reset and see if these make a difference. If not, then seek support from an Apple Store or Authorised service provider.
    Hope this makes sense.
    -Dib.

  • HT1937 i unlocked my iphone 4 factory and i upgrade to 6.1 when i connect it to itunes it apears  The SIM card inserted in this iPhone does not appear to be supported This iPhone is not currently setup to work with carrier you're attempting to use. Please

    i unlocked my iphone 4 factory and i upgrade to 6.1 when i connect it to itunes it apears
    The SIM card inserted in this iPhone does not appear to be supported
    This iPhone is not currently setup to work with carrier you're attempting to use. Please insert another SIM card from a supported carrier or request that this iPhone be unlocked.

    It sounds like you or someone else hacked the phone to unlock it. Updating it locked it to the original carrier.
    How did you unlock it? The ONLY legitimate way is to ask the carrier it is locked to to unlock it. Any other way requires hacking or jailbreaking the phone.

  • I recently purchased 2 iPad2's for my children. I currently have my own apple id and have successfully setup 2 more for each child. I have setup one iPad with the one apple id, but the second iPad has me apple id on it. How can I change the apple id on th

    Santa recently purchased 2 iPads for my kids.
    I currently have my own apple id for my iphone.
    I have created 2 aple ids for each child and succesfully setup one iPad with one of the new apple ids, but the other iPad has my own apple id.
    Can I change the apple id on a device (iPad 2)? And how?

    You sign off and sign in with the correct Apple ID.
    See this tip and is still valid for IOS 6
    iOS 5 & iCloud Tips: Sharing an Apple ID With Your Family

Maybe you are looking for

  • Application Variables in application.cfm and asp

    If anyone could provide some insight into using application variables declared in application.cfm, but retrieved in asp code, it would be appreciated. GOAL: Retrieve values into an asp page from application variables in application.cfm. PROCESS: Defi

  • Migration assistant back out

    I attempted to use migration assistant to migrate a user from one mac to another newer one. After sitting on less than one minute remaining for several hours I forced quit on the migration. Based on the amount of hard drive now used on the new comput

  • Advanced Queueing and databases synchronization

    What kind of (application) problems could be solved by Advanced Queueing ? What about databases synchronization ( two Oracle Database Standard Edition One ) ? TANK YOU !

  • Grey screen w/whirring circle lasts 4ever when trying to boot up - help!

    Hi gang, Just as of recent, my macbook pro screen stays grey with the whirring circle for ever! Today after several minutes of staying on the grey screen, I shut it down and tried to reboot again...same thing happened but not as long and it finally b

  • Color doesn't change printing online.

    Have a HP C4180 Printer. When printing online and assign the color kind to black and white, it still prints in color. Anyone have answers? Thanks. iMac G5   Mac OS X (10.4.8)