Sequence of material line items in Project

Hi all,
        I have transfered the BOM using CN33 in the project, the systems is configured such a way that after BOM upload the system creates PR automatically but, when the PR is created in the system the sequence of the line item material is not same as that of in BOM. How this has to be solved?
Best Regards,
Nitesh H Panchal

Hi,
I am aslo using BAPI for uploading material component. What it is doing , it is creating the line item number in the sequence I am planning . Like if I planned material A first then it is creating line item number for that irrespective of its activity and WBS number.
Regards
Keshav

Similar Messages

  • Error while editing PO - deleting service line item and creating material line item.

    In SAP SRM Extended classic scenario, PO is in 'ordered' status and contains a service line item. While editing this PO, I delete the service line item and create a new material line item. This gives me the following error.
    Back end error: Enter G/L account
    Back end error: LIne item still contains faulty items.
    This happens only with service- material comibination and no other combination(material-service, service-service, material-material).
    I need to know the reason for this issue and how it can be solved?

    PO Values (Inc Tax):
    Item 1: INR 228 L
    Item 2: INR 27.83 L   (Payment also done in 2008)
    GR for Item 1: INR 207.46 L
    Remaining Comm = INR 21.01 L
    Item 1 having 73 sub line items.... fo some of the sub-line items GR for some qty already done in last fiscals.
    User changing for remaining qty.
    Budget Report values:
    Previous Years:  Budget, Actual & Assigned = 304.85 L
                                Available = 0      (Carry Forward done for Budget & Commitments)
    2011:                   Budget = 75.15 L
                                Actual = 53.86 L
                                Comm = 21.01 L   (Same as Remaining Commitment)
                                Avai = 0.28 L
    Hope this will help.

  • Generate sequence nuumber for line items.

    Hi,
    Am using jdeveloper 11.1.1.6.0
    I have generated a form using master detail. po_header as master and po_line as child in po_line i need to generate the sequence number.
    The problem am facing is
    If i generate using create sequence in my DB. Its working fine.
    consider
    I have po_number 1234 for this po_line while i click the add button the sequence number is added. for eg: form 1 to 10 i have the po_line against po_number.
    If am created another po_number 12345 for this while i click the add button the sequence number starts from 11...., But it need to be started from 1 since its a different po.
    Could anyone help me how to acheive this?
    Regards,
    Prasad K T,

    Hi,
    in addition, have a look how you would model the line items in a database schema. Here you would have purchase orders and line items in separate tables that are linked with a foreign key. To uniquely address line items you would have a unique sequence in the line items table. What you are looking for is a combined key (purchase order AND line item ID) to have line items numbered 1 .. 10 (this however, from a database design aspect makes no sense).
    Frank

  • Separate tax line item based on material line item in MIRO

    Hi Guru,
    PO qty is 100 unit with RM1/each. Condition maintained as sales tax 10%. I did 2 GR separately (MIGO) for said PO with 10qty & 20 qty each.  That means sales tax total is (30qty x RM1 x 10% tax) = RM3.
    Now I wanted to do IV (MIRO). I noticed 3 line item altogether as show below;
    1. 10qty & RM10 (material)
    2. 20qty & RM20 (material)
    3. 30qty & RM3 (tax)
    All line item qty & amount are correct but then the tax line is accumulate altogether. User wanted this separate like how the 1st & 2nd line item is. The reason is the user only wanted to post 1st line item with tax that belongs to 1st line item this month & the 2nd line item may post next month. Please take note that according to our business process, user are NOT allowed to make any changes in qty or amount in MIRO.
    May I know how we can separate all condition type amount & qty based on GR qty so that user can select each pair accordingly & able to post it.
    Thanking in advance.
    rgds,
    nema

    Dear Experts,
    Can anyone assist me?
    rgds,
    nema

  • UNPLANNED DELIVERY COST NOT PROPERLY DISTRIBUTED TO MATERIAL LINE ITEM

    Hi ,
    Presently my system is Configured to distribute  Unplanned Delivery Costs among invoice items,but it is not properly distributed among line item while doing the posting.
    What may be the problem,Is there any additional settings to be checked ?or in which areas i need to check? Plz Help regarding this.
    Thanks,
    Raju

    Hi,
    Plz chek the SPRO settings for unplanned delivery cost. You need to maintain the company code
    in SPRO - Material Management - Logistics Invoice Verification -Incoming invoices - Configure How Unplanned Delivery Costs Are Posted
    regards

  • REG: Multiple material line item in a single HU

    Hi All,
    I am new to the concept of Handling units,
    I have a requirement where I am getting an Inbound IDOC with the necessary delivery information,
    and two line items are packed into a same handling unit(same handling unit number).
    line item mat          tot quan                     pk quan                    han unit no
    abc                        10                                 7                           1ZA500948563
    def                         10                                 3                           1ZA500948563
    abc                        10                                 3                            1ZA500948581
    def                         10                                 7                            1ZA500948581
    How to go about in fetching the two materials and assign different handling units
    Can two line items be pckd in a same handling unit and can that unit be assigned same han unit number.
    if so what are the necessary conditions to pck them.
    Please help me out in this regard!
    Thanks
    Srikanth.P

    Moderator message - Cross post locked
    Note that repeat violaters can end up with their account deleted.
    Rob

  • PO Line Item wise gross value for combination of WBS and Material Group

    Hello,
    Our requirement is to get report for PO Line Item wise gross value for combination of WBS and Material Group. Standard report ME2J gives net price but not gross value for Material Line items. Please let me know if any standard report( or ME2J) will suffice this requirement.
    Regards,
    Milind Dumbre

    Dear Milind
    No standard report available to get the PO Line Item wise gross value for combination of WBS and Material Group. Please go for development by taking reference ME2J.
    Warm regards
    Ramakrishna

  • Issue with sorting of TO line item while using LM05 / LM07

    Hi,
    We have found an issue in using LM05 / LM07 trnasactionwhile performing picking activity using the RF transaction.
    1. Transfer Order is created for the same Material and Batch Combination with multiple line items. So when we display the TO the materials appear in the sequence of TO line item say 1, 2, 3, 4, 5 etc.
    2.  When we try to confirm the transfer order using LM05 the system is not picking the line items in the order that the TO was created. It is pickinga a random line item from the order and selecting an item from the lower line items of the TO's.
    We have debugged and found that there is no specific sort sequence which is changing the sequence of line items as all the sort eliments have the same values except that there are few empty fields. The statement where the sort sequence is changing is 'SORT TMP_SORT_TAB BY NLTYP SORLP NLENR MATNR CHARG' but my concern is it is not sorting by this sequence specified in the code after execution.
    If anyone has seen this kind of an issue and has a solution please let me know.
    Thanks in Advance,
    Harish

    As for std SAP ME59N - make sure there is not rounding value is activated in the Material master as well as info record
    If this is not the case than check any custom code is activated for ME59N
    becuase generally in many compnay when they use ME59n they don't want the same material from diff PR to create the diff line item in the PO so using the custom logic in the user exist they trick the code
    it might be the case for you where you have issue.

  • MIGO BADI - Check line item after clicking on  ITEM_OK Field in MIGO

    Hi,
                I am looking for Enhanacement option for MIGO Transaction . What i found it, there is one Badi MB_MIGO_BADI at the creation of material document. When i click on ITEM_OK Field at material line item level. and click on CHECK Button, i want to check material master if that material is having QM View or not . That i can write in one of the method in badi which i found is CHECK_ITEM bt that method is having parameter called I_LINE_ID which have line item no. bt how should i get material doc. no and material no. at that line item?
    Plz try to give me solution.
    Thanks & Regards,
    Saurin Shah

    Hi,
    When you are posting a GR against PO when you check the document
    Method Line_modify of the badi MB_MIGO_BADI is gettin triggered and if you check the importing parameter cs_goitem
    it is getting populated wit the values of the lime item
    Like you said material no, po number, batch no, item no etc.
    Since you can get this details as you said you can check for the view maintained.
    Hope this help you.
    Regards,
    Ranjith N

  • Withholding tax amount exceeds the customer/vendor line item amt (in MIRO)

    Dear Gurus,
    MIGO done for 8 material line items WHT has been posted for 7 line items during MIRO.  For 8th line item while doing MIRO, the above error is displayed.  Kindly advise the possible reason and solution.
    Thanks in advance,
    Sadashivan

    Der AVD,
    Thanks for your kind response.  Currently, in Central Invoice - no Central Invoice is checked.
    Is it OK.  For Central Inv. & 1st P.pmt. indicator, the help document says it is used in Argentina only.
    We have not yet proceeded for payment stage. Still MIRO has to be completed for the MIGO done
    for last line item and thereafter the payment will be done.  It is right to clear the downpayment
    for the 7 invoices generated now so that this error will not come during MIRO for 8th line item.
    In the meantime, I will also go through the SAP notes referred by you.
    Thanks and regards,
    Sadashivan

  • Customer /Vendor line item..

    Hi..
    One query..for line item display of GL account we select in GL master "line item display"
    but for customer and vendor line item display in FBL1N & FBL5N...from where we tick the line item dispaly .
    Please reply

    Dear expert
    For each vendor account, the system notes which line items have been posted to the account. You can specify the sort sequence of the line items by entering a key in the Sort key field within the account master record. This key specifies how the Allocation field is to be filled in the line items posted to the vendor account. When you call up the line item display, the system sorts the line items according to the contents of the field. You can change the sort sequence in the line item display.
    Please refer below link
    http://help.sap.com/saphelp_40b/helpdata/en/01/a9b6aa455711d182b40000e829fbfe/content.htm
    Regards
       Ajeesh.s

  • Tax line items in MIRO

    Dear Friends
    When we are doing MIRO, number of tax line items are created in a document for each material line item. How to get total tax in one tine item.
    Thanks & Regards

    Hi
    I would not recommend to use work-around if you do this there will so many scenarios will come into picture with each unique tax code. I think it is advisable to stick with SAP standard but still you want to try some work around then I following may or may not helpful
    LMR1M002 Account grouping for GR/IR account determination
    BAdI for saving an invoice document (INVOICE_UPDATE)
    Thanks,
    Jagdeep

  • During MIRO Condition line item not picking against Delivey Note

    Hi,
    We create a PO with Entry tax condition type. Problem is....
    Case 1: - When we are doing MIRO of this PO, Entry tax condition is showing in line item.
    Case 2: - When we are doing MIRO against Delivery Note of related PO, Entry tax condition is not showing in line item...Why???
    Note: - During testing we found 2 diff. thing for both case..
    1. In Case 1 during MIRO, Variance Type showing values (B & A)...
    ...........B for Material Line Item.
    ...........A for Condition Line Item.
    2. In Case 2 during MIRO, Variance Type showing value only B..
    Please guide..

    Hi
    Check this thread
    MIRO - Tax Code
    Thanks !
    E.Avudaiappan

  • Parallel Approval of Multiple Line Items Simultaneously in BRF - SRM

    Hi Friends,
       We have developed our Schema . Which has 4 Approval levels.
    Issue is:
    The Workflow does not go to the 2nd Approver , until all the 1st Level Approvers of the  Shopping Cart Approves it.
    Ex:
    My Shopping has 2 Line items. Each Line Item has 3 approvers each in 3 different Process Levels.
    Line Item 1 -- Project Level -- APP01
                          Category Level-- APP02
                          Finance Level -- APP03
    Line Item 2 -- Project Level -- APP07
                          Category Level -- APP05
                          Finance Level -- APP09
    Until both Approvers of Project Level ( APP01 & APP07 ) , executes .Neither of Category Level ( APP02 & APP05 ) can execute the Shopping cart.
    We need that the Category Approvers should be able to Approve/Reject once the line items Project Level is done.
    Need your assistance.
    Regards,
    Jagan

    Thanks Hayashi.. for your reply..
    We have achieved this by doing the coding in the Agent Determination Badi.
    AREA GUID1 --> ITEM1 -- > 1st Approver
                                ITEM2 -->1st Approver
    AREA GUID2 --> ITEM1 --> 2nd Approver
                                ITEM2 --> 2nd Approver.
    Created a Custom table which will have the above fileds along with Level GUID's.
    And then have used the ADHOC_SAVE  & ADHOC_READ function modules to Map and read the above mappings dynamically.
    Now the issue is resolved.

  • Automatically connecting Docs LInks to PR line item in ME51N

    Hello Experts,
    We are using ECC6.0 with EHP6 package and implement MM system. We got a requirement as below.
    When User enter any material in ME51N and press enter , we need to automatically load the "related"  DMS documents on the basis of some Business roles from the Document Server.  When I checked,currently  user has to click on the "Document" button and search it ,then add it..But we need to do the same thing automatically.
      When I searched found that this is happening in
    Class LCL_REQ_ITEM_GRID
    Method LINKED_DMS_DOCUMENTS
    But not understand how can we achieve our requirement..
      Is it possible to achieve this  in ME51N?
      If Yes, how can we do ,,is there any exit present ?
      Kindly let me know if any one have idea on this.
    Thanks and Regards
    CB

    Hi Channappa,
    Object linking in ME51N works as follows. You can link DIR's to Line item and not material.
    Both linking are done in different ways.
    You link following documents to a material master such as design Drawing, Maintainence procedure, Manuals and drawing which is specific to a material.
    You link following documents to Purchase order or PR line item which various with every PRor PO such as Material Specifications, Detail Design or internal design document.
    Now you can attach same documents to PR/PO line item or Material master based on your business.
    If you want automatic apply all DIR linked to Line item in PR/PO, Then this is not possible through standard fucntionality.
    My Solution-Wild Guess. Check if on Save you have any BADI ot User exit in PR/PO. You can create a FM which will run on save and fetch all Material Line items and apply all Object links from Material Master to Line item. For this you need to go through BAPI's available for SAP DMS.
    Hope this helps you.
    With Warm Regards
    Mangesh Pande

Maybe you are looking for

  • How do I print from HP Connect Photo

    I've been looking for an app or program which will permit me to select a photo from my album and print it. I have just downloaded HP Connect and Photo OK but I cannot get past the opening page. According to the video, there should be a place where I

  • Release blocked Invoice by checking the GR

    hi all i need to release the blocked invoice in tcode MRPR by checking GR already posted or not... if not then it should allow the invoice to release... is there any SAP standard functionality or we have to customize this one? please help. thanks

  • "who am I" for functions?

    With custom tags, there's a 'ThisTag' variable. Is there an equivalant for functions? How does a function know who it is? The 'this' scope seems to call the parent, and the function's name is present in the local 'variables' scope, but there's nothin

  • Zoom not working on bridge CS5

    zoom function not working on bridge, when using zoom slider at base, the jpegs move off right of screen a bit before filling next row,

  • Oracle table comparision

    hai i have a table pk04 with 5 columns and 1000 rows in oracle. same table i am having in ms.access mdb file with 2000 rows. i want to compare this both table and find out the missing records in each. how can i achieve it? Pls help s