Sequence of the fotos

I have several photo files. I organize the sequence of the fotos. Once the folders are synced with i-tunes it changes " my oder" why?  I dont want them sequenced accoeding to the date, I want  sequence!!!

Spare yourself the frustration, use Photo Manager Pro.
https://itunes.apple.com/sg/app/photo-manager-pro/id393858562?mt=8

Similar Messages

  • Media Encoder CC won't import a JPEG sequence to the queue

    I am running Media Encoder CC 7.2.2.29 (64-bit) on OSX 10.9.4.
    I have a JPEG sequence GoPro timelapse image sequence that I want to encode into a video clip. All files have a .jpg extension. They are 4000x3000 and have an RGB color space. The Color profile is SRGB IEC61966-21. All images are 3.9MB.
    According to the ME help I should do the following.
    To add an image sequence, choose File > Add Source. In the Open dialog box, choose the first file of the image sequence. Enable the  Sequence Import checkbox for your file type, and then click the Open button.
    I follow the instructions and select the first image in the sequence. The "JPEG File Sequence" checkbox is active and I check it and click the Open button. The dialog disappears and nothing happens. There are no warnings.
    How does one get JPEG sequences to import to the queue?
    Please advise.
    -Travis

    Yes, import into premiere work fine. The nice part about using AME directly is you don't have to have to create a project or use an old one every time you want to crunch a timelapse. Also, AME has this nice feature where it will autoname the output file IMG[FirstStill]-[LastStill] (ie IMG[GP001234-GP001297]). This was helpful because GoPros change the first number in the sequence every time you stop and start time lapse.

  • Sequence header at the end of the sequence in the report

    Good afternoon everyone,
    I have a strange issue with my TestStand Report (any kind of report type) : some time ago the headers (with the name, the parameter's values, the module time, the status) of the sequence and sub-sequence were at the begining. Now they are a the end of the sequence, which means instead of having the status of the sequence first, I have the status of all the steps contained in the sequence BEFORE having the status of the sequence.
    I have checked and double checked the Report options : nothing tells that the headers must be at the end.
    I have 2 bench on which my sequences are running and one of them has the sequence headers upside down in the report and the other has the headers in the proper order. Their report options are exactly the same and I can't find where the configuration is different !
    Does anyone have some idea ? Please ?
    TestStand revision : 2010

    To Norbert : 
    The steps in the body are ok, in the correct order yes.
    I've attached two extract of report (check the Report Correct first), change the extention from ".txt" to ".html", the html one wasn't authorized by the forum.
    To jiggawax
    I'm not using XML format, only text or html. Where is located the ReportOptions.ini file ? I cannot find it with a basic search, could it be hidden ? As I am not managing this file in the configuration of the benches, it might be the origin of the problem !
    Both benches are running the same client sequence indeed : the client sequence are located on a network reachable by the benches.
    I doubt that one the client sequence can override a report callback but afterall I should make sure of this possibility.
    Thanks for your help !
    Attachments:
    Report Correct.txt ‏12 KB
    Report Upside down.txt ‏15 KB

  • After Effects CS5.5 will not open a Dynamically Linked Premiere Pro sequence in the comp. window

    Hi all,
    I'm trying to export a Premiere Pro sequence which is in 2K and the footage has been shot as RED 5K. Adobe Media Encoder will simply not work as I am having the quite widely discussed issue where it will just 'hang' at certain points and not complete the export.
    The most popular solution to this problem is to export via the Render Queue in After Effects instead. However, therein lies the problem.
    I go onto After Effects. Choose File -> Dynamic Link -> Import Premiere Pro Sequence.
    The box pops up, I choose the Premiere Pro Project File then select the sequence I want to export. It then appears in the After Effects project panel window like so:
    However - when I try and drag this to a new composition window, one of two things have happened. Either A) nothing happens (literally, NOTHING changes) or B) as the following example shows, it seems to add it to a new composition, but the video is entirely black. I have tried rendering it and it just produces a black video.
    The other thing people seem to suggest is to just import the entire Premiere Pro sequence into After Effects. I've tried this, but any titles I have added in PP force the video to fade out then back in, in the place where the title should be?? So I can't export the video this way either.
    My system is as follows:
    Thanks massively in advance for any help that is provided!

    This is months old but I'm now having the same problem with AE and Premiere CS6 after updating last night: Dynamic linked sequence shows up in the project window in AE and even plays video if previewed, but will not drag or alt-drag into any comps, including a new comp (makes a new comp with matching settings, but empty).
    Furthermore, I do actually have an earlier version of the same sequence placed in one of my AE comps, which I think was done using the same steps just prior to updating the apps last night. Did this break?
    I'm a little concerned since the biggest reason I'm trying to use premiere is to eliminate the exports when adding graphics in AE.

  • How to create the Access sequence for the Vendor+material+plant combination

    Hi all
    Please let me know How to create the Access sequence for the Vendormaterialplant combination..
    Whats the use? What its effect in purhcase and taxe..
    brief me please

    Hi,
    you are asked to maintain the access sequence for the tax condition for which you are putting 7.5%.
    goto OBQ1 or img..financial accounting new...global settings.... taxes on sales and purchases ......basic settings.....
    find the tax condition type. see in it which access sequence is attached.
    if there is none then use JTAX used for taxes in India.
    or you can create the similar one for your.
    to create the same goto OBQ2.
    new entry or copy JTAX.
    and assign the access sequence to condition type.
    this will resolve your problem if you just need to assign the access sequence.
    regards,
    Adwait Bachuwar

  • Finding the name of my teststand sequence in the process model

    I would like to be able to find the file path and name of a teststand sequence in the process model. I have created a simple vi which will display this information when run in a sequence. If i insert the vi into the process model, the file path and name returned is that of the process model and not the sequence under exectution. Is there a way of extracting this information in the process model?

    Davepar -
    If you are executing in the process model you can use the following as a lookup string if you are in the root context "RunState.ProcessModelClient.Path" or "RunState.Root.RunState.ProcessModelClient.Path" if you are not in the root context.
    Scott Richardson (NI)
    Scott Richardson
    National Instruments

  • Why is my QuickTime Pro exporting image sequences in the wrong order?

    I am making timelapse films and using QuickTime Pro to export the images as a movie file. I have all the images in a folder named numericaly. I go file>import image sequence click on the first image and import. The images are in the correct order in the source folder I have also checked the resource files under show movie properties and they are in the correct order there. I then export as a QuickTime movie file at 1080p H.264 the film is stepping and the frames are out of sequence in the eported movie file. Why is this? Has anyone come across this before?

    Is there anything else I could try.
    Not sure. I would likely test an x264 export of the image sequence from QT 7 Pro or MPEG Streamclip (or from HandBrake if your system is not configured with the x264 codec) and see if the result was any better. This is not a problem I run into very often and, even then, the files were sent to me with no real indication of how they were originally encoded.
    Or do you know how I can analise the exported file?
    Not really... but it would be nice to have a tool which indicated the current frame type and listed pointers to frames/stacks of frames used for rendering reference.

  • Access sequence for the partner is optional?

    Hello Experts,
    Is the access sequence for determining the partners is optional? What if no access sequence is mentioned in the partner determination procedure for any of the partner functions? Is there any other way of determining the partners exists other than access sequence?
    Could you please clarify?
    Thanks in advance!
    Regards,
    Swathi

    No, you must use access sequence. The only other way would be that you write your own function in which you prefill partners and trigger this function with event or if you write the same logic in on of the suitable badies.

  • I have had my Iphone 5s for 2 months and all the fotos and data (fotos and data were not backed up) that I had were erased after I restored it with my old Iphone 4s backup, can I get my unsaved fotos and data back? and if I can, how?

    I have had my Iphone 5s for 2 months and all the fotos and data (fotos and data were not backed up) that I had were erased after I restored it with my old Iphone 4s backup, can I get my unsaved fotos and data back? and if I can, how?

    If you never backed up your phone to iTunes and never backed it up to iCloud all of your content is gone forever.

  • When I'm done with my fcp sequence, whats the best way to get it to dvd?

    When I'm done with my fcp sequence, whats the best way to get it to dvd?

    The advice to go to Compressor left out the part that you may want to convert your audio to AC3 becaus ethe MPEG2 bitrate is probably too high for DVD specs.
    This method is in the DVDSP manual and it's in the Compressor manual, both difficult to locate, but easily searchable.
    Here's what I'd do: Export the timeline form FCP in the native sequence settings, self-contained. Bring that self-contained movie into DVDSP and let DVDSP handle the transcode.
    The advice to go to iDVD is even easier.
    bogiesan

  • FailureHan​dlerExampl​e does not seem to work when used in the ProcessMod​elPostStep​Failure Sequence of the Sequential​Model

    I've incorporated the FailureHandlerExample into my Test Sequences (with some minor modifications) and it works ok when it is in the SequenceFilePostStepFailure in my Sequence File. However, it says in the Sequence comments that this can be made into a ProcessModel Sequence by putting into the ProcessModelPostStepFailure Sub Sequence of the SequentalModel. I tried this, and it doesn't work. It has the same internal steps as the SequenceFilePostStepFailure Sequence, but it never gets called. What do I need to do to get this to work properly in the event of a failure?

    I have just tried the callback and it works for me. Here is what I did.
    1) open new sequence file.
    2) double click on model path shown at the bottom of the sequence editor. This opens model file associated with the new sequence file.
    3) with the process model file active, select Edit>>Sequence File Callbacks
    4) select ProcessModelPostStepFailure in the dialog box provided, click the Add button and then the Edit button.
    5) Add a message popup to the newly created ProcessModelPostStepFailure.
    6) Return to the new sequence file created in step 1 above.
    7) select the None adapter and insert a Numeric Limit Test step type.
    8) change the step limits to be 5 and 10. The step will then fail since the default measurement is 0, outside of the limits.
    9) run the sequenc
    e by selecting Execute>>Single Pass.
    The step fails and the ProcessModelPostStepFailure is called, displaying the message popup.
    See if this works for you.

  • How to apply Property Loader to all sequences in the Sequence File?

    HI,
    I'm following the help instructions for the Property Loader and it states....
    Use Current Sequence File—Selects the file where the step is located.
    Sequence—Specifies the name of the sequence into which to import variables and properties. The specified sequence must exist in the specified sequence file. Select the <ALL SEQUENCES> tag from the drop-down list to instruct TestStand to import variables and properties for all of the sequences in the specified sequence file. You must specify a valid sequence name for the step to work properly.
    In my specific sequence file I added the Callbacks:  SequenceFileLoad, SequenceFileUnload, PreUUT. In addition to that, my MainSequence is calling 2 subsequences.
    I put the propertyLoader step (setting few values of the SequenceFileGlobals) in the setup section of the SequenceFileLoad, checked the 'Use Current Sequence File' and selected ALL SEQUENCES tag in the 'Sequence' option.  I verified that it does what I wanted.  Then, is it entered the PreUUT subsequnce, the values returned to the "original" values.
    Is that a bug?
    If not, how do I use the PropertyLoader in a sequenceFile that include several subsequences as well as Callback sequences.
    Thanks
    Rafi

    Ooops, sorry about that...
    I forgot to mention....it is TS 3.5.
    As per your questions-- yes they all in the same sequence file. 
         mySeqFile.seq
               SequenceFileLoad
               SdequnceFileUnload
               PreUUT
               Seq1
               Seq2
    AS I said....I put the property loader in the setup of the SequenceFileLoad,  I see that it works properly in that subsequence.  Then, after the SuequenceFileLoad is finished, I do Ctl+F5 for Test UUT's.  I put a breakpoint in the first step of the preUUT subsequence and check the context.  I notice that the variables in the FileGlobals to whom the property loader writes, have been changed back to the original values.
    I'll try to create a simple program to duplicate it but it may take me time as this test station is very busy.
    Thanks
    Rafi

  • When I try to send a sequence to the color fcp closes. What can I do?

    when I try to send a sequence to the color fcp closes. What can I do?

    BINGO!
    You can't migrate the Final Cut Studio apps. They install bits and pieces all over the system folder and libraries. if those files are missing, the apps can't work properly.  That's your issue.
    use FCS REMOVER from digitalrebellion.com (free) to uninstall FCS 3, and then install again from scratch, and update with the Software Update.

  • Export Limits for Multiple Sequences in the Same Sequence File for TS3.0

    Hi,
    I am using TestStand 3.0 to a test application. Because we want to have our limits in a csv-file I have tried to use the Import/Export tools in TS. But this application only supports to export limits for the selected sequence (e.g. main, or subseq1) at a time. This makes it a pretty hard job to export limits from 30 test sequences. What I need is a possibility to export my limits from �all sequences� in my seq-file.
    I have found an article on NI Dev. Zone about �Export Limits for Multiple Sequences in the Same Sequence File (TestStand 1.0.x)�.
    http://sine.ni.com/apps/we/niepd_web_display.DISPLAY_EPD4?p_guid=B45EACE3D9CB56A4E034080020E74861&p_node=DZ52236&p_submitted=N&p_rank=&p_answer=&p_sourc
    e=External
    I have tried to use this code but because it�s for TS 1.0.2 the limits from my multi num test step and my custom steptypes isn�t exported. So that doesn�t fulfill my needs.
    Is there an updated version with �all sequences� added to TS 3.0? Is there other good solutions to my problem out there?
    Best Regards,
    Morten Pedersen
    CIM Industrial Systems A/S
    Denmark

    Hi David Mc,
    Thanks for your reply. I have already considered this solution because the source code is added in the folder described in your reply. But that is not a good solution. It will cost me a lot of time to establish the toolchain, reverse engineer the source code, make the implementations and build a new dll (most off these is already knowledge by NI). And when NI make future releases of TestStand I have some merge work to do every time NI have made some changes in the files I have changed.
    But as I write above: I have hoped that NI already has/or could made a solution like the one to 1.0.2 (see link in root) to me. And then they could include it in the next version.
    I don't think I am the only one in the TestStand world that ne
    ed this feature.
    Best regards,
    Morten Pedersen
    CIM Industrial Systems A/S
    Denmark

  • How to maintain the sequence in the custom table

    Hi,
    We have custom table where we will store the standard text name based on different flags and it will be fetched the value according to the condition.
    Example code
    SELECT SINGLE field1
                      field2
                 INTO  ( vaiable1 variable2 )
                 FROM custom table
                WHERE tdobject = iv_signature
                  AND bukrs    = vbdkr-bukrs
                  AND vkorg    = iv_vkorg
                  AND vkbur    = iv_vkbur
                  AND lland    = vbdkr-land1
                  AND fkart    = vbdkr-fkart
                  AND kschl    = iv_kschl.
      CHECK sy-subrc <> 0.
      SELECT SINGLE field1
                      field2
                 INTO  ( vaiable1 variable2 )
                 FROM custom table
                WHERE tdobject = iv_signature
                  AND vkorg    = iv_vkorg
                  AND vkbur    = space
                  AND fkart    = vbdkr-fkart
                  AND kschl    = iv_kschl.
      CHECK sy-subrc <> 0.
    SELECT SINGLE field1
                      field2
                 INTO  ( vaiable1 variable2 )
                 FROM custom table           
                WHERE tdobject = iv_signature
                  AND vkorg    = iv_vkorg
                  AND vkbur    = space
                  AND fkart    = vbdkr-fkart
                  AND kschl    = space.
    The solution I created to avoid the select is, i have created the FM with all parameter. Addition to the FM, I have created a Table as well to maintain the flag.
    New table                                                                               
    TDOBJECT   TDID BUKRS VKORG VKBUR KUNNR      MWSKZ AUART VGBEL_AUART KTGRM LLAND FKART WERKS KSCHL STNAME                                                                               
    FOOTER                                                                           X     X           ZNET_DICI_FTR_FI  
    FOOTER                                                                           X     X           ZNET_DICI_FTR_NL  
    FOOTER                X     X                                                    X                                   
    i.e. say example if we maintain the value in the custom table based on the first select query. Then we need to maintain the flag in the table which was created newly.
    Note In the both field the key fields are same.
    The problem now is we have plenty of select query for different condition, i though of maintain the sequences of the entries. But my worry is how many sequence number will be maintained and in what bases it will be maintained.
    Could you please help me to resolve this problem?
    Regards,
    Vijay

    Hi,
    I got your requirement as,
    whenever a new entry is made in the table, one sequence has to be maintained somethign like serial number and everytime it has to be incremented. If it is so, then you can go for an additional field as serial number. Then get the max serial number from the following select query:
    select max(serial) from cust_table
    into v_serial.
    Now, when you make a new entry, just give (v_serial + 1) to serial number...
    Please let me know if i understood wrongly... or what you want...

Maybe you are looking for

  • How to Create a system in portal server

    I am trying to do the tutorial: How to Create a JDBC-based iView for Add/Update/Delete Record. Its pre-requisite is: A system – with an alias “JDBC” – defined on your portal server, and mapped to a database. Since I am new to VC, I do not know how to

  • Handling deleted parked invoices in the BI report

    Hi Experts, I am working on a PO History report, which has an invoice total summary .The invoice total includes Posted and Parked invoices,  but if the parked invoice is deleted they are still showing up on the report for the total, the requirement i

  • OWB 9.0.4 :SQL*Loader: Operator POSTMAPPING does not support

    Hi, While trying to poulate Analytical Workspace using WB_LOAD_OLAP_CUBE, I got the following validation error The analysis of the mapping is not successful under all supported languages and operating modes. Detail is as follows: SQL*Loader: Operator

  • Cumulative YTD COPA Report

    Hello, We have requirement in copa report (ke30) wherein Year to date information should be available based on period range selected in input parameters. Say for example if user gives period range of Apr to June 2014 in ke30, then report should displ

  • Umwandeln von BMP in AI

    Hallo Zusammen, ich hoffe es kann mir bei meinem Problem geholfen werden. Bei uns in der Firma wird der Adobe Illustrator C6 benutzt. Beim Umwandeln einer BMP-Datei in ein AI-Format (Schwarzweisslogo) werden die Kanten eines Kreuzes nicht sauber nach