hi,
In Normal Routing in sequence overview - extras - new entries we can find the option of creating a Parallel or Alt sequence, but in Rate routing there is no way to select the type of Sequence. It by default shows Parallel sequence.
Pl. let me know the step by step proceduer to create a Alternate sequence in Rate routing.
regards
Dear Rishi,
We cant create any alternative sequence for a rate routing.This is one of the difference between routing and rate routing.
Rate routing supports only standard and parallel sequence.
If alternative sequence is present in a routing,then at the time of order creation the system gives a pop to select for alternative
sequence or to skip it and proceed.
For this under OPL8,for plant order type combination the field sequence exchange should be having value 2 - manual selection.
Creating production version or sequence in my understanding depends on the business requirement.
Check and revert
Regards
S Mangalraj
Similar Messages
-
Problem in automatic rate routing selection
Dear all,
I am using REM and according to that I have maintained REM profile in Material Master, rate routing, line hierarchy, production version, but the time of scheduling of planned order, system is saying " The automatic selection of routing is not possible".
I suppose I am missing some configuration.
As also, I have already done the same scenario in other server.
If u have any suggestion then pl. forward me.
Thanx,
DasDear SAP PP,
1.Check whether have you included the check box for REM allowed indicator in the production version.
2.Also ensure you have assigned the rate routing option for detailed planning and the correct group and
group counter in the production version.
3.Check the valdiity dates of the rate routing,try to create a planned order in some advanced future date
so that your rate routing is valid for the planned order start date.
4.Check the status and the usage of the rate routing.
Regards
Mangalraj.S -
Sequence Selection in Production Order
Hi All,
I am having following problem related to the sequence selected in production order...
In my scenario there are multiple sequences in a routing for a material.In the production Order Type I have made setting of manual selection of sequence while creation of production order.When I create production order the system ask for selection of the alternate sequence and after selecting the alternate sequence the system copies all the data related to that sequence <b>But</b> when I go and see the operation overview the system still displays the standard sequence. How can I correct this problem because when I am doing confirmation the system throws error message than the standard sequence 0 does not exist.
Please help me correct this problem.
Regards,
Anup DubeyHi,
As i have mentioned the system is asking me select alternate sequence it means that the tick is there.
Please lemme know why the system is displaying the standard sequenec in operation overview though all the details related to operation are of alternate sequence.
Regards,
Anup Dubey -
Dear All,
We were trying to carry out mass changes to Rate Routing,
by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
Regards
MithunDear Mithun,
In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
BDC's or LSMW's.
Regards
Mangalraj.S -
Rate routing std values not appearing during backflush
Hi ,
Rate routing is defined from REM product. The REM profile has check to post activities.
In MFBF when I try to do assembly backflush the activities are not proposed from rate routing when "Post with correction ".
What could be the reason for this ?
Regards
ShankarRDear Shankar,
Once after selecting the radio button for assembly backflush>post with correction->click on actual activities and check the rate
routing details along with the work center,timings etc.
If you are unable to find the same means,goto KKF6N--->mention the product and plant and click on change mode and click on
cost calculator button for preliminary cost estimate and save the data,then check in MFBF.
Regards
Mangalraj.S -
Add Image Sequence default frame rate
Compresssor 3.5 appears to default to 24 fps when adding image sequences to the batch.
Is it possible to change this default to 23.98 fps in a plist somewhere? I deal almost exclusively in 23.98 material so having to change this for EVERY image sequence I process is a pain.
-MattI'll try to re-formulate (I'm sorry, english is not my native language).
What I do in Compressor:
1) I import my image sequence
2) set it at 25fps in the image sequence settings
3) choose prores 25fps export (I created a prores preset at 25fps, as you suggested)
And the resulting clip is okay.
BUT
I have many image sequences and it's too slow to manually interpret every one of them at 25fps. The problem is in point 2). Because there's no way to interpret all the image sequences at 25fps with just one click for all.
I think it's the same with quicktime: you have to import every single image sequence, select the frame rate, export... one at a time.
I will have a look at mpeg streamclip.
thanks for answers -
Help me,Mass Changes to Reference Rate Routing
Hi,
I need to mass changes to reference rate routing.
but i don't know how to do it.
by using CA85N i was able to make changes to Normal routing but not reference rate routing.
so.so.so. i need your helps.
best regards.
thanks.Hi
While entering the selection criteria make sure that you are entering the correct selection parameters. Since the routing exist in CA32, it will be come in CA95N also. Please try with correct selection parameters.
Thanks
S.Murali -
Standard routing and rate routing
Hi All,
Can someone tell me what tables I should use to get the standard routing and rate routing for the query?
Thanks
Edward.Dear,
Yes you are right.
The main difference between routing and rate routing is you can not create parallel sequence in rate routing CA21 only nothing else.
There are lot of different opinion on this topic but there is no too much difference in them only we use rate routing in REM and normal in Discrete manufacturing.
Also check this thread ,
Difference between routing and rate routing
Hope clear to you.
Regards,
R.Brahmankar -
Hi..
I have one query reference to CEWB ,is there any selection criteria for selecting task list type R(Rate Routing) in CEWB.
I have checked the same in CEWB found only Routing,Reference operation set,Inspection plan.
I have checked also op77 but it is bydefault Routings for production & not the rate routing one.
Any suggestions to above issue pl.
TusharHi Anupam,
Thanx for reply...
I have checked the settings which you have mentioned & tried with the selection criteria as you said but not possible with desired result as there are only three task list type selection as mentioned above .
I have also checked OP77 ,I tried to create new work area with usage area "R-Repetitive manufacturing" but it is bydefault comes with Routings for production.
Is there any setting which I couldn't incorporate?
Pl. suggest
Tushar -
Differences between rate routing and reference rate routings?
Hello PP members:
I would like to differences between rate routing and reference rate routings
Thanks for your time,
Thanks Again,
Suren RHi Mr.Suren,
As explained by other friends Routing is used in Discrete manufacturing and Rate routing is used for REM-Repetitive manufacturing.
In addional to these types SAP has given 2 more types
1.Reference operation set -Used in Discrete manufacturing.
2.Reference rate routing - Used in REM.
If similar rate routing is been used for producing many materials,then instead of entering(these steps) in rate routing of each material you create a refrence rate routing and you enter the work centres used and the other details.After saving you get a group counter number showing reference rate routing is saved with group XXXXXXXXX.
When you are creating rate routing for a material say A ,after giving the name and plant details in the top you will be able to see an icon "copy from" and you can select the radio button for reference rate routing and give the group counter number. or else without giving it here you have got an option to select the reference rate routing after entering into the operation screen also.
In that particular page in operation overview screen,there will be an icon copy,there you can click that icon and you can give the reference rate routing group counter number and very easily you can create rate routing for N number of material.
Likewise you can use reference operation set while creating routing for a material in Discrete manufacturing.This basically reduces the time in creating routing or rate routing for materials in Discrete & REM respectively
CA01,CA02,CA03-Create,Change,display (routing) respectively.
CA11,CA12,CA13-Create,Change,Display reference operation set Respectively.
CA21,CA22,CA23-Create,Change,Display rate routing respectively.
CA31,CA32,CA33-create,change,display reference rate routing resp.
I hope this will help you.
If useful reward your points.
Thanks & regards
Karthik. -
Hello All,
Please provide me some refrence for rate routing. How to create & use. I don't know any thing about it. So I need to know from begining of rate routing. Is there any refrence from where I can read & test rate routing
Thanks in advance
Mohit GuptaDear,
Please refer this useful link,
http://help.sap.com/saphelp_erp60_sp/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm
You have to proceeds following steps:
1) CA21 - Create Rate routing
First screen = Material on which you have to create a routing
Plant
Second screen = Usage 1 if you create routing for production purpose.
Status 4 release general
Enter
2) Now go on to application tool bar and select operation
Here you have to enter work center, control key and description
For eg. w/c 1 plant pp01 description
w/c 2 plant pp01 description
plant pp99 goods reciepts
3) Now select the component allocation
Select the material here and click on to the new assignemnt for assign the operation seqence on to the material.
4) SAVE
Now routing is create with routing group number
Regards,
R.Brahmankar -
Hi,
please let me know the usage of reference rate routings
how they are advantageous to regular rate routings creations ?
regards,
madhuDear Madhu Kiran,
Reference Operation sets are used to create Routing which are used in Discrete scenario.
Reference Rate routing are used to create Rate routing which are used in REM scenario.
Also check this,
Reference Operation Set
Definition
A type of routing that comprises of a series of operations that recur frequently. It is used to create a
routing.
Use
A reference operation set cannot be used directly in production.
To reduce the effort needed to create a routing, you can
reference the reference operation set
All the changes you make in the reference operation set are automatically implemented in the referenced operations of the routing.
If you have referenced a reference operation set in a routing, you can unlock this reference. In this case the operations of the reference operation set are copied into the routing and can be changed there. The connection to the reference operation set no longer exists, which means that any changes in the reference operation set are not transferred to the routing.
use the reference operation set as a source to copy from
Operations are copied from the reference operation set to the new routing and can also be changed there. Changes you make in the reference operation set have no effect on the routing.
Structure
A reference operation set has the same structure as a routing. You cannot assign a material to be
produced to a reference operation set. It can have neither parallel nor alternative sequences.
Regards
Mangalraj.S -
Raouting, Rate Routing and Cost run Problem
We have changed the our process from routing to rate routing.
But while doing the cost run - CK40N, the sytem is considering the routing in stead of rate routing.
Please advice.
Regards
PranavDear Pranav,
1.Check what selection ID has been assigned in the quantity structure control tab(for the costing variant that is used for costing in
CK40N) for routing selection,If it's 01 means,then check with selection ID 02 where the first priority is assigned for routing type R.
(In standard SAP selection ID 01 by default has first priority to routing - N and then further prirority to rate routing - type - R).So
assuming selection ID 01 is assigned and a product has both routing(task list type - N) and rate routing(task list type - R),now at
the time of costing the system picks up the routing by default as the first priority is set for routing.
2.Also check whether the task list type and the corresponding group and group counter has been changed in the production
version for inhouse manufactured product either in MM02-->MRP4 view or else in C223.
Check and revert back with your further queries.
Regards
Mangalraj.S -
Delete Rate routing with archiving
Hi to all,
I want delete a rate routing with TC: CA99.
can any one help me, how to do that correctly?
tks in advance.
Rgds
Alaaeddine.Hello BDH,
Go to CA99 screen, select the write action,
Create the variant (select the maintain)
Please insert required detail in field and save the variant.
Make sure deletion flag tab checked and test run tab unchecked
now execute this transction(if required take help from technical team for execution of this)
I hope this information helpful to you,,
Thanks & Regards
Umesh Mali -
Hi Gurus,
Please explain me the difference between Routing and rate routing in details
Thanks in advance
RupeshHi,
Functionality of Routing and rate routing is similar.
Routing: It defines the sequence of operations that should be carried at a work center to make up a product.
Routing is one of task list in PP module to carry out the production of finished and semi finished parts. it consists operation sequence which requires for manufacture finsihed and semi finished parts like operation 10. 20, 30...
It is mostly used in Discrete Manufacturing
Rate Routing: A routing for whose operations the production quantity and a fixed duration has been defined. Thus the production rate is also defined.
Rate routings are used when you plan on a quantity basis, for example in repetitive manufacturing.
With regards
Ram Kumar
Maybe you are looking for
-
Nota fiscal de serviço eletronica
Senhores, boa tarde. Estamos com problemas para emissão de notas eletronicas de serviços. Atualmente as prefeituras nas quais temos empresas não aceitam a DANFe como um documento oficial de faturamento de serviços. No sistema legado, os departamentos
-
Hi, I'm getting a short dump if I run RSCONN01. Is there any way to avoid that, or any setting required to run the report. It happens in a FORM Routine XAB_RUN_DRIVER if new_function = space.
-
How can i delete some books from ibook?
How can i delete some books from ibook? It says: this book can't be opened. The book is corrupt. I can't open and I can't delete it
-
Defaultaction is not called when displaying OptionDialog
If the Enter-Key is pressed to fast after the setVisible Method for the Dialog is called (At this moment the dialog is not visible on Screen) not the defaultAction is called as expected. The action of the first focusable component ist called. A furth
-
Final Cut Express, Preview not working in Capture
I've just purchased Final Cut Express, and have installed it in my G5 iMac. When I try to download film from my Sony TRV 17, I am unable to do so. The preview screen has a message "Preview Disabled", and I am unable to capture anything. The capture c