Server Replacement - Migration Path?

Hello,
I currently have 2012 R2 deployed with the Essentials role installed and configured. The server it is deployed on is coming up on end of life, with a new server on its way. What are my options in terms of migrating from the old hardware to new? Any guidance
available on this? I think I see the following choices:
- Just move the hard drives to the new box and pray to the PnP gods
- Install new server in migration mode, deploy and reconfigure various features to suite
-- Would be resource intensive, and require a change to data paths (as it would be a new machine name)
- Stage a temporary swing server for identity data, promo down existing server and remove from environment, promo up new server
-- Install/reconfigure functionality as required
-- Could keep existing name/IP address
-- Restore from backup could be a tangent to this, though I'm not 100% on how well the restore would work.
Any thoughts on this are appreciated.
Thanks,
Tim

Hi Tim,
Based on your description, I understand that you want to migration from old server to the Windows Server 2012
R2 with the Windows Server Essentials Experience role installed. Please refer to the following TechNet article and check if it helps you.
Migrate from Previous Versions to Windows
Server 2012 R2 Essentials or Windows Server Essentials Experience
If anything I misunderstand, please don’t hesitate to let me know.
Hope this helps.
Best regards,
Justin Gu

Similar Messages

  • What to do when SLS - Lion Server Upgrade & Migration Fail

    Hi everyone,
    I've had a tough time over the past week trying to updating my SLS to LS. (It was a slow week at the office so despite the warnings in these discussions I wasn't disturbing anyone, so I thought I'd try...) Both an upgrade to the current running system and a clean install on a wipe of that hard drive stall at the "Configuring Services" "Upgrading services" screen of the set up process. The migration path eventually fails, and as far as I can tell, it seems that the upgrade path just stays there forever.
    Don't worry - I'm doing this all on a Super Duper! clone of my primary drive, so I can go back to SLS whenever I need to.
    BUT, I can tell that the server's status is at least partially okay, even in this stalled setup state - iChat seems to work on various clients, and I can use Server Admin to see stats and services, etc.
    So despite the discomfort of a failed install, part of me feels like I'll be fine with the LS if I can just figure out how to move my old data into the right places for the new system to use it. But I can't find any guidance for that. I'm looking to migrate OD (seems to have migrated fine), iCal, iChat, Address Book, Wikis, Time Machine, and File Sharing (which should be trivial to set up, I reckon).
    Can anyone point me in the right direction?
    Thanks very much,
    Willhaus

    Okay, so I've had some marginal success.
    After leaving the hung install for a ridiculous amount of time (24+ hours), I realized that I could click the help button, and from the help window click the "further info about Lion Server" link to launch Safari. That gave me access to Software Update from the Apple menu, which then let me install the latest Safari update which conveniently enough requires a restart.
    After restart, the Server Migration Assistant kicked in again, but failed quickly in the upgrading services stage. Another restart, and the sever finally booted more or less normally.
    The strange thing was that although chat services worked fine during the hung install, all OD-related services stopped working after restarting. Turns out there were no users or groups in OD. Importing them from an OD archive, though, restored them.
    So now iChat works great (even the old chat longs migrated successfully), and AFP is properly sharing our volumes across our studio's network. So our server is limping along.
    The other services we need that aren't up yet are Wiki and iCal. Some info about those:
    Wiki: administrators can log in and see all wikis just fine. That's awesome because it means the data migrated successfully. Any non-admin users can log in, but are then get a wiki-styled page that says simply "No wikis found". It's as if they don't have permissions to see the wikis, even though in Server.app they belong to the groups that the wikis are associated with. I've tried removing and re-adding users to groups, but that doesn't seem to do it. Any ideas how to fix this?
    Calendar: While I can't get this to work, it's not like it's completely lifeless. An account in a client Lion iCal configured with the proper Lion settings returns an error that reads:
    "The Server is Busy or Unavailable.
    "The server at myserver.com is currently unable to handle the connection for account “ Calendars” due to a temporary overloading or maintenance of the server. If this continues you should contact the server administrator.
    "You may try to connect to the server again or take the account offline."
    As a logged in administrator, in a wiki clicking on Calendar in the nab bar goes to the calendar style page with an unending dialogue box that reads "Getting events from server". And clicking on Calendar from Home page footer takes me to the URL https://myserver.com/webcal with an error that says:
    "Service Temporarily Unavailable
    The server is temporarily unable to service your request due to maintenance downtime or capacity problems. Please try again later.
    Apache/2.2.20 (Unix) mod_ssl/2.2.20 OpenSSL/0.9.8r DAV/2 Server at myserver.com Port 443"
    Again, at least I'm confident that the data migrated properly -  I can find all the calendar data in it's proper new location - but either the service won't start or something's not configured correctly. I've tried chaining the hostname and restarting the service about a billion times. I've got no idea what to try next. Any ideas?
    Thank you so much,
    Willhaus

  • Howto deploy a temporary exchange 2013 server for migration between two Office 365 accounts?

    Objective:
    We plan to migrate our office 365 from our current tennant (E3) to a new tennant (M) to drastically cut our annual costs for the same services, while retaining the mail and group memberships of all our users. This will involve installing an exchange server
    to download and upload mail from the old tennant to the new tennant.
    Background: 
    We are a longtime O365 customer, and have been a customer since before the "Midsize business" plans existed. There is no "cookie cutter" migration path from E3 to M. Microsoft currently recommends deploying an MS exchange server and off-boarding
    the mailboxes from your E3 subscription and then On-boarding them to a new account under the M plan.  As ridiculous as this is, this is indeed the path our company has decided to go. It isn't cool/fair that we're being shackled to the E plans (that are
    vastly more expensive) when we're a small/midsize business that has been a longtime customer of O365, while new customers of equal size to us can expect to save over $4000 annually. The services (when compared) offered are nearly identical.
    After calling MS support several times for guidance for this issue, I am advised that we should contact a 'partner' and ask for their support in doing this migration. We did as requested and were provided a quote to the tune of approximately $15,000 to do this
    migration for us. Obviously this is unacceptable, and thus our business has decided to rely on my abilities to get it done. Again, involving an MS partner is not an option.
    Environment:
    1 MS AD domain:
    - Original FQDN was @contoso.ca of this domain and UPNs were [email protected]
    - UPN has been changed to [email protected] to allow for ADFS
    - ADFS has been deployed and SSO works for all users with UPN [email protected]
    - An "On-Prem exchange server" does not yet exist
    1 O365 Account where main tennant FQDN is @corp.com
    - There are 5 registered domains
    -contoso.ca
    -corp.com
    - contoso.legacy.ca
    -deprecated/will be deleted
    -deprecated/will be deleted
    - There are 40 E3 licenses, all using a @corp.com UPN
    - There are 5 E1 licenses (we acknowledge that these will be upgraded to an M following the migration) that use the UPN contoso.legacy.ca
    - No accounts currently use contoso.ca for email
    - O365 was upgraded to 'the latest version' sometime in summer 2013.
    Migration Plan (High Level):
    Setup a local windows server (trial license)  
      Deploy an exchange 2013 server (trial license) on the aforementioned windows server  http://technet.microsoft.com/en-us/evalcenter/hh973395.aspx
      Prepare and deploy Dirsync Deployment
    of Dirsync
      Add exchange to office 365 and begin replicating the mailboxes from the cloud to the exchange server. Wait for synchronization to complete.
    More information: http://technet.microsoft.com/en-us/library/hh534377(v=exchg.150).aspx
    http://help.outlook.com/en-us/140/ff633682.aspx
      Evaluate total time it took to sync data. 
    Time it takes to download data to exchange should be relatively similar to time it takes to restore mail to the new service.
      Open a new office365 account under the M plan.
      Plan a 1 hour mail & contoso.ca domain login outage
      temporarily change all user UPN's to match the new tennant
      perform a dirsync to the new tennant
      disable dirsync after all accounts have been auto-created/provisioned
      re-establish UPN + mail access.
      Plan a date and time for the cut over.
      remove the exchange hybrid server from the old tennant. 
      Point MX records directly to the exchange server.
      Cut office 365 service.
      After the 30 minutes ~ 1 hour 'mandatory' wait time imposed by MS to 'register' the domain with O365, add @corp.com to
    the new tennant
      fix all user UPN's in the cloud to match their real UPN's.
    This can be done with powershell.
      attach exchange hybrid server to new tennant
      Point MX records to the new tennant 
      Migrate all data from the local exchange server to the cloud under the new plan.
    Current progress (Lab):
    I have created a sandbox (Lab with no internet access or connectivity to production) environment in VMware and cloned the following servers to it:
    1x Domain Controller (DC) running windows server 2012 (named DC02)
    1x DC running windows server 2008 R2 (named DC01)
    1x windows server 2012 R2 - prepped with all the pre-requisites to install exchange 2013. (named EXC01)
    Where I am stuck / Problem:
    I have installed exchange on the server EXC01 in the lab environment using my account. I am a domain administrator in the contoso.ca domain, but my UPN is [email protected]
    After the installation of exchange, I notice that my email address in Active Directory changed from @corp.com to @contoso.ca. By default, I do not see @corp.com to be an available email address to select as my email address, and changing it in AD does not resolve
    the problem. 
    In the exchange portal, I found "Mail flow ---> Accepted Domains", and believe I should add @corp.com to the accepted domain list. Questions:
    1) Must I add corp.com and the other domains that exist in office 365 to the local exchange before I go through with the hybrid wizard?
    2) If I must add them to exchange, I am provided with three choices: 
    - Authoritative Domain
    - Internal Relay Domain
    - External Relay Domain
    Given that the domain is currently in office365 and is authoritative there, which of these applies?
    3) Most documentation I have found has been about a one way migration from on-prem to the cloud. I have had a hard time finding a step by step guide for cloud to local (new server) and then back to cloud. Does anyone here have any good documentation for this
    process? Would love it if it took into consideration multiple UPN/email addresses.

    Hi,
    Here are my answers you can refer to:
    1. Yes, we should select the primary SMTP domain for our organization and any other accepted domains that will be used in the hybrid deployment:
    http://technet.microsoft.com/en-us/library/jj200787(v=exchg.150).aspx
    2. It depends on the usage of the specific accepted domain. And Exchange version has no influence.
    To determine it, you can firstly check the function of the three types in the following article:
    http://technet.microsoft.com/en-us/library/bb124423(v=exchg.150).aspx
    3. Here are some reference about the migration from on-premise Exchange server to Office 365:
    http://www.msexchange.org/articles-tutorials/office-365/exchange-online/configuring-exchange-2013-hybrid-deployment-migrating-office-365-exchange-online-part1.html
    Additionally, since the issue is related to Exchange online, I recommend you ask for help on our Exchange online forum to get more professional help:
    http://social.technet.microsoft.com/Forums/msonline/en-US/home?forum=onlineservicesexchange
    If you have any question, please feel free to let me know.
    thanks,
    Angela Shi
    TechNet Community Support

  • Suggested migration path for 10G rel 1 (90400) installation to 10.1.2.0.2?

    We are a heavy forms/reports shop. We have just gotten done installing 10G Rel 1 (9.0.4.0.0), and now that the latest version of the App Server has been released, I'm wondering what the suggested Migration Path should be? And whether there are any "must have" features that will make an appreciable difference in forms/reports. Or, should we just install the latest patchset for our 904 installation and be done with it?
    Thanks in advance.
    Phil McDermott

    Hmm... well, I'm going to be testing the forms/reports features of 10.1.2.0.2 just as soon as I get time, but what I'm hoping for most is that forms will work with SSO through the webcache. There is a bug in 9.0.4 that I'm aware of where SSO fails while working through the webcache. Oracle said they were working on the issue...
    ...anyone here know if Oracle fixed that bug? It may be a while before I'll have the time to play with 10.1.2.0.2.

  • 11gR2 RAC stability and migration path

    We are preparing to go from a 10g Data Guard environment (1 primary and 1 physical standby) to an 11g RAC cluster on Sun M5000s (Data Guard will not be part of the final configuration). We have heard that 11gR2 RAC is not yet mature enough so we are considering going to 11gR1. I'm curious what the general consensus is regarding the stability of 11gR2 RAC.
    Also wondering what the best migration path would be. We are considering upgrading the 10g Data Guard databases to 11g and then creating a RAC physical standby database on the 11g cluster for the primary database on the old server. The migration to the new RAC cluster will consist of a failover to the new 11g RAC database and will involve minimal downtime. The 10g Data Guard databases and servers will then be decommissioned.
    Thoughts?

    You will be surprised if I said Oracle RAC11gR2 seems to be a new version NOT a new realease of Oracle RAC11gR1.
    Many new features, surprises, bugs, yes bugs....
    I suggest to directly address to Oracle itself , to your support at Oracle , as it seems to be a production DB. DOnt take the risk to decide from this forum , ask oracle experts at your support!
    Good luck

  • Migration Path from v2008.3 to v9.3.2

    Is there a migration path from v2008.3 to v9.3.2?
    Our v2008.3 environment is on a Windows 2003 server, therefore we cannot do an in-place upgrade to v9.3.2 (on Windows 2008R2).  CatalogDeployer does not work between v2008.3 and v9.3.2.
    Any ideas on how to move the services from one environment to another?
    Please help!

    We were on 2008.3 and then went to 9.1 SP2.  The upgrade meant we had to install the last service pack for 2008 and then install to 9.1 and then install the SP2 pack.  This change fro 2008.3 to 9.1 SP2 was a big pain for us on the Reporting side.  The MyServices and ServiceDesigner pieces had little problems.  This was an upgrade from Win2003 w/ SQL 2005 to Win2003 w/SQL 2008.  We've been running 9.1 SP2 on SQL2008 for a year now with no problems.
    We are now upgrading to 9.3.2 and are just going to run the 9.3.2 installer.  We will have new servers put in place with Win 2008R2 and on the database side have just done an inplace update from SQL 2008 to SQL 2008 R2.  This means that currently we are running 9.1 SP2 on SQL 2008 R2 in production.  We run a very high volume for RequestCenter so the setup works fine for us in this topology.  Going to Win2008 we are going to copy the database tables and run an in-place upgrade on the newly built Win2008 app server. 
    As for CatalogDeployer, we kept the old environment and the new environment around while testing the upgrade.  This meant we could make changes to Prod using the old environment and then once production was upgraded, we deleted the old environment.

  • Exchange 2003 On-Premise to Office 365 - Easiest Migration Path

    We would like to migrate our domain from an existing on-premise 2003 Small Business Server to Office 365.   We only have 2 users so I am looking for the easiest upgrade path.  
    We will be retiring the SBS 2003 Server and have purchased a Windows 2012 Server to use strictly as a files server post-migration.  
    I would like to split the migration into 2 phases:
    1 Migrate the Exchange Server functionality to Office 365 in Phase 1
    2. Migrate the file server function from SBS 2003 to Windows Server 2012 in Phase 2. Sicne I only have 2 users, I am going to kill the SBS 2003 domain, create a new local domain, and migrate
    the profiles and files.
    The questions I have:
    1. 
    Can I migrate the domain mail server functionality to Office 365 and just import the PSTs for the 2 accounts.  
    I have perused the migration documents but I think it would be easiest just to import the PSTs for 2 users rather than setting up the Outlook Anywhere on a 2003 Server.
    2. Will I be able to initially manage the Active Directory accounts in Office 365 and then move that functionality back onto the Windows 2012 Server when that comes on-line?
    3. If I am overlooking any issues other than those that I have mentioned, please provide feedback

    Hi,
    Just checking in to see if the information provided by the MVP was helpful. Please let us know if you would like further assistance.
    Best Regards,
    Steve Fan
    Forum Support
    Come back and mark the replies as answers if they help and unmark them if they provide no help.
    If you have any feedback on our support, please click
    here

  • Is there a Migration Path from EP 5.0 to EP 7.0?

    Hi,
    I´m checking if there is a Migration Path from EP 5.0 to EP 7.0, has some one done this or know if this is Posible or if we need to go from 5.0 to 6.0 and then to 7.0?
    Thanx in Advanced!
    Kind Regards.
    Gerardo J

    Hi Gerardo Jiménez ,
    we need to go from 5.0 to 6.0 and then to 7.0(Migration path to be followed)
    The following websites give u detailed procedure & order of migration :
    How to Migrate from SAP Enterprise Portal 5.0 SP6 to SAP Netweaver '04
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/08279e8d-0701-0010-6d9a-8c1a790eb3b8
    How to Migrate from SAP Enterprise Portal 6.0 SP2 to SAP Netweaver '04
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/778ac2ee-0901-0010-61a9-a2e174996bd7
    Pls give u'r mai ID so that I can forward some docs.....
    cheers!
    gyanaraj
    ****Pls reward points if u find this helpful

  • Classpath, weblogic.class.path, server's class path, javaclasspath, serverclasspath ?? confused

    When I type t3config , I see a couple of class paths and I'm confused which
    one is which and
    what are the diffrences between them, there is classpath, javaclasspath,
    serverclasspath, weblogic.class.path
    and JVM class path, Server's class path on the weblogic console window.
    any clearification is appreciated.
    thanks,
    CLASSPATH Prefix
    CLASSPATH
    JAVA_HOME
    WEBLOGIC_LICENSEDIR
    WEBLOGIC_HOME
    system properties
    weblogic.class.path
    INITIAL HEAP
    MAX HEAP
    SERVERCLASSPATH

    Why would you do that - same class in both class paths? Don't.
    Don't put any application classes in the system
    classpath (JAVACLASSPATH).
    Mike
    Dimitri Rakitine <[email protected]> wrote:
    http://www.weblogic.com/docs51/classdocs/API_ejb/EJB_deployover.html#1056256
    Tony Lu <[email protected]> wrote:
    Can someone tell me how does weblogic use the weblogic.class.path? what's
    the relation between weblogic.class.path and systemclasspth ? if I have 2
    different classes ( same name but different ) on bothpath, which one would
    be loaded ? the one in classpath or the one in weblogic.class.path?
    Dimitri

  • Project Server 2013 migration workspace error

    Project Server 2013 migration workspace error
    Hello all,
    I have just completed my Project Server 2010 to 2013 migration. All look OK until I tried using Project Professional 2013 and opening a project with about 25
    Users (Enterprise Resource) . Opening took about 7 min. I tried creating a new project with 5 users and still took longer then is should. 
    I decided to run the below command and I received a lot of errors about missing workspace.  Please help if anyone can.
    Thank you in advance !!!
    Test-SPProjectWebInstance -Identity http://XXXXXXXX.XXXXXX | Format-Table -Wrap -AutoSize | Out-File -FilePath c:\
    Rule                                                                        
                     TimeStamp             Message                          
    Microsoft.Office.Project.Server.HealthRules.ProjectBICenterExistenceHealthRule                4/16/2014 12:05:57 AM                              
                                              The following ProjectBICenters   
                                              have missing lists:              
                                              (/projectserver/ProjectBICenter, 
                                              Reports).                        
    Microsoft.Office.Project.Server.HealthRules.ProjectWorkspacesExistenceHealthRule              4/16/2014 12:05:58 AM The following projects are       
                                              missing the workspace webs: 'cf8f
                                              0345-c4b5-e311-a4d0-0019b93bec52'
                                              , '52babaa6-c4b5-e311-a4d0-0019b9
                                              3bec52', '37ff2ac5-37bc-e311-b0a9
                                              -0019b93bec52', '17fe20c2-38bc-e3
                                              11-b0a9-0019b93bec52', 'b7faad6a-
                                              39bc-e311-b0a9-0019b93bec52', 'c9
                                              a70e95-a3b3-e311-b36f-0019b93bec5
                                              2', 'fdf3c3f9-86ba-e311-b3d2-0019
                                              b93bec52', 'ee95175e-f4bc-43f6-a9
                                              c9-02837b5791bc', '5e2cbc54-4114-
                                              4f24-af05-03e024c85046', 'bfd9e49
                                              5-2a42-405c-9035-04e51f4afb2b', '
                                              e381d24d-e82d-452b-b1ae-04f74e215
                                              fd8', 'b85dc99a-0989-4fe1-af0a-05
                                              c6b9448991', 'f2e1c579-2493-4ffd-
                                              99a0-072b7f5f527f'

    All,
    Bulk update and post up gradation tasks was completed at time of migration.
    I did notice that when opening Project Professional 2013 and unselecting
    Load Resource Assignments, everything opens and runs as it should. Not sure why ? So I think for now, I'll run Project Professional 2013 without Load Resource Assignments until I find a fix.
    As for (The following projects are missing the workspace webs) error, still getting them.
    Thanks all for the Quick Reply's.
    JBAE

  • Forms 6i to Forms 11g - Migration path

    Have a customer who is currently using forms 6i and DB 9.X and is willing to migrate to Forms 11g and DB12g.
        Questions
            a) Does anyone know the migration path that should be used?
            b) As far as my understanding it should do both upgrades (forms and DB) at the same time as forms 6i is not certified with DB 12g and Forms 11g is not certified with DB 9.X right?
            c) Any project to use as reference?
            d) Any re-usable?
    Regards,
    Mariano

    Is this an EBS installation? If yes, please note that Developer 11g is not certified with R12 and you will need to use 10g instead.
    Using the OracleAS 10.1.2 Forms and Reports Builders with Oracle Applications Release 12 (Doc ID 444248.1)
    How To Bring Up 10G Forms Builder In R12 Environment? (Doc ID 579318.1)
    How To Upgrade 11i Custom Forms To R12 (Doc ID 563258.1)
    Accessing Custom Forms After Upgrading From To R12. (Doc ID 451934.1)
    Thanks,
    Hussein

  • New Clean Mac - Best Migration Path?

    I currently have a iMac G5 running Tiger and iLife 06 and have just recieved a new iMac with Leopard pre-installed and was looking for some advice in the best migration path.
    I would like to know wether people recommend just using the Migration Assistant to get everything across or should I start afresh and copy across specific photos, music, mail files etc?
    The question stems from the fact that the G5 has had a couple of upgrades in its time and I look at things such as the iphoto library files and they seem to be mutiple libraries (ie iphoto library, iphoto 6 library) and other duplicate files. So not sure if MA will sort and clean these out or will copy all across?
    Any thoughts would be apreciated........thanks Daniel

    Hello Daniel,
    Very similar issues here. Just upgraded from a G4 to an intel 2.4G. I cloned the G4 onto an external. Set up the new iMac. Connected to the external and ported across only those files I wanted or needed. Now have a clean iMac with no clutter or unwanted junk on it. Double checked that everything was in order before wiping the external and cloning again.
    Hang on to the G5 - Just in case you missed something. A flash drive or CD will resolve any issues.
    Regards
    Ian

  • Get SQL Server default data path via ADO/C++?

    Hi,
    I am trying to get the SQL Server default data path via ADO/Visual C++.
    I find the SQL statements that will do that in
    http://stackoverflow.com/questions/1883071/how-do-i-find-the-data-directory-for-a-sql-server-instance/12756990#12756990
    So I just concat all the statements above into a CString object strStatements, then try to open a recordset as follows:
    _RecordsetPtr m_pRecordset;
    m_pRecordset.CreateInstance(__uuidof(Recordset));
    m_pRecordset->Open(_bstrt(strStatements), _variant_t((IDispath *)m_pConnection, true), adOpenDymanic, adLockOptimistic, 0);
    m_pRecordset->MoveFirst(); 
    The last MoveFirst statement will cause com_error, which said
    “ADODB.Recordset error '800a0e78'
    Operation is not allowed when the object is closed.
    It seems that there are no data in the recordset at all. What is the problem?
    Thanks

    Hello,
    Which query statement did you used to get the database data and log file path? Can you get the result by run the query directly with SQL Server Management Studio? For example,  
    SELECT SUBSTRING(physical_name, 1, CHARINDEX(N'master.mdf', LOWER(physical_name)) - 1)
    FROM master.sys.master_files
    WHERE database_id = 1 AND file_id = 1
    Regards,
    Fanny Liu
    If you have any feedback on our support, please click here. 
    Fanny Liu
    TechNet Community Support

  • Final Cut Studio 2 Migration path from Final Cut Express

    I'm currently using FCE HD 3.5, which I upgraded from FCE version 1.0
    I understand that no migration path exists from Final Cut Express to Final Cut Studio 2.
    However I have seen on ebay someone selling an upgrade to Final Cut Pro 5 HD from Final Cut express.
    I was wondering.... if I got this then could I then get a Final Cut Studio 2 Upgrade from FCP 5 HD?
    Does anyone see any problems with doing this? It seems to be a way to save money.
    Thanks,
    Steve.

    And it's well worth it. you can recoup a little of
    your cost by uninstalling fce and selling it.
    What's required in order to sell it? Can the registration be transferred to a new owner?

  • Automatically Replacing Absolute Paths with Paths Relative to the TestStand Search Directories

    Hi,
           I'm trying to replace file paths on a few projects with relative paths. I've found this  http://www.ni.com/example/25087/en/ which suggests the sequence there should do it. However I get a lot of error when I try to run this sequence. 
          Anyone else encountered this issue. (I'm using teststand 2010)
          Thanks!

    Hi ds_1,
    Apologies that this reply isn't massively helpful but it seems like some of the parameters are missing for certain steps in the sequence. This has likely occured due to the sequence being written in an older version of TestStand.
    I would recommend posting feedback on the actual example itself requesting an updated version. The person who originally uploaded the sequence will be notified and can make the changes.
    Best Regards,
    Chris
    National Instruments - Tech Support

Maybe you are looking for

  • Eveything involving disk access is slow

    Why is everything to do with HD access seems to be slow, very painfully slow!! Due to a failed RAID I got a new 500gb Seagate SATA HD drive to install internally. I have been tiding files up and using 'Archive' a lot and it takes an age to do anythin

  • Photo Analysis service Bug. Process starts by itself even after you disable the service

    A process with the name Photo Analyser Service keeps popping up in my list of running processes. It looks as though this is the Photo Analysis service which can be turned on and off in the gallery, it's in the menu under the `Faces` folder. I keep pu

  • Cannot make UDF visible in XLR report composer

    Hi, Customer is using 2007A PL30. There is an UDF in Marketing document title. Title=NumAtCard, Description=Vendor Ref No  Type=Alphanumeric(100). We had made this UDF visible in report composer(light dimension) and refresh XLR but we still cannot vi

  • [Stage3D]The ATF compress texture quality loss in some phone.

    Left picture is original. On the right is to use the ATF compress texture. I used the command png2atf.exe -c e -q 0 -n 0,0 -r -4 -i "in.png" -o "out.atf" The phone use android system 4.2.2 and CPU model is MT6592(GPU is "Mali 450 MP4").

  • Download location of Oracle OpenSSO Security Token Service

    I am not finding the war file for Oracle OpenSSO Security Token Service, where can I download it from? The docs say that it is part of OpenSSO server but I dont find that in oracle_opensso_80U2.zip also. Please let me know where can I get it from?