Service entry sheet creation for planned services

Hi,
I have created a service purchase order with planned services. After this I am trying to create a service entry. During ML81N, I give the P.O number and then click on create service entry.
However, to adopt the services from the purchases, there is a service selection tab which takes the user to the services tab of the purchase order and then the user must select the relevant service and click on the adopt button to bring the  service into service entry sheet screen.
However, in my  case, the service selection tab is not appearing on the service entry screen. Hence I am not able to call the services from the purchase order. I am on ECC 6.0 version.
Am I missing some step in config or in procedure ?
Kindly advice.
Regards,
Rajeev

Hi,
This doesn't sound like a config problem.
If the services are on the PO then you should be able to select the option to choose them from the PO services.
A remote (very remote) possibility is that you may have an authorisation problem, stopping you from being able to use the PO details? Is this possible? do you have authorisation to change this PO via ME22N etc:?
Steve B

Similar Messages

  • Service Entry sheet Creation for Shipment cost Document

    Dear All,
    While creating a shipment cost document .A service PO is getting generated in the back ground based on which a service entry sheet is created and LIV is made.But in the configuration we are mapping the Transportation planning point to Purchase organisation alone.
    Can some one let me know whether the generation of PO in the back ground for a shipment cost document in the back ground is a standard SAP feature if so can you tell me the configuration steps.
    Regards,
    K.Vivek

    Hi,
    Creation of Service PO in shipment cost document is based on the following SPRO setting or T-code.
    T code : T_56.
    SPRO > LE > Transportation > shipment cost Document > Shipment cost types and item categoires.
    Get into the details of item categoires, you can see the indicator Generate PO.
    hope this helps.
    Harish

  • Mvt. 101 with ML81N for service entry sheet split for every service line

    Dear guru.
    I have one purchase order position for service (item category D)  with three different service line.
    I run ML81N and i create the service entry sheet for every service line.
    If I see the goods receipts movement generate , the system show 1 movement line with qty 1 and the total of amount in LC of the 3 service line.
    Does exist a chance in order that system create 3 different movement lines for every service line with quantity and amount specific.
    Thanks

    Hi,
    I think you have create Service PO with description & UOM .
    then that you have mention activity for services ( Service line) . But if you mention n number of service line  that all values acumulate to service line of line item.
    so, you can't get different entery in accounting document & material document. this always w r t line item of the service PO.
    You have to note one think  all the service line tiem is unter the line item 10 only.
    just check your PO in ME23N.
    SAM

  • Issue with service entry sheet creation using synchronous service

    Hi,
      I am using a synchronous service inside that i am calling bapi bapi_entrysheet_create with testrun
    set,so that commit doesnot happen inside the bapi,then outside i am explicitly calling commit work.
    Still database table is not updated,commit is not working.

    Hi Venu,
       But I cannot set test run as initial because if testrun is set to initial bapi_entrysheet_create logic
    is written in such a way that it calls commit work inside the bapi....and so we cannot rollback later
    in the synchronous service.
    Regards,
    Tess

  • Service entry sheet creation thru bapi for multiple line items

    HI All,
    WE are using BAPI_ENTRYSHEET_CREATE bapi for the creation of service entry sheet against service PO.
    We are able to create the service entry sheet successfully with single sevice line item using this bapi,but when we are going for multiple service line items in item services tab in aPO, we are able to create the service entry sheet with only one service line item although there are 4 service line items in the item service tab in the po.
    We know that this bapi cannot support more than one po line item as it has provision for only one line item at the header leavel in the bapi
    will be rewarded for the best solution.
    Regards,
    velu

    Hi,
    Do you know the note 420334?. There you have very useful information.
    Best Regards,
    Arminda Jack

  • Supress Mandatory field for Service Entry Sheet Creation

    Hi,
    I am using BDC for Service Entry Sheet creation as BAPI cannot fulfill the Business needs.
    During Recording when I click on Service Overview and click on Service Selection we provide the Model Service Specification Number there I can see the Services and select it, but when I select the service and adopt, an error message ocuured to enter the quantity.
    Is there any way to supress the standard error message without using acess Key.
    BR
    Aviram

    Hi Aviram,
    Messages type 'E' , 'I' or 'W' are controlled through configurations. Please check with your functional consultant with the message number you want to supress. It can be made as 'I' or 'W' through configuration.
    Similarly if you do not want that particular field as mandatory field ask functional consultant to make it optional.
    Regards
    Sachin
    Edited by: sachin G patil on Mar 9, 2011 3:13 PM
    Edited by: sachin G patil on Mar 9, 2011 3:20 PM

  • Error ' Quantity exceeds quantity in PO' in service entry sheet creation.

    Hi,
    I am getting error "Quantity entered 7,000 exceeds quantity 5,000 in purchase order' ,  Message no. SE363" while creating service entry sheet
    PO Quantity - 1 AU
    Service  quantity - 5 HR
    in service entry sheet creation i am giving 6HR instead of what is planned in PO
    Not sure what driving this error, please help
    Thanks

    Hi
    Could you please check if Message SE 363 is set as an E (Error) in the IMG transaction OME0?. If it is set to an error you will not be  able to accept service overdeliveries even if you have the unlimited indicator set.                                                                               
    Regards,
    Mauro

  • How the freight cost are transferred from condition type of shipment cost document to service entry sheet and collected in service PO item

    Dear Experts:
    could you please share with me the knowledge for below topic:
    How the freight cost are transferred from condition type of shipment cost document to service entry sheet and collected in service PO item, because these three objects use three different pricing procedures, and different condition type.
    how did the condition type of service entry sheet know to copy the value of whcih condition type in the pricing procedure of shipment cost document?
    Is this SAP standard function OR there need an enhancement to do that?
    I didn’t find related condition value copy setting in background, could you please share related setting with me? Thank you very much for your kind help!
    Best regards,
    Andy

    Hi, Gopi,
    Glad to see your feedback, but i still have question on your feedback:
    which condition type in the pricing procedure of service entry sheet should know to capture the net value of shipment cost doc? becasue there are so many condition types,
    And i have checked the corresponding condition type (PRSX) of service entry sheet pricing procedure in my SAP system, this is a self-defined condition type, but NO any calculation routine maintained for the condition type (PRSX), how did the condition type (PRSX) know to copy the total cost of shipment cost document?
    Below is the example and another question:
    what the relationship between the pricing procedures at service PO item level and service line item level?
    1. The freight cost in shipment cost document—including used condition type and pricing procedure
    The pricing procedure of shipment cost document
    2. The freight cost in service entry sheet—including used condition type and pricing procedure
    The pricing procedure of service entry sheet--the pricing procedure at service line item level
    3. The freight cost in service PO item—including used condition type and pricing procedure:

  • Entry sheet creation for services in MM module

    I would like to know the what are the fields to be filled in creation of entry sheet through BAPI_ENTRYSHEET_CREATE function module tables to create an entry sheet.And its functionality of each field what exactly it denotes.How package number is external can be given, why that externally given package number is not stored in any of SAP database tables and,in that case how we know that Externally entered package number can be referred in what way in the point of iew of exteranl user?

    Hi,
        while creating through BAPI for entry sheet creation, how many material document items are created in the case of GR-Based, Non-Service Based PO item.Whether through T.Code and BAPI will give the same number of material documents.If so what fields will influence the in which table of BAPI_ENTRYSHEET_CREATE  will influence the number of material document items.I am getting DIfferent number when comapred to BAPI with T.Code.But I know that through T.Code it is giving correct number.Suggest me in this regard.
    Thank you
    Santhi Kumar

  • Service Entry sheet creation - Using a diffent contract diff from line item

    Hi,
    Here is the scenario...
    I have a services purchase order referring to contract  and its service item with services ( service masters) attached to it.
    And the PO  item is a limit item with some limits maintained on the limits tab, but contract reference is specified at the limits level it is only at the line item level.
    System version : ECC 6.0
    Lets say PO number : 123456789
    Lets say contract number and item is : 2323232323  item 10 ( Account assignment U )
    My supplier is : 111111111
    Now I am creating the Service Entry sheet  and I am trying to add the services  ( services selection button)  I get a pop up to  search for services  by certain selection criteria  and one of them is purch document ( remember it doesn't pre-populate and grey out the purch doc field with that the contract number from the item level) and now I can select any service contract that belongs to any supplier and select the services from it and complete my  SES.
    So lets say the contract from which I chose the service is : 3232323232
    And the supplier on the contract is 2222222222
    Is this a valid scenario or not?
    Has any body ran into this situation  before?
    Hope I was clear in explaining my scenario....  
    Thx,
    Krishna.

    Hi Krishna,
    the External Services Management distinguishes between planned and unplanned services.
    In case you have ONLY limits, no planned services in the PO item, it does not matter if you have entered a contract number into the PO item - in this case this contract will be not a real reference for your services.
    If you have entered limit values only as overalllimit and expected value and you did not enter a contract limit on the contract limit tab, then you will not have a special contract reference on unplanned level neither.
    In this case it is NOT an error when you start the entry sheet creation and you can select services from other contracts or purchase orders against your limit values in the PO into the entry sheet.  The system does NOT check for a different vendor when you select services from other documents than the contract which you have specified in your PO item, because it is NOT a real reference - nor on services level as you have only limits in your PO item, nor on limit level since you have NOT entered a contract limit into your PO item.
    In order to understand this process please study the unplanned scenario and contract reference scenarios.
    Regards,
    Edit

  • Service entry sheet creation from PO without selecting line item of PO?

    Dear SAPIENTS,
    While creating service entry sheet for one frame work order (PO) i do not want to select line item of PO. I want all the service of PO line item should come automatically in single service entry sheet number.
    At present whenm i enter the PO number its taking line item 10 as default because of this service of that line item is coming and for every line item i have to create different service entry sheet.
    Regards,
    Kaushal Rai

    Hi,
    in ML81N please enter the entry sheet header data, then go to full screen services, push the button for
    "service selection" and after that  a popup appeares for the service selection (SAPLMLSP
    0500). On the bottom of this popup you have the button "complete" = adopt all = F9. If you hit this
    button all of your services within the service specification will be copied into the entry sheet
    at the same time.
    Regards,
    Edit

  • Service Entry Sheet creation!!!!

    Hi all,
    I am working on service procurement with ECS scenario.The Service Entry Sheet in the backend R/3 system is subject to release strategy(for a material group).
    Whenever I create a Service Entry Sheet(SES) based on a EBP PO, then the SES is subjected to a release strategy.
    Whenever I create a confirmation in the EBP system(which doesn't have a workflow for confirmation), the follow-on document i.e. Service Entry Sheet is getting created in the backend with absolutely no release strategy whatsoever.
    Why is the SES getting created automatically,even though there is a release strategy attached to it at the backend?? This release strategy is functioning fine when I create a SES manually in the backend.
    I found a thread { Service Entry sheet auto released when created through EBP } wherein someone had faced the same issue that I faced, but no one gave him a clear picture as well.
    Help me!!
    Regards
    Hari

    Hi,
    This is standard SRM design.
    The Service Entry Sheet created from SRM in ECC is directly released to create a material document (good receipt).
    This is because, there is no release functionnality available from SRM.
    Thus, if there were a release strategy, there is no way in standard to pilot it from SRM.
    If you need a release straegy, you need to use the confirmation WF in SRM that will occur before the Service Entry sheet is created in ECC.
    Kind regards,
    Yann

  • Service entry sheet restriction for vendor

    hi guys,
    Can any one explain how to restrict the service entry sheet for a specific vendor?
    thanks.

    If that is only the vendor v can block but that specific vendor changes continuosly.
    For this i have set up the relaese procedure in service entry sheet by taking strucure CESSR and field LIFNR.
    the problem is, i have given the characterstic value as vendor a/c no.. for whom v r trying to restrisct,but release is triggering to all vendors.
    v want only for specific vendor.
    thanks.

  • CATS - Service Entry Sheet creation

    Hi Experts,
    I'm trying to create a Service Entry Sheet via CAT2 but have been unsuccessful up to this point. I have been unable to solve this issue thus far and I've spent quite some time. I was hoping that someone out there might have some information that could aid me. At this point, I've done the following:
    I've created Info Types 0315, 0000, 0001, 0002, 0006, 0007, 0003, 0105, 0024, 0016, and 0019. In addition, the Personnel Number has been set up as with an Employee Group of 9 - External Employee. At this point I'm unable to actually create the Service Entry Sheet via CAT2 and I unable to figure out why.
    Kind Regards,
    Jason

    Hi Jason,
    if u merely create an employee with necessary infotypes thats not sufficient tobe able to access the timesheets thru CAT2. a data entry profile needs to be assigned to the userid along with appropriate authorisations.

  • Service entry sheet (Confirmation for service) creation by supplier

    Service procurement MM-SUS.
    For processing service orders(no hirarcies, only one service line)
    I Have transfered the service Purchase order from ECC
    to SUS(SRM7.0).i am able to see the purchase order
    and POR created and transfered to ECC. Further confirmations
    for Creating SES in ECC,how?
    i have tried with create confirmations in start page of SUS.
    but service POs are not available.what are the settings  required in SUS (for service confirmation) to create SES in ECC.
    with screen shots is more helpful.
    regds
    Rami

    Hi Nikhil,
    thanks for your Feedback.
    we are not using EHP4. our ERP system is ECC6.0 only. I know EHP4 is required at ECC side. But  in this stage
    we are going with ECC6.0.with Custom developments. I think modifications are required in the Interfaces and at ECC side.
    as SRM is already upgraded to  SRM7.0.I think no custom developments needed at SRM side.only the service orders requests
    from ECC to PI and PI to SRM needs to be modified?
    scenario name  : ECC triggers Idoc to PI and PI generarate XML to SUS (Orders02 to Purchase order request).
    i have checked the Idoc and all  fields required for creating service order in SUS is available.is any other fields/check box required in Purchase order Idoc. so that we can map.
    in service purchase order Item detail screen(service lines) is not displaying in SUS side and also confirmation(SES creation).
    regds
    Rami

Maybe you are looking for

  • IPhoto library file includes what?

    Hi, I store my photos in folders under "Pictures". Sometime ago I opened up iPhoto and used it for my photos. I don't use it anymore as I find using my folders under "Pictures" far easier. In "Pictures" there is a file called iPhoto library and this

  • When I try to install the Flash update it asks for a password that does not exit and I can't install

    When I try to install the flash update I get a request for a password that doesn't exit  Please help

  • Plannoing application and ASO cube

    Hi, To my knowledge when we create a Planning application and create the database it creates a BSO cube. But we had a call today with Oracle and they were suggesting to use ASO cube with Planning. Is it possible to have an ASO cube for a Planning app

  • Adobe Encore CS6 - Import Premiere Pro Sequence don't work

    Adobe Dynamic Link - Import Premiere Pro Sequence don't work I need asap your help! It imposible to import from Premiere Pro CC in Adobe Encore CS6 with Adobe Dynamic Link(is inactive) What is the probleme? Give me at addvance!

  • Controlling the re-sizing of widgets:

    I have read several Swing tutorials, but many are limited in their scope. I have been searching for a way to control the resizing of my JPanels and widgets. A solution I found is to use transparent JPanels that have no content or borders. I give them