Hi,
Here is the scenario...
I have a services purchase order referring to contract  and its service item with services ( service masters) attached to it.
And the PO  item is a limit item with some limits maintained on the limits tab, but contract reference is specified at the limits level it is only at the line item level.
System version : ECC 6.0
Lets say PO number : 123456789
Lets say contract number and item is : 2323232323  item 10 ( Account assignment U )
My supplier is : 111111111
Now I am creating the Service Entry sheet  and I am trying to add the services  ( services selection button)  I get a pop up to  search for services  by certain selection criteria  and one of them is purch document ( remember it doesn't pre-populate and grey out the purch doc field with that the contract number from the item level) and now I can select any service contract that belongs to any supplier and select the services from it and complete my  SES.
So lets say the contract from which I chose the service is : 3232323232
And the supplier on the contract is 2222222222
Is this a valid scenario or not?
Has any body ran into this situation  before?
Hope I was clear in explaining my scenario....  
Thx,
Krishna.

Hi Krishna,
the External Services Management distinguishes between planned and unplanned services.
In case you have ONLY limits, no planned services in the PO item, it does not matter if you have entered a contract number into the PO item - in this case this contract will be not a real reference for your services.
If you have entered limit values only as overalllimit and expected value and you did not enter a contract limit on the contract limit tab, then you will not have a special contract reference on unplanned level neither.
In this case it is NOT an error when you start the entry sheet creation and you can select services from other contracts or purchase orders against your limit values in the PO into the entry sheet.  The system does NOT check for a different vendor when you select services from other documents than the contract which you have specified in your PO item, because it is NOT a real reference - nor on services level as you have only limits in your PO item, nor on limit level since you have NOT entered a contract limit into your PO item.
In order to understand this process please study the unplanned scenario and contract reference scenarios.
Regards,
Edit

Similar Messages

  • Issue with service entry sheet creation using synchronous service

    Hi,
      I am using a synchronous service inside that i am calling bapi bapi_entrysheet_create with testrun
    set,so that commit doesnot happen inside the bapi,then outside i am explicitly calling commit work.
    Still database table is not updated,commit is not working.

    Hi Venu,
       But I cannot set test run as initial because if testrun is set to initial bapi_entrysheet_create logic
    is written in such a way that it calls commit work inside the bapi....and so we cannot rollback later
    in the synchronous service.
    Regards,
    Tess

  • Supress Mandatory field for Service Entry Sheet Creation

    Hi,
    I am using BDC for Service Entry Sheet creation as BAPI cannot fulfill the Business needs.
    During Recording when I click on Service Overview and click on Service Selection we provide the Model Service Specification Number there I can see the Services and select it, but when I select the service and adopt, an error message ocuured to enter the quantity.
    Is there any way to supress the standard error message without using acess Key.
    BR
    Aviram

    Hi Aviram,
    Messages type 'E' , 'I' or 'W' are controlled through configurations. Please check with your functional consultant with the message number you want to supress. It can be made as 'I' or 'W' through configuration.
    Similarly if you do not want that particular field as mandatory field ask functional consultant to make it optional.
    Regards
    Sachin
    Edited by: sachin G patil on Mar 9, 2011 3:13 PM
    Edited by: sachin G patil on Mar 9, 2011 3:20 PM

  • Error ' Quantity exceeds quantity in PO' in service entry sheet creation.

    Hi,
    I am getting error "Quantity entered 7,000 exceeds quantity 5,000 in purchase order' ,  Message no. SE363" while creating service entry sheet
    PO Quantity - 1 AU
    Service  quantity - 5 HR
    in service entry sheet creation i am giving 6HR instead of what is planned in PO
    Not sure what driving this error, please help
    Thanks

    Hi
    Could you please check if Message SE 363 is set as an E (Error) in the IMG transaction OME0?. If it is set to an error you will not be  able to accept service overdeliveries even if you have the unlimited indicator set.                                                                               
    Regards,
    Mauro

  • Service entry Sheet does not pick any Condition charges From Service PO

    Hi All
    Service entry Sheet does not pick any Condition charges From Service PO. What could be the reason ?

    HI,
    Please check Sap note 381030
    Along with other thing It says
    "Delivery costs are generally not supported in external services management and in case
    of blanket purchase orders, item category D or B. Instead of representing delivery
    costs via conditions, in case of service documents, freight costs and other, SAP
    recommends to add in additional service lines."
    So that is the reason you are not getting those account entry in the time of service entry sheet
    Use another service line with text ( or service master) for the additional costs as suggested by SAP
    Hope it clarifies

  • Service entry sheet creation thru bapi for multiple line items

    HI All,
    WE are using BAPI_ENTRYSHEET_CREATE bapi for the creation of service entry sheet against service PO.
    We are able to create the service entry sheet successfully with single sevice line item using this bapi,but when we are going for multiple service line items in item services tab in aPO, we are able to create the service entry sheet with only one service line item although there are 4 service line items in the item service tab in the po.
    We know that this bapi cannot support more than one po line item as it has provision for only one line item at the header leavel in the bapi
    will be rewarded for the best solution.
    Regards,
    velu

    Hi,
    Do you know the note 420334?. There you have very useful information.
    Best Regards,
    Arminda Jack

  • Creating Service Entry Sheet without using Service Master/Service lines

    We are invoking the BAPI_EntrySheet_Create to create the service entry sheet. We are currently facing this issue...
    1) For assigned PO's, we are getting the PO item and Account assignment information from BAPI_PO_GetDetail. We are using these values to populate the parameters/tables to invoke BAPI_EntrySheet_Create. For population the Entrysheetservices table, we are not using information from Service Master/Service lines but use the information we get from an external system to populate the Service lines(ESLL). We do not provide a Package No/Service information when invoking the BAPI but populate the service lines with short text, quantity, Gross price etc without service information like package no, outline indicator etc. The BAPI creates a service enty sheet successfully(this is without the SES Acceptance indicator not being set) but when we lookup the SES# from ML81n transaction the ESLL details lines are not displayed.
    When displaying the SES using transaction ML81N, the header information is displayed correctly but the lines are not displayed. The Header information is correctly populated in ESSR table and detail is also populated in ESLL table. I think the cross reference information is correctly set in ESLH table to pull up the detail when ML81N as it is missing the package/sub pack information.
    Your expert advise in resolving this issue is very much appreciate. Please advise.

    Hi,
    Creating Service entry sheet using bapi  BAPI_ENTRYSHEET_CREATE
    For creating service entry sheet follow below link and it helps to you.
    http://wiki.sdn.sap.com/wiki/display/ABAP/CreatingServiceEntrySheetusing+BAPI
    Regards,
    Sekhar

  • Service entry sheet creation for planned services

    Hi,
    I have created a service purchase order with planned services. After this I am trying to create a service entry. During ML81N, I give the P.O number and then click on create service entry.
    However, to adopt the services from the purchases, there is a service selection tab which takes the user to the services tab of the purchase order and then the user must select the relevant service and click on the adopt button to bring the  service into service entry sheet screen.
    However, in my  case, the service selection tab is not appearing on the service entry screen. Hence I am not able to call the services from the purchase order. I am on ECC 6.0 version.
    Am I missing some step in config or in procedure ?
    Kindly advice.
    Regards,
    Rajeev

    Hi,
    This doesn't sound like a config problem.
    If the services are on the PO then you should be able to select the option to choose them from the PO services.
    A remote (very remote) possibility is that you may have an authorisation problem, stopping you from being able to use the PO details? Is this possible? do you have authorisation to change this PO via ME22N etc:?
    Steve B

  • Service Entry Sheet creation!!!!

    Hi all,
    I am working on service procurement with ECS scenario.The Service Entry Sheet in the backend R/3 system is subject to release strategy(for a material group).
    Whenever I create a Service Entry Sheet(SES) based on a EBP PO, then the SES is subjected to a release strategy.
    Whenever I create a confirmation in the EBP system(which doesn't have a workflow for confirmation), the follow-on document i.e. Service Entry Sheet is getting created in the backend with absolutely no release strategy whatsoever.
    Why is the SES getting created automatically,even though there is a release strategy attached to it at the backend?? This release strategy is functioning fine when I create a SES manually in the backend.
    I found a thread { Service Entry sheet auto released when created through EBP } wherein someone had faced the same issue that I faced, but no one gave him a clear picture as well.
    Help me!!
    Regards
    Hari

    Hi,
    This is standard SRM design.
    The Service Entry Sheet created from SRM in ECC is directly released to create a material document (good receipt).
    This is because, there is no release functionnality available from SRM.
    Thus, if there were a release strategy, there is no way in standard to pilot it from SRM.
    If you need a release straegy, you need to use the confirmation WF in SRM that will occur before the Service Entry sheet is created in ECC.
    Kind regards,
    Yann

  • Service Entry sheet Creation for Shipment cost Document

    Dear All,
    While creating a shipment cost document .A service PO is getting generated in the back ground based on which a service entry sheet is created and LIV is made.But in the configuration we are mapping the Transportation planning point to Purchase organisation alone.
    Can some one let me know whether the generation of PO in the back ground for a shipment cost document in the back ground is a standard SAP feature if so can you tell me the configuration steps.
    Regards,
    K.Vivek

    Hi,
    Creation of Service PO in shipment cost document is based on the following SPRO setting or T-code.
    T code : T_56.
    SPRO > LE > Transportation > shipment cost Document > Shipment cost types and item categoires.
    Get into the details of item categoires, you can see the indicator Generate PO.
    hope this helps.
    Harish

  • Entry sheet creation using BAPI_ENTRYSHEET_CREATE

    I wanted to create Service entry sheet for Purchase order Service items.I am using the BAPI -BAPI_ENTRYSHEET_CREATE.BAPI returns the error 'Unplanned service may not be entered'.I am passing PLN_PCKG & PLN_LINE from ESLL to the structure/ENTRYSHEETSERVICES, still the service lines are considered as unplanned service.

    Hi,
    I came across this issue and have blogged a solution that gets round it for our purposes. This may help:
    http://community.altiusconsulting.com/blogs/adamadshead/archive/2009/09/24/bex-analyzer-s-file-upload-bug-when-integrated-with-sap-portal.aspx
    Regards,
    Adam

  • Service entry sheet creation from PO without selecting line item of PO?

    Dear SAPIENTS,
    While creating service entry sheet for one frame work order (PO) i do not want to select line item of PO. I want all the service of PO line item should come automatically in single service entry sheet number.
    At present whenm i enter the PO number its taking line item 10 as default because of this service of that line item is coming and for every line item i have to create different service entry sheet.
    Regards,
    Kaushal Rai

    Hi,
    in ML81N please enter the entry sheet header data, then go to full screen services, push the button for
    "service selection" and after that  a popup appeares for the service selection (SAPLMLSP
    0500). On the bottom of this popup you have the button "complete" = adopt all = F9. If you hit this
    button all of your services within the service specification will be copied into the entry sheet
    at the same time.
    Regards,
    Edit

  • CATS - Service Entry Sheet creation

    Hi Experts,
    I'm trying to create a Service Entry Sheet via CAT2 but have been unsuccessful up to this point. I have been unable to solve this issue thus far and I've spent quite some time. I was hoping that someone out there might have some information that could aid me. At this point, I've done the following:
    I've created Info Types 0315, 0000, 0001, 0002, 0006, 0007, 0003, 0105, 0024, 0016, and 0019. In addition, the Personnel Number has been set up as with an Employee Group of 9 - External Employee. At this point I'm unable to actually create the Service Entry Sheet via CAT2 and I unable to figure out why.
    Kind Regards,
    Jason

    Hi Jason,
    if u merely create an employee with necessary infotypes thats not sufficient tobe able to access the timesheets thru CAT2. a data entry profile needs to be assigned to the userid along with appropriate authorisations.

  • Service entry sheet cannot revoke acceptance

    Dear All,
    Service PO is created with four line items in Service tab in item details.
    All are entered as short text i.e without service master record.
    Three Service entry sheets are created for the first three items. But only one material document (with mvmt type 101) has been created for those three service entry sheets.
    This material document contains these 3 line items with 3 service entry sheets as reference document.
    For fourth line item in services tab of PO, fourth service entry sheet + material doc (101) created.
    Also in PO history tab of PO, Three GR line items for first material document and Fourth GR line item for second material document displayed.
    In PO history, Only fourth service entry sheet is diplayed.
    Now when we want to revoke acceptance of one of the three SES (with common mat doc), system is not allowing. Its giving error message SE025 as below
    Not possible to cancel acceptance immediately due to aggregation
    Message no. SE025
    Diagnosis
    It is not possible to revoke acceptance due to aggregation of the PO history records.
    Procedure
    To revoke (cancel) acceptance of one or more entry sheets, you must first disaggregate the PO history records (report RM06EKBE).
    But when report RM06EKBE is run, its not getting executed.
    Please suggest how to revoke acceptance of those three SESs.
    Thanks & Regards

    Hello,
    From your description of the problem, I assume this is an inconsistency
    problem. Hence, I would suggest you to carry out the 2 steps in solving
    the problem.
    STEP 1 :  RESTORE THE SES IN THE EKBE
    STEP 2 :  REVOKE THE ACCEPTANCE.
    Report ZMO_EKBEUPDATE is used to solve the STEP 1 and this report works
    for the all SPs. The report is in the Note 527907.
    First run the report in the simulation mode just to realise the missing
    SES. After that the Report can be run without simulation mode.
    This will do a database Update.
    Once the DB Update is done and the SES is in EKBE the you can revoke the
    SES.
    ABOUT THE REPORT ZMO_EKBEUPDATE
    The report in the Note 527907 is a very useful report.
    It does 2 things,
    1. Restores the Missing SES in the EKBE
    2. Solves the inconsistency in the NETWR in ESSR and EKBE.
    For us Point 1 is more important than 2.
    It is the enhanced version of RMESSRK2 from note 442091.
    This Report will solve the current problem and the note that you have
    applied will prevent the future occurrence of the problem.
    if you are still not able to solve this incoinsistency, I would suggest that you open a ticket at SAP.
    Best Regards,
    Arminda Jack

  • Service Entry Sheet Qty Change

    Service PO is created with 21 line item of service. And Service entry sheet is created for 18 line item.
    Now i want to edit the existing service entry sheet to make it for 21 line item.
    Please help....

    Hi,
    if Service entry sheet is fully released/accepted   then  reverse service Entry sheet release by Revoke option using t-code ML81N/ ML85 .
    or
    if Service entry sheet is not released,then add the remaining line items by using service selection option using Tcode ML81N  and go to change mode.