I am looking at the config in ML81N  - Create Service Entry Sheet.
We have locked out the ability to change the network number at the SES , based on plant. We have allowed the change of Cost Center at all plants. My issue is I am trying to find where the locking out of changing the network at the plant level exists. I am trying to disable it at another plant.
Thanks

Hi All,
     Material Description is at client level data it will be applicable for all plants. But if you extend the material for using it in the other plant you can make a note in the sale text or purchase order text.
Hope this will solve your problem,
Regards,
Pherasath

Similar Messages

  • Change material description at plant level

    Hi,
    can material description be changed for  only one plant.

    Hi All,
         Material Description is at client level data it will be applicable for all plants. But if you extend the material for using it in the other plant you can make a note in the sale text or purchase order text.
    Hope this will solve your problem,
    Regards,
    Pherasath

  • How to disable Wifi and Network access in low level setting for security ?

    Hi
    New to here
    One of our final customer bought imac last months. OS 10.9, SN is c02*******J4i
    Since they are security printing, all the necessary ports accessing to outisdes need to be disabled in low level setting(not the ons just like turn on and off ).
    The ports including USB storage, Network and WIFI.
    I googled and found the following
    Open the /System/Library/Extensions folder.
    To remove support for USB mass storage devices, drag the following file to the Trash: IOUSBMassStorageClass.kext
    Open Terminal and enter the following command: $ sudo touch /System/Library/Extensions The touch command changes the modified date of the /System/Library/Extensions folder. When the folder has a new modified date, the Extension cache files (located in /System/Library/) are deleted and rebuilt by Mac OS X.
    Choose Finder > Secure Empty Trash to delete the file.
    Restart the system.
    I want to confirm this before sending to final user. Since I didn't have mac on hand, just wonder whether there are similar kext files for network and wifi to remove.
    Just like step 2 described.
    I would like customer to backup these files before permanently removed.
    Many thanks
    Kevin
    <Edited By Host>

    chiqui wrote:
    Is it possible to disable Internet access point and WAP as when I use WiFi some connections to WAP server of my provider are still made and I get charged. I am looking for the option not to delete it entirely from the access point list, but rather disable it as I might need connection when WiFi is not available and I want to be able to enable it as once I delete the server name and setting I won't know it.
    Is it possible to do it and how?
    You could delete WAP accesspoint. Not all providers (carriers) allow this.
    ‡Thank you for hitting the Blue/Green Star button‡
    N8-00 RM 596 V:111.030.0609; E71-1(05) RM 346 V: 500.21.009

  • Vendor Master partner functions change at plant level

    Hello All,
      I need to change the vendor partner functions at the plant level.By default it takes the partner no equal to vendor no.But in my requirement the partner no can be differnt than the vendor no.Can anyone let me know how to do this?I cant do a BDC recording
    also since the system cant automatically select the plant no in the table control.
    Thanks,
    Rakesh.

    Hello Jürgen!
    Thanks!
    Do you know of any user exit which will help on this.
    Best Regards

  • Changing Batch Level from Material Level to Plant Level.

    I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
    Kindly suggest.

    Hi, Thanks for ur reply.
    I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
    What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide.

  • How Can We Change Batch Management Level From Client level to Plant Level?

    Hi all,
    I want to know whether it is possible to change the batch management level from client to plant level.Pls Help..

    Hi,
    Refer SAP Note 891902 - FAQ: Batch level

  • Batch Management - Changing Material level to Plant level

    Hi friends,
    We are configuring batch management for ECC 6.0 with CRM 5 .
    I can see the batch level in my system as Material level. But we would like to convert  batch level in to Plant level. when i try to convert the batch level i am getting error "This type of conversion is not implemented".
    There is no batch record exists in the stock.
    Please clarify why can't able to change to plant level from material level.
    Thanks

    YOu need to use  the OSS note 41715
    This will explain what exactly you need to do.
    Please go through the above OSS note.

  • Batch management level change to plant level

    Hi,
    Currently,i am using batch managment at material level.I have created material and has its stocks.
    I need to convert it to plant level..How can i convert it to plant level?
    Thanks
    Srini

    Hi,
    Please check the OSS Note 41715 - Resetting batch level from material to plant level.
    Hope it helps you.
    Kuber

  • Add New Fileds in XK01 Plant level and Menu Enhancement

    Hi Experts,
    I want to add a push button in XK01 (vendor ) create and change in the production data and Plant level data .I can add in the Production level using Vendor_add_data and Vendor_add_data_cs . But i want to add that same in the Plant level data.
    Navigation to plant level : in the production data->additional data ->click plant -> choose purchasing.
    Please help me how to add new button and new screen related to this button.
    And in plant level Extras->texts .. This menu item is disabled so can u please tell me how to enable it.
    Thanks In Advance.

    Hi,
    I have added a field to LFB1 with append structure. Activated the BADIs so that I now get the extra tab, and my field in XK01. I can't save the input data though. "No changes were made". Do I need to write some code in "get_Data" method. if so, what should it be like?
    Thanks in advance.
    Edited by: gorkem ozok on Sep 22, 2008 2:20 PM

  • How to restrict from creating the  Network for  1st & 2nd level  WBS

    Hi All,
        In our project structure we have up to 5 levels of WBS, In some cases we have creates  3 level also . Now we want to restrict creates Network for first two level WBS  , actually we want to restrict user to Create PR for those WBS so if we restrict them from creation of Network for 1st &  2nd level then they not able to create PR for same  .
    Thanks,
    Virendra

    Hi Virendra,
    I can suggest you other way round solution.
    If you are sure that those two WBS will not take any actual or commitment cost, then its better to NOT to mark those WBS elements as Account Assignment Element. I mean, if you do not set the indicator of Acct. Assignment Element (Untick Acct Assignment Element) on those WBS, then user will not be able to create Networks on those WBS Elements. Try this on your development or quality client and let me know if it works.
    If it works, then you just need to disabled the Acct. Assignment Element indicator for those two WBS element and you can achieve that through substitution and field selection of WBS as well.
    OR
    Just look at OPSG settings at tab component. Just look if that can solve your purpose because your requirement is to stop PR from those WBS element. (I am just wondering if you can stop user from creating/change material components from those WBS-Networks)
    OR
    Go for User Status and set it to on those WBS Elements. Object Types will be Networks and Network Header.
    OR
    Try to achieve a validation or substitution where in you can mark Res./Pur. Req as 1 (Never) only for those two WBS elements. In this way user cannot create PR on those two WBS elements.
    Regards,
    Amit

  • How to disable delivering plant for sales organisation and material

    HI
    We usually deliver via 2 delivering plants and changing them via MM02 according to availability Theese 2 delivering plants are connected  with many sales organisations
    It  is possible to disable delivering plant for some products to specific sales organisation , so that customer service is not able to order a this material from a plant for this sales organisation? Other sales organisation should be still able to order the product  from that plant.
    I can imagine to block the whole delivering plant for a material. But how is possible to do so on the level of sales organisarion-material-plant?
    Thanks a lot
    Sona

    With standard, it is not possible.  You can try with USEREXIT_CHECK_VBAP in the program MV45AFZB
    G. Lakshmipathi

  • "Network disabled because Internet connection is slow"

    I have both a Samsung Galaxy S3 and a new Samsung Tab 3.   After a recent software upgrade, I was having connectivity issues to wireless routers.   The message I got when connecting to a secure wireless network was "Network disabled because Internet connection is slow".   I determined that I had no issues with either my phone or tablet on either an unsecure router (WiFi hotspot), or with any older router that broadcast WPA2 personal with either aes OR tkip security.   I do have a problem with connecting to any new router that broadcasts BOTH aes and tkip at the same time.   When I change the routers under my control to broadcast only aes or tkip, then I can immediately connect both my phone and tablet to the router.   There are obviously a lot of routers over which I have no control, so this needs to be fixed.  I am pretty sure that there is a problem with the latest Android software upgrade in this regard

    I am having the same problem with my Galaxy 3S since the upgrade. Have searched for settings, etc. but haven't found anything I can control. My home network is getting 54.4 down and 5.7 up! Have had this issue nearly everywhere I am connected.
    I think it needs a fix - noticed today that Verizon has doubled my DATA for free. May need it if this continues.

  • Info record mandatory at plant level

    We want to restrict info record mandatory at a plant level out of many plants.
      i could make it mandatory and price not editable in the po, but while creating sched agreement it does allow the changing the prices.
    Pl help.
    Haresh

    Hi,
    Either goto spro>MM>Procurement>Environment Data>Define attributes of system messages and make 06/341 as Error or Warning, as required.
    Or
    Make source list mandatory in material master.
    Or
    Source List mandatory at plant in Source List config.
    Or
    Remove the pricing condition PBXX from your prcing that means you will have only PB00 (Gross price) condition in your PO which is determine the gross price from Info or contract or SA or RFQ but can't allow user to enter the price at PO level w/o any source document
    Or
    Customer exit MM06E005-EXIT_SAPMM06E_012
    Regards,
    Ashish.

  • Info Record create at Plant level at the time of PO

    HI,
    Is the system create the Inforecord at plant level not at P.Org level.Problem is system can create the Inforecord at P.Org Level.
    If possibility that system create the Inforecord at plant level at the time of create the P.O.
    What  setting need to configure in the system.
    Thanks & Regards,
    Andra

    Hi,
    Go in transaction OMF0 and change the condition control as plant level
    for all those plants where the info records should be maintained at
    plant level. This will solve your problem.
    regards,
    JP

  • Client level, plant level and material level batch

    Hi,
    Can any body tell me wat is the actual meaning of
    !) Client level batch,
    2) plant level batch,
    3) material level batch
    with exa. please.
    Thanks
    Nilesh Ithape

    Hi,
    Below is the extract from the IMG Documentstion..
    ====================================================================
    Batch numbers can be unique at the following levels:
    at plant level
    at material level
    at client level for a material
    If you choose plant level, the batch number is unique in conjunction with the respective material and the plant. If you choose material level, the batch number is unique together with the material. At client level, the batch number is unique in the whole client.
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    =========================================================
    Hope this helps..
    Regards,
    Siva

Maybe you are looking for

  • Weird Msg after repairing permissions

    hello I am on Lion OS, I repaired permissions and got the following message Warning: SUID file "System/Library/CoreServices/RemoteManagement/ARDAgent.app/Contents/MacOS/ARDAg ent" has been modified and will not be repaired. What is it.? and do I fix

  • Material master upload-Batch input method

    I am trying to extend sales view.When i try to upload,the system is thrwing error msg *     172     You have not fully maintained the tax classifications* The field is TAXKM,but this field not availbale in the field mapping.How to map this field & up

  • IPad app pdf formulars

    How to edit pdf formulars on the ipad app? Are there any restrictions? Thanks for your help!

  • Handling SAP Events from CPS

    Hello ,           is there anyway can we handle SAP events from CPS  , our scenario is if we schedule a job in SAP from CPS , the job in SAP is firing an SAP event based job , how can we get the status of event based job from SAP to CPS. Regards Ragh

  • Error 1418 on a Mac