Set Basic finish date in serviceorder with today + 10 days

Hi,
when we create an service order (IW31) the Basic start date and Basic finish date has default
value of today.
I will set Basic final date as default with today + 10 days.
I have search in SPRO but don't find any way.
Is there an EXIT or BADI to do this?
thanks.
Regards, Dieter

Hi Paul,
thanks for your answer, i have tried it, but no effect.
I have to clear what i really want to have (sorry that i havn't done it in the first thread.
First we create an Service notification via IW51, and go direct via "create" button to "create order".
A little popup is shown to insert order type, planning plant, main work center. After press enter
we are in create Service order (with revenues) at this time i don't insert any value.
Now the value of "Basic start date" and "Basic finish date" has a value of today, it seems that these
value are set as default, priority is empty.
Now i want that the 2 date-fields are set as default with today and today + 10 days.
How can i do this?
Regards, Dieter

Similar Messages

  • Changing basic finish date in Preventive maintenance orders

    Hi Experts,
    My requirement is to block PP work centre when maintenance schedule the equipment for preventive maintenance. I am making system condition as zero in generated preventive maintenance order but basic finish date is not changing in the order automatically. Can anybody please explain how to bring this? Finally my requirement is system should change basic finish date and time as time given in operation of task list.
    Thanks in advance.
    best regards,
    Srinivas M

    Hi Praveen,
    I have done all setting and tested but there is no change.
    My client requirement is like this - whenever maintenance plans are scheduled, for the scheduled dates, production capacity should not be considered by production. We could do this for breakdown orders but not happening for PM orders unless we change the finish date.
    The issue is to get the finish date automatically when scheduling maint.plans with respect to values given in operations. Please suggest how to get the  basic finish dates automatically.
    best regards,
    -Srinivas

  • Production Order: warning when Basic finish date is before scheduled finish

    Hello experts,
    We will set in config OPU3 (scheduling parameters for prod order) Adjust dates = 2 Do not adjust basic dates, ... Essentially this will allow the shop floor controller to change scheduled date ie. production dates without affecting basic dates.
    With this setup the system may display in the header of an order the scheduling note "Basic finish date is before scheduled finish" as well as generate a scheduling log "Scheduled finish is after basic finish date" (message 36 mess class C7).
    These messages are not enough visible for our planners. I would like to find a way to generate a warning before save. I tried to add a record in OPJB: message class CO no. 533 "Scheduled date & is after the requirements date &" but this doesn't work.
    Note: I tried to add message class C7 no 36 in OPJB but got the error "Please enter a legal value".
    Have you been able to add message in table OPJB ? Is it a good idea or the only option is enhancement?
    Thanks for sharing your ideas.
    Francois P.
    Edited by: Francois Paquet on Sep 30, 2010 5:30 PM

    Hi Francois
    I'm trying to do the same (also for C7 035).
    Have you already found out how to do this?
    Arno

  • Material Availability Date and Corresponding Basic finish date

    Hi experts,
    I have one requirement from my Business for updating Basic Finish date based on the Material availability date
    Requirement goes like this, When we enter a Component of 100 qty  in the service order , if stock is not available we get system status as MSPT and IWBK we can see how much quantity confirmed
    But i dont see any table or report which shows when this material can be available for further delivery. Based on the next available material date i have to change the basic finish date in the service Order
    Please let me know if you any report available for this or any standard approach. I want to know if any exist to leverage this functionality and logic how to get this accomplished
    thanks
    sarvan

    Sarvan,
    You would need to perform this check when saving the work order as there could be multiple components all with differing ATP dates.
    But a development could do something like:
    Read all active/open components/materials on the work order
    Determine the availability data for each component/material
    Determine the latest of the above dates
    Apply this date to the order Basic Finish Date
    You would need to ensure your scheduling parameters do not set this date back to its original value (OPU7).
    You could achiev the above through user-exit IWO10009 (SMOD) or BADI WORKORDER_UPDATE (SE18).
    PeteA

  • Basic start & Basic finish date in PM Order

    Hi,
    This is related to Preventive Maint. Order Basic start date & Basic finish date.
    I have configured 2 priorities.
    Priority 1 with Relative Start 1 & Rel. end 10 Days
    Priority 2 with Relative Start 1 & Rel. end 30 Days
    PM Plan is created with strategy
    Weekly & Bi-weekly
    Priority 1 is set in PM plan
    Scheduling Period 60 days
    Call horizon 100%
    Scheduling has beed done with start date as 02.09.2014.
    Plan dates are as below.
    09.09.2014
    16.09.2014
    23.09.2014
    etc
    PM Orders have been called through IP30.
    When I checked the Maint. Orders, I found that the Basic start date & Basic finish dates are same as below in all the Orders generated through IP30.
    Basic start date: 09.09.2014 & Basic Finish date: 09.09.2014.
    Actually it should calculate Basic Finish date as Basic start date + 10 days (as per my priority).
    Can I know reason why system does not consider the priority duration in this.
    Thanks in advance.
    Regards,
    CSR

    Greetings Raman,
    To shift the basic dates for the Orders generated by a Strategy Maintenance Plan, you may use the Float (Initial and Subsequent) values defined on the Strategy level in the Maintenance Strategy itself (IP11)
    Normally, the Date Shifts maintained in the Priority do not come into play when you are scheduling Maintenance Plans.
    So the rundown is that you can shift the basic dates in Preventive Work Orders, differentiating on the Maintenance Package, rather than Priority.
    If you require the Basic Dates to be adjusted for generated Orders, you can develop a solution using EXIT_SAPLCOIH_012
    See some more useful info:
    Answer by Pete Atkin in this thread: Maintenance Plan Priority not changing the dates in the Generated Order
    Basic end date does not influence priority from maintenance plan
    Workaround for maintenance plan priorities in work orders?

  • Process Order Basic Finish Date and Scheduled Finish Date

    Folks,
    I have a requirement from the business to be able to update the Process Order Basic Finish Date and Scheduled Finish Date independently from each other.
    In other words, update the Basic Finish Date and the Scheduled Finish Date cannot change or update the Scheduled Finish Date and the Basic Finish Date cannot change.
    I believe the reason for this is to be able to use the Basic Date to maintain the ATP accurately and keep the Scheduled Date to mark when the order was originally due from the shop floor to be able to measure if orders are being completed on time or late.
    I have worked in tnx OPUZ and had some success with other issues with these dates but I can't seem to make them work independently from each other.
    Or does anyone have any ideas how to measure proces order performance to the production schedule?
    Thank you for your help,
    Greg

    Rajesha, thank you for your reply but it doesn't solve my problem.
    Let me restate my scenario:
    I start a process order and both the basic and scheduled finish dates are the same, June 1.
    At some point, shop floor tells me they will be late and cannot deliver until June 15.
    I need to update a date in the system so the ATP and the MRP planning runs have correct information for promising customers, I will update the Basic Finish date with June 15.
    I also need to keep the original June 1 date in order to measure the shop floor performance to the production schedule to measure how early or late the  order was delivered. How can I keep the original finish date or how can I measure if a process order is early or late??
    Thank you for your help,
    Greg

  • Production finish date differs from basic finish date in backward schedulin

    Hi, experts.
    When i do scheduling the planned order,
    production finish date differs from basic finish date in backward scheduling as below.
    Scheduling: Backward
    Basic finish date : 2010.01.22
    Basic start date : 2010.01.21
    Production finish date : 2010.01.23  09:00:00
    Production start date ; 2010.01.22 03:57:09
    *GR time : 0.
    *Scheduling Margin key : 0.
    I don't know why production finish date set in 2010.01.23 09:00. ( Basic finish date +1 day)
    Please reply me.
    Thanks.

    Dear Jong,
    1) what is the parameter used in MRP run, Basic scheduling or lead time scheduling
    2) you must find a exception Mssg for that plan order in MD04
    3) basic scheduling take the time from material master & lead time scheduling will take time
    from Routing
    Regards
    Madhu

  • Change of Basic Finish Date for a Maintenance Order

    Hi Experts,
    I have a requirement where I need to change the Basic Finish Date of an order. Currently in config for order type and plant combination, scheduling parameters are set as:
    Adjust to Basic Finish Dates
    Automatic Scheduling.
    If in an order, I remove the tick for Automatic Scheduling, I am able to change that but I am not supposed to do that.
    Can you suggest me how thisissue can be resolved. Remember, changing the Config is not an option.
    Regards...

    hi
    Since you have done the adjust basic dates ,kindly change the operation dates ,which will automatically change the dates specified in the operation dates
    regards
    thyagarajan

  • MO basic finish date how to compute

    Hi, i create a MO, qty = 42000, basic start date 200/12/01, the system automatic calculation basic finish date 2009/02/19, Can you tell me the basic finish date how to compute?
    our system setting:
    standard margin key = 000
    scheduling type = Forward

    Hi,
        it will consider your processing time if u have made a production order based on standard value & base qty u have given in routing. plz check them.
       In case of Planned order creation generally it will take ur in house production time but if u have maintained base qty & setup time, processing time etc in work scheduling view then it will take finish time according to that & it will not consider in house production time.
    Regards
    Rakesh

  • The Basic Finish date is a Day earlier than Planned date

    Dear Experts,
    I am getting a strange behaviour about Maintenance order Basic Finish Date when generated from Maintenance Plan. I have Customizing settings (TCode : OPU7) Adjust: "Adjust Basic dates, adjust dep reqmts to order start date" and scheduling type : Backwards in Time. For this setting Order Basic Finish Date is a day earlier than Planned date , but when Schduling type is Backwards instead of Backwards in Time, Basic Finish date is same as Planned date.
    Example: The start of cycle of a monthly plan is 14-Nov-2010, 1st Planned date is 14-Dec-2010. When Scheduling type is " Backwards in time" , the order generated is having Basic Finish Date as 13-Dec-2010 .And when Scheduling type is "Backwards" , Basic finish date is 14-Dec-2010.
    Thank you.
    -Malay-

    Hi there,
    Please check the primilinairy buffer in your strategy package. This field have an effect on your order start date.
    But I agree on Pete, you should use a forward planning.
    Regards,
    Johan
    Edited by: Johan Zeeman on Dec 17, 2010 11:29 AM

  • Basic Finish Date in Service Order

    Hi Gurus,
      I want to change the Basic Finish date in the service order. The
    system is allowing me to change it in the change mode of service order
    (IW32), but after saving when I come back and see the order again, it is
    showing the old date only. I want to change the Basic Finish date as
    10.09.2007. Could anybody please guide?
      Prassee

    Hi Thyagarajan,
    Thanks, I have already checked the same. For the order type and palanning plant, the date adjustments set as " Adjust basic date.......", but still it is not allowing me to change the basic date.
    Prasanth
    > hi prasanth
    >
    > check for you order what scheduling parameters are
    > you maintained.if the Adjust shchduling is set as" DO
    > not adjust basic dates:, then i think your problem
    > will occur.
    >
    > regards
    > thyagarajan

  • Basic finish date earlier than basic start date while backward scheduling

    I am encountering an issue where in when I am selecting backward scheduling for a process order and I am entering the Basic finish date, afte which system is giving me a Basic startdate which is after the basic finish date.
    For eg:- When i give the basic finish date as 08.12.2011, system is giving me basic start date as 09.12.2011
    I have checked the recipe of the material. In the recipe one major flaw that i found out was that all the activity timings were maintained as 0. But when i created a similar scenario in the testing client, i am not getting the issue.
    Please help.

    Hi,
    Check what is maintawined in number of days the start day is allowed to be in the past in scheduling parameters of the order type, in OPU3. If there is an opening float defined in schedule margin key of the order, and concerning this float backward scheduling finds a start date which falls into past, lead time scheduling will automatically switch to forward scheduling starting from today. 9.12.2011 could have been deducted this way. Also check the factory calendar if days upto 9.12.2011 are defined as working days.
    Regards.

  • Work Order Basic Start Date and Basic Finish Date to be changed

    Hi,
    Currently the business creates work orders without specifying the work resulting which the start and fish dates on work order are same. Also we have automatic scheduling turned off. In spite of this If I am trying to manual modify the basic start and basic finish dates on work order it does not allow me to do so. This issue is seen with work orders which are Released whereas orders with status outstanding have no issues. Could anyone please let me know what could be the reason?
    Thanks,
    Vinay

    Please check whether Scheduling type only capacity requirement is configured.
    If yes, choose this scheduling type in order, you can able to change Basic start date & basic finish date.

  • Need to count the number of times the Basic Finish data chages

    HI Expertes,
    I have a requirement I need to count number of times the Basic finish date chaged for PM work order. I went throug our forums I got some info like using a standard function module
    CHANGEDOCUMENT_READ_HDRS_ONLY
    CHANGEDOCUMENT_READ_HEADERS
    CHANGEDOCUMENT_READ_POSITIONS
    But all the above function module will not be suitable for my requirement since  CHANGEDOCUMENT_READ_HDRS_ONLY it gives whole changes but my requirement is just need number of changes occurred in Basic Finish date but CHANGEDOCUMENT_READ_POSITIONS can give the filed number which has been changed but still I need change id.
    So kindly suggest me wether there is any other Standard FM to get number of changes occurred in Basic Finish date?
    Thanks,
    Rajesh

    Hi Debbie,
         To count the number of groups please try the folling steps:
    1) Create a formula @reset and place this formula in the page header
        whileprintingrecords;
        numbervar i:=0;
    2) Create another formula @evalgroup place this in the group header where you want to count the values.
        whileprintingrecords;
        numbervar i:= i+1;
    3) Create another formula @display and place this in report footer.
        whileprintingrecords;
        numbervar i;
    In order to display the count of details which are printing in the detail section place the eval formula in the detail section and the @display formula in the group footer.
    Hope this helps!!!
    Regards,
    Vinay

  • Collective orders header order basic finish date is not changing

    Hai all,
    I am working on collective orders. The header order has Basic finish date as 17.05.2011 . Now i have changed this date to 10.05.2011 and re scheduled the order . But again system changing the Basic finish date to 17.05.2011. how to solve this.
    In the outline dates also i have given finish date 10.05.2011 it is remaining the same but order Basic finish date is not changing and schedulded dates are also not changing. can anybody help.

    Hi gurus,
    In a collective order suppose the lead order is having three child orders.  Kindl
    If one of the child order is partially confirmed is the entire collective order can be rescheduled.
    If one of the child order is Fully confirmed is the entire collective order can be rescheduled
    Can any body help me out

Maybe you are looking for

  • Firefox is adding a .part extension to my downloads and they won't open. Why?? Fix???

    When I download a file, Firefox does 2 things: changes the file name to gobbledy-gook of letters and numbers, AND, adds a .part extension -- therefore the files won't open. This is a NEW problem. If I manually remove the .part extension in the downlo

  • Passing parameters in order by clause of cursor

    Hi friends, I am facing a strange problem I have a cursor with a order by clause. OPEN cursor_nomrpt FOR SELECT DISTINCT CAST(plano.desc3 AS VARCHAR2(50)) category ,plano.name plan_name ,nvl(CAST(plano.desc6 AS VARCHAR2(50)),'not applicable') pcrr ,n

  • New G/L and FI-SL performance

    Hi guy, We are thinking about implementing 6 ledgers in FI-SL. We foresee to have 3 ledgers in FI-new G/L. FI-GL and FI-SL are linked to BW We have 15 new coding blocks configured in new G/L We will have 30 new dimensions in S/L only (that are not ne

  • OracleXE 10g cannot be installed in the same location as Client.

    hello! i would like to install XE DB (of course in silent mode) from a java application, but i always get this error in c:\WINDOWS\OracleDatabaseXEServerInstall.log file: "Oracle Database 10g Express Edition cannot be installed in the same location a

  • IPhone/Safari can't navigate Internet Sites with Frames.

    Here's a riddle for all you mega-geeks out there...my iPhone 3G can't function on an Internet site I use that has Frame type navigation (navigation links are in a separate window on the left, the main window always shows the homepage address in the b