Set WBS status in Project System from CRM Status
Hi Gurus
I am figuring out a solution for how to influence WBS element status in Project Systems in ECC from the campaign/Marketing plan status in CRM. Has anyone done it before or is there any BADI for it.
Your help is greatly appreciated.
Regards
-MP
Your yourself answered your question.
"Can we create our own list of system status"
"Our own" status creation and maintenance feature within SAP in called "User Status".
Please follow link below to have additional information regarding system status.
link: [http://help.sap.com/saphelp_erp60/helpdata/en/a9/8a853488601e33e10000009b38f83b/frameset.htm]
Similar Messages
-
WBS Elements not getting created in ECC Project System from CRM 7.0
Dear all,
We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
1. Set up the RFC connections between the two systems
2. Selected the connection type as Middleware in CRM system.
3. Installed the cProject Add on in CRM box.
4. Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
5. The Project Scenario in PS config has the same name as the Project Type in CRM config.
6. Created and released the campaign ids being created in the CRM system.
As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
Thanks and Kind Regards,
Aditya ShrivastavaHello Aditya,
We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
Some inputs related to our system,
We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
Your help is highly appreciated.
Thanks & Regards,
Sumukh Kapoor. -
How to upgrading system from CRM 4.0 to 7.0
How to upgrading CRM system from CRM 4.0 to 7.0 ?
What is procedure to upgrate it ? Any document available for doing this ?
Regards,
Anup RecheHi
You can find the upgrade documentation here:
http://service.sap.com/instguides
SAP Business Suite Applications > SAP CRM > SAP CRM 7.0 >Upgrade
hope it helps
Rupesh -
POD flag set up automatically after BP replicated from CRM to ECC
Hi Experts,
we are working on CRM 5.0 and ECC 6 as backend system.
*Requirement :*We will create a BP record in CRM and the same will be replicated to ECC.For the BPs which is replicated to ECC from CRM , the "Relevant for POD "(Proof of Delivery) flag should set up automatically.
Note: we have done the following settings
1) Created a Reference Customer in ECC in which we have set up a flag "Relevant for POD ".
2) Initial download Reference BP from ECC to CRM by going to TCode:CRMC_BUPA_CONSUM in CRM.
3) Maintained relevant Sales Areas for the BP.
Question:
In CRM we dont have field called "Relevant for POD ".How can we populate the field "Relevant for POD " for the Business Partner that is Created in CRM and replicated to ECC?
For any helpful answer points will be awarded.
Thanks in advance,
-Rahul.
Edited by: rahul biji on Feb 12, 2008 6:21 PMHi,
did you find a solution to make this work ? We have the same problem with other fields that are only available in R/3. We are thinking of adding a FM to fill these fields in table COM_BUPA_CALL_FU. Did you find another way ?
Best regards
Annette -
Transaction Data for Project Definition & WBS Element of Project System(PS)
Hi all,
We want to install the Project Systems and the requirement is to report on the following fields:
Project Definition (Project Definition PROJ PSPID)
Project Definition (PS Short Description PROJ POST1)
Project Definition (System Status CNJ_STAT STTXT_INT)
WBS Element (Project Type PRPS PRART)
WBS Element (Short ID PRPS POSKI)
WBS Element (Person Responsible PRPS VERNR)
WBS Element (Company Code PRPS PBUKR)
R/3 Table Names and Field names are in brackets.
0PROJECT_ATTR & 0PROJECT_TEXT are DataSources of 0PROJECT Master Data.
0WBS_ELEMT_ATTR & 0WBS_ELEMT_TEXT are DataSources of 0WBS_ELEMT Master Data.
How can I find the transaction data for those above fields, PLEASE ?
Thanks in advance.Hi
Kindly check the following data sources:
0PS_CLM_CST ( Costs of a Claim)
0PS_CSH_NTW ( Network plan payments)
0PS_CSH_NWA ( Payments on network plan process)
0PS_CSH_WBS ( Payments on WBS element)
0PS_DAT_NTW ( Network dates )
0PS_DAT_NWA ( Dates network operation)
0PS_DAT_PRJ ( Date project )
0PS_DAT_WBS ( WBS Element Dates)
0PS_NAE_EVA ( Progress in Network Activity Elements)
0PS_NTW_EVA ( Progress in Networks)
0PS_NWA_EVA ( Network Activity Earned Value)
0PS_ORD_EVA ( Order Earned Value)
0PS_WBS_EVA ( Earned Value WBS Element)
hope this helps!
best regards,
Thangesh -
Can different working calendars be set and used in Project system
Actually we are going through implementation of SAP Project system, i would like to ask whether there is an option in SAP PS to set different working/factory calendars and use them for individual activity like Primavera. Because at some places there is 5 days working and at places 6 says working. Also holidays are different for different people/places. A uniform calendar for all activities can spoil the schedule of project in regard of planned finish dates when one enters a certain duration.
Kindly clarify this for me
Regards.Hi Abdul,
As a reference, go through this thread,
Factors Influencing Scheduling - Dates - SAP Library
In addition to this and as mentioned above by Saurabh, there are some good threads available that talk about this. The threads carry a good amount of information and am sure it will help you.
Please search the forum.
Best Regards,
Gokul -
Reset user status in project system
dear all
In project system i have maintain the user status in which maintain 4 levels are maintain. my requirement is that when i save 4th level then it will automatically reset to initial level(first level) i dont want to do manually
thanksYour yourself answered your question.
"Can we create our own list of system status"
"Our own" status creation and maintenance feature within SAP in called "User Status".
Please follow link below to have additional information regarding system status.
link: [http://help.sap.com/saphelp_erp60/helpdata/en/a9/8a853488601e33e10000009b38f83b/frameset.htm] -
Function module to get the status of WBS elements IN Project Systems
Hi,
I am suppose to delete the WBS elements in PS depending on certain conditions. WBS elements that are to be deleted should satisfy the following conditions:
1. Status of WBS elements should not be AUC construction
2. WBS element, which have cost association, like PO association or internal order association shouldnt be deleted WBS element does not have confirmed activities.
3. WBS elements, which have confirmed activity in association with their networks, should not be deleted.
Either I can check for status of WBS for the above mentioned conditions or if u can suggest me some diff way I shall be grateful
Need help in this regards.
ThanksHi
Use the FM:
<b>JV_GET_WBS_ATTRIBUTES</b>
Regards,
Sreeram -
Tracking Idoc status in target system from XI
Hi
We have done File to IDOC Scenario succesfully i.e HR
data from file has been mapped to HR Idoc(HRMD_A06) .
Now when Idoc is posted to R/3 , SXMB_MONI shows
successful status(Idoc posted successfully) .
But when we check in R/3 in WE05 transaction ,though
the idoc is present but it shows status 51/52
with message "Idoc could not be posted" /"IDOC not
fully posted" .
In this case how can we track in XI whether the Idoc
is properly posted in the target system(i.e R/3) .
Since XI only shows that Idoc was successfully sent
irrespective of the status in R/3 .
Please suggest as we are new to XI .
Regards,
ShikhaHi
Thanks for the guide.
we are not sure of the steps to configure it in R/3
system so that it sends the acknowledgement back to XI
system.
When we tried to configure it as per the guide , for
test purposes we executed the program RBDSTATE but it
gave message "No parties are interested in the selected
data" .
Please guide us on this .
Thanks
Shikha
Message was edited by: Shikha Jain -
Remove budget in Project System from prior fiscal years
Hello,
Budget control has been activated in PS. In PS, it is on annual budget so there's budget and actuals in FY 2003, 2004, 2005, 2006, & 2007. Is there a way to remove the annual budget in those Fiscal Years? I've deactivated budget control using tcode CJBW. Once budget control is deactivated, I tried removing the budget but it's giving an error "budget exceeded."
Is there a way to remove budget in PS for prior fiscal years?
Thanks.hi,
as per my knowledge, you had already de-activated the budget control.
so, my Q is why do u have to remove/delet the budget, when the system has no control of budget on project.
regards
parikshit -
KPIs for Project systems from standard SAP
Dear Friends,
can you please provide me the KPIs for PS module, available from standard SAP.
Thanks,
NavNot able to understand your requirement.
In my understanding there is no such things as KPI for SAP PS in standard SAP.
KPI's are usually reporting requirements assessed during blueprint phase and are client specfic. -
Errors in PHASE DIFFEX phase during the CRM 6.0 upg from CRM 5.0
Hello,
I am in the process of upgading our CRM systems from CRM 5.0 version to
CRM 6.0 and having issues at the PHASE DIFFEXPADDE during the upgrade
right after the DB_ACTION_LOWQ1 phase and ADJUSTCHK being the previous
phase.
We are currently at CRM 5.0 dual stack system on Linux X86_64 SLES9 and
DB - Oracle 10.2.0.2.
I was able to finish the PREPARE phases on both ABAP & JAVA stacks
successfully.
The phase DIFFEXPADDE is failing with a error message in the
DIFFEXPA.ELG which I have mentioned below. I am also attching few other
related logs for your reference in the attached zip file
(DIFFEXPA_logs.rar)
DIFFEXPA.LOG
UpgDialog.log
SAPECCI700.C15
TP00.ECO
SAPup.log
"~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
ADD ON OBJECTS (DATA)-Export ERRORS and RETURN CODE in SAPECCI700.<SID>
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
2EETW190 "INDX" "WFMFC_INDTOR_GRP 01 " has no active
version.
Long text:
Cause
You have tried to export a Dictionary object that has no active
version. The reason for this probably is that the author of the DD object has forgotten to activate it.
System Response
The transport request is not released.
What to do
Activate the Dictionary object and repeat the export.
2EETP200 Export with errors, request will not be imported
Long text:
Cause
The export was finished with errors or terminated (return code >=
8).
System Response
The request is not imported. Instead it is set back to "can be
changed"
in the source system.
What to do
The export log contains remarks concerning the reason for the
incorrect
export. Correct the error and repeat the export.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
ADD ON OBJECTS (DATA)-Export ERRORS and RETURN CODE in SAPECCI701.C15
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
ADD ON OBJECTS (DATA)-Export ERRORS and RETURN CODE in SAPECCI702.C15
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I am stuck at this step and unable to move forward until I get past
this error. Please let me know how do I proceed and if you have any
more questions.
Would appreciate your early help!
Thanks in advance!I was able to get past this issue by logging in to the client 000 and
activate the object WFMFC_INDTOR_GRP from transaction SE11.
Dictionary Object --> Activate from the menu bar. Gave me few warnings
but did not error out.
Hence went past the phase and the upgrade is progressing as of now.
However, can you please confirm if this is a correct fix or do you want
me to do anything different since I have not reached the MODPROF_TRANS
phase yet.
Thanks -
IDOC Not getting Posted in PI from CRM
HI All,
I had Configured,
in CRM side : SM59,WE21,BD54,WE20
in XI side: datatypes,MT,MI, Maaping not yet done, IDX1,SM59
Idoc is not getting displayed in XI system.
I had a small Question, Do we need to Configure all the setting in XI for Getting IDOC from CRM.
Thanks in Advance,
Sriram.Hi Jag,
Thanks for the reply.
1.CRM: go to Tcode-WE81 and check message type CRMXIF_PARTNER_SAVE created?
Yes exists
2.CRM: Execute Tcode-WE82, Check message type CRMXIF_PARTNER_SAVE has relevant IDOC type and version.
yes both message type and basic type exists
3.XI: Did you import right Message type and IDOC type in to IR in XI?(name will be like Message_type.IDOC type)
yes imported CRMXIF_PARTNER_SAVE.CRMXIF_PARTNER_SAVE01 in IR.
When i see in Table EDMSG in XI system i am not finding the value CRMXIF_PARTNER_SAVE, but this value Exists in CRM system
in XI i m not finding the message type in WE81 and WE82.
Thanks in Advance,
Sriram -
Filter Delta Upload from CRM into R3
Hi SAP gurus,
How can i set the filter for delta upload from CRM into R3? As far as i know, the filter settings in R3AC1 is only applicable for data exchange from the source system R3. What if i would like to filter the data where the source is CRM instead? Did i miss out anything in the configuration? I have been able to filter data coming from R3, but NOT data from CRM going into R3.
Would appreciate your help on this.
Thanks. Points will be rewarded.Do you set all req.customizing in tr smoeac?
-
Extract data from CRM to SAP R/3
Hi Experts,
I Facing Problem to Extract the data from database table BUT000 in CRM 2.0 System to SAP R/3 whether its possible to update the data directly in R/3 system from CRM. whether any functional module exists?
Plz Provide me details about itWhy do you need to copy it? The data is easily available from R/3 via RFC.
Rob
Maybe you are looking for
-
How can I use an 02 SIM on my iphone 4s which was originally on Orange?
Hi, I purchased an iPhone 4S approx 2 years ago from Carphone Warehouse on Orange/EE. At the end of the 2 years I decided to leave Orange and use O2. I called up Orange to unlock my phone but they told me as the phone was purchased from Carphone War
-
Settlment from Internal order to asset
Hi Guru! I have some problem about integrate between Internal order (Investment funtion) and Asset I have Internal order master and assign investment profile in master and in Internal order link to AUC automatic. End of period I input Asset n
-
How to get the URL parameter value when navigating from JSP Page to portal
Hi All, I have web Dynpro application with one button, while clicking that button It will navigate to JSP page as external window. In the JSP page I have a input field and Button. In the JSP page input field I will enter some values and press submit
-
Assign Business Partners to iBase Components
Hi Experts, I have created Solution for my Satellite systems in Solution Manager , I followed below path to Create and Assign the Component Systems as iBase . 1) DSWP> I have Selected a Solution and went to EDIT tab>Initial Data Transfer for IBase.
-
I just opened an "old" project in a newer version of iPhoto and the pages in the book doubled in number with the seam in the middle of each page. Suggestions?