Setting in Mass processing activity
Hello Forecasting Experts,
There are two parameter settings while creating an Forecasting mass processing activity -
1. Always use job profile
2. Generate profile and assign it
Can someone tell me what is the effect of using each above setting? Please give some recommendation as to which one has to be used when?
Thanks in advance.
Kelly
Hi Kelly,
These are not one or the other. You can have none of the options checked and things can run fine.
'Always Use Job Profile' option means system will use the forecast profile specified in the activity, regardless of what forecast profile assignments the demand planners may have made. This can be problematic. If the forecast profile in the activity is seasonal and it processes a CVC that should really have a constant model, the system may interpret noise as seasonality and give you what it thinks the seasonality is. This is a recipe for higher forecast error.
'Generate profile and assign it' options instructs the system to create a new profile with a GUID and assign it. Strategy 56 was made for this... Seems like it would take longer to process your forecast this way.
'Generate new profile when errors' option will only generate a new forecast profile and assign it when the system encounters an error during normal calculation. Example of this kind of error is when the model is Seasonal but you have some periods with blank history mixed in there -- the system can't calculate a seasonal index on zero history. In this situation the system would generate a profile with a GUID and assign it. The good news is that these are then easy to find in trxn /SAPAPO/MSDP_FCST2 since they have a GUID. You can then have a demand planner go back to the CVC and tune the model properly.
(Warning! Business Process advice ahead!! Proceed with extreme caution!!!)
One strategy with these options is: Use the 'Generate profile and assign it' when you're first getting underway at go-live. Let the system do the heavy number crunching the first few times. Then have your demand planners tune the models for A and B products/families. When they've had a fair amount of time to get all of those done, delete all GUID profile assignments (there's a button for this in trxn /SAPAPO/MSDP_FCST2 called 'Delete Generated Profiles'). So now, all actively tuned models (A & B products) have a demand-planner-assigned profile and all C products have no profile assignment. During the forecast calculation run, A & B products will follow their assigned forecast profiles and all C products will use the profile specified in the activity. In this strategy, none of the options in the activity are selected.
Hope this helps!
Dan
Similar Messages
-
Set preferred inspection type checkbox with mass processing
Hi all,
I have a requirement for processing the "Preferred inspection type"-indicator in the QM-view of the mateiral master (Field APA from table RMQAM) with some kind of mass processing tool like for instance LSMW.
I have used QA08 for creating the inspection types in the materials, now i need to indicate the preferred inspection type which is not possible with QA08.
My issue is i do not see any standard objects in LSMW that can do this and i cannot find any standard MASS transactions which can help me.
Please help!
Kind regars,
DagIt is possible with QA08.
In QA08, enter your criteria. Then if you click on the tab Mass Processing, enter in the inspection type, then when you click on execute, the pop-up window of the settings comes up. Here you can click on the preferred tick-box for the inspection type. Once you do so, click the green check mark and you'll get a list of materials that met the criteria you enterred on the initial screen. Select the ones you want to change, (or click on Select all icon), then click on Save icon.
Your materials should be updated with the preferred status. No need for LSMW. -
Hi,
I am able create sale plan through MC87 transaction by selecting the create sale plan through forecasting, when total consumption values are maintained in the material. But I want this to be done by MASS processing function. In other words I want to up date key figure sales in S076 table.
There is one tcode MPBT which is to create total forecast in background. But this is happening only when unplanned consumption values are maintained in material. Is this behaviour is correct?
Can u detail the configuration settings required for mass processing of SOP.
Through help I came to now that mass processing can be done for forecasting. Is this forecasting and creating sales plan are same. Kindly brief.
Thanks & Regards,
N. Laxmanyou can refer the below link:
[http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOLISPLN/LOLISPLN.pdf]
configuration steps for SOP:
1)Set parameter for Info structure and Key figure
2)Maintain Transfer Profile
3)Define Activity
4)Define Key figure assignment
5)Define copy profile.
procedure of Standard SOP:
1. Create Plan in inactive version
2. Disaggregate product group plan & Check capacity
3. Version Management
4. Transfer Product group to planning
procedure of Flexible Planning:
1.Create Plan in inactive version
2.Convert Plan in to Active Version
3.Transfer to Demand management
Master Data in SOP:
1.Information Structure
2.Planning Type
3.Planning Hierarchy
4.Product Group
5.Resource
6.Rough cut planning profile
It's very helpful link & std procedures for SOP.
SOP steps have 3 classifications
1) STD SOP for Material
2) STD SOP for Product Group
3) Flexible Planning
A) Now Let we take STD SOP for Material
This will takes place in Material and Plant level
so the charateristics will be Material and Plant
The key figures are Sales,Production Qty,Targer stock level,.......etc
Steps
1) Create Planning for material MC87
2) Copy to Active Version MC78
3) Transfer to Demand Mangement MC74
B) STD sop for Product Group
Here also the Characteristics are same material->product group
You have to maintain master data Product group
steps:
1) Create Product Group MC84
2) Create Plan for Product Group MC81
3) Disaggregate Product Group Plan MC76
4) Copy to active version MC78
5) Transfer to Demand Management mc75 for Pg or mc74 for material
C) FLEIXIBLE PLANNING
Here you can able to Define your own characteristics and Key figures
Char like Sales org,Dis chann, Div,......
Key figures like stock,invoice qty,....
steps
1) Create Info structute MC21
2) Maintain Planning Parametes MC7F
3) Create Planning Type MC8A
4) Create Flexible Planning MC93
5) Copy to active version MC8V
6) Transfer to Demand managemet
5) Create Std SOP Planning -MC
6) Transfer to DM from change mode of Flex Plann with active version MC94
if you want use the flexible planning info like SIS in std sop after the 4th step of above it will be like
5) MC87 std sop there Sales data from SIS it will ask for info str and version then you can get it automatically then the std steps like
6) Copy to Active Version MC78
7) Transfer to Demand Mangement MC74
Pls let me know any clarifications. -
Mass processing for forecating in SOP
Hi all
I ma able to forecast a material online thru MC87 in standard SOP, but when I try to set up a variant for mass processing in the background the forecasting does not work. Has anybody encountered this issue?
thanks a lotTajuddin
Thanks for your reply. I am reading the R/3 documentation and it talks about Mass processing of SOP forecasting ( R/3 documentation verbiage below) I am trying to follow these steps but it does not work. Isn't this mass processing supposed to be for forecasting in mass in background?
Am i understanding this incorrectly?
How to Run the Forecast with Mass Processing
You can use SOPs mass processing function to run the forecast. In this process:
You create a forecast profile.
You create a planning activity and include in it this action (the forecast profile).
You create a mass processing job for this activity.
You schedule this mass processing job.
The results of the forecast will be different if the forecast is run at a high level and the results then disaggregated to the detailed level than if you carry out the forecast at the detailed level. -
Problem in COHV with mass processing function Release.
Hello,Guru's
I have problem in COHV with mass processing function Release.
even after execution of COHV the status of Orders remains unchanged.i.e. remain Created instead of Release
My user require all Orders should release in mass process
with material availability Check .
and OPJK setting is
material availability
Check availability during order release=X
Release material = 1(User decides on release if parts are missing)> with material availability Check .
> and OPJK setting is
> material availability
> Check availability during order release=X
> Release material = 1(User decides on release if parts are missing)
Hi,
With these two settings in OPJK, there will not be any impact on COHV.
Any dates, date ranges you are inputing in the COHV.
Try with Manually inputing some of the Orders in COHV and in the Foreground you try.
Afterwards, try with Some selected Orders in the Background..
You may get the clue for the problem..
Regards,
Siva -
Dear Experts,
I know the transaction QAC2 for transfering inspection lot qty from plant to plat or storage location to storage location.
When it is executed for an inspection lot and SL is changed or plant is changed a material document of mvt-323 is generated for each individual posting.
But is there any transaction for mass processing of this activity and to create only one material document for bulk inspection lots.
If any one knows about this, please update ASAP
Regards
VivekThere is no std SAP T- code available which could process this in Mass .
-
Substitute variables for external process activity in process flows
Has anyone used with success substitute variables such as ${Working.Rootpath} for external process activity?
I can't get it working. Variables aren't substituted and my scripts fail.
Sample value for parameter_list parameter for external process I use is:
|${Working.Rootpath}|
and in the script I get:
${Working.Rootpath}
which is of course not what I expected.In documentation is Working.Rootpath so there is a bug in documentation. It is ugly because it's hard to guess.
Thank's for your reply Michael. I checked all that you described. Previously I had Working location set to "Use default location". When I changed it to actual location substitute variables started to work properly.
If I correctly understand "Use default location" means: use location associated with process module. And for execution it works but for substitute variables doesn't. So I think it is a bug.
Next thing is variables in the script itself. From examples sent by Mark (script: cd ${Working.RootPath}...) they should be set in environment and accessible to shell. This doesn't work for me but it is not described in documentation and can be easily achieved by passing parameters. So that's not a problem.
One more question: Should I open tars and file bugs describing what we found? -
HI,
Is it possible to st the Deletion flag to the process order through mass processing.
Regards,
AmitHi ,
Thanks for the reply.
Actuallay in my senario we have a user status NDLF - No deletion Flag.
So in mass processing i want to deactivate the NDLF status and want to activate the DLFL status. we are scheduling background job monthly once to do this activity.
So i was just trying through COID / COHV / COHVPI. Whether it can possible or not.
But in COID mass processing we can update user status NDLF but we can not update DLFL deletion flag.
So i need to run 2 different variant
1 for Removing NDLF stataus through COID and
2 for Updating DLFL status through program .
Do you have any better solution than this.
Regards,
Amit -
Hi All,
I am working on flexible planning in SOP.. I am trying to transfer the SOP plan to demand management through mass processing function..
I have done the following...
I created transfer profile through MC8S
i created activity through MC8T and assigned the transfer profile created earlier..
then created a mass processing job through MC8D and then finally scheduled it... SOP plan is not getting transferred to demand management.
I am getting the below error...
When I transfer the plan manually through MC90 for each material transfer is successful...
why the plan is not getting transferred through mass processing.. can somebody help me out...
Thanks
KumarHi,
Thanks for reply.. our planning periodicity is weekly buckets....
I am sending the screen shots of the same....
Screen shot of planning type...
Screen shot of MC8D...
I have entered plan in weekly buckets
Now this is not getting transferred to demand management...
Can you help me out...
Thanks
Kumar -
Hi Experts,
I am doing mass processing of process orders through CORM transaction, its showing errors for some orders,
The errors are,
1. Balance of ORD 1000010 is not zero
2. Unprocessed future change recs for order 1000012 prevent del. flag/completion
3. System status CRTD is active (ORD 1000220)
Please explain me in details the solutions for all the above errors.
Thanks & Regards,
Karad D DHi Devidas,
1. Balance of ORD 1000010 is not zero.
For this please get in touch with Costing persons. Orders are not yet settled. hence this problem is there.
2. Unprocessed future change recs for order 1000012 prevent del. flag/completion.
Few transactions are open for this material please close it.
3. System status CRTD is active (ORD 1000220)
Please put status TECO for this orders this will solve your problem.
Please confirm,
Regards,
Amit Kulkarni. -
Hello all,
I have a client scenario, in which picking is done. i want to know any SAP fuctionality that exists for mass processing of TOs. IF so, pl. post it the t-code and the procedure.
Thanks,
MaxxHello Maxx,
Instead of using very generic words, please be specific.
btw,
In picking process you can have the following optimization:
1. Auto Delivery creation: You need to setup batch job to create outbound delivery automatically.
2. Auto TO creation: You need to configure WMTA output type to create auto TO (Search forum for settings), for all WM relevent delivery will be picked automatically.
3. When you go for auto TO creation, your search stretagy must be set.
4. Auto TO confirmation: need to set configuration.
Hope this helps.
Regards
Arif Mansuri -
Hi All,
Is there any way to mass processing of MRP Areas in Material master?
We want to create MRP areas for a number of materials.
regards,
MohitHi Mohit,
Use T.Code: MM17
Field: MARC-DIBER (this is only for Activation check box )
For inside MRP Area filelds, check
T.code: SM30
Table: CIF_IMMTMRPA (Integration Model Reference Table for Material)
Table: MDMA (MRP Area for Material) -
Reside on a network that contains network GPOs. We are given authority to create unique GPOs for our specific LAN Web server. Our Intranet web page requires Windows Process Activation Service and another service to open. Before creating
the local GPO, the two services were in Disabled mode, but we could set them to Manual and start them. The network GPOs would reset them at random every few hours, but again we could reset them. After creating the local GPO, the WPAS is set to
Manual and will not start at all with the Title errors being generated. Administrator previously completed successful GPO mods in WinSvr2003. Is there a different way of doing GPOs in WinSvr2008R2? I cannot provide logs or further details
other than the above. Any ideas would be helpful.> open. Before creating the local GPO, the two services were in Disabled
> mode, but we could set them to Manual and start them. The network GPOs
> would reset them at random every few hours,
Then you should adjust your "network" GPOs which we usually call "domain
gpos"...
> them. After creating the local GPO, the WPAS is set to Manual and will
> not start at all with the Title errors being generated.
# for hex 0x80004015 / decimal -2147467243 :
CO_E_WRONG_SERVER_IDENTITY
winerror.h
# The class is configured to run as a security id different
# from the caller
# 1 matches found for "80004015"
Seems you screwed up the service account or service security or
something like that...
> previously completed successful GPO mods in WinSvr2003. Is there a
> different way of doing GPOs in WinSvr2008R2?
No.
Martin
Mal ein
GUTES Buch über GPOs lesen?
NO THEY ARE NOT EVIL, if you know what you are doing:
Good or bad GPOs?
And if IT bothers me - coke bottle design refreshment :)) -
Background processing in CIFING/mass processing while CIFING
can anyone tell me what are the settings/steps to perform CIF in background?
how to do mass processing while CIFING ?
as I have to cif some lacs of ppms what is the feasible option to save time?
thanks in advance.
regards
andyAnand,
Regarding CIFing lacs of PPM
You can implement funnctionality of parallelisation and optimum block size for intial data transfer of same object type in your case : PPM
Path for Parallelisation in customization :
Logistics ->Central Functions -> Supply Chain Planning Interface ->Core Interface Advanced Planner and Optimizer ->Environment -> Current Settings ->Define Number Ranges for Parallelization or using transaction
Path for defining the Block Size in customization the optmimum packets of data transfer
Basic Settings for Data Transfer ->Initial Data Transfer ->Set Filter and Selection Block Size or using transaction CFC3.
You can see more details at the following link :
http://help.sap.com/saphelp_scm41/helpdata/en/d2/3e089134134b44ad7f7d33251db911/frameset.htm -
"error occurred setting the server application active"
Hi All,
I found following error when I save outline in ASO application. It seems that the application cannot be started correctly. Other applications (BSO/ASO) are running correctly.
"error occurred setting the server application active"try this:
Issue can be from both server and application side:
1)Addition of SERVERTHREADS with a proper value. When any database operation is requested then monitor the number of process, memory etc. Idea is to identify which process is trying to use max resource on server level.
2) Also, if possible try and increase the ulimit setting to "unlimited".
3) Verify NETDELAY and NETRETRYCOUNT -- Guess you have checked this so values should be fine here.
4) If the environment is windows then:
a)Open the Registry
b)Navigate to Local Machine\System\CurrentControlSet\Services\TCPIP\Parameters
c)Add new DWORD Value named TcpTimedWaitDelay, right click and select Modify. Select decimal radio button, type in 30. (The default value of this parameter is 2 minutes. This is how long it will take for a TCP/IP port that was used by the network for a connection to be released and made available again. 30 sec is the minimum allowed by Microsoft)
d)Add new DWORD Value named MaxUserPort, right click and select Modify. Select decimal radio button, type in 65534. (The default value is 5000. This determines the highest port number TCP can assign when an application requests an available user port from the system).
e)Add new DWORD Value named MaxFreeTcbs, right click and select Modify. Select decimal radio button, type in 6250. (The default value is 2000. This determines the number of TCP control blocks (TCBs) the system creates to support active connections. Because each connection requires a control block, this value determines how many active connections TCP can support simultaneously. If all control blocks are used and more connection requests arrive, TCP can prematurely release connections in the TIME_WAIT state in order to free a control block for a new connection).
f) Reboot the server.
5) On application side, look at the cache settings, If they are very high then try lowering them and check.
Cheers!!
HA:-)
Edited by: user9513506 on Sep 2, 2008 5:03 AM
Maybe you are looking for
-
I have my masters referenced on an external hard drive, and I've been mirroring that drive with another so that I have a backup (the volume names were ApertureLib1 for the primary drive and Photo7 for the backup). I've filled that drive, so it will
-
When sharing a folio for content approval, it gives you the option to paste in a list of adobe ID's. What list form works best. I haven't had any luck with Excel or Word lists.
-
BAPI or FM to create an outbound delivery?
Hi all, does anyone know of a BAPI or a Function Module that given only the sales order document number and the posting date to create an outbound delivery? (I am looking for something that creates automatically a delivery just like when I create a s
-
SAPNW2004sJavaSP9_Trial installation error - CSAgent' does not exist
Hi All, While installing SAPNW2004sJavaSP9_Trial on my laptop i am getting the following message and am not able to complete the installation. ERROR 2008-04-14 22:42:52 MOS-01185 The subkey 'HKEY_LOCAL_MACHINE\SYSTEM\CurrentControlSet\Services\CSAge
-
Start condition in workflows, not working
Hi, I have been trying to edit the start condition for a workflow. I have entered the condition in coloumn "c" but the symbol does not comeup ( the condition active symbol). I have been trying out different things, but nothing helps. Please help me o