Setting up MRP in multiple plant scenario

Hi,
We are planning to implement MRP in our system. I understand that MRP is normally carried out at a plant level. However, since we have multiple plants (from which we ship our products), we want to be able to run MRP across multiple plants. To elaborate, we want to have one forecast figure for all the plants (basically forecast at material level, NOT by plant), consider inventory across all the plants, and then based on that, we want to be able to generate PRs/POs. It would be ok to create POs with one default plant and if needed, change later the receving plant on the POs manually based on the inventory situation in each plant. Of course, we need to tie in the demand situation (customer orders) in each plant in the MRP process.
Is there a way to do this using standard SAP or with some amount of customization?
Any insight/ideas would be greatly appreciated and help us move in the right direction.
Thanks,
Prayarna

<b>Total Planning</b>
<b>Use</b>
<b>Total planning covers the planning of all the materials that are relevant for requirements planning and includes the BOM explosion for materials with a bill of material.</b>
You can use total planning for a single plant or you can use the scope of planning to control whether the total planning run is executed on a multi-plant level
for several plants
for one MRP area
for several MRP areas
for a combination of plants and MRP areas.
Prerequisites
Only for multi-plant planning with scope of planning:
You have grouped together the plants or alternatively the MRP areas, which are to be planned together, in Customizing for MRP in the IMG activity Define scope of planning for total planning.
In Customizing for MRP, you have made the necessary settings for Parallel processing in the IMG activity Define parallel processing in MRP.
Features
Defining the Scope of Planning
You can define different scope of planning groups in Customizing.
You specify the sequence of the individual MRP units (plants or MRP areas) for each scope of planning by entering a counter. This counter defines the sequence in which the MRP units are to be planned.
You can enter as many plants as you like in the scope of planning.
If you have activated material requirements planning with MRP areas, the entry of a plant thus includes all the MRP areas of this plant. During the planning run, the MRP areas of a plant are always planned in the following sequence: plant MRP area, storage location MRP area, subcontractor MRP area.
You can, however, also enter one or several MRP areas in the scope of planning and thus restrict the total planning run to these MRP areas.

Similar Messages

  • MRP across multiple plants

    Hello everyone,
    I have a scenario where I have multiple plants. During Production of some finished products, I have to procure some material from anothere plant. For this I have used Special procurement key in MRP 2 to throw requirement to corresponding plant.
    As Per MRP run, I Hope to use NEUPL run once a week for the corresponding plant. Do I Have to run MRP seperately for each plant so that MRP requirement for semi finished products are also raised in corresponding plant. Will in that case help to group together multiple plants under scope of planning or an MRP area.
    My second question is that if we run MRP with processing Key: NETCH what can be the corresponding impact. I was hoping to run it daily so as to capture changes in requirements, if any.
    Please do give your suggestions.
    Sincerely,
    Aji Kurian Mani

    Brian,
    I am looking for a way to run MRP across multiple plants as if it was one plant.
    Well, that phrase can mean different things to different people.  In general, though, SAP ERP does not support this requirement.
    I guess you overlooked the rules of engagement for this forum, which state that you should first search the forums for answers before posting a question.  There are lots of workarounds, using Special Procurement and/or MRP Areas.  Just search the ERP PP and ERP MM forums.  This topic has been discussed extensively.  
    There are also several third party products available that can probably meet your requirements as well. Be advised that the purchase price of these products are substantial, and the implementations are not trivial.  Many shops are unwilling to invest the money and effort into advanced planning systems, and end up just working with ERP planning, using workarounds, enhancements, and  business process changes.
    SAP is also marketing one of these advanced planning products as a 'solution extension', that they are calling Supply Chain Response Management (SCRM).  This software was developed by the third party software company ICON, and SAP now has established a relationship with ICON. You can see info on the software at
    http://www.sap.com/solutions/solutionextensions/supply-chain-response-management/index.epx
    and also on the ICON website at
    http://www.icon-scm.com/en/products/sap-supply-chain-response-management-by-icon-scm/
    Best Regards,
    DB49

  • Setting up MRP parameters for plant A and plant B

    hello,
    how could i Modify production plant parameters in order to run MRP for plants A and B (Option "Carry Out Overall Maintenance of plant parameters" in the manufacturing customizing).
    thanks
    JJ

    Use can define this in follwing SPRO path->Production->Production Planning->Material requiement planning->planning-define scope of planning for total planning.
    In this you can maintain both plant for scope of planning.
    Regards,
    Ajay Nikte

  • MRP Run for Multiple plants

    Hi Guys:
    IN SAP R/3
    My client has requirement to merge planning of material for multiple plants and run the MRP under one head plant.
    For example:
    Plant : 1000, 1001, 1002, where plant 1000 is a head plant who had authorization to perform MRP run.
    if I run MRP Sepeartely:Each plant has below requirement for one material number (M1)
    Plant 1000 : 3 EA
    Plant 1001 : 2 EA
    Plant 1002 : 5 EA
    Instead of running MRP per plant, my client needs to run MRP for multiple Plants  that Consolidate  total requirement for all plants.
    and generate PR--->PO , In the PO, M1 should be delivered to 3 different plant locations by vendor and Po Will be issued from Head Plant 1000?
    Is there any Report in SAP , Where MRP Controller can See Requirements from Different Plants @ Central Purchasing  level after one Multi Plant MRP run, So that he can decide on how much to allocate to each plant?
    Thanks for help
    Thanks
    Sweth

    Hi,
    If u want to perform the MRP in one plant for all the plant requirement is depends on the bussiness process.
    You can try the following scenario:
       Planning in one plant nd production in other plant - Respective master data and special procurement have to maintain.For 
    further clarity please follow the below link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm.
    We can evaluate the PR and PO by providing the authorisation object for the multiple plant to the respective users.
    Revert me back in case of clarification.
    Thanks
    P.Srinivasan

  • Intracompany STO between multiple plants

    Hi Experts,
    What should be the easy way of setting up STO between multiple plants via delivery. I've 15 plants defined here under a single company code and any plant can transfer goods to all plants. So should I maintain this settings at "Assign document type" factorial 15 times i.e., xxxxxxxxxxxxxxxxx times?
    Please help. what should be the easiest way?
    Thanks,
    Rajoo

    Do you want to create STO po between all 15 plants? Every time you create STO? Why don't you go for MB1b with movement type 301 or 303 and 305. Alternatively you can think about using special procurement key in MRP-2 view for direct withdrawel from the alternate plant.
    But if you want to do STO between all plants then you need to give all possible combination with document type in config, you have no other alternate
    regards
    Antony

  • MRP planning components at multiple plants

    I would like to present a unique scenario, we have a plant and a warehouse both are created as two different plants in SAP.
    When we run MPS/MRP at a Finished product (FERT) level at the mfg plant, I would like to
    1) Consume inventory of components (Packaging material - VERP) at the plant first
    2) It should then consume inventory of packing material from warehouse
    3) Only then it must creates a procurement proposal for the remaining qty at the mfg plant.
    4) There shall not be procurement proposals created at a warehouse, all proposals should be directed to the plant.
    Most of them would advice to create the warehouse as a storage location within the manufacturing plant but that is not possible due to financial reasons.
    Flood me with ideas.

    Hi Manoj
    The standard MRP cannot consider stock in different plants for the same material.
    Please observe that this issue has been already discussed on several thread on this forum. Check  for example my answer on the thread below:
    MRP Run considering Stocks for Multiple Plants and Requirement maintained for Plant Cluster
    BR
    Caetano

  • Common MRP area for Multiple plants

    Hai gurus,
    I had created a MRP area called 'X' , this MRP area contians some 10 storage locations.
    1) Now my question is whether I can assign the above MRP area 'X" to Multiple plants namely A/B and C
    2) Can i run MRP for plant A seperately and plant B seperately and plant C seperately , so that the storage location
        stocks in the MRP area 'X' is considered , and create the requirement accordingly, plant wise
    waiting for the positive reply.
    regards,
    sekar chand

    HAi,
    The company has three plants, which is under same management, they produce some similar products in all plants
    and some different products in each plants.
    so the requirements from all the plants are collected , procurement is made commonly and stored in common storage
    locations( As we are calling now as common  MRP area) for all the three plants, and based on the requirement the raw material
    is moved to three plants.
    This is the scenario and not the simulation , so my question is can we assign one single common storage MRP area to
    all the three plants, so that while running MRP run for each plant individually or under scope of planning, the stock under
    common MRP area is considered each plants , and then the requirement is created accordingly.
    regards,
    sekar chand
    Edited by: sekar chand on Aug 26, 2009 6:00 AM,,

  • MRP STO from multiple plants

    Hi All,
    Is there any way that we can configure standard SAP to look in multiple plants before it can create a STR for special procurement key ?
    thanks for your help.

    Chandru,
    If it is your only business requirement is to manually search other plants for stock, you don't need to do anything special.
    When you are in the sales order, perform your ATP.  On the Availability control screen, you will see what the ATP situation is against the plant contained in the sales order.  If the proposal is unsatisfactory, you can clik on the "other plants" button at the top.  It will propose a list of plants that can supply this product.  Select the ones you want, and proceed to the next screen.  It will show you the possible commit dates available for each of these plants.  Select the one you want, and it will then perform a standard ATP check against that plant.  If you accept the results, it will change the plant in the sales order item to the one you have selected.   Save.
    Yes, a bit of work.  But, no more than you would have to do if you manually searched for stock, and then transported the stock to the original plant.
    Regards,
    DB49

  • Checking the stock in multiple plants by creating STO to fulfil an order.

    Hi All,
    The requirement is to do a Stock Transfer from different Plants for fulfillment of Configuration Order(putting together different components to make one product) which always be done at one central plant. When configuration order is created the Order Header requirement is always set to u2018Complete Deliveryu2019, which means that all the line items on the Order be delivered to the Warehouse in one delivery for Configuration completion. 
    There are multiple plants around the Central plant and the suggestion made was to create STO from other plants to the configuration plant whenever there is a shortfalls. Currently in legacy the STO process for meeting shortfall requirement is met through Automated STO. The system looks for inventory in nearby Plant in a Sequence until it finds the inventory in one of the Plant and not external Procurement is done for this configurable materials.
    Is there any way that this can be configured in SAP from MRP or planning perspective to look for the stock in a sequence of plants specified? I know using a Special procurement key u201Cstock transferu201D under the MRP view in Material master but I was not completely clear on this process.
    Can anyone provide me their thoughts on how to resolve this issue. 
    Regards
    Shane

    HI Csaba,
    Thanks for your thoughts. Yes it is not possible to acheive this with in Materials management. It looks like APO has the in built functionality to handle these kind of scenarios.
    Shane

  • Pass on Material requirements to MRP areas within Plant

    - We are on ECC 6.0 & have a scenario wherein material requirements from depots are passed on to respective plants according to the settings defined in the Special Procurement key in the Material Master (MRP View)
    - The requirement from depots are passed on to the manufacturing plant & further down  to the Plant in which MRP areas are defined, in the form of Planned Orders, if the stock is not sufficient at depot.
    - For Subcontracting, we have various MRP areas within a single separate plant. The requirement is that PR that is generated for STO should be able to pass the requirement to an MRP area (after stock checking at MRP area level), (system to decide the MRP area to be selected for passing on the requirements).
    - Currently the system is passing the requirements & checking the stock at plant level only.
    - Stock determination rules donu2019t seem to work here.
    - The opening up of the u2018Issue storage locationu2019 in STOu2019s by config: (u201CPurchase order-> - Set up Stock Transport order - > Set up Stock Transfer between storage locationsu201D) is yet to be tested.
    - But in that case, only a single MRP area is defined for the material & therefore the requirements may flow directly to that particular MRP area. In case of Multiple MRP areas being defined for a single material, how can we ensure that the system determines a stock checking at one particular MRP area & pass on the requirements to it.
    Seeking guidance as to how this issue can be resolved.
    Precisely,
    REQ.FRM>FLOW TO>AS (MRP element)
    Depot>Plant 1>Planned order (PlOrd)
    Plant 1>Plant 2>Material reservation (MtlRes)
    Plant 2>MRP area of Plant 2>Transfer reservation (TrnRes)

    dear colleague,
    Please check the following info that can be useful:
    1) Note 358936 is relevant for MRP areas of type storage location and
       not for Subcontractor MRP areas (which you would be knowing).
    2) Secondly this note was created as an advance development and not
       for any particular customer problem. It was also feasible to
       develop this functionality with a small change.
    3) The feature of procurement with Schedule lines for components
       in subcontractor MRP areas is not available in the standard SAP
       suite and there are no plans to develop this in the near future.
       This feature would be an advance development.
    best regards

  • MRP creating multiple delivery schedule lines in PR

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Dear
    Are you dealing with Single vendor  where you want Multiple Schedule Line item through single PR  which should be generated through MRP run ??
    What you will have to do is to set up the Outline Agreement or Info Record for your vendor and material and then create the source record for this vendor- material relationship and make sure that this source record is set as MRP relevant. Once MRP is run, the vendor is automatically defaulted to your PRs. If in your material master, you have defined the same purchasing group for various material numbers, then with Transaction ME59, it is feasible that you can combine various PRs of the same purchasing group by flagging onto the 'Per Purchasing Group' indicator checkbox. Make a trial test and let me know how it goes.
    Or you can use Qouta arrabgement in that case for different vendor .Please refer : Multiple Requisition  line itme for Quota arrangement
    Just check and revert
    regards
    JH
    Edited by: Jiaul Haque on Dec 25, 2010 1:52 PM

  • STO for multiple plants

    Hi,
    I need a help on one issue.
    I have 4 plants say A,B,C,D.(Under 1 Co code)
    I want to configure STO process.I have done it for 2 plants in the past.
    We have to crete internal customer & vendor (acct grp 0007).
    Now in SPRO,I have to do the set up for STO.
    For plant A, cusromers will be B,C,D & similarthing will be for plant B,C,D.
    I can assign only one customer in the STO set up.
    How to do this in case of multiple plants?? I 'm doing this STO with delivery.
    Similarly, how the subcontracting scenario will be there in plant to plant?
    Please throw some light.
    Thanks in advance,
    Piyush

    Dear,
    I think ur confused,
    be clear that u have to maintain in customising that
    the plant u r setting up is which customer code for u.
    say plant XYZ .And u have created the plant XYZ as a customer ABC and Vendor as PQR
    so in Customising u r settings as
    XYZ is my plant which is customer as ABC and selling through the mentioned sales area.
    in vendor master u are maintaining that this vendor PQR is my plant XYZ.
    and in customer master ur maintaining that this customer ABC is my plant XYZ
    regards,
    sujit

  • Any difference setting background MRP run in MDBT and SM37

    Hello,
    Just wander if there is any differences setting up MRP run in MDBT or in SM37 to run RMMRP000?  This is to run MRP at plant level in background.
    Thanks,
    Lin-Lin

    Hi,.
    Both MDBT & SM37 are having same program (SAPLBTCH) . MDBT is <b>Foreground</b> job as well as <b>Background job.</b>
    SM37 is only for <b>Background job</b> only.
    Pls let me know any further clarification.
    regards,
    Mohan
    Message was edited by:
            Mohan Ramalingam

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Materials with multiple plants and wm views

    Hello,
    we are migrating materials to an environment where we have multiple plants, sales org., warehouse numbers. When we create the WM view we set a plant and warehouse number. As WM view is not really connected to a plant (table MLGN) we have the problem that when the users wish to mantain a material WM view, they see different combinations of plants and warehouse numbers, what is not really correct, as they are in different countries.
    Country 1: plant 0001, warehouse number 001
    Country 2: plant 0002, warehouse number 002
    Country 3: plant 0003, warehouse number 003
    In country 1, with MM02, the user can open the material in plant 0001 and in any warehouse, ie. 001, 002, 003. This user should only be able to open plant 0001, warehouse nr. 001.
    Is there a way in customizing, authorizations, etc. to avoid this?
    Thanks for your comments.

    Hi
    THis can be contolled via authorisation to the users. Please check with Basis consultant.
    [http://help.sap.com/saphelp_45b/helpdata/en/91/1a39516e36d1118b3f0060b03ca329/content.htm]
    Karthik
    Edited by: Karthik on Jun 29, 2011 5:59 PM

Maybe you are looking for

  • HT1152 Error 4310 when trying to burn a playlist from iTunes.

    I have done all the troubleshooting set forth in the prior discussions, including burning the same playlist via Windows a Media Player.  But still no luck burning it from iTunes.  I am using Windows 8.  It seems that may be the problem.  If there is

  • I'm frustrated! :-( Connecting a Roland piano to my MacBook Pro via Firebox

    I need some help as I am having someone come to record a song for me tomorrow on my Roland. I have a Roland piano with an audio out 1/4 inch cable. I have connected it to my Presonus Firebox in Line In port 3. I have connected the firewire cable. I b

  • Problem deploying my jsp pages to the BPEL Server

    Hi, I want to invoke a bpel process using a java file that is executed by a jsp page, so I deployed the jsp page and the java file to the bpel server where my bpel processes are, but i get the next error when i execute the jsp page. I use struts to d

  • Mail - return receipt

    Is there a way in mail to set up for a return receipt when the recipient either receives or reads the message sent to them? The mail box with the internet provider provides this functionality when I use their webmail application. The provider is FUSE

  • Effective date in SSHR

    Hi, we have a process using the HR_SIT_SS workflow. We use this workflow to make new entries. Some of the fields in the new entries are pre-populated, using queries based on the session date. Is there a way to change the session date in the HR_SIT_SS