Settings for performance based maintenance plan

Hi experts,
Incase of hour or Km dependent performance base plan, how we can fix the reading (In hours or Km) limit or period of order generation? what is the impact of annual estimate? Please give me an example with all readings.
Regards,

When you create a plan with a counter (Associate a measurement point of counter type to the same), then you would be able to specify at what intervals (Counter readings for this measurement point), the call object associated to the Maintenance plan should be generated.
The actual call date for this maintenance plan however depends on the "Annual estimate " for the measurement point counter and also the actual counter readings captured for the measurement point
For ex: Annual estimate maintained for the Point : 12,000 Miles .Maintenance for this equipment should be triggered for every 1000 Miles (This should be the counter interval maintained for the Maintenance plan). Based on the above the maintenance plan would generated a call every one month (Annual estimate / period).As an example,  when this Maintenance plan is scheduled for 1 yr, then 12 maintenance calls will be generated one each for every month. The actual and scheduled dates for the call depends on the various other scheduling parameters maintained for the Plan.
Its critical for any counter based maintenance plan that the counter reading is Captured , Through measurement documents regularly, EVEN IF THERE IS NO CHANGE TO THE COUNTER READING, Otherwise, the system generates call objects (for example, maintenance orders) based on the estimated annual performance entered for the counter, even though the counter reading has not in reality been reached.
for ex: owing to a vehicle breakdown/ repair if the vehicle has been in repair shop for a month,To avoid a maintenance order being created before it is needed, you maintain the new total counter reading in the system regularly over the period of the month. You then reschedule the maintenance plan using IP30, and the call date is recalculated based on the updated counter reading. In this case, the call date would be later.
[Detailed SAP Help|http://help.sap.com/erp2005_ehp_04/helpdata/en/3c/abbcf6413911d1893d0000e8323c4f/frameset.htm].
Regards
Narasimhan

Similar Messages

  • Performance based maintenance Plan and regular reading

    SAP says that for performance based plan it is imporatnt to enter the current reading REGULARY, even if it has not changed. otherwise, the system genrates call objects based on estimated annual performance entered for the counter, even though the counter reading has not in reality been reached.
    My question is what does REGULAR means? does it means weekly reading? or daily as suggested in post http://forums.sdn.sap.com/thread.jspa?threadID=2016488&tstart=0
    My concern is daily zero value reading, isn't this an over kill and too much unneccessary data.
    I will appreciate your views.
    Regards

    Thanks fopr your reply.
    I didnt quite get that though.
    are you saying I dont need to load regular zero values if vehicle is not doing any KM, as long as annual estimated value is realistic?
    What should be the annual estimated value of the counter for the following plan?
    1- 3MON OR 10,000 KM
    2- 6MON OR 20,000 KM
    3- 30MON OR 60,000 KM
    I would think its 40,000 Km per year. But if i do that and if my vehicle doesn't do any KM and stay parked for longer period then maintennace plan calls the the KM based package instead of Mon based. hence bringing the call object sooner then it was suppose to.
    My original question was how REGULAR reading is acceptable for performance based plans e.g. weekly, monthly etc?
    Regards
    Edited by: aqvarious on Feb 16, 2012 7:14 AM
    Edited by: aqvarious on Feb 16, 2012 7:22 AM

  • Performance based maintenance plan

    I am trying to schedule my performance based plan under two conditions:-
    In the first factor,I have kept my initial counter reading as 0 as on today,my cycle as 2000 hrs,estimated as 2500 hrs.
    An my plan date is calculated as  24.10.12.
    In the second factor,I have kept my counter reading as 0 as on today,my cycle as 2000 hrs,estimated as 2500 hrs.
    An my plan date is calculated as  24.10.12.
    Why the planned date is coming as 24.10.12 in both the cases.It should be different.

    Hi,
         I believe you have created counter today and starting value may be 0 or directly 500KM .. in this case last counter reading for both the values will be same date ..so better post 550KM tommorow and then try this way and check :
    First condition :- Start counter reading with 0KM
    Secondition :- Start counter reading with 550KM ..
    Doing the above should give you different dates ..
    In your case  you have posted both OKM & 500KM on same day you will not find any difference in calculation of dates ..
    Note :- System takes the last counter reading date as the start date for calculation ..in case of Counter based plans ..
    regards
    giri

  • Performance based maintenance

    I have made performance based maintenance plan , in this plan i have assin counter with annual estimate 100 nos and my Maintenance plan cycle lenth 10000 nos .  ( annual estimate i kept 100 nos because  i need  maintenance order counter baase only ) so system schedule the plan ,with call plan date 4 jan 2110 .now when  i update the maintenance document ,counter reach 100001 system generate the maintenance call with plan date 4 jan 2110 not on order generate date.
    but we required the plan  date on which maintenance order generate  so what can i do in the master data so i can get same date on which maintenance order generate.
    Pl help
    Raghav

    There are 3 things in Maintenance Plan.
    Maintenance Plan - Call Date
    Maintenance Plan - Plan Date
    Maintenance Plan - Call Horizon
    Call Date is date on which Maintenance Order gets created.
    Plan Date is basic start date of Maintenance Order (when maintenance should start)
    Call horizon specifies as a percentage when a maintenance order should be created
    In your case i would suggest you to maintain call horizon as 100% that means your order created date and maintenance date (basic start date of maintenance order) are same.
    Also plz refer the below link.
    http://help.sap.com/saphelp_crm60/helpdata/en/3c/abb377413911d1893d0000e8323c4f/content.htm

  • Performance/Counter Based Maintenance Plan

    Dear All,
    Please guide me the detailed process related with "Performance/Counter Based Maintenance Plan" with step wise(with Tcode) .
    its urgent
    Please help.
    Sushant

    Hi Sushant,
    as it's urgent, I simply refer to a blpg document created by Maheswaran KD:
    Behavior of Performance Based Plan in SAP Plant Maintenance
    Please, all credits to Maheswaran!
    Regards,
    P.

  • Counter based maintenance plan triggered improperly

    Hi,
    we have created one counter based maintenance plan with cycle unit 1000 hours  offset unit 0 hours this plan was created on 21.04.2008 . But 68 orders triggered on 19.04.2011 why it was happend.
    how find start of cycle reading  for the Maintenance plan?
    Regards
    Ganesh

    Hi,
    Counter based plan will work based on the Measuring point assigned to that.
    In Measuring Point, you would have defined the Annual Estimate. Based on the Annual Estimate & Cycle value in Plan & Scheduling period in the plan, based on all these, call object would be generated.
    Doubt in Single Cycle Performance based Plan
    Regards,
    Maheswaran.

  • Get latest order for a scheduled maintenance plan

    Hi experts,
    I have a requirement where i have to get the order id for a scheduled Maintenance plan.My scenario is explained as below:
    A maintenace plan is scheduled and as a result of it an order will be created automatically  by system. Now i have to write a Report program which will be running daily and this report has to pick only those order which are NOT complete and these order will come from the above scheduled maintenance plan.
    Therefore i have to pick incomplete order based on scheduled maintenance plan.Any idea how to achieve this requirement?
    In case of any doubt please let me know.
    Regards,
    Abhishek

    Thanks for reply. But my requirement is a bit differen.
    I need a BAPI which can take Maintenance Plan as input and it can return the latest created incomplete order which is created due to scheduling of Maintenance Plan.
    Regards,
    Abhishek

  • Condition Based Maintenance Plans

    Dear All,
    My client has the requirement of condition based maintenance plans without interfacing etc. An example is described below:
    Compressor bearing has temperature limits of 70 deg C and 90 deg C. If measurement document reading is recorded outside the range specified here a maintenance call / maintenance order should be triggered.
    Please give an example or process for the above dsicussed condition based maintenance plan upto two or three calls.
    Thanks and Regards,
    Saif Ali Momin

    Hi,
    As such there is no functionality directly. You can use the following user exits and can develop your on logic to trigger notification in case measured values are out of tolerance values.
    IMRC0003 Menu exit - measurement document
    As I remember there is sample code available for ythe same. You can check through SMOD transaction.

  • Condition based maintenance plan

    Dear Experts,
    Can anybody clarify me about the condition based maintenance plan?
    How the plan is created and measuring points and measuring documents are controlled?
    My requirement is as follow:
    I have one equipment, for that equipment I have created a measuring point (Temp) with counter. And the engineer enters the measuring document for that equipment.
    Here when the measuring reading reaches certain level, say Temp reaches more that 80 Degree C, i.e., a measuring document is entered for the measuring point with a reading of 82 Degree C, system should generate a maintenance order for that equipment?
    How the above scenario is addressed in SAP?
    Please help me out.
    Thanks in Advance,
    Regards.

    Hi all,
    Thanks for your replies.
    PS: Ramesh,
    The operator maintains the log sheet of the equipments out side SAP, since he doesn't have the access to the SAP system. All the details are entered by Maintenance Engineer or Supervisor. The same log sheet details are entered by them in the system.
    Will you please clarify me on thing:
    *need to specify the min & max level in your measurement point at which u want to get call*
    how can we specify the min & max levels in measuring point? Is it possible through customer exit only? Because I did not able to find those filed in the measuring point master data.
    Regards..

  • Steps to create the counter based Maintenance plan

    Hi!
    Can any body give "Steps to create the counter based Maintenance plan"
    (Mater Data,Transactional Data and Customizing Data creation)
    Regards,
    MDSFR

    hi
    please refer the following link
    http://help.sap.com/saphelp_46c/helpdata/en/fe/67ef189d6f11d189b60000e829fbbd/content.htm
    regards
    thyagarajan

  • BAPI for Creation of Maintenance Plan (TCode - IP01)

    Hello
    Kindly help me with the BAPI for Creation of Maintenance Plan (TCode - IP01)
    Thanks and Regards
    Avishek

    Hi
       Check Tcode: IBIP. and LSMW method and below link it may be helpful.
    [link|Re: LSMW for uploading equipment.]
    Thanks,
    Asit Purbey.

  • Best settings for film based PAL to MPEG2?

    There's a fair amount of useful information online regarding the best settings for film based NTSC footage export etc but I'm unable to find anything regarding the best Compressor settings for the export of MPEG2 from PAL video from a 25 frames per second film sourced master.
    Can anybody help?

    Okay, so after reading heaps of stuff on interlacing and progressive, my head is hurting. Since my 1080i50 Pal footage captures into Final cut interlaced and setting field dominance to NONE doesn't do much, I realise I need to de-interlace in an another application. Ken Stone has a great example of what to do in compressor though I dont have the current version (3) and am not sure how to reinterpret this for Compressor 2. I had a go without much luck. I am in the process of trying to use MPEG Streamclip to deinterlace and trying getting the right settings. Will see how that goes. I also have tried using JES deinterlacer but also wasnt sure about settings etc with this application either.
    Which is the best to use and what settings should I set. I wish to use my footage for watching on our macs primarily and also from our mac server which is hooked up to our hdtv. I can then convert to other formats for iphones and web etc. But my main problem is this interlacing issue. I have a nice new HDV camera but it certainly isnt looking too much better atm than my old dv footage.
    PLEASE help!

  • Automation of scheduling for performance-based planning

    Colleagues,
    I've got a question regarding automation option for skipping calls upon measurement document reading update.
    So, scenario as follows
    MP with strategy (activity) is scheduled with 1K, 5K, 10K hours with surpressing hierarchies 1,2,3 accordingly. Initial counter reading is 0, estimated ann perf- 20K. So, we schedule IP10 which gives us all scheduled-on-hold's for 365 days of scheduling period.
    Once I enter 5600 reading measurement doc, the batch would generate four 1K calls and one 5K one..They want the system automatically skip those calls in background and get only one 5K order, avoiding redundant four 1K' ones..
    I don't see much of room for maneuver for automatic scheduling in PM..
    Any suggestions??
    Thanks in advance!

    Hi,
    (that's me who initiated the thread-service marketplace was messing with my last name)
    They've got elaborated on the scenario and aforementioned user exit perfectly serves the purpose of restarting cyclees with offset when late reading is entered, skipping the redundant calls.. However, in that particular scenario described below that wouldn't help..
    so, the requirement is as follows:
    1.minor/mayor PM every 750h and 1500h accordingly
    2. three different overhauls (at 15000, 30000, 60000H accordingly)
    3. 500h inspection after each overhaul
    After 60500H the cycle should start all over
    the sutuation is worsen by the fact that I should create 5 different plans, since every maintenance pack has different call horizons..
    So, we have
    1.  plan #1 for 500H inspections with call horizon 100%, strategy offset '500'
    2. single plan#2  for minor/mayor PM with call horizon 67%, strategy offset '1250' for minor PM and '2000' for major PM
    3. plan#315K overhaul1 with call horizon 93%,
    4. plan#4 30K overhaul1 with call horizon 90%
    5. plan#5 60K overhaul1 with call horizon 95%
    I have two strategies: one for inspections and minor/mayor PM, another-for overhauls, both strategies using supressing hierarchies..
    I was using offset and 'restart'  and 'start-in-cycle'  those plans..
    after first 15K overhaul package completed:
    plans #1 and 2 are restarted with latest counter reading using function u2018Restartu2019;
    Plans #3,4,5, are restarted with latest counter reading using function u2018Start in cycleu2019, selecting the relevant timeframe (i.e. offset shall be set before next due call on relevant cell in package sequence ruler)
    Just wanted to double check with you whether you guys got any suggestions or recommendations..
    Appreciate it!!

  • Tcode for checking the Maintenance Plan

    Hello,
    I want the transaction code for checking the list of maintenance plan for a particular plant. I went thru tcode IP03, IP16 but could not find the option of plant there..
    Kindly guide..
    Regards,
    Naren

    Naren,
    As stated above, there isn't a plant field in the maintenance plan (only maintenance item, hence the reference ot IP17)
    However, it is quite common to use the maintenance plan Sort field as a plant field by customising the table settings for each plant.
    PeteA

  • Strategy in task list and Strategy based Maintenance Plan

    Dear Gurus,
    I have some doubt about
    is it same if we create a single cycle plan with a task list in which maintenance strategy let say A is being used and a maintenance plan strategy based let say A and task list without any strategy
    can some one explain use of strategy in task list and maintenance plan
    Regards
    Armaan

    Hi,
         In Strategy Based Plans :- When ur entering strategy in initial screen of IP42 then inside the plan system will allow u to select tasklists created with that strategy only ...
    In Single Cycle Plans :-  Here even though if u select tasklist of a particular strategy , system copies all the operations of the tasklist to the order...
    From your above example :- Single Cycle Plan if cycle is monthly is equal to strategy based plan having only 1Month package .
    further package in strategy allows u to select which operations of tasklist u want for 1Month..
    regrds
    pushpa

Maybe you are looking for

  • Repeating a group element on each page of a report.

    I have a report where I need to repeat a group element on each page. The element is from the first group in the data. It is in the center group. Currently, the values from this group only print when the group changes. Everything I try does not work.

  • Transferring From Final Cut Express to Pro

    Hey! I am looking to upgrade from Final Cut Express to Final Cut Pro. I have a present project in Express and plan to finish it shortly. However, can I take this file from Express and finish editing it in Final Cut Pro? Thank you!

  • RFC PROBLEM:NO DATA AVAILABLE IN ST03N

    Hi experts, On the t-code ST03 when i enter lastminute's load and confirm, getting the error RFC Problem:No data available. How to go ahead. From Deepak Keesara.

  • Exceptions in a stored procedure

    Hi I am writing a stored procedure and I am running a select statement. On NO_DATA_FOUND exception, I want to raise another exception called NO_EMP_FOUND. Question is where in the stored procedure I have to define this. Remember that the select state

  • BAPI Extension for Purchase requisition

    Hi All, I have to add a custom field in EBAN  and have to enhance PR BAPI to include that additional field. What steps shud I follow? how can I use BAPI Extensions? Any help will be rewarded. Regards, Pragya