Settlement from internal order to asset under construction

HI All,
I have allocated some labors hours cost from production cost centers to real order which is created for allocating the internal cost to asset under construction.
when i allocate the labor hours by using the "KB21N" it has used the secondary cost element that is "Internal activity allocation" cost element "1200002".
i have given the source cost element "1200002" which is created as "internal activity allocation" and in settlement cost elements folder i have given receiving category is "FXA" and selected by cost element check box. i selected required entry field in settlement profile and assigned in order type.
when i do the settlement to asset under construction from internal order it is showing bellow errow.
"Settlement by cost element not possible due to secondary cost element
Message no. KD553
Diagnosis
You want to settle the secondary cost element 1200002 by cost element to an asset or G/L account, which is not allowed.
Procedure
Extend your allocation structure R3, so that secondary cost elements are not settled by cost element, but with a settlement cost element."
please let me know the problem and where i did mistake. give me the solution
thanks in advance
Mr.Rao

HI,
in your allocation structure R3 you entered in the view "Settlement cost element" that settlement receiver categoy FXA receives values "by cost element". This is only possible for primary cost elements. For internal activities do not tick "by cost element" but use a settlement cost element with cost element category "22".
best regards, Christian

Similar Messages

  • Settlement of Internal order to Asset under construction (AUC)

    Hi,
    To All
    While settling an internal order to AUC through KO88 it shows already settled whereas the balance of the internal remains the same and while settling AUC the error shows "there is no line item".
    What can be the problem, why internal order is not settling to AUC?
    Has anybody face this issue before? I have spent hell of the time on this issue but haven't resolved this. I would greatly appreciate your response on this.
    Thanks
    Jainendra

    Hi Jainendra,
    Please refer OSS Notes# 310116 (Settlement AuC: Open items not correctly cleared )
    OSS Notes# 412869   (AuC settlement: AW521 or line item not settled )
    Have a look into the below link,
    http://help.sap.com/saphelp_47x200/helpdata/en/4f/71daf9448011d189f00000e81ddfac/frameset.htm
    Also refer the below SDN link:
    Re: Capitalization of Asset
    Hope this helps.
    Please assign points as a way to say thanks
    Message was edited by: Ravi Rana

  • Settlement of an Internal Order to Asset Under Construction

    We are running SAP 4.7 and Iam trying to settle an Internal order to AUC and I get the following error
    You cannot use this transaction type to post to this asset
    Message no. AA834
    Diagnosis
    The transaction type entered belongs to transaction type group 15. According to the specifications for this transaction type group, posting with transactions types belonging to this group are only allowed in specific asset classes (for example, asset classes for assets under construction).
    The asset to which you are posting belongs to class 18000 (chart of depreciation SEEF). You cannot post to this class using the transaction type you have entered.
    Procedure
    Check the asset number entered. You may want to allow posting with this transaction type group for the asset class of the asset.
    **Please take note that the costs which have come on the internal oder are through GR( Goods receipt) and not down payment. Also note that last month, the order settled without any problems!**

    Hi,
    thanks for your answer.
    I want to do that because of some french tax rules.
    These rules say that goods, hours or services produced internally for the contruction of an asset can be "delivered" to itself.
    So you can register output tax based on the value produced but you have also to register input tax for the same amount.
    Finally the balance for VAT amount is 0.
    I was interested to know if that was possible to automize. If not, there is still the possibility to make a separate postings at month end or year end.
    Best Regards

  • Settlment from Internal order to asset

    Hi Guru!
       I have some problem about integrate between Internal order  (Investment funtion) and Asset
       I have Internal order master and assign investment profile in master  and in Internal order link to AUC automatic. End of period I input Asset no 100001 , 100002 in settlment rule  by Transaction code KOB5 (line item settlement orders and then) and I settlment by t. code KO88. The result is expense from Internal order transfer to AUC only not transfer to Asset no. 100001 , 100002. after settlment  in Asset module  have transcation type 116 Acquisition - internal settlement to AuC only  but not have 336,339 Acquirg transfer of curr-yr acquis from inv.meas.  I need 336, 339 for transfer value from AUC to Fixed Asset . How I solve this problem?
    thanks

    Hi,
    In OAXG, select the transaction type 336 & 339.
    In this go to Other features
    Remove the tick from the Checkbox Cannot be used manually. Try to excute the transaction.
    Regards,
    Amit

  • Internal Orders with AUC ( Assets under construction) Config steps

    Dear Experts,
    Can you send me the step by step configuration for Internal order with Asset Under Construction
    Thanks
    Sanjai

    Hi nick,
    you can maintain this in the settlementrule of the internal order, Type ANL
    Best regards
       Horst

  • Asset under Construction through Internal order- Functional deficit?

    Hi Experts,
    I have created an internal order and all the expenses incurred for the asst under construction are being booked at this internal order.
    While settling the internal order the system always picks up the month end date as the settlement date and hence the balance of internal Order is getting transferred to AUC on month end date (say31.07.2007).
    So,
    The date of transfer of balance from internal order to AUC is month end date that is 31.07.2007.
    But in Actuality the AUC got complited before month end (say 15..07.2007) and the Asset was put to use on 15.07.2007.
    Now the system is not allowing to settle the AUC to Main Asset as on 15.07.2007 as the AUC was not existence on that date. <b>Error:</b> Posting not possible (Value date earlier than capitalization date).
    I am able to transfer the balance in AUC to Main Assets as on 31.07.2007 but in this case my client is loosing the depreciation element on this asset from 15.07.2007 to 30.07.2007. Is this the functional deficit in SAP? Is there any way through which depreciation can be availed from 15.07.2007?
    Thanks & Regards,
    Bijay kumar Deo

    You can settle the AUC value in one period and posting can be made in another period. in the same you can give the different asset value date in KO88 screen. The only limitation is this possible only if the fiscal year is same.
    Give the asset value date as 15.07.2007 in KO88
    Hope this will work
    Radha

  • Asset under construction in internal order

    Dear All,
        can any one tell me how to create Asset under construction in internal order...
    Suresh patipati.

    You must have a separate asset class for Asset Under construction(OAOA) with line item settlement selection.
    Create an asset(AS01) under AUC asset class
    Then create internal order through KO01 and in Settlement rule mention the
    Category as FXA
    Settlement Receiver: AUC Asset
    % as 100% or as you require
    Save the entries.
    Now enter the capital expenditure using this Internal order.  After you finish with the postings settle the internal order(KO88).  On Settlement the values are transferred to AUC asset from Internal order.
    Now use AIAB & AIBU to distribute and Settle the AUC asset values between Main asset(s).  Here also in the settlement rule you must enter the settlement receivers.

  • Creation of internal order (investment order- asset under construction)

    I want to capture the cost of asset under construction through internal order (controlling) not throgh Investment Measure module. How i can do this.

    Hi
    It is the same flow as explained by AP above
    If Investment management module is active, then on settlement i believe the AUC asset is automatically generated. Therefore you have to define an asset master and then include this asset in the settlement rule of the IO. Thus on settlement the cost in the IO would flow to the asset
    Thank You,

  • Asset Under Construction creation, Internal Orders,

    Hi,
    We employ internal orders for collecting costs for an AUC. However, we have a requirement in which when an internal order is created for asset under construction, SAP has to automatically create an AUC asset and assign it in the settlement profile of the internal order. Is this possible? If so what configuration should I do.
    Thanks for your help.
    Ram

    Hi Ram,
    Yes. It is very much possible. You will have to create an Investment profile for that and in the investment profile give the Asset class of the AUC. Do this in transaction OITA.
    When this investment profile is entered in each Internal order you create, the system automatically creates an AUC asset to which the costs can be settled.
    Read the documentation for Investment Management component in the IMG and SAP help. YOu will get what you need. Thanks.
    Thanks,
    Vishal.

  • Asset Under Construction  Internal Order

    Dear Expert,
        When I am making any entry in f-70 for procuring asset underconstruction, can I book it agaist internal oder.
    I am asking this question because I saw the receiver category in allocation structure are cost element.
    Please suggest.
    Regards,
    David

    Hi,
    As far as the cost elements are assigned in the allocation structure (individual cost element or cost element group), the postings can be done to an internal order. Else, the settlement of internal order will have an issue.
    Please check the T.code you mentioned.
    Regards
    Hari

  • Settlement of  Asset Under construction

    Hi Folks
    Can someone please explain an overview of settling Assets under construction. I am having some issues with AUC. The actual value of asset is being taken from AUC, not from final asset. Any kind of assistance will be highly appreciated.

    Hi,
    The Below are some important Steps.
    1.  T.code KO88 - Here you settle Expences to Settlement cost Elements via internal Order or Cost Centers. Give the Settlement rule and by tht Expences will be distrubuted or settled to SCE..
    2. In AIAB T.code -Here Distrubution is done from Settlement Cost Elements to AUC, Here settlement rule is defined as such.
    3. In AIBU T.code  - Here Settlement if Cost from AUC to Actual Asst is Done.
    after AIBU Transcation is Processed, you can directly run the Deprecation for tht Asset.
    Hope the above would Help in Understanding the Concept of AUC Settlements.
    Thanks
    Goutam

  • Asset Under Construction Settlement

    Hi ,
    Asset under Construction  Settelement  is it a month end activity ?
    If it is a month end activity what are the reasons?
    If it is not month end  activity  , why?
    if Settlement is posible in between the period what are all the  effects in sap?
    Please reply me
    Regards,
    Laxmi

    Hi
    You can settle from AUC to Main asset at any time during the month and any no of times... No -ve consequences.. However, it is advisable to schedule it at month end... Other wise, you would be generating more no of docs due to multiple settlements to the same asset
    However, if you are settling from an Internal Order to AUC / Main Asset - In that case prefer it to be a month end activity.....
    Br, Ajay M

  • Settling investment internal orders to an asset (AA310 msg)

    hi.
    I am wondering if somebody can shed some light for me on the following:
    let's say we have 2 investment internal orders (representing 2 different projects) which are to be settled to one asset.
    for the 1st order the job was done and the status changed to TECO in 2010. Upon full settlement (KO8G, full ) the cost has been settled to an asset (from AuC) and the asset has been capitalized. the capitalization (aquisition) date was set to the end of the period (e.g. Dec 31, 2010).
    the status of the 2nd order has been changed to TECO in 2011. Currently when I'm trying to do a full settlement of the 2nd IO (with KO8G, partial capilazation) I'm getting AA310 (asset value date in diff year) as far as the system is trying to default the asset value date to date when the IO status was chagned to TECO (2011).  I do not want to default the asset value date on the KOG8 screen.
    The question - what is wrong in my approach and what should I do in the case I have a second investment orders to settle to a final asset.
    Sorry if I was not clear, i'm primarly an abaper but trying to understand some business processes related to internal orders and settlement. any information to understand this relationship would be appreciated.
    thank you,
    viktor

    Creation of Internal Order- KO01
    Maintain Settlement receiver as the AUC asset
    Settle the Internal Order- KO88
    Now the values have come to AUC asset
    Distribution of AUC- AIAB
    Enter the Settlement receiver as the Main Asset
    Settlement of AUC- AIBU

  • Internal Order - AUC - Asset Settlement

    Hi All,
    Please can anyone help me with the below issue on settlement (AUC):
    Only 95% of the cost is settling to Asset from internal order.  But I need 100% settlement.  What settings needs to be changed.. Pls advice..
    Will be helpful if solution is adviced asap.
    Thanks,
    Vinay

    Dear Vinay,
    Please check your settlement rule----
    be sure that it must be 100%. (KO02)
    If it is 100% then check in maintain allocation structure
    (img-controlling-IO-actual posting-settlement-maintain allocation structure)
    now select allocation structure (which is assign to your settlement profile) and double click on assignment and then source--- in this see whether all cost relating to IO  is maintain or not. and then Double click os settlement cost element....here you see that by cost element field should be blanck.
    come to the settlement profile (img-controlling-IO-actual posting-settlement-settlement profile)----
    here you check that settlement should be full and also check the indicators....
    Assign points if it helps you..........
    Rgds,
    Madhuri Panda
    Edited by: madhuri panda on May 22, 2008 8:53 AM

  • AA-Asset ID Number from Asset Under Construction to Final Asset

    Hi Expert,
    In our organization we use Asset Under Construction by creating individual asset and later we released to final asset. The system work fine in accounting wise but in practical scenario we are facing issue to track physical asset number.
    Example: 1 Asset Under Construction #10001, later create final asset in class computer "SERVER IBM # 50001"
    When this server was purchased IT departed put the asset number as 10001 on physical asset. later this asset was re-classified to proper asset class which now has asset number #50001
    In this scenario IT department facing issue to perform physical inventory.
    Can some one share experience on how to handle this scenario from SAP/Conceptual process wise?
    Regards,
    prashant rane

    Hi,
    Your requirement is so common to the consultents like me, I do advice to the client as follows:
    1st Step: Creating AUC Asset the number from 1series would be the temporary number, can be used till settlement to main asset.
    2nd Step: Fixed asset number 5series would be the parmenent number.
    Note: 1 series all the numbers should be settleed to the main asset and the temporary number should be replaced / noted with parmenent number.
    I guess it would work to you.
    Regards
    VG

Maybe you are looking for

  • Error is "sec_error_unknown_issuer", regardless of deleting either cert8.db, or cert_override.txt, resetting FF, or anything, I can't ADD Exception, Works in IE

    I get this from the server that runs the WatchGuard SPAM Filter, and I USED to be able to add an exception, and it was fine. Under "Technical Details" I get: "An error occurred during a connection to sp-servername.domain.local:4119. Peer's Certificat

  • I have 1 song credit, but i don't know how to use it XD

    as some people saw, i lost my money, but the story had a happy ending well, i won a song credit so now it says 46,25 + 1 credit, well, i bought a song ( that i wanted so till now ok) and it charged, it was supposed to use the credit? or i just can us

  • Custom step description

    When creating a custom step type, what do I need to enter in the "Step Description Expression" box to display the "operation" and "route(s) to connect/disconnect" the programmer has entered in the switching tab properties of each step? This custom st

  • Built is not executing in Runtime

    Hello, i have to PCs. One with LV 2013 to develop and create exe-files and a second PC with only Runtime installed. Just now i tried the first time to execute a fresh built exe-file and got this popup: But in my Windows 7 64bit under software i see t

  • Acrobat Elements

    Hola, ¿Se puede modificar un documento pdf con el Acrobat Elements? o ¿Sólo deja convertir un documento a pdf? Similar a la forma en que el Acrobat Standard permite cambiar una linea de texto o borrarla. Muchas gracias