Settlement issue.

Hi PS Experts,
I am faced a lots of issue in settling the project cost.
I am able to run the transaction code CJ88 successfully.
But when I checked CJI3 Report, The project cost is not changed to "ZERO". (Project cost is same)
I don't know from where the below Cost element is captured in the CJI3 Report.
I have attached the screenshot settlement Profile and allocation structure.
Request you to let us know how to settle the project cost to "ZERO" in CJI3 report and settle all the cost to AUC,as I am doing settlements for the first time.
Regards,
Wasim.

Hello,
Line item reports pull all postings as actual, settlement & statistical, so have you tried to exclude the statistical cost from the report selection and run the report? You can exclude the statistical cost using filter function on the output screen.
2nd thing check whether cost is showing in CJI3 after settlement is not that manual posting to asset if yes then reverse those entry and go though CJ88 then check CJI3 you will get expected result.
Regards,
Sanjeev

Similar Messages

  • Asset settlement issue from Project System

    Hello everyone,
    In SAP, we have tied Project System and Fixed Asset in the sense that for each network/activity in PS we create and link an asset in Asset Accounting. In the Purchase Order, the network/activity number is assigned and all the transactions that occur through this PO (including down payment, its clearing, GR/IR)  are then settled on the specified asset when we execute settlement run at month end through CJ88.
    However, we have encountered scenarios where an asset was not timely allocated to the network/activity but the transactions were carried out through the PO. When the settlement run was executed, its impact was not visible in Asset Accounting. Later, it was realized and the asset was created and assigned. Once the asset was assigned, all the subsequent transactions through the PO were then being settled successfully. But the problem is with those transactions for which the asset number was initially not assigned.
    Is there any program that can be executed to include the impact of the previous transactions. Otherwise, suggest alternatives.
    Thanks

    Hi Thanks for your reply, But that is not relevent to this issue.
    The issue here is -
    First 2 documents has value date of 4th period and the amount is 8800
    Next document has value date of 5th period and the amount is 1200
    Now i am trying to settle 10000(8800+1200) with 5th period date. Its givign an error Settlement amount is greater than Available amount
    Will it solve if i settle 4th period with 8800 first and then 1200 with 5t period? or any other process?
    Thanks
    Yadayya

  • Rebate settlement issue

    Hi Guru,
    Could you plase advise about my issue which is related to rebare agreement.
    in my client theu are mainting rebates for trade promotion.
    that rebate is created in Jan 2009. validity from 01.01.2009 to 02.02.2009.
    they didn't given any accrual percentage. but hey given settlement percentage.
    as of now it is not settled it means still it is open.
    now they wants to close the rebate ageement without any settlement.
    when they are settleling it is showing the credit value...it is posting in customer master...
    i tried somany ways...which are below..
    there are two ways to close the rebate agreement
    1     i changed  settlement percentage is zero (o%)...
         here i am not able to processes completely  because of zero values willnot post in fi....here the rebate agreement ststus wll be
              " C "
    2       i deleted agreement, because it is old date it is not require to show afterwards.....
    3   please kindly advise me what is procedure to close the rebate agrement with out settlement.
    Thanks & Regards,
    Muthyam.G

    thanks gyus...i got solution

  • Settlement issue for Pooled asset

    Hi all,
    I created a notification (type MF) for pooled asset in IW21. I was able to view the notification in the planning board (PAM03). I was also able to do the planning of the demand and was able to reserve, issue and return the pool asset.
    Now, I am facing an issue during settlement. Which I try to do the settlement, system is giving an error 'Unable to determine the pool category for requirement'. Message No. PAMS145
    Below is the detailed message:
    Diagnosis
    In Customizing for PAM, you define activity types for each pool category for
    each controlling area.
    When settling a PAM requirement, the system calculates the service performed
    for the activity types defined for 'Rental price' and 'Price/unit.'
    The pool category is determined using the equipment or message (in this
    order) for the requirement
    The controlling area is determined from the equipment.
    Unable to determine a pool category for the requirement.
    System Response
    The settlement of the requirement is terminated.
    Procedure
    Depending on the business process, store a pool category in the equipment or
    the message.
    I think I am not able to tie up the pool category which is there in the configuration of PAM with the equipment I created. Has someone faced similar issue before? What could be the possible way to resolve this error?
    Thanks,
    Tajinder

    hello Gandalf ,
    Create an IO Through KO01 with extra Create AUC........
    Then post the exp to AUC........
    Then assign the settlement rule as Fixed assed and enter the Asset number and give % or amount....
    Settle the IO through K088
    Hope this will resolve your issue............
    Regards
    Kumar

  • Project Settlement Issue

    Hi All,
    We had an invoice that was entered with a wbs that had the following currencies:  CO Currency = USD, Transaction Currency = USD and Object Currency = GBP within a company with a currency of GBP.  However, when settling through CJ88, the settlement produces CO Currency = USD (zeros out), Transaction Currency = GBP (balance) and Object Currency = GBP (zeros out).  So, when you try to settle for the next month, CJ88 states that there is an error states "Execute amount settlement up to and including settlement period 003 2009 first"
    Message no. KD262. 
    As a bit of background, the project is in USD by some of the wbs elements within the project are based in GBP from the company code which is in GBP.  I'm not sure how to have the settlement work out so that there is no balance.
    Any assistance would be greatly appreciated!
    Pete

    Hi Sarang,
    We settle on an individual wbs element so I tried reversing the settlement and then re-settling the wbs once again.  The same issue is occurring where the CO Currency = USD, Transaction Currency = USD and Object Currency = GBP within a company with a currency of GBP. However, when settling through CJ88, the settlement produces CO Currency = USD (zeros out), Transaction Currency = GBP (balance) and Object Currency = GBP (zeros out).  In order to properly settle, all 3 currencies need to zero out but it is still not working.
    Any other thoughts?
    Pete

  • IO Wrong asset settlement Issue

    Hi
    We settlement rule for internal order 2500007 was erroneously set to settle costs to asset 11 (company 123). That asset is already part of a different internal order.
    Costs from internal order ***0007 were settled to that asset in prior periods(from Jan 2104) and depreciation has begun. This is incorrect since the asset should not be related to that internal order.
    We would like to reverse the amounts settled to that asset from IO ***0007 and settle them to a different asset instead.
    This should result in a reversal of the depreciation booked to this asset from the costs settled from IO ***0007.
    Do suggest how to achieve this.
    Thanks & Regards,
    D Dixon.

    Hi,
    You have two issue, one is wrong settlement to asset, and wrong amount of deprecation is posted.
    First of all you need to reverse the depreciation, to reverse the depreciation, just change the depreciation key to 0000 in asset master AS02, and repeat the depreciation run to reverse the depreciation for this assets. once you verified that depreaction is reversed for this asset, just go AS02 and again change the dep. key to original one.
    Second step is to reverse the Settlement, you can reverse the settlement from the same t.code from where you have settled the order, lets say KO88, just go to settlement menu and Click on "Reverse"
    After settlement reversal,  create the correct settlement rule, and post the settlement, then again run the the depreciation AFAB in repeat mode, to post the correct deprecation.
    I hope this will help you.
    Regards
    Javed

  • AIAB issue (asset settlement issue)

    Dear Sapguru,
    On dev system, we are facing an issue for tcode AIAB. In our current process we park & post document through MIR7 & MIR6 respectively. While posting the document we post to CWIP asset & later on transfer from CWIP to actual asset.
    But from January 2012, CWIP asset master shows document  posted  but while transfering from CWIP  to main asset through t code AIAB line items are not display. but in QA the same is working fine.
    Kindly help us to resolving issue.
    Thanks & regards,
    Pramod Chavhan

    Varsha,
    When did you settle the Values from IO to AUC?
    If this was done in 2011, just look after year closing and opening new.
    If it is in 2012, go to AR01, AR02 and AR03 and check if the values are appearing for AUC
    Let us know the results
    Thanks

  • CJ88 - Final settlement issue

    Hi All,
    Seek solution for this issue:
    After final settlement (CJ88) the cost that is getting settled and posted in FI is equal to the sum of the difference of Closing CTC (cost to complete) for period 10 and Opening CTC for period 10 and the closing CTC for the period.
    But the amount that should actually get settled is the difference of Closing CTC (cost to complete) for period 10 and Opening CTC for period 10. 
    For eg.  the amount that should get settled for Period 10 is 11,85,220.70 (Which is shown in Result Analysis - KKA2 under the head 'Changes in the period - C(period)'. This is the difference of Closing CTC for period 10 and Opening CTC for period 10).
    But the amount that is actually getting settled is, this amount i.e. 1185220.70 + Closing CTC i.e. 29,481,426.30.
    What could be the reason and solution for this? 
    Best regards,
    Nimish Goswamy

    Hi
    First maintain IT16 Contract elements
    IT185-subtype 03gratuity
    For Termintation Work bench both these IT are a must.
    Lock Personnel no in PU03 before running the termination workbench
    pc00_m40_term
    Then Enter personnel no-reason for and notice date and leaving date.
    Gratuity Leave encashment and all other wagetypes can be given at the time of termination workbench for calculating F&FS
    All the amnts are automatically updtd in IT15
    Run the leaving action with the date which was entered in pc00_m40_term
    Release the personnel no in puo3 and run the payroll-pc00_m40_calc
    DO reward points
    regards
    Iyer

  • CJ88 and CJ8G tcodes - Settlement issue

    Dear Experts,
    We are having an issue in the settlement process. We ran the actual mass settlement for all the projects for the specific RA keys. I do see the cost has been posted and transferred and they are settled as expected. Accounting looks good as well. However, if I ran the settlement individually on tcode CJ88 that has been already settled in the mass settling process, it shows up on the list "to be settled" in the test mode. If I re-run it again in "Actual" mode, it settles without any issues and then it disappears from the list finally. Did anyone experience this issue before? I will post the example screenshots of the examples that I am analyzing.
    thanks,
    DK

    Hi D K,
    This doesn't seems to be a way it has to work, is there any support packs recently added, this can be a bug.
    If you are able to replicate the issue always, do raise it with SAP, they will be able to provide a resolution or conclusion.
    If you check with Orders, system will check for Networks or Work Orders assigned to the WBS element and the same should be settled, may be there is some cost pending from Order end. Check the order or network assignment.
    Regards
    Terence

  • Production Order settlement issue

    Hi ,
    We are planning to do re-work . We want to capture the labor activties for the order. Is it possible to settle the labor activties only for the order settlement ?
    Thanks
    Nic

    Hi Nick,
    From a business stand point you have two options to follow:
    1. settle the costs to the original Production order
    2. Settle the costs to seperate cost center
    for both cases, you need to have seperate Production Order type. Because the settlement paratment are different from regular production order type.
    So please use seperate Production order type with settlement profile being settlement to Cost Center.
    Hope this will solve your issue
    Best Regards
    Surya

  • Prd Order Settlement Issue

    Hi all,
    While carrying out production order settlement for a production order, the system is determining the wrong GL A/C. Well it's deriving the GL A/C which does not exist. I need to change this assignment to a valid GL A/C. How am I suppose to fix this?
    It's an MTO order, settlement cat. SDI. I'm not sure why the settlement rule is SDI for this specific order too, normally it should be MAT.
    Regards,
    G. Coelho

    The valuation now is for sales order is incorrect.   SDI means that the sales order stock is non-valuated and sales order is used to capture the costs.  This is because the requirement class of the sales order is incorrect.
    First check the requirement type in sales order (VA03).  In procurement tab of the first main screen, it will show the requirement type for your sales order item.
    Then check t-code OVZH, there will be a link between requirement type and requirement class.
    Then check OVZG to check the requirement class.
    (If you want to change, use the config.path Controlling -> Product Cost Controlling -> Cost Object Controlling -> Product Cost by Sales order -> Control for Sales-order-related Production... -> Check requirement class.  Howeiver, this should be done after you consult with SD and CO consultant)
    You will see the your requirement class.  Check whether account assignment cat., and valuatio are both set to M (ind.cust.order w/o CO, and valuated sales order stock).  I suspected that a sales order per your issue is set to non-valuated stock (Account Assignment E, valuation blank).
    Hope it helps.
    Edited by: ayethebing on Jul 16, 2010 1:34 PM

  • CO88 Settlement Issue.

    HI,
    I am facing an issue with settlement.
    When i run the WIP calculation in KKAX, system is properly calculated the WIP value.
    I run(test run mode) settlement for single order in KO88 and it is showing ready settle value correctly where as the for the same month, if i run settlement in CO88, system is not showing the respective order number(detailed list).
    How come one order will show in KO88 but not in CO88?
    Please let me know if i missed something .

    Dear Prakash
    I am sorry I misunderstood your question.
    You want to say that a particular order say no. 100000 is being settled individually but in collective settlement it is not being selected. Right?
    Please check that plant stated in settlement is the same for which the order is made? Also in bot the cases you are giving the same period?
    Regards
    Rajneesh Saxena

  • ERS Settlement Issue

    Hi all,
    I'm facing an error "ERS settlement: No message was found for partner ....../company code  ......"
    while doing settelment through MRRL Transaction.
    Pls Note: I had done all the settings to the best of my knowledge, but still this Error is appearing.
    Settings that i had done and Checked:
    1. In Vendor Master --> Purchasing View.
       Set the GR Based IV Verfication and AutoEvalGRSetmt Del. indicators.
    2. In Purchase Info Rec --> No ERS checked is removed.
    3. In Purchase Order, GR Based IV and ERS Check are defaulted and Tax Code is also Specified.
    4. Message output is also Defined in SPRO
    Message type is maintained with Access Seq 0002 'Ccode + Vendor'
    condition is also maintained in MRM1 transaction and Printer is also attached in communication.
    But still i'm facing this error.
    Regards,
    S Anand

    Hi
    error : ( ERS settlement: No message was found for partner ERS : co code : 1111)
    Ans : SPRO u2192 Logistic Invoice verification u2192 Message determination u2192 Master condition.
    Message setting = ERS
    Key combination ; Co. Code;
    Regards
    anand

  • Process order settlement issue

    When we are settling process order to the material, which is having std price.The following entry is passed.
    1) Price diffrence account- Debit/ credit (prd)
    2)Inventory movement -Debit/ credit (gbb-vbr)
    For point 2,the material code is not passed in FI doc.
    Can ny one knows the reason for this?

    FI docuemt gets generated with reference to the GL of the respective material, which is based on the Valuation class.
    You can also try , by CHECKING "Material Origin" in costing 1 view of material master.

  • Internal Order Settlement Issue

    HI,
    I have posted some entries in Postage internal orders. But when i tried to settle that in KO88, it is showing the below message.
    No Transaction Data Posted Since Last Settlement
    Actually once the client executed KO8G transaction for all orders. At that time 2 Orders was not settled. Now When i tried to settle them in KO88, It is giving the above message.
    Why it is not getting settled? How to fix this error. Kindly help me
    Thanks
    Kishore

    Dear,
    Because these order are alreaddy settled. No balance on these order please check in KKBC_ORD. You can just settle additional amounts posted since last settlement.
    For deatils refer this link,
    Order Settlement
    Regards,
    R.Brahmankar

Maybe you are looking for

  • How to download Creative Cloud on new computer after deactivating on another computer?

    I need to switch a Creative Cloud license from one computer to another. I deactivated the license via the CC Desktop App and then uninstalled it from the first computer. Now I want to download it on the other computer and activate. The Adobe website

  • How to connect a CVS server with remote Hosts(NWDS7.0)

    Hi Frndz.. I installed CVSNT server in one machine n itz workiing fine with that NWDS in that machine , now i want make connect that CVS server from remote machines NWDS's to use that CVS server as a central repo' Can anyone guide me how can i connec

  • Advice on cutting file size in half?

    Got a problem re: compression for web video - got a 1:30 (animation codec - mix of Livetype and DV video) sequence, exported QT conversion, Mpeg 4, h264, data rate 150, 176 x 144, 200 keyframe, mono audio, 30 fps. Given the above settings, when I ope

  • MBP 2011 died and having problems reinstalling Mac OS

    Hello, Having problems trying to make my MBP start working again... Tech info: Early 2011 MBP, 10.6.6 preinstalled Mac OS X 2.3GHz Quad-core Intel Core i7 8GB 1333MHz DDR3 SDRAM - 2x4GB 256GB Solid State Drive SuperDrive 8x (DVD±R DL/DVD±RW/CD-RW) Ma

  • Trying to Boot from Disc, CD Drive Keeps Ejecting It

    I have a PowerPC G5 with OSX 10.4.11.  I am looking to sell it since I am using a MBP now, but I'd like to wipe the hard drive.  I have the 10.3 installation disc it came with, along with a 10.4 Tiger disc.  I have tried to reboot and press C, only t