Settlement to work center
I had problems in my company now, in the module PM .. at the moment when the settlement is introduced to the imposition of a cost center in the equipment, but now changes are so important that at the time of settlement is introduced wanted to Cost center of Main work center, where I can do that may need guidance from the expert
Hello Ramses,
Though your query is not clear. I want to tell you what I have understood.
Currently the settlement is done & cost is being posted to the cost center of an equipment.
Now you want to settle cost to cost center of work center.
Is this the maintenance work center? or the work center which uses that equipment?
If it's maintenance work center then settlement of cost to it's cost center doesn't support the logic at all. It means that the work is carried out by the work center & the cost is accumulated to it again. How is this possible?
If it't the work center which is in-charge of the equipment then you can enter the cost center assigned to the work center, in equipment master.
With this the requirement can be fulfilled. Also seek help from your finance experts to get the more clarification.
Hope this helps.
Mangesh S
Similar Messages
-
Dear All,
What is meant by cost element.any link between cost element and work center.how to configure this.Kindly give the steps to follow.
Regards,
DeviHi Devi,
Cost element is Classification of the organization's valuated consumption of production factors within a controlling area.
Each cost element corresponds to a cost-relevant item in the chart of accounts.
Primary Cost element & Secondary Cost element.
Primary cost elements are like materail costs, personnel costs, energy costs... where a corresponding GL account exists in FI..to allow costs to flow...
Secondary cost elements are like production costs, material overheads, production overheads, they can be created and administered in only CO. These are used in internal cost allocation, overhead calculation, settlement transactions., it does not flow to FI...
I don't think there is any link between Cost element and Work Center.
If useful reward.
Regards,
Santosh -
Hi All,
How to get details for Work center wise WIP per product / order?
Thanks & Regards
VarmaTo get a report of WIP values per Plant, material and order number, you need to run the Production order overhead and then run WIP (in a test mode if you do not continue to settlement) the standard WIP report will give you:
value of WIP, plant, material, and order number
Summarize it as you want.
WIP is calculated for the ORDER while work centers are at a lower level, so you won't get WIP in a Work Center.
Althea -
How do I create a new Work Center for the transaction launcher and links
Hi
The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
Regards
DeclanHi Robert,
Thanks again for taking the time to reply.
Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
Is this correct?
Cheers
Declan -
Changing operations work center during creation of PM order
Hi all,
I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
Does anyone know such possibility?
AssafAssaf,
Have a look at BADI IWO1_TL_INTEGRATION2.
Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
Which system are you running?
PeteA -
All default routing value has to be changed, while changed the work center in production order
Dear friends,
our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
Thanks&Regards
Sabhapathy RHi Rahul,
Thanks for reply. I am maintained in diff value maintained routing , Ex :First routing i have work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
Now I think you get to know what the client requirement, kindly do the need full.
Regards,
Sabhapathy R -
Work center wise production order infomation report
Hi all,
i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
i have three operation in production order.
my order scheduled start date - todays date.
In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
Clent want like that (with quantity break) report..
Any standard report ???
If customization.... How it can be mapped in SAP.??
Thanks in advanceHi,
You can use the FM COIS_SELECT_ORDER_DATA_READ.
CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
EXPORTING
iv_prod_order_sel = lv_prod_order_sel
iv_proc_order_sel = lv_proc_order_sel
iv_planned_order_sel = lv_planned_order_sel
iv_rem_objects_only_sel = lv_rem_objects_only_sel
is_objects_to_read = ls_objects_to_read
it_parameter = lt_parameter "General Structure for PARAMETERS and SELECT-OPTIONS
it_status_hdr = lt_status_hdr
it_status_opr = lt_status_opr
it_status_cmp = lt_status_cmp
TABLES
ct_ioheader = lt_ioheader
ct_ioitem = lt_ioitem
ct_iodocl = lt_iodocl
ct_ioopdocl = lt_ioopdocl
ct_iomamo = lt_iomamo
ct_ioconf = lt_ioconf
ct_ioopconf = lt_ioopconf
ct_iosoconf = lt_iosoconf
ct_iogomo = lt_iogomo
ct_ioopgomo = lt_ioopgomo
ct_iosogomo = lt_iosogomo
ct_iogmer = lt_iogmer
ct_ioopgmer = lt_ioopgmer
ct_iosogmer = lt_iosogmer
ct_iosequen = lt_iosequen
ct_iooper = lt_iooper
ct_iosoper = lt_iosoper
ct_ioopcomp = lt_ioopcomp
ct_iooppreq = lt_iooppreq
ct_iosopreq = lt_iosopreq
ct_iooppord = lt_iooppord
ct_iosopord = lt_iosopord
ct_ioopmst = lt_ioopmst
ct_ioopprt = lt_ioopprt
ct_ioopcap = lt_ioopcap
ct_ioopscap = lt_ioopscap
ct_iosocap = lt_iosocap
ct_iososcap = lt_iososcap
ct_ioopsccf = lt_ioopsccf
ct_iososccf = lt_iososccf
ct_ioprodlist = lt_ioprodlist
ct_iomatver = lt_iomatver.
This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
Thanks and regards,
Pradip
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:27 AM -
In the report level user wants two persons against each work center.
Hi Experts,
Please let me know the solution, I have provided scenario below.
check the query which the user is referring to report:
Example
Work center Person
KNE33102 44003850
According to the user, the names for the Work centers should be as follows:
Work center Person
KNE33102 44003850,
KNE33102 44003603
I have check the data in T-code-CR03, each work center getting two persons, as can be shown below.
Work center Person
KNE33102 44003850,
KNE33102 44003603
In RSA3 it can be seen that both the records are being extracted
Work center Start date End date Person
KNE33102 09.02.2009 31.12.2009 44003850
KNE33102 09.02.2009 31.12.2009 44003603
In BI , when checking in PSA, it can be seen that the data is also being loaded to BI (Two persons loaded against Work center-KNE33102)
Work center Start date End date Person
KNE33102 09.02.2009 31.12.2009 44003850
KNE33102 09.02.2009 31.12.2009 44003603
But when loading to the Info Object, one person has deleted. Because of this, in the report level displaying one person.
Note:-Please let me know what is the procedure, in the report level user wants two persons against each work center.Hi,
As you said in your post the data has mentioned up to 2009. can you try execute the query till to date .
Regards
sivaraju -
Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
Ø Open Question:
a. Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center? We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
b. Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
Regards .. Dheeraj SainiWhenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.
-
How can I create a new work center
I try to create a new work center.I found a transaction 'OP42' . But I can't set a personal number and name.where should I write them, or should I use any other transaction??
Thanks...Hi,
Pl go to <b>CR02 -Capacity-Goto menubar select Goto -Individual capacity -Enter personal name here</b>.
Hope this helps.
Regards,
Mani -
Error when launching Work Center
Good Day;
I am getting the following error when I try to launch Work Center (Solman_workcenter).
We are running solution Manager on a 4.6C system.
Any ideas??
The URL http://sd07x797.prod.net:8080/sap/bc/webdynpro/sap/ags_workcenter/ was not called due to an error.
Note
The following error text was processed in the system SM1 : Exception condition "FAILED" raised.
The error occurred on the application server SD07X797_SM1_01 and in the work process 1 .
The termination type was: RABAX_STATE
The ABAP call stack was:
Method: GET_BPM_SOLUTIONS of program CL_AGS_BP_INTERF_MON==========CP
Method: WDDOINIT of program /1BCWDY/37BSLDTWTRKDYKK9XQEG==CP
Method: IF_WDR_COMPONENT_DELEGATE~WD_DO_INIT of program /1BCWDY/37BSLDTWTRKDYKK9XQEG==CP
Method: DO_INIT of program CL_WDR_DELEGATING_COMPONENT===CP
Method: INIT_CONTROLLER of program CL_WDR_CONTROLLER=============CP
Method: INIT_CONTROLLER of program CL_WDR_COMPONENT==============CP
Method: INIT of program CL_WDR_CONTROLLER=============CP
Method: INIT of program CL_WDR_CLIENT_COMPONENT=======CP
Method: IF_WDR_COMPONENT_FACTORY~CREATE_COMPONENT of program CL_WDR_CLIENT_COMPONENT=======CP
Method: IF_WD_COMPONENT_USAGE~CREATE_COMPONENT of program CL_WDR_COMPONENT_USAGE========CP
Thanks All.
Regards
Don> I am getting the following error when I try to launch Work Center (Solman_workcenter).
> We are running solution Manager on a 4.6C system.
I'm pretty sure you don't run SolMan on 4.6c.. maybe on the same server but certainly not in the same instance
What support package level is your SolMan?
Markus -
System monitoring work center and CEN system
Hi everybody.
I'm setting up the central monitoring, using SSM as monitoring system. I'm also having a look at the work center for system monitoring; but I don't find how to link the central monitoring capabilities with this dashboard.
I mean, it looks the central monitoring does not provide any advantage to work with this work center, am I right? Anyone has experienced this?
Thanks for your answers!!
FermíHi!
I've done finished this issue!
Please follow steps below:
1. Create activity type in T-Code: KL01
2. Go to KP26 to create the realtionship between Cost Center and Activity.
Now you can see new activity in Costing tab.
Regards!
Woody. -
Error during creating a work center
Hello everyone,
I am creating a work center and i get the error , activity type not set up in cost center ( error message cr061) . I tried doing all the possible settings , tried in kp26/kp27 . but didnt work . Can anyone give me the solution .
thanks & regards ,
BhavnaHi
Go to costing tab in the work centre and assign activity type and cost center to work center.
regards
Srinivas -
How to get a list of production orders for a work center?
Hello SDN Community,
I have an requirement to display in a pop-up window a list of production orders for a work center.
Does anyone know which screens/transactions would show this relationship?
Or better yet, does anyone know how to demonstrate this from the tables themselves?
Thank you,
Dean Atteberry.Hello Mangalraj.S
>>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
>>and execute,by this you will be able to see the operations for each order and to which
>>work center they are assigned.
The system I am working on is ECC 6.0.
For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc". But nothing that says PPIOO000 - operations and layout.
>>Or else in the in input screen of COOIS,enter the work center for which you want to see which
>>are the production order's assigned and execute.
For system I am working in, I do get a grid display when entering a work center. It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc." But no column with Work Center.
Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
Thank you,
Dean Atteberry. -
Some error in creation of Work Center
Dear Experts,
After completely creating the project, I tried to check the chart for scheduling, but to my surprise no dates were appearing and the scheduling chart was also not proper. After lots of permutation and combinations I realised that the work center(RENOV) that I created had some effect(or difference) that the dates and duration was not getting picked up from the internal activity tab on project builder(CJ20N) screen.
Hence I created a new Work Center (Ren1), which was just a copy of another working Work Center. When I used this work center along with my existing activity (ABCD) I could see the duration appearing in the dates tab and my project could also show proper schedule lines.
I did side by side comparison of the RENOV and REN1, apparently they are alike in appearance. I am curious to know what could be the reason for this anomaly.
Thanks
ManishHi,
Did you check the on the Costing tab, whether Validity period of the Cost Center is correctly showing.
Thanks
Dasa
Maybe you are looking for
-
How do i get pop3 mail to stay "completely" on iphone?
my work email is a pop3 account. it works well other than the following: 1) email loads properly w/ attachments, etc. and i can view on the iphone. 2) when i go back to look at the same message later, the iphone looks for the information again, will
-
Can't listen to more than one song itunes freezes on second song
I want to listen to samples of songs prior to purchasing them. I can only listen to one sample. When I choose a second sample Itunes stops working and I can't close it.
-
Hi all experts, I am very new to ABAP.I need to copy item data from reservation document to goods issue transaction item data using t-code MB1A. Apart from that i need the movement type to be default from reservation document. Further i need to proce
-
Standard Manager not starting.
Hi Gurus, On EBS 11i (11.5.10.2) with DB 10.2.0.4 node having CM service and all other apps services running on seperate node. The Internal Manager is running fine with Actual and Target 1 , but the standard managers are showing actaul 0 , target 20
-
I just recently downloaded the free trial of LIghtroom 5. One day i was using it and it was on my desktop and the next day it was gone, almost like it crashed and will not let me re-install. Please help