SG300 Stacking and Powered from POE by Upstream Switch

Hi Everyone,
I searched on Google for this unique behavior I discovered on a pair of SG300-28P.
On a second switch (ver 1.2.7.76) when I unplugged the power cord, to my amazement the switch turned right back on (about 1 second later), with the power cord removed. To verify that the power is indeed coming from POE, the upstream switch (ver 1.1.2.0) that is the same model (sg-300-28p), shows all 7 Ethernet ports connecting the two drawing from 2700mW, to 3000mW.
While the second switch is powered from the first over POE, the POE does not work on the second switch to power anything, and the system summary mentions something about "PoE Power Information on Master Unit".
What kind of mode is this?
Is this a stacking operation, and is POE on the second switch NOT supposed to work when powered over Ethernet from an upstream switch?
Thanks!
Jarrett

Hi Thomas,
Thank you for your response, here is a small diagram of the connection between the two switches.
[GBE 3-1– SG-300-28P]
      | - From Ports 1, 4, 5, 7, 8, 11, 16
      |
      |  - (Trunk)
      | - To Ports 1-4, 16-18
[GBE 4-1– SG-300-28P]
The show power inline output on both switches:
GBE3-1
Port based power-limit mode
Unit  Power  Nominal Power   Consumed Power   Usage Threshold   Traps
1     On      180 Watts     81 Watts (45%)         95         Disable
  Port      Powered Device         State          Status    Priority   Class
  gi1                               Auto            On        low     class0
  gi2                               Auto        Searching     low     class0
  gi3                               Auto        Searching     low     class0
  gi4                               Auto            On        low     class0
  gi5                               Auto            On        low     class0
  gi6                               Auto        Searching     low     class0
  gi7                               Auto            On        low     class0
  gi8                               Auto            On        low     class0
  gi9                               Auto        Searching     low     class0
  gi10                              Auto            On        low     class3
  gi11                              Auto            On        low     class0
  gi12                              Auto            On        low     class3
  gi13                              Auto            On        low     class0
  gi14                              Auto            On        low     class0
  gi15                              Auto            On        low     class3
  gi16                              Auto            On        low     class0
  gi17                              Auto        Searching     low     class0
  gi18                              Auto            On        low     class0
  gi19                              Auto            On        low     class0
  gi20                              Auto        Searching     low     class0
  gi21                              Auto        Searching     low     class0
  gi22                              Auto        Searching     low     class0
  gi23                              Auto        Searching     low     class0
  gi24                              Auto            On        low     class0
GBE4-1
Port based power-limit mode
Unit  Power  Nominal Power   Consumed Power   Usage Threshold   Traps
1     On      180 Watts      0 Watts (0%)          95         Disable
  Port      Powered Device         State          Status    Priority   Class
  gi1                               Auto          Fault       low     class3
  gi2                               Auto          Fault       low     class3
  gi3                               Auto          Fault       low     class3
  gi4                               Auto          Fault       low     class3
  gi5                               Auto          Fault       low     class3
  gi6                               Auto          Fault       low     class3
  gi7                               Auto          Fault       low     class3
  gi8                               Auto          Fault       low     class3
  gi9                               Auto          Fault       low     class3
  gi10                              Auto          Fault       low     class3
  gi11                              Auto          Fault       low     class3
  gi12                              Auto          Fault       low     class3
  gi13                              Auto          Fault       low     class3
  gi14                              Auto          Fault       low     class3
  gi15                              Auto          Fault       low     class3
  gi16                              Auto          Fault       low     class3
  gi17                              Auto          Fault       low     class3
  gi18                              Auto          Fault       low     class3
  gi19                              Auto          Fault       low     class3
  gi20                              Auto          Fault       low     class3
  gi21                              Auto          Fault       low     class3
  gi22                              Auto          Fault       low     class3
  gi23                              Auto          Fault       low     class3
   gi24                              Auto          Fault       low     class3
The picture of the switch powered on while it is unplugged.
Thank you,
Jarrett
http://www.jarrettcadiz.com
http://www.cloudchase.net/company/jarrettcadiz

Similar Messages

  • Looking for an Access Point with 2 Ethernet ports and powered via PoE

    Hi Gurus,
    I am looking for an Access Point with 2 Ethernet ports and the access point can be powered via PoE. I have been assigned with a requirement where the rooms need to have access point as well as an Ethernet Cable provided from the Access Point as a backup for connectivity.
    The room only has one data cable coming from the main IT room as well does not have a spare power socket to power the Access Point. Will be good if it can be centrally controlled or controller based.
    Any recommendations?
    Regards
    J

    For the backup plan, the cheapest solution may be to just run a couple new cat5e drops to the room(est cost $250). If not then purchase a small Cisco POE switch for the room(est cost $2k). For wireless I would purchase a POE enabled Cisco AP. But you will need to verify the POE switch/blade you will be connecting the AP to can power the AP you buy. I got burned by that issue when we purchased some Cisco 1251 AP's with dual radios and they needed more power than our 4500 POE blades could handle. We were told we would need to purchase new 48 port 10/100/1000 blades or power injectors. Our Cisco sales vendor took the heat for that mistake.
    Posted by WebUser Steven Kinney from Cisco Support Community App

  • Comments and questions from a new Entourage switcher

    When Leopard came out, I decided to take the plunge and move from 7 years of Entourage-ing over to the whole Mail/Address Book/iCal/.mac combo.
    It's been a challenge, and one I'm glad I'm making. I really see the future lies here, especially with all the great GTD tools (like OmniFocus) that are so well integrated into these Mac apps.
    I have a bunch of things that I'd like to ask or comment on, that I've collected since the switch. I hope these don't sound like whining. More, it's really to stimulate conversation in these areas to find out if anyone has found workarounds, add-on utilities, or even if I'm not doing something right.
    *1. Checking If They're Already In Address Book.* If I get an email from someone, I like to know if they're already in my Address Book. In Entourage, you'd right-click, select "Add to Address Book" and if they were already in there, a window would pop up, saying, "This already exists, would you like to add to it, or just open the contact". In Mail, there's no such checking, so clicking on "Add to Address Book" can end up duplicating and triplicating what's already there. In other words, I'm looking for a quick way to open up that person's contact info.
    Oddly enough, sometimes a right-click on someone's email address, who is already in ones Address Book, will bring up an "Open in Address Book." However, it's extremely inconsistent. My own brother's emails don't work like that. But odd companies, whom I rarely get email from, will show it.
    *3. No Categories.* This is the biggest missing piece for me. If I get an email from someone that treats me with familiarity, but I don't recognize them, there's no way to go into my address book and tell what relationship I have with that contact. Client? Acquaintance? Purchaser? Relative I only met once? This is because there seems to be no way to attach a Category to each contact. Once you have over 2000 contacts, it becomes difficult to remember what each person or company is there for (we have over 5200). Which product did they purchase? Or are they a vendor. Someone I met at a party? Ex girlfriend? There is the Mail Group function, but those act more like Smart folders and aren't attached to the actual contact, so when viewing the All Contacts, there's no way of telling who's who. Even if there were simply a way to color each contact, those colors could act as a category, and one could sort by them. This is my major concern right now with Mail over Entourage. Here's hoping someone creates a utility that does just this!
    *4. No Easy Way to Copy Entire Address.* Every hour, we are copying addresses and pasting them into a customized DYMO label (that has our return address and company logo on it). There doesn't seem to be any way to grab the entire mailing address in one Copy. You can highlight/copy the address, street and zip, and paste that into, for instance, a Dymo label, but you have to go back and grab the name separately. The Print function has some very interesting ways to print (including to a plain default Dymo label), but since we have customized labels, we just need to copy the address ourselves.
    *5. Search Function Blandness*. The search function could use more refinement. If you search for "Comcast," you logically get all of the contacts that have "comcast.com" in their email address (Further, if the word happens to be in the Notes field, it'll bring those up as well). But there should be a way where it gives precedent to the actual Comcast company contact—which the word "Comcast" in the company field—instead of being forced to scroll through hundreds of contacts to find the actual one I'm looking for.
    *6. Auto Name Fill To Slow.* When entering names in an email name field, you can't go very fast, because Mail takes a couple of seconds or so to recognize the name you're typing. For instance, if I'm sending an email to Mark, and type Mar, Mail autofills the rest for "Mark Smith" but the spinning thingie is still spinning, and if I don't wait that extra second, and hit tab or Return, Mail just puts in an empty "Mar" without any email address. I have to wait until the spinning thingie stops before hitting tab or return. When entering 5 or 10 email addresses, this is a hassle. Often I find that even after the spinning thingie stops, and Mail looks like it has autofilled, if I click Tab or Return, the address often still didn't fill correctly. It only stopped at the 3 or 4 letters that I'd typed in. If I didn't catch the error, I think I've sent it, only to get an error message later on.
    *7. iCal Alarm Window.* They forgot the lower right corner resize thing in the iCal Reminder window! And regardless of the number of alarms (I often have 20 or more), the green button is always grayed out. So if you have 20 or 30 iCal reminders, you can only view them one at a time in that small window, and have to use the up and down arrows. I'd like to be able to drag this window down so I can view all 20 at a time.
    *8. Limited iChat Alarm Window Delay options.* If you want to delay (called "repeat" in iCal lingo) any to-do in the iCal Alarm window, you have options for 1 minute, 5, 15, and 30 minutes, 1 and 2 hours, 1 day and 1 week. It'd be great to if a hack were developed that allowed for other useful delays, such as "tomorrow morning" (so one can see everything all at once first thing in the morning), 2 days, 3 days, and 2 weeks. A "4 hours" would be handy as well, since that's like saying "bug me this afternoon."
    Again, don't misinterpret this as whining, I'm digging the move and am totally committed to it. I just want to see if anyone has wondered about any of these, too, and has discovered a workaround (or a pref I'm not seeing!) or knows of a 3rd-party utility (or downright hack).
    Thanks for any ideas on these.
    Edit: corrected some misspellings...

    Re: Categories - I too miss that and I've 'solved' it two different ways. First, I set up groups which helps me find someone who I know within a certain context. ie, I know I'm looking for John who is a student. I look in the student group for all the Johns. Second, I use the note entry to jot down things I want to remember about the person.

  • I have 2 iMacs (24 and 27) both powered from an old Solo 520 UP which is playing up. I want to replace it. Any recommendations? Thanks

    I have 2 iMacs (24 and 27) both powered from an old Solo 520 UP which is playing up. I plan to get the local retailer to diagnose the fault as the manual isn't any help with the ID of the flashing lights. it is old and although it has served me well the regular battery replacement and service charges are expensive. I want to replace it. Any recommendations? Thanks

    I am replying to my own message. I had a final check after I posted this message and found 2 errors. The UPS should be the Sola 520 UPS. Sorry about that. I would still welcome anyone's experience with State of Art UPSs.

  • Improve Auto-Stack and Process Collections with user settings

    I have read through all of the Bridge request discussions, and encountered a few comments on the stacking process but nothing to explain my critique and feature request. My apologies for any redundancy.
    Bridge CS4 includes two features that would (virtually) streamline my entire photo-organization workflow. Brilliant! Except that they offer zero configuration and my default scenario is very different from Adobe's, so these two would-be-wonderful features are pretty much useless to me, and to anybody else who doesn't happen to shoot in the way the presets are configured.
    The first feature is to automatically group images into stacks, based on their similarity, exposure settings, and timestamps. Unfortunately Bridge considers no minimum or maximum amount of photos per stack, and has a fixed timestamp window of 18 seconds. I shoot everything in three-exposure bursts and sometimes multiple shots in less than 18 seconds, so being able to say "process collections in 3-item stacks only" would be absolutely perfect. For other people, being able to limit the timestamp range or other min/max exposure options would work great.
    The second feature, which could save me hours every week but is equally useless, is to automatically process collections in Photoshop. My biggest ire about this function is that it completely ignores stacks that I have manually created AND stacks that were previously created using the auto-stack feature. Every time this function is run, it re-runs the auto-stack process from scratch and then delivers the collections to Photoshop. Not only is this made useless by the previously mentioned inflexibility of the auto-stack process, but even if auto-stack worked perfectly, this would waste time by doing the entire thing again and denying the user the option to review the stacks before committing to the Photoshop processing. The process collections feature would also be much improved if the option were given to process ONLY panoramas or HDR photos, or auto-detect. I have never shot a panorama in my life and I'm sure plenty of people have never shot HDR, but Photoshop isn't capable of knowing our intentions and there's no reason why we shouldn't be able to instruct it.

    Agree. It is an interesting capability that falls short of being really useful. I feel like an ingrate to complain, but ...
    I'd also like to see the capability to specify something than "Auto" for the panorama option. My experience is that most of my panos work best with "Cylindrical + Geometric Correction".
    My experience is that once you get past 5+ images in a pano, it becomes very tedious ... and then 20+ images in rows is painful. Unlike a single image that you can quickly evaluate, with panos I find I need to make the pano to tell if it going to turn out.  I have been generating smaller 1800x1200 or 1200x1800 files to speed up the evaluation process, but it is still very manual and tedious.
    The Auto-Stack generates a AutoCollectionCache.xml, but I haven't found it workable to edit this. I'd like to be able to modify it to "force" my knowledge of what is in a group. It seems to check the time-stamp, and re-do the Auto-Stack, thus ignoring my changes. Sigh.

  • Cisco SG300 - IGMP and multiple switches

    Hi all,
    I have read through various Cisco documents and tried various configurations and i have been unsuccessful
    Here is the network layout
    Cisco SG300-10 in Layer 3 mode, managing all VLANS created and inter-vlan traffic is working fine
    Ports 1-4 are in LAG 1 with LACP enabled, Ports 5-8 are in LAG 2 again with LACP enabled, port 9 is connected to the ASA 5505 (Trunk port, all VLANS) and port 10, again a trunk port I use for management
    LAG 1 and 2 are connected to Cisco SG300-52 switches
    again traffic between the switches is working ok, what we would like to do is the following
    on VLAN 7, we have multiple devices streaming using UDP multicast, what we would like to do is allow PC's on VLAN 5 to be able to pick up these streams as and when they need to, the devices broadcast on their own unique UDP ranges
    Could someone please explain to me what I need to configure on the Layer 3 switch and the other two Layer 2 switches in order for this to work?
    If i put a port into VLAN 7 and can view the stream without a problem, also if there is any fine tuning to be done once this is working
    Thanks
    Andy

    Jason,
    The only advantage you would get from using SFPs (fiber tranceivers) in the GBIC slots would be if you needed to make a run of over 100m between the switches.  Unless you have a very large property with switches at either end you are just as well to use the copper ports in the setup you described.  There is also nothing wrong with chaining the SG100s together if necessary to free up a port on the RV320.  The only other thing to consider is if you are using VLANs.  Each unmanaged SG100 will only pass a single VLAN so if you need segregated distribution coming from the RV320 you would need to put each SG100 on its own port.  Or, you could run a trunk from a port on the RV320 to your SG200 and then split off your untagged VLANs from there.  Hope this answers your question and have a nice day.
    Regards,
    Mike.V

  • Re@lted t0 bluetooth dongle, stack and configuration.. .......

    Hi to all,
    Those r new or require some more info realted to STACK and statring the prohect read the following page
    http://www.cs.hku.hk/~fyp05016/kyng/bt_j9.htm
    This is may be benifical to u.
    Anyhow, i am making the my final year project related to Bluetooth and i am trying to use AVETANA which can be dowloaded from the following link:
    http://www.avetana-gmbh.de/avetana-gmbh/downloads/relicense.idmexieubncmqxqphuvrohkpjcgwbv.eng.xml
    After u visit this link u will see that, avetana require three bluetooth address. I have inputed the address 22:22:22:22:22:22 ( or 22-22-22-22-22-22). I have extracted this address from start-run-ipconfig/all after i install the device dirver software "BlueSoleil_1.6.2.1" in Win XP OS. My bluetooth dongle is "ISSC Bluetooth Device" which i extracted from Device Manager (Start - Right Click My computer - Properties - Hardware - Device Manager). Moreover my VID and UID of the bluetooth dongle is "USB\VID_1131&PID_1001". I have even cheked the microsoft XP site
    http://support.microsoft.com/kb/841803/
    for the sake of conformation that whether my bluetooth dongle is supported my Win XP sp2 and the above VID and UID is not present there.
    Now the problem is that site doesnot accept my above written address, and so i am unable to download the avetana,,,
    In the end(after searching on the net) I have concluded that might the following reason may be there:
    1) my bluetooth dongle is either of some local company manufacturer which is not recognized by win XP
    2) i am using wrong device driver
    3) i am unable to configure properly the bluetooth device.
    Moreover, even after installing the device driver (BlueSoleil_1.6.2.1) i am unable to see any bluetooth icon in the Control panel so that i can see/change the bluetooth property.
    Plz help me up..
    and if i am thinking correct, which company dongle i should purchase or which other bluetooth stack (say like atinav, BlueCove) i should use...
    I even want to know that with respect to stack (say atinav) i need to purchase the dongle or not..
    moreover, i donot want to buy any stack as this is only my academic project so i donot have so much money to buy a stack (like atinav)
    thx in advance..

    Bluetooth forum
    http://vietcovo.com http://forum.vietcovo.com

  • PI 7.1(dual stack) and PI 7.31(Single stack) -

    Friends,
    I have a proxy to proxy scenario - Proxy --> PI --> Proxy
    We have two servers PI 7.1(dual stack) and PI 7.31(Single stack)
    i did the development in ESR and my ESR is pointing to PI 7.1, when i execute the scenario i receive one error message "receiver could not be determined", i ensured that all my input is correct, still i get the same error message.
    the expectation is my scenario should point to PI 7.31, Can some one help me where and what settings i need to make in-order to make it work.
    Please Note: All my data is correct and i read some scn forums wherein they asked to refresh the cache , i have refreshed the cache also still the problem persists.
    Thanks in advance!

    Iñaki Vila
    Communication component in ID is the same as sender side.
    could you share your sender configuration?
    Did you mean Tcode - SXMB_ADM and under that Sender/Receiver configuration
    Krupa Rao Atluri
    In ID steps are correctly defined.
    I spoke to my colleague he hinted that at RUN TIME we want to point to PI7.31, he mentioned config change needed in SXMB_ADM
    any further inputs from any one could be useful.

  • FRM-13002 : Stacked and Tab Canvas must be created within Content Canvas

    Hi,
    I have a Tab Canvas with 2 pages on it.
    In one of the pages the data to be displayed will be
    out of the region(size or length) of that page.
    I read in this forum for the same problem, the
    member had suggested to use a Stacked Canvas on that
    Tab page alone and enable the scrollbars of the stacked canvas.
    When I drag and drop a stacked canvas on a tab page
    of the tab canvas I get the following error:
    FRM-13002 : Stacked and Tab Canvas must be created
    within content canvas.
    Any help is appreciated.
    Thanks in advance
    Sharath

    Hi,
    I am breaking my head over this.
    I am still unable to solve this issue.
    ========The Requirement is as follows :===========
    When I select a Tab Page of a Tab canvas, I get a
    combo box with items in it. When I select an item from
    the combo box, based on the item selected, I am
    retrieveing the data from the database and displaying
    it in that Tab Page itself. This data is in a matrix
    format. i,e Has a number of rows and columns.
    Without a Horizontal and a Vertical Toolbar attached
    to the Tab Page I would be unable to view all the records
    that are displayed on that Tab Page.
    Any suggestions or examples is most welcome and
    appreciated.
    NOTE : ALso in what situations can we use a stacked
    canvas, if the designer does not allow me to
    use it with other canvases?.
    Thanks in advance
    Sharath.

  • PI Pipeline Doubt : Pipeline Steps in ABAP stack and JAVA stack

    Hello
    Can anyone please assist me with which stages steps of the PI Pipeline are executed on the Java or the ABAP stack.
    Receiver Determination
    Interface Determination
    Message Split
    Message Mapping
    Technical routing
    Call Adapter
    Also can anyone please provide links relating to the PI architecture diagram describing it from ABAP and Java Stack Perspective and not from the Components perspective i.e. Integration Repository and Directory.
    Thanks.
    Kiran

    Hi
    Tha ABAP stack consists of the Integration Server which in turn contains your Integration Engine and Business Process Engine.
    The J2EE stack contains the Adapter Engine and your IR and ID run on the J2EE engine.
    Most of XI pipelines happens in the ABAP stack.
    All messsages picked by the Adapter Framework running on the J2EE engine are passed to the Integration Engine, which does the routing. The mapping program again gets executed on the Java stack and the rest of the pipeline servies are executed again on the ABAP stack and so on.
    Message, Java & XSLT (under Imported Archives) mappings are executed at Java stack;
    ABAP & XSLT (in ABAP stack) mappings are executed at ABAP stack.
    PI Architecture  look threads
    Architecture
    /message/5802842#5802842 [original link is broken]

  • ABAP STACK and JAVA STACK certificates

    Hi Fiends,
    I have requirement in which I want to use HTTP adapter to send message and apply security certificate. I got from sdn that if I wan to use http adapter with certificate than I have to install certificates in ABAP stack.
    My problem is I had one scenario in which I am using BC adapter to send message with security certificate and for that I had applied certificates in java stack and its working properly.
    My question is,
    Is it possible to use Java Stack and ABAP STACK together..?
    I mean is it possible to implement both of the above scenario in same xi system?

    Hi Soni,
    You cannot use the same certifcates wihch you installed in Java stack with abap stack. You need to install separealy on teh abap stack.
    For HTTP communication you dont need to install certificates. You only need when you want to use HTTPS communication. So if you want to use HTTPS communication and want to use SOAP adapter then you can use ther certifcates which is already installed on java stack. But if you want to use HTTP adapter then you need to install in ABAP stack.
    Please see this hlep on how to install on the java stack and the process behind it:
    http://www.i-barile.it/SDN/EnablingSSL&ClientCertificatesOnTheSAPJ2EEEngine.pdf
    Also check this help:
    http://help.sap.com/saphelp_nw04/helpdata/de/14/ef2940cbf2195de10000000a1550b0/content.htm
    on abap stack check seshus response:
    HTTPS  enabling
    Regards,
    ---Satish

  • Errror in RFC connection between SCM ABAP stack and JAVA Stack

    Hi All
    we have installed SCM Abap stack and SCM java stack on same system within single database.when i create rfc connection AI_RUNTIME_JCOSERVER from SCM Java stack to SCM Abap Stack its working fine,but when i am configuring same from SCM Abap to SCM Java using SM59 its giving error.
    Error Details     Error when opening an RFC connection
    Error Details     ERROR: failed to open file G:\usr\sap\SCD\DVEBMGS00\data\sideinfo.DAT
    Error Details     LOCATION: SAP-Gateway on host OPS20SCD1.Octal.pet / sapgw00
    Error Details     CALL: fopen
    Error Details     COMPONENT: SAP-GW-LIB (ReadSideInfo)
    Error Details     COUNTER: 1854
    Error Details     ERROR NUMBER: 2
    Error Details     ERROR TEXT: ENOENT: No such file or directory OR: The system cannot find the fi*
    Error Details     MODULE: gwxxside.c
    Error Details     LINE: 274
    Error Details     RETURN CODE: 451
    Error Details     SUBRC: 0
    Error Details     RELEASE: 701
    Is it compulsory to create RFC connection between abap and java installed on the same system.
    plese suggest.
    Regards

    to configure acceptance of the ABAP (integrated ITS / WebGUI) saplogonticket on the java stack, just log into the java stack (http://FQDN:50xxx/nwa) and select configuration  THe last item in the list is Trusted System... click.
    on the ensuing page, click on the add trusted system button --> by querying trusted sytem.
    Enter the required data on the page:
    system type: ABAP
    host name: FQDN
    System Nr: your instance number
    client (of the productive client)
    and a username and pw with superuser priveliges in the system (SAP_ALL/SAP_NEW, etc).
    the click next
    On the final screen, click finish.
    You have now SSO setup between the ABAP and Java stacks. To configure SSO to accept java saplogontickets on ABAP see:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2b0310d6-0801-0010-3185-b2371a280372
    This should resolve your question.

  • How is the interface between the Java Stack and ABAP stack is achieved?

    How is the interface between the Java Stack and ABAP stack is achieved?..Please send me the answer to [email protected]

    Hi,
    By interface, I assume you mean the connection between the ABAP and the Java stacks in a double stack system.
    The connection from Java to ABAP is through JCo connections defined in the WebDynpro section of the J2EE start page. So Java to ABAP requests are processed through JCo.
    The connection from ABAP to Java is through RFC connections defined in TA SM59. The ABAP to Java requests are processed through RFC.
    Refer https://dsd.esco-salt.com/StartPage/documents/integration/3.html for detailed explanation.
    The UME can be maintained in either ABAP or in JAVA depending on the persistence.
    Refer: http://help.sap.com/saphelp_nw70/helpdata/en/5b/5d2706ebc04e4d98036f2e1dcfd47d/frameset.htm
    Check UME data source configuration.
    Some quick FAQs can be found at:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/ad47eb90-0201-0010-7cb2-ddfa5ed879ec
    Hope this helps.
    Best Regards,
    Srividya.R

  • Java stack and ABAP stack in upgrading SP

    Hi,
    pls pardon if it appears silly question. I dont have much knowledge in Basis
    I am on XI3.0 with SP 09 and upgrading SP to SP20 from SAP service market place.
    How can I identify which is java stack and which is ABAP stack in evrery SP because Java stack can be directly upgraded to SP20 but ABAP stack has to be upgraded one by one (like sp 01..10..11..finally sp20).
    Could you pls let me know, from the list of files how can I identify which is ABAP stack and which is java stack ? so that I can first update the ABAP Stack one by one and then move to javastack
    thanks,
    Dushanth

    This was answered yesterday:
    Upgrading SP 09 to SP 20

  • WSUS patch status information not rolling up from Downstream to Upstream

    We have a Windows 2008 R2 WSUS server running WSUS 3.2.7600.274
    We have a Downstream replica also Windows 2008 R2 WSUS server running WSUS 3.2.7600.274
    At some stage the Patch Needed status stopped rolling up from the downstream to the upstream server. ie the needed/installed/error counts can all be seen on the downstream replica however on the upstream they all show as 0 and the updates with no status
    is the total number of patches available.
    After days of troubleshooting. We re-installed WSUS on both the upstream and downstream and let the agents report in again and the issue was resolved.
    Less that 30 days later the issue has started occurring again. Needed counts are correct on the downstream replica however this is not replicating up to the upstream. New agents that report in show "no status" for all patches, and all agents
    show 'no Status" for any new patches. 
    The downstream server has now been deleted from the upstreams "Downstream Servers" section, forcing all machines to be removed from the Upstream console and then re-sync the downstream again. Now all machines show no status for all patches.
    The WSUS instances are at the same version.
    The time is within 1 minute of each other on downstream and upstream.
    the rollup reporting is enabled on the upstream.
    Currently we have the support teams using the downstream for reporting and approving patches on the upstream. Not ideal.

    Thanks for the reply Michael,
    The SoftwareDistribution.log file on the downstream replica has the below quite regularly:
    2015-04-08 21:37:30.215 UTC Warning w3wp.5 SoapUtilities.CreateException ThrowException: actor = http://WSUSDOWNSTREAM:8530/ClientWebService/client.asmx, ID=0c03abf0-abb8-4ca3-ad3b-d61960b7922e, ErrorCode=ConfigChanged, Message=, Client=d2acf1c9-c820-428c-8634-44c2e69272e6
    2015-04-08 21:37:48.575 UTC Warning w3wp.6 SoapUtilities.CreateException ThrowException: actor = http://WSUSDOWNSTREAM:8530/ClientWebService/client.asmx, ID=e4110e63-2358-447c-b003-4596b60abee1, ErrorCode=ConfigChanged, Message=, Client=47e558c1-e57e-4948-829c-98eb99727321
    2015-04-08 21:37:50.700 UTC Warning w3wp.6 SoapUtilities.CreateException ThrowException: actor = http://WSUSDOWNSTREAM:8530/ClientWebService/client.asmx, ID=434cd484-86dc-468a-a57a-e69cd9e869c2, ErrorCode=ConfigChanged, Message=, Client=6d4c52c5-0252-4260-b07c-15674cee68f3
    2015-04-08 21:38:02.934 UTC Warning w3wp.7 SoapUtilities.CreateException ThrowException: actor = http://WSUSDOWNSTREAM:8530/ClientWebService/client.asmx, ID=423780bf-8957-4278-8af1-4520d241c683, ErrorCode=ConfigChanged, Message=, Client=6c3a8800-9261-487b-b79a-421f8d26cead

Maybe you are looking for