SharePoint 2013 : Migration of customization from development server to production server

Dear all,
I have the following scenario and servers:
1. Development Server; (Server where our developers would develop our dms and/or enhancement based on change request)
2. Test Server; (Test server where our users will test the system (dms) and/or enhancement requested)
3. Production Server (Our production server where only our end users will have access , developers wont have access to this env.)
My question is how to migrate our changes from development server to test server and finally to production server?
Is there a mechanism/ guide /best practice approach for this?
Any help/guide would be greatly appreciated.
Many Thanks & regards
Vinay

Hi Vinay, 
Thanks for posting your issue, Moving stuff from environment to environment will depending on your stuff;
Content, like list items and documents, can't be easily moved. They can be moved with 3rd party solutions, or custom code. You can do it with a C# solution or even using PowerShell.
Stuff like lists, libraries, master pages, CSS, etc. should be packaged in a solution file, either sand box or farm solution. This solution file can contain all of the assets you require, and then it can be deployed into a new environment, which then provisions
all the stuff you need (it could also load up test/sample data if needed)
Another nice solution, if you're working with a brand new site, is to back it up and restore it into another environment. That helps get the bulk of the stuff copied over, and then you can use one of the above methods for continuing updates.
Also, check out below mentioned URL to move content from on environment to another environment
http://www.sbrickey.com/Tech/Blog/Post/SharePoint_environments_-_dev_test_and_prod
I hope this is helpful to you, mark it as Helpful.
If this works, Please mark it as Answered.
Regards,
Dharmendra Singh (MCPD-EA | MCTS)
Blog : http://sharepoint-community.net/profile/DharmendraSingh

Similar Messages

  • Migrating Endeca Application and Data from development to a production server

    We need to move an Endeca app (including data domain) to a production server from a development server
    I installed EID 3.1 in the prod server successfully and this is what I did after the install:
    1. Created a new application in Studio (name: JULY2014POC)
    2. Manage Pages - Import the .lar file
    3. Copy JULY2014POC.worddat file and JULY2014POC_indexes folder to new server, location: domains/endeca_server_domain/EndecaServer/data with all the servers down. Then restarted endeca server, ps server, and studio server.
    4. When I try to create an Endeca Server connection it gives me error (Connection definition format is valid but unable to connect.)
    5. This is my entry:
      "contextPath": "/endeca-server",
      "currentFunctions": [],
      "dataDomainName": "JULY2014POC",
      "name": "JULY2014POC",
      "port": 7001,
      "restrictedToRoles": ["Administrator"],
      "server": "10.2.192.171"
    6. When I run any endeca-cmd at OS level I get the following Warning (4 times):
    $./endeca-cmd.sh list-dd-profiles
    <Oct 29, 2014 4:51:33 PM EDT> <Warning> <oracle.wsm.resources.policyaccess> <WSM-06210> <An instance of the interface oracle.wsm.policymanager.IUsageTracker bean for the local repository at path "" was not available for configuring the oracle.wsm.policymanager.accessor.BeanAccessor repository accessor for context "ResourcePattern [pattern=DOMAIN/weblogic/endeca_server_domain, subjectType=MANAGED_DOMAIN, terms={PLATFORM=weblogic, SUBJECT_TYPE=MANAGED_DOMAIN, DOMAIN=endeca_server_domain}]".>
    default
    What am I doing wrong?  Can someone please help me?  thank you

    Hi Sergio,
    How the data import and export works is what you have to look into. Whenever you export your content it gets exported to a particular directory. If the same directory should be referenced by the code base as well which would be mentioned in the properties file for fetching the configurations.
    If they are not aligned they won't pick it up. Also you will have to create pages like endeca-server and make it the default page in your properties file.
    Hope u cross this hurdle soon.
    Thanks
    Karthik V

  • In Oracle How to migrate .Rdf file from Development to Production Environ..

    Hi,
    Please explain me step by step how to migrate report(.Rdf) file from development instance to production instance ASAP.
    Thanks & Regards,
    Raj

    Rai,
    Please ask your questions in the EBS section, since they are not PeopleSoft related.
    Regards,
    Hakan

  • Transport from development server to production server in BW

    I need step by step procedure to transport contents from bw-development to bw-production server.
    please forward me if you have one .
    thanks
    ajit

    Hi Ajit
    Post this to BI form. I think that will be the right place for this query.
    BI Form
    BW transports
    Thanks
    Gaurav

  • How to export tables from development server to production server

    HI,
    Any body plz let me know how to export tables from development server to production server. what are the user names and password i need to ask my manager to do that. what are the requirements i need to ask him.
    Plz reply me ASAP.
    Thanks in advance.

    hi buddy
    first of all you should let us know the environment of production and development servers
    database versions
    and you need to have userid which has privilege to export tables of other schema. userid(owner) of the tables you want to export.
    Traditional way
    export tables in development server and then ftp to production and then import
    in the above case you should have similar database structure(tablespace etc) to avoid errors...
    if there are few tables only , you can use dblink instead of export and import...

  • Transporting requests from development server to production server

    Hi gurus,
    can anyone tell me how to transport requests from development server to production server.

    You can use SAPGUI now instead of calling tp at OS level.
    Serious: Totally wrong forum!

  • Deploy Browsable Infopath form from Development server to Production server

    Hi All,
    I have designed and published an 'Infopath 2010' browser enabled form 
    as site content type to a sub site names SITENEW.
    Form security level is 'Domain' level.
    The form contains following types of data connections and one SPD worklfow attached to form library..
    1. Send multiple Emails of current/active view
    2. Submit data to form library
    3. Get Details from SharePoint lists.
    4. WEB sercice calling GetUserProfileByAccountname ( Same site collection).
    Form library, lists in point number 3 are located in same site i.e SITENEW
    I need proper steps to deploy this to production sub site.
    Is  saving the 'SITENEW' as site template and upload to production  good idea?
    How should I take care of data conncetions?. Please advise.
    Thanks to all
    Murali Krishna Dittakavi *********************** If my answer/post resolved your query could you mark the post as answered. If it is helpful then vote as Helpful. Thanks

    hi All,
    Can any one help me for the following issue.
    Issue:-
    i am able to see the promoted column name "Test2" , but not able to see the data(Value) of the "Test2" in production server "TestFormLib" Library when i did second time promoted in second time imported subsite cmp.
    I have a issue with info path form  promotion fields in production server.
    Scenario:-
    I have a site ,ex:- http://host/sitecollection/subsite1 in dev. machine, the subsite1 have
    a form library "TestFormLib".
    published infopath form wtih some promotional fields (ex:- Test1) to "TestFormLib" library.
    i am able to see all promoted 'Test1' field data  in the library.
    taken  back up form the dev upto sitecollection and restored in the production.
    created subsite1 in prodiction server and taken subsite1 cmp from dev , imported into production server and published form which have promoted columns to "TestFormLib" library.
    able to see the promoted (Test1) field data in "TestFormLib" library in production subsite1.
     re-activated info path form to "TestFormLib" library in dev machine with additional (Test2) field promotion.
    i am able to see the "Test2" promotion field data(Value) in dev machine "TestFormLib" library.
    then , taken cmp for "SubSite1"  from the dev. machine, imported into production server on "SubSite1" .
    re-activated the latest form which is promoted "Test2" field to production server.
    i am able to see the promoted column name "Test2" , but not able to see the data(Value) of the "Test2" in production
    server "TestFormLib" Library.
    Any Suggestions to solve the above issue and i dont want to recreate the library in production . Because the data has been deleted.
    Help please..
    Thanks & Regards,
    Raghava Reddy S

  • Transporting from DEV server to Production Server

    Dear Experts,
    Like in ABAP and other SAP modules we are having Transport Requests to transport from Dev server to Production server In XI how can we transport all the configuration done by me from Dev server to Production server.

    Hi,
    In XI we can transport in two ways :
    1) File Transport
    2) Using CMS which needs configuration to be done
    Using the File Transport you can easily the Export the Objects and Import the Objects in the Target system.
    Select the Object in the Design or Configuration ->right Click you will find Export option.
    When you select the It creates the .tpz file which can be imported in the Target System
    Using file transfer or CMS we transport xi objects.
    Transporting XI from DEV to QA
    Look into this blog for how to export / improt IR and ID objects,
    XI Software Logistics II: Overview
    XI Software Logistics 1: SLD Preparation
    Transporting IR,ID Objects using File System
    http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_nw2004s/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm
    Regards
    Ganga

  • Transferrring Objects from my Workstation to Production Server

    Hi Guys,
    I should really thank all you guys for the your help.
    I need to know detail steps invloved in Transferrring the Objects from my Workstation to Production Server or testing server.
    Thanks
    Sid

    Hi,
    When u create a object and save it, it will ask for the package name to save, then assign one package and then it will ask for the request .
    Create the new request. and this request can be released before transporting.
    Go to se09 or se10 and then select ur request number and click the release button. then object will  be released and is ready to transport to quality.
    After that goto <b>STMS</b> and then transport it to qwuality server.
    However it will be the work of the basis guy to transport to quality after u have released...
    Hope it is needful..
    Cheers,
    Simha.

  • Lotus Notes to SharePoint 2013 Migration support

    Hi,
     We have a requirement to migrate existing Lotus Notus 7.5 application to SharePoint 2013. Customer asked us to develop the solution based on Cloud based. I heard that there are many third party tools available to migrate it. Please find my below queries
    and suggest me which tools is best in the market and which tool covered all the features based on my needs
    List of required features:
    1. Existing LN application has 550 web pages and 1750 documents. Which tool is used to miigrate the webpages to Sharepoint pages?
    2. Existing LN Application has some features like below,
      a. Calendar
      b. Web Casts
      c. Search
      d. News feed.
    How to migrate the data and what OOTB functionality SP provides?
    3. Can we migrate the same look and feel of web page of LN into SharePoint?
    4. Webpages contains some javascripts, html and css... do we need to develop from scratch and use the existing css or using tool it will create automatically?
    Balaji -Please click mark as answer if my reply solves your problem.

    1. Existing LN application has 550 web pages and 1750 documents. Which tool is used to miigrate the webpages to Sharepoint pages?
    Inder: Quest \ avepoint can help
    2. Existing LN Application has some features like below,
      a. Calendar
      b. Web Casts
      c. Search
      d. News feed.
    How to migrate the data and what OOTB functionality SP provides?
    Inder: Yes except webcast. video library should do webcast
    3. Can we migrate the same look and feel of web page of LN into SharePoint?
    Inder: you can modify the html and use it with sharepoint manager. I would recommend you to recreate new
    4. Webpages contains some javascripts, html and css... do we need to develop from scratch and use the existing css or using tool it will create automatically?
    Inder: Yes. new files needs to be developed. some can be used as it is.
    If this helped you resolve your issue, please mark it Answered

  • ERROR WHILE MIGRATING SSIS PACKAGE FROM DEVELOPMENT TO PRODUCTION IN EXECUTION

    HI,
    I have a problem while executing the package after migrating from DEVELOPMENT to PRODUCTION.
    We have two SQL database connections DEVMIDDLEWARE and PRODMIDDLEWARE for dev and prod respectively. When we have created package in development we have used DEVMIDDLEWARE and we have credentials in CONFIG file of that package and executed sucessfully. When
    we migrated this same package to PRODUCTION when have given credentials of PRODMIDDLEWARE in CONFIG FILE of this package we are getting error as below
    "Description: Failed to decrypt protected XML node "DTS:Password" with error 0x8009000B "Key not valid for use in specified state.". You may not be authorized to access this information. This error occurs when there is a cryptographic
    error. Verify that the correct key is available.  End Error  Error: 2014-10-28 07:41:44.24     Code: 0xC0016016     Source:       Description: Failed to decrypt protected XML node
    "DTS:Password" with error 0x8009000B "Key not valid for use in specified state.". You may not be authorized to access this information. This error occurs when there is a cryptographic error. Verify that the correct key is available. 
    End Error  Error: 2014-10-28 07:41:44.85     Code: 0xC0202009     Source: Package Connection manager "DEVBIZTALKDB01.RHUL_Staging.devmiddleware"     Description: SSIS Error Code DTS_E_OLEDBERROR. 
    An OLE DB error has occurred. Error code: 0x80040E4D.  An OLE DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E4D  Description: "Login failed for user 'devmiddleware'.". 
    End Error  Error: 2014-10-28 07:41:44.85     Code: 0xC020801C     Source: Package Log provider "SSIS log provider for SQL Server"     Description: SSIS Error Code DTS_E_CANNOTACQUIRECONNECTIONFROMCONNECTIONMANAGER. 
    The AcquireConnection method call to the connection manager "DEVBIZTALKDB01.RHUL_Staging.devmiddleware" failed with error code 0xC0202009.  There may be error messages posted before this with more information on why the AcquireConnection method
    call failed.  COM error object information is available.  Source: "Package"  error code: 0xC0202009  Description: "SSIS Error Code DTS_E_OLEDBERROR.  An OLE DB error has occurred. Error code: 0x80040E4D.  An OLE
    DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E4D  Description: "Login failed for user 'devmiddleware'.".  ".  End Error  Error: 2014-10-28 07:41:44.98    
    Code: 0xC0202009     Source: Package Connection manager "AGRDB01.abwr66"     Description: SSIS Error Code DTS_E_OLEDBERROR.  An OLE DB error has occurred. Error code: 0x80040E4D.  An OLE DB record
    is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E4D  Description: "Login failed for user 'CC\epsdbuser'.".  End Error  Error: 2014-10-28 07:41:44.98     Code:
    0xC020801C     Source: Data Flow Task OLE DB Source [1]     Description: SSIS Error Code DTS_E_CANNOTACQUIRECONNECTIONFROMCONNECTIONMANAGER.  The AcquireConnection method call to the connection manager "AGRDB01.abwr66"
    failed with error code 0xC0202009.  There may be error messages posted before this with more information on why the AcquireConnection method call failed.  End Error  Error: 2014-10-28 07:41:44.99     Code: 0xC0047017    
    Source: Data Flow Task SSIS.Pipeline     Description: component "OLE DB Source" (1) failed validation and returned error code 0xC020801C.  End Error  Error: 2014-10-28 07:41:44.99     Code: 0xC004700C    
    Source: Data Flow Task SSIS.Pipeline     Description: One or more component failed validation.  End Error  Error: 2014-10-28 07:41:45.00     Code: 0xC0024107     Source: Data Flow Task     
    Description: There were errors during task validation.  End Error  DTExec: The package execution returned DTSER_FAILURE (1).  Started:  07:41:44  Finished: 07:41:45  Elapsed:  0.859 seconds.  The package execution failed. 
    The step failed."
    Can anyone help for this error.
    Many thanx in Advance

    Hi Babloo,
    According to the error message, the package may have failed are as follows:
    The user account that is used to run the package under SQL Server Agent in PRODUCTION server differs from the original package author.
    The user account does not have the required permissions to make connections or to access resources outside the SSIS package.
    The package may not run in the following scenarios:
    The current user cannot decrypt secrets from the package. This scenario can occur if the current account or the execution account differs from the original package author, and the package's ProtectionLevel property setting does not let the current user
    decrypt secrets in the package. In this scenario, we can change the SSIS Package ProtectionLevel property to EncryptSensitiveWithPassword, then modify the SQL Server Agent job step command line to include this password.
    File access fails because the current user does not have the required permissions to write to the file share that the connection manager accesses. In this scenario, we can create a SQL Server Agent proxy account. This proxy account must use a credential
    that lets SQL Server Agent run the job as the account that created the package or as an account that has the required permissions.
    References:
    SSIS package does not run when called from a SQL Server Agent job step
    Run an SSIS Package Under a Different Account
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • 2.DMS uploading from Development server to Production server[GO LIVE]

    Hi All
    Is it all document type [dms] which r created in development server, these will transefer from development to production server by [uploading]transport request.
    Or is It needs Basiss Help.
    Rgds
    Ben.

    hi,
    I think for moving customization request to production, u dont need help of basis, if u have authorization then u can transport the request.
    Before moving first identify which are the request number u want to transport and release them using t code SE10 in development server.
    Go to production server, execute STMS t code for importing the request from devp server.
    Once ur request moved to production successfully then all customization will be available in production system except number ranges and class and characterstics.
    If ur using classification system, then create class and characterstics in production system it self.
    award points if useful
    regards
    Sham

  • SharePoint 2013 - consuming service applications from a 2010 farm?

    Hi all,
    This question relates to both SharePoint 2010 and SharePoint 2013. Does anyone know whether it is possible/supported for a SharePoint 2013 farm to consume service applications from a 2010 farm (search/UPS etc. via SA publishing)?
    There’s obviously plenty of documentation explaining how this would work the other way around (2010 farm consuming SA’s from a 2013 farm). Unfortunately, I haven’t found that much info on the scenario I’ve described above.
    Many thanks
    Matt

    I don't know that it won't work, but in the article dealing with upgrades MS specifically recommends upgrading Services Farms first when upgrading mixed installs.  So you should be able to share a 2013 service with a 2010 farm, but not the other way
    around.  You can read about it here:
    http://technet.microsoft.com/en-us/library/cc303435(v=office.15).aspx
    Paul Stork SharePoint Server MVP
    Principal Architect: Blue Chip Consulting Group
    Blog: http://dontpapanic.com/blog
    Twitter: Follow @pstork
    Please remember to mark your question as "answered" if this solves your problem.

  • Vignette to SharePoint 2013 migration

    HI 
    We have a requirement to migrate an internal portal for one of our client from Vignette to SharePoint 2013. We are looking out for manual and automated process to migrate but most of the popular tools that we saw does not migrate to SharePoint 2013 for example
    DocAve, Protenq etc. Also there is no document available that provides the details about the migration scope as to what components of Vignette will be migrated with the help of tool and what will not.
    Any guidance would be highly appreciated.

    The DocAve facility for checking the migration route seems to be the most popular one. Basic Information is viewable here
    The elements that can be easily migrated can be seen here.  This link also has white papers and guide that should hopefully answer some of your questions.
    http://www.avepoint.com/vignette-sharepoint-migration-docave/
    As a disclaimer, I've not used this tool and I don't have any affiliation with DocAve.
    Hope that helps
    Steven Andrews
    SharePoint Business Analyst: LiveNation Entertainment
    Blog: baron72.wordpress.com
    Twitter: Follow @backpackerd00d
    My Wiki Articles:
    CodePlex Corner Series
    Please remember to mark your question as "answered" if this solves (or helps) your problem.

  • DMS uploading from Development server to Production server[GO LIVE].

    Hi, All,
    I have configured DMS at client palce. Here they don't have quality server.
    What we configured will be tested in development it self. So in the unit test there is no errors at all and
    uploaded some documents in the development also.
    So i want to know how i could tranfer request and full DMS configuration to production server[Go Live].
    1.Wheather I could need Basiss Help.
    2.What are all precautions i could take before and after 'go live'
    3.What are all requirement needs to 'go live'.
    plz give procedure i details
    Rgds
    Ben

    hi,
    there no mandatory of quality server to test , if ur confident, u can directly transport to production
    For request transporattion its better to have basis person, if u know the procedure, u can also import from production server.
    Before that release all transport request in devp server.
    After transporting to prod server check wheather all customising setting imported or not, wherever necessary u create master data in production system it self(Class and characterstics, and number ranges).
    For going live u need to create all roles and autorization and need to assign to respective user ids.
    award points if useful
    regards
    sham

Maybe you are looking for

  • Unable to mount volume

    I have a partitioned USB drive hooked up to my Intel 24" iMac. Two of the partitions are HFS+ formatted while the third is MS Dos File System FAT32 formatted. On my G4, I can mount the two HFS+ volumes when I go to the Network icon in my sidebar. I c

  • SOAP Sender Adapter

    i work with some sender SOAP adapter in my xi project. After installing SP19 all Communication channell gets error when i send message: the error (in adapter monitoring) is following : 2006-12-15 15:29:01 Error Returning to application. Exception: co

  • Cancelling Rejected Items in DP90

    Hi SAP Gurus,      Is there an easy way to reverse/cancel items that have been rejected in RRB DP90 ?? Look forward to any help Ross

  • Ways to get the line number in sapscript form?

    Hi, all. May I know whether that there are ways to get the line number in sapscript form? For example, I want to get to know the certain line number in the MAIN window. Thanks in advance.

  • Systeme Preference Corruption for All Users!

    In one of my user account, I can't get the scroll bars to show!!! I want in preference-general and select ''Always'' under Show Scroll Bars, but I can't see them in Safari, Mail... When I close Preference, my ''Always'' selection is gone and it retur