SharePoint Designer Workflow 2010 - System Account Initiator

I am current running SharePoint 2013. I have a drop-off library which routes documents to the correct location. But when I use the drop-off library the workflow initiator shows up as "System Account". When the document is added to the SharePoint 2010
Workflow fails (I've been able to get 2013 Workflows to work but I really need SharePoint 2010 Workflow for this scenario).
How can I solve this problem? Is there a setting I can change? Or even change the Workflow initiator?

Hi Spupload,
It is by design that Content Organizer rule will route documents with System Account and 2010 workflow cannot be triggered by system account.
I recommend to start the workflow programmatically with Event Receiver.
You can refer to the links below for detailed codes:
http://blog.ozippy.com/2010/06/starting-workflow-when-content.html
http://zimmergren.net/technical/starting-a-sharepoint-workflow-from-code-event-receiver
Best regards.
Thanks
TechNet Community Support
Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact
[email protected]

Similar Messages

  • Updating a title column in list that is a lookup column to document library in sharepoint designer workflow 2010

    Hi I have a requirement to create a list item in Contracts List when a document is uploaded in Contracts Vendor library.
    Contracts List will
    have  columns - Contract Name ( title column), Contract Number, Contract Start date and end date.
    Contracts Vendor library will have Contract
    Name,Contract NUmber.
    User will select the Contract Name from drop down ( this is look up column linked to Contract Name in Contract
    List).When user uploads document in Contract Vendor library then item should be created in Contract List with selected Contract Name and
    Contract number .
    Contracts and Contracts Vendor are related by look up Contract Name. Contract Name is internally a title column in
    Contracts List.
    Issue1 :
    Since Contract number is look up column, while I am creating item the Contract name is not getting updated in
    Contracts List. I have to use sharepoint designer workflow to achieve this task. Title colum or Contract Name shows no title.
    Issue 2:
    One
    more issue I am facing is that Contracts List has Section and Division cascaded drop downs when i select values from section and division
    dropdowns and save item in Contracts list the values are getting saved in Contract List.
    Could anyone suggest me how to handle this ? I am
    attaching the screenshots of the list and library structure. TRuly appreciate your help.
    Below are screenshots of the list structure

    Hi,
    According to your post, my understanding is that you wanted to update a title column in list that is a lookup column to document library in sharepoint designer workflow 2010.
    I try to reproduce the issues as follows:
    Create a custom list named Contracts List, add columns: Contract Name ( title column), Contract Number(Number), Contract Start date(Data and Time) and Contract End date (Data and Time).
    Create a document library named Contracts Vendor library, add columns: Contract Name(Lookup), Contract NUmber(Lookup).
    Create a workflow associated to the Contracts Vendor library.
    Add action: Create List Item.
       5. Start the workflow automatically when an item is created.
       6. Upload a document, select the Contract Name and Contract NUmber, the workflow will be started automatically.
       7. Open the Contracts List, an item will be added with the Contract Name and Contract Number in the Contracts Vendor library.
    Thank you for your understanding.
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • Designer Workflows with System Account

    Hi..
    I created a SharePoint List Workflows using SharePOint Designer and i want to know the reason why workflow not working for
    System Account and for remaining users it working fine.
    Ravindranath

    Check these links...you may find your answer here...
    http://blogs.msdn.com/b/sowmyancs/archive/2009/03/31/issue-with-sharepoint-designer-workflow-to-start-under-system-acccount.aspx?Redirected=true
    https://blogs.technet.com/b/victorbutuza/archive/2009/03/14/workflows-do-not-start.aspx
    ***If my post is answer for your query please mark as answer***
    ***If my answer is helpful please vote***

  • Sharepoint designer workflow 2010 change status

    Hi
           I have a document library which contain certains folders .I have written a sharepoint designer OOB workflow (i e  a simple approval workflow) When I tried to add some items inside a folder for eg I have a folder named Test
     and i add a document testdoc inside the folder Test . Workflow name status is "In progress" (for the items inside  Folder Test) but workflow status name is "COMPLETED" for parent Folder Test (but should be "In progress"
    as approval process is not completed) . Is there a way  to stick on to the folder (parent folder)workflow status name  to "In progress" as items (as it is still "IN PROGRESS" status). 
    Thanks in advance
    nain1987

    Hi
    Workflow is attached to an item. Each folder is also considered as an item. When you create a folder first, workflow triggers and then gets completed. Again when you create an item inside the folder, workflow triggers and hence the status of the item inside
    the folder is in progress and workflow for the folder item is already completed.
    Thanks

  • When building a vacation leave holiday system using SharePoint Foundation 2010 and SharePoint Designer workflows how can I add half day functionality?

    Hi,
    I have built a vacation leave holiday system for SharePoint Foundation 2010 using SharePoint Designer workflows and Javascript. Everything works perfectly but I'm struggling to design a solution for users to specify half day requests that span over dates
    greater than 1 day, i.e. my half day solution works but only when the start and end date are the same. How would I change the user interface to allow users to choose which day they want the half day to be requested when the vacation leave holiday request is
    from, say,  6th - 10th Jan 2014?
    Thanks.

    Hi ,
    I have a test on my machine with a custom approval workflow and it can work normally .Here are the detailed steps :
    1.      
    Open the site in SharePoint Designer .Create a workflow to associate with the document library .Set the workflow to start when an item is created and when an item is changed
    .Also allow the workflow to start manually .
    2.      
    Choose ‘Collect Data from a user’ .
    3.      
    Click on the data and give a name to the Task created .
    4.      
    Define the custom form field name as ‘Approve ?’ .Set the information type as Choice .
    5.      
    Set the choices as ‘Approve’ and ’Reject’ .Display as Checkboxes .Uncheck the ‘Allow fill-in values’ and ‘Allow blank values’
    .Click finish to save .
    6.      
    Click on users and add the users who will approve the documents .
    7.      
    Keep the output to variable as collect .
    8.      
    Add a new step .Choose ‘If any value equals value ’ .Set the any value ‘Data source’ as  workflow variables and parameters .Set the ‘Field
    from source’ as Variable: collect .
    9.      
    Set the value behind ‘equals ’ as ‘Approve’ .
    10.  
    Add a new action ‘Update list item ’ .Set the item as current item .Add the field Approval status as Approved .
    11.  
    Add an Else-if branch to update the Approval status as Rejected .
    12.  
    Publish the workflow and test in your site .
    Thanks,
    Entan Ming

  • SharePoint Designer Workflow unnecessary set Modified By value as System Account.

    Hi Friends,
    I have created SharePoint Designer Workflow, it update other List Item as well same Item on Item Adding and Editing event.
    I have Developed workflow using System Account.
    While doing any change by general user in Workflow list it update Modified By value to System Account only.
    I want modified by value as General user only.
    Or No need to update modified and Modified by details.
    So please help me How I can resolve this issue.
    Thanks,
    Digambar Kashid 
    Thanks and Regards, Digambar Kashid

    Hi Digambar, that's by design, but here are some workarounds:
    http://blog.mmasood.com/2012/12/approval-worfklow-showing-system.html
    https://social.technet.microsoft.com/Forums/office/en-US/f3f9b1ff-9507-4471-935d-4ab8937839b6/oob-approval-workflow-makes-modify-by-field-as-system-account?forum=sharepointadminprevious
    cameron rautmann

  • Can we have a loop in SharePoint designer workflows?

    I am using Infopath2013 form along SharePoint Designer workflows. The approvers are dynamically selected based on the multiple drop down selection. In certain scenarios, there may be 10 approvers and workflow should flow everyone in sequence with approve/reject
    option. If anyone rejects, the workflow stops, else workflow should reach till 10<sup>th</sup> approver.
    I am using Repeating table and I am able to capture all the 10 approvers and put them in a SharePoint list as column value. But in SharePoint Designer, I am not finding way to loop the task for the number of approvers.
    Is there way create a loop in SharePoint workflows?
    Thanks!
    Ravi
    Ravi

    Hi Ravi,
    Do you use SharePoint Designer 2007?
    Have you tried to use sequence approval workflow with participants in serial order?
    http://office.microsoft.com/en-001/sharepoint-designer-help/understand-approval-workflows-in-sharepoint-2010-HA101857172.aspx
    If you use SharePoint Designer 2013, there is an "loop" operation available you can take a look.
    http://prasadtechtactics.blogspot.in/2012/07/sharepoint-designer-2013-workflows-part_24.html
    Thanks
    Daniel Yang
    TechNet Community Support

  • SharePoint Designer Workflow - Unable to use ProjectUID in Emails

    Hello Everyone,
    I have a SharePoint Designer workflow running smoothly. The client now has a requirement where every email should link to the project's PDP page.
    I can do this by stitching a URL together like this:
    But when my workflow gets to this email, it fails with a status of Suspended (and the error below).
    RequestorId: 8df1cbcb-fc04-dc9f-0000-000000000000. Details: RequestorId: 8df1cbcb-fc04-dc9f-0000-000000000000. Details: An unhandled exception occurred during the execution of the workflow instance. Exception details: System.ApplicationException: HTTP 403
    {"error":{"code":"35120, Microsoft.ProjectServer.PJClientCallableException","message":{"lang":"en-US","value":"WorkflowActivityInvalidArgument"}}} {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["0"],"SPClientServiceRequestDuration":["276"],"SPRequestGuid":["8df1cbcb-fc04-dc9f-b9ff-b373c077c4f0"],"request-id":["8df1cbcb-fc04-dc9f-b9ff-b373c077c4f0"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"MicrosoftSharePointTeamServices":["15.0.0.4517"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
    RequireReadOnly"],"Cache-Control":["max-age=0, private"],"Date":["Tue, 11 Feb 2014 20:48:48 GMT"],"Server":["Microsoft-IIS\/7.5"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]}  
    at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext context)   at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager)  
    at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager bookmarkManager, Location resultLocation)
    I have even tried sending an email with nothing but the ProjectUID and it still fails with this message, so I know that this variable is the issue.
    I have this issue on multiple environments and multiple servers, I cannot believe I couldn't find anyone else having this issue while researching.
    Does anyone have any clue as to what is happening? Isn't this happening for you as well?
    120811049008

    Hello Paul,
    This seems to be a bug and supposed to be fix in December 2013 CU. Please review the below thread
    http://social.technet.microsoft.com/Forums/ie/en-US/71829125-09de-4094-9a0d-d9740aa73348/error-workflow-project-server-2013
    Hope this helps.
    Thank you,
    Kiran K.

  • How to see/use Target Audience column in SharePoint Designer Workflow (SharePoint 2013 Online, Designer Workflow)

    Hello,
    I'm attempting to use use the Target Audiences field in a SPD 2013 workflow, in this case just attempting to log the value to history for testing purposes.  This is failing saying the column does not exist.
    I enabled Audience Targeting on the list then create a simple workflow to log the value to history when the item changes.
    I change an item and the workflow starts, but when it gets to any action looking at "Current Item:Target Audiences" it stops and says:
    HTTP BadRequest to <site url>/_api/web/lists(guid'XXXXXXXX')/Items(4)?%24select=ID%2CTarget_x0020_Audiences 
    The field or property 'Target_x0020_Audiences' does not exist. 
    But it does.  It is listed in the list setting and enabled for the content type.
    I ran the listed API through an API program and sure enough, Target Audience is not listed in the results object.
    I'm 99% sure I've enabled this and that the field is present and the workflow is valid.  I ran the same situation on two lists to ensure it wasn't a hiccup, same results.
    Is this a know issue?  I couldn't find anything obvious online saying you cannot see this field via workflow, most of what i found said this would work.
    Thanks an advance for any input.

    Thanks so much Lisa, for the clarification.
    I understand what you have explained, and have seen several similar explanations that have lead to my confusion.  Can you elaborate a bit, maybe for the sake of future information seekers?
    I understand that audiences can be defined using the rules operations in Central Admin, but it seems another standard function is to just directly assign existing SharePoint groups.  I think this is what you mean above, but this is also the point of
    my misunderstanding.
    In this particular setup I have only used existing SharePoint groups with no audiences defined in Central Admin.  List Item A has a target audience of SharePoint group X, just that simple of a setup.
    Assuming the above is valid, I would then like to see or alter the groups via SPD workflow.
    Based on the following posts, I was under the impression this may be possible (but obviously not fully clear and thus I posted this):
    https://social.msdn.microsoft.com/Forums/sharepoint/en-US/5eb984ba-55a3-4da7-a904-c34b2fece84c/how-do-i-set-the-target-audience-using-sharepoint-designer-workflow
    http://www.sharepoint-tips.com/2011/01/setting-target-audiences-with-code.html
    (sorry about lack of links, my account must still require verification)
    So in SPD, I set a simple action such as "Log Current Item:Target Audience to history" (note the I am able to select target audience in SPD like any other field with no errors).  At this point I am assuming everything is valid as SPD is treating
    the field like any other string field.  When executed the error in the above post comes up.
    So to confirm your explanation, this is not supported?  Even though the field is available for selection by design, it is not capable of use and known to produce errors in all cases of its use?  The first post above is 100% wrong and you cannot
    use SPD to set/view the target audience field?  The second post is also wrong as it seems to present the fields as available for alteration using string concatenation?
     If in fact the field is present by design, but also impossible to use by design, is this potentially a bug as the field is not supposed to be available if it will always produce the error when used with no error in SPD during compile?
    Thank you again for the reply and I hope we might be able to provide a rock solid answer to this for future seekers. 

  • When a task expires is not triggered in SharePoint designer workflow

    Hi all,
    I am using sharepoint designer workflow for document approval and the tasks are assigned in serial.. but the when a task expires event is not triggered..  I have set due date for the task process but still it is not triggered.. Can anyone tell me how
    to resolve this issue..
    I am using this option to escalate the task to the next approver if it is not completed within the specific duration.. Can anyone tell me if there is any alternative way to do this..

    Hi ,
    I  understand that when a task expires ,the workflow doesn’t create the tasks for next approval .This is how serial tasks works .You
    need to complete the first task first before the next task is generated .So you can add actions by change the behavior of a single task .
    Open the workflow in SharePoint Designer .Click Approval(1) to modify the approval process .
    Choose ‘Change the behavior of a single task ’ on next page .Find the ‘When a task expires ’ section  .
    Add actions like ‘Rescind task’ (this action completes the task without an outcome) ,’Reassign Task’(reassign current task to another people ), ‘escalate task ’(escalate current task to manager)  .
    In this way ,the current task is whether completed or reassigned for completion ,then the next task will be created after current task is completed .
    For more information about this task action ,please refer to this site:
    Workflow actions in SharePoint Designer 2010: A quick reference guide :
    http://office.microsoft.com/en-us/sharepoint-designer-help/workflow-actions-in-sharepoint-designer-2010-a-quick-reference-guide-HA010376961.aspx
    Thanks
    Entan Ming
    TechNet Community Support

  • Bug? - SharePoint Designer workflow email to a person field - combines two emails to create an invalid email

    Hi there,
    In my SharePoint 2010 Custom List - I have a SharePoint Designer workflow that sends emails to a Person Type column called "Notify". However when I type several users here in NewForm.aspx in Notify field - two of the users do NOT get email. On
    checking logs it so turns out that email is being sent to: [email protected]; [email protected]@c.com; [email protected]; [email protected];
    Now the bold text above is an invalid email address (without the semi colon between two users) and user2 and user3 do NOT get any email.
    The way it is implemented in SharePoint Designer workflow is pretty straightforward - see Notify field below.
    Any help will be appreciated on how to fix this? This seems to be an SPD bug?
    Thanks.

    Hi,
    According to your post, my understanding is that you wanted to send email to a person field.
    I try to reproduce the issue, however, I can send email to five people correctly.
    I recommend to create workflow as below:
    Then when you open the email, you can find that it cc to five users.
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • SharePoint Designer Workflow 'Failed on Start', SP Logs has WorkflowValidationFailedException, works ok when recycle IIS App Pool and restart

    Hi there, 
    I know there are a lot of posts about "Failed to Start" errors, but I have yet to see one that describes our problem.
    We have workflows built with SharePoint Designer 2007
    Normally these workflows start ok and work completely
    Occasionally though they will all fail to start, instead showing "Failed on Start (retrying)" in the Workflow Status and the following exception in the SP Logs:
    01/16/2015 15:43:27.28 w3wp.exe (0x15D4) 0x1A00 Windows SharePoint Services Workflow Infrastructure 936l High Engine RunWorkflow: System.Workflow.ComponentModel.Compiler.WorkflowValidationFailedException: The workflow failed validation. at System.Workflow.Runtime.WorkflowDefinitionDispenser.ValidateDefinition(Activity root, Boolean isNewType, ITypeProvider typeProvider) at System.Workflow.Runtime.WorkflowDefinitionDispenser.LoadRootActivity(Type workflowType, Boolean createDefinition, Boolean initForRuntime) at System.Workflow.Runtime.WorkflowDefinitionDispenser.GetRootActivity(Type workflowType, Boolean createNew, Boolean initForRuntime) at System.Workflow.Runtime.WorkflowRuntime.InitializeExecutor(Guid instanceId, CreationContext context, WorkflowExecutor executor, WorkflowInstance workflowInstance) at System.Workflow.Runtime.WorkflowRuntime.Load(Guid key, CreationContext con...
    01/16/2015 15:43:27.28* w3wp.exe (0x15D4) 0x1A00 Windows SharePoint Services Workflow Infrastructure 936l High ...text, WorkflowInstance workflowInstance) at System.Workflow.Runtime.WorkflowRuntime.GetWorkflowExecutor(Guid instanceId, CreationContext context) at System.Workflow.Runtime.WorkflowRuntime.InternalCreateWorkflow(CreationContext context, Guid instanceId) at System.Workflow.Runtime.WorkflowRuntime.CreateWorkflow(Type workflowType, Dictionary`2 namedArgumentValues, Guid instanceId) at Microsoft.SharePoint.Workflow.SPWinOeHostServices.Send(SPWinOeWorkflow winoeworkflow, SPWorkflowEvent e) at Microsoft.SharePoint.Workflow.SPWinOeEngine.RunWorkflow(Guid trackingId, SPWorkflowHostService host, SPWorkflow workflow, Collection`1 events, TimeSpan timeOut)
    What is strange, is that if I recycle the App Pool for the SharePoint site and then restart the workflows, they all work fine for a time. Until the next time they don't =) 
    The workflows must be configured ok since they do work complete at time, but I wonder if there is something with the memory usage of the app pool or something that is being re-compiled when the App Pool is recycled
    The App Pool is set to recycle nightly, and when virtual memory > 1700MB or memory > 1000MB
    Is anyone able to shed any light on this problem?? Or what steps I can take to debug the problem further.
    Thanks in advance
    Miguel Clark =)

    Hi Sudip,
    Thanks for the link.
    The workflows in question are SharePoint Designer workflows using standard actions, so unsure exactly how to check the 'correlation tokens' and 'DLLs', plus the workflow works fine as soon as I recycle the IIS App Pool, so do not see how these could be the
    problem
    As to the 'lodctr' commands, we have tried  these in the past, to no effect. Though may try them again next time the issue comes up just to see if it does the same thing as recycling the app pool.
    My big question here is "why would it suddenly work after recycling the app pool??" I feel like it must be something memory related, since recycling the app pool releases the resources used by the IIS worker process.
    Miguel =) 

  • Copy ID from one library to list using sharepoint designer workflow 2013

    Hello,
    I am new In SharePoint Designer workflow.
    I want to copy ID [by default] from one SharePoint Library to SharePoint List by using SharePoint Designer workflow 2013.
    So Please provide me any solution on it.
    Thanks,
    Samadhan.

    Hi Bjorn,
    Please create a workflow based on SharePoint 2010 platform, there is OOB action "Copy List Item" which can copy attachment to another list.
    Then use "Update List Item" action to update fields value for the new item. In this action, we could use Item title to locate the newly created item. For your reference:
    However, we cannot make this workflow to start automatically. As workaround, we could use SharePoint Designer to create a Custom Action in the Source List and initiate the workflow. In my test, I created a Custom Action in the type of List Item Menu. Then
    the custom action would appear in the Item ellipsis dropdown menu:
    Regards,
    Rebecca Tu
    TechNet Community Support
    Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact
    [email protected]

  • Edit webpart properties using sharepoint designer workflow

    Hi Guys,
    I am not sure if there is any way to Edit properties of Excel Web Access WebPart using SharePoint Designer Workflow. I want to change workbook source of a web part on specific date.
    I don't have environment to write custom code.
    Thanks, Nilesh

    Hi,
    Per my knowledge, we can't achieve your requirement using SharePoint Designer Workflow.
    We have to use custom code to achieve it. The following articles for your reference:
    How to: Work with Web Parts on a Page Using JavaScript
    http://msdn.microsoft.com/en-us/library/office/hh185010(v=office.14).aspx
    Programmatically Update the SharePoint Web Part Properties on the List Forms
    http://nikpatel.net/2010/11/04/programmatically-update-the-sharepoint-web-part-properties-on-site-pages/
    ExcelWebRenderer class
    http://msdn.microsoft.com/en-us/library/microsoft.office.excel.webui.excelwebrenderer(v=office.15).aspx
    Best Regards
    Dennis Guo
    TechNet Community Support

  • Convert word document in PDF,e pub,by using third party dll in Sharepoint designer workflow 2013?

    Hi,
    I want to convert word document to PDF,  EPub, by using third party (.dll).
    In SharePoint designer workflow in 2013.
    So that I have question, Can we Install third party (.dll) in SharePoint workflow Designer for conversion?
    Means I have created one simple application conversion of word to e Pub, PDF, Image by using (Spire.doc dll) in Visual Studio.
    So this same conversion I want to work in SharePoint designer workflows?
    So anybody has any solution then please provide me.
    Thanks,
    Samadhan

    it might be worth looking at these CodePlex steps, that plug directly into the Word Automation Services.
    http://sp2010wordautomation.codeplex.com/
    It'll provide you with a configurable step like the below that should help you achieve your aims
    Steven Andrews
    SharePoint Business Analyst: LiveNation Entertainment
    Blog: baron72.wordpress.com
    Twitter: Follow @backpackerd00d
    My Wiki Articles:
    CodePlex Corner Series
    Please remember to mark your question as "answered" if this solves (or helps) your problem.

Maybe you are looking for

  • [SOLVED]How to install this font : it doens't seem available for Linux

    Hi everyone, I'm currently running Gnome, and I'm trying to have the same theme than here : http://gnome-look.org/content/show.php/ - ent=108433. I've installed and used the Hydra theme : no problems with that. The only thing I miss now is his font,

  • Dolby Audio Driver not working. PLEASE HELP.

    Hi, recently i've been getting a messege when starting up my laptop 'unable to start the dolby audio driver. please restart the computer or reinstall driver if problem persists.' i thought nothing much of it at the time but after that, there are no s

  • Error in the hierarchy structure - Data Load Failure

    Hi We are having a regular Master data hierarchy Full load: 0WBS_ELMT. This data load is from the SAP R/3 source system. It was failed today with following message: Error in the hierarchy structure      Node ID 00016749 does not exist. Node ID 000058

  • How to enable Minimizing Window in all apps by pressing "escape" button?

    ...cause I found long ago that pressing esc does this just for Safari, Preview, iPhoto but it does NOT in iTunes, iWork. Is it possible by means of AppleScript, Terminal or smth else to assign this command to every app on my Mac and if yes, then, how

  • J2me Game for Mobile phone

    i'm having a problem here. I am using the nokia's api for additional features. For those who'd use nokia's series 60's emulator, u should know there's additional arrow keys constant to the FullCanvas class. The problem is everytime i press on a arrow