升级到ECC6过程中,XPRAS_UPG出现错误

环境是WIN2003 X64 + SQL 2005 X64, SAP 46C 61补丁,升级到ECC 6 .,我的SID:C11 ( SAP- APPLICATION + DATABASE:SQL2005同一机器上 )
问题如何解决?
前面一切都是正常的,提示这个错误:
============================================================
ERROR: 6 ERRORS detected during XPRAS_UPG.
             Analyze summary error logfile XPRASUPG.ELG
             and remove all error conditions in the way
             it is described in the upgrade manual. Repeat
            this phase until it is error free.
           Additional hints may be given in logfiles
           SLOG700 and F:\usr\sap\put\log\R3up.ECO
============================================================
错误日志XPRASUPG.ELG:
============================================================
  LIST OF ERRORS AND RETURN CODES  *******
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
XPRA ERRORS and RETURN CODE in SAPR700WG3.C11
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
2EENR397FThe subobject value table "TFK_NUMGR_IT" contains invalid key fields
2EENR893INumber range object "FKKEXBL_IT" " "
2EEPU133 Errors occurred during post-handling "AFTER_IMP_NROB" for "NROB" "L"
  Long text:
    Cause
      During the upgrade, import post-processing &V#& was performed for
      object &V#& &V#&. Errors were reported.
    System Response
      The upgrade is interrupted.
    What to do
      You will find the error messages for post-processing &V#& directly
      before this message. First read these error messages and the respective
      long texts. You will find further information there on correcting the
      errors.
      If this information is not sufficient, look for error notes in the
      SAPNet - R/3 Front End. Keywords you can use for the search are
      the name of post-processing &V#& or
      the message numbers of the preceding error messages. The message number
      appears in the header of the long text display.
      If you enter a problem message for the error, enter the following
      information:
      the name of post-processing &V#&
      the message numbers of the preceding error messages
      the components in which the error occurred
2EEPU136 The errors affect the following components:
  Long text:
    Cause
      During the upgrade or import of a transport request, errors occurred
      which affect particular components of the SAP System.
      The following messages list the components in which the errors
      occurred.
    System Response
      The upgrade or import of the transport request is interrupted.
    What to do
      Read the preceding error messages and their long texts for more
      information on correcting the errors.
2EEPU137    "BC-SRV-NUM" ("Number Range Management")
  Long text:
    Cause
      During the upgrade or import of a transport request, errors occurred in
      the component
         &V#& (&V#&).
    System Response
      The upgrade or import of the transport request is interrupted.
    What to do
      Read the preceding error messages and their long texts for more
      information on correcting the errors.
1 ETP111 exit code           : "8"
>>> PLEASE READ THE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<<
XPRAs are application reports that run at the end of an upgrade.
Most XPRA reports have a report documentation that explains what
the report does and how errors can be corrected.
Call transaction se38 in the SAP system, enter the report name,
select 'Documentation' and click the 'Display' button.
>>> The problematic XPRAs are mentioned in messages of type PU132 above <<<
====================================================================
Edited by: mo ziyou on Dec 24, 2010 1:23 PM

Similar Messages

  • ECC6 upgrade phase XPRAS_UPG running for long time

    Hi,
    I am performing a Downtime minimized upgrade (MODPROF_TRANS) from R34.7ext2 to ECC6.0 / Windows2003/MSSQL2005
    Currently i am in the phase XPRAS_UPG .It is running for really long time.I tried to reset the phase but still went on for more than 10 hrs. I initialized the phase now its running for more than 7 hours. There are no processes when i check in SM50 and no log files updated. There is no log file called XPRAS_UPG.ELG.SM37 no jobs running.
    Though if it takes long time , How do i confirm that my upgrade phase is running ??????????as its not updating anything
    In PARDIST_SHD phase when there was en error , i have manuall deleted the DB trigger acording to the note 956198. And the phase went on.
    Now after reading few messages reg this error , i checked DB02 but no locks on any table . Have cheked note 558197,1292069,1142410,1138351,1062559,597885,551298. But nothings applicable in my case.
    Please suggest ...
    will really appreciate your help.
    Chandra

    Dear Chandra,
    Regarding long runtime for XPRAS phase kindly note the following:
    1. The reason of slow performance of XPRAS phase can vary differently.
    Basically during XPRAS phase, there're a lot of reports to run. These
    reports are inlcuded in the transport requests(both upgrade
    requests and support packages). If there's a performance problem,
    it very likely the database performance problem, such as wrong
    access plan was chosen, or missing index, etc.
    2. To find out the performance problems in the XPRAS, you can always
    logon into the system. During the XPRAS phase, the system has to be up and running.
    In SM50, usually you can find which report is running, and/or which table is being accessed.
    If you find some table accesses take unusually long time, please
    record the table name and find the SQL statement. Sometimes a simple
    index can solve the problem, sometimes you need help from Oracle
    to get the solution.
    3. If you want to shorten the downtime, you can select less support
    packages since all SPs have a lot of reports to run in XPRAS. But
    remember you need to import them soon or later. But if you prefer
    import them later it's fine.
    Currently if you check in SM37 then you can see RDDEXECL job in active status.
    Check for the job log, if there are any errors reported?
    Thereafter check the SM50 and see if its taking unusually long time for some particular table.
    If so then it might be because you might have not updated the statistics for that particular table.
    Also check what was the parameter value of Number of batch processes defined by you
    for upgrade. If you have defined very less number of batch processes for upgrade then also
    it will take more time.
    Check accordingly and let me know for further help.
    Regards,
    Abhishek
    Edited by: Abhishek Srivastava on May 9, 2010 10:57 AM

  • Upgrade From 46B to ECC6 SR3 - XPRAS_UPG errors

    Hello,
    I ugrade a system from 46B to ECC6 SR3.
    Windows 2003 SP1 32bits / MSSQL 2000 SP4.
    During the XPRAS_UPG phase, i have an error in the post-import method RS_SHIP_AFTER_IMPORT for the transport SAPK700ZH1.
    The log is the RDDEXECL job log:
    Job started                                                    
    Step 001 started (program RDDEXECL, variant , user ID DDIC)    
    All DB buffers of application server xxx were synchronized
    Incorrect input for activating transported shadow IPacks       
    Job cancelled after system exception ERROR_MESSAGE             
    Have you already encountered this problem?
    Thanks,
    Alexandre

    The problem is solved.
    It was due to an empty entry in table rsbasidoc.
    Alex

  • XPRAS_UPG Phase

    Hi
    we are at Downtime Road map step with MAIN_NEWBAS/XPRAS_UPG phase of ECC6.0 Including EHP4 SR1, where we have noticed its running since 16hours without any  log entry in Upgrade Directory but can see there is a background Process Running.
    Please advise
    Phase XPRAS_UPG:
    Deleting file E:\usr\sap\UPS\upg\abap\log\PHASES.LOG
    Deleting file E:\usr\sap\UPS\upg\abap\log\TOOLOUT.LOG
    Deleting file E:\usr\sap\UPS\upg\abap\log\IMPDP.LOG
    Copying file E:\usr\sap\UPS\upg\abap\buffer\XPRASUPG.BUF to E:\usr\sap\UPS\upg\abap\buffer\UPS
    SAPup> Starting subprocess tp.exe with id 5876 at 20091005151956
    EXECUTING E:\usr\sap\UPS\SYS\exe\run\tp.exe pf=E:\usr\sap\UPS\upg\abap\bin\XPRASUPG.TPP put UPS
    Environment: PATHEXT=.COM;.EXE;.BAT;.CMD;.VBS;.VBE;.JS;.JSE;.WSF;.WSH
    Environment: Path=C:\Program Files\HP\NCU;C:\WINDOWS\system32;C:\WINDOWS;C:\WINDOWS\System32\Wbem;C:\Program Files (x86)\Microsoft SQL Server\80\Tools\Binn\;C:\Program Files\Microsoft SQL Server\90\Tools\binn\;C:\Program Files (x86)\Microsoft SQL Server\90\Tools\binn\;C:\Program Files (x86)\Microsoft SQL Server\90\DTS\Binn\;C:\Program Files (x86)\Microsoft SQL Server\90\Tools\Binn\VSShell\Common7\IDE\;C:\Program Files (x86)\Microsoft Visual Studio 8\Common7\IDE\PrivateAssemblies\;c:\Program Files\Microsoft SQL Server\90\DTS\Binn\;E:\usr\sap\UPS\SYS\exe\run
    Environment: auth_shadow_upgrade=0
    Environment: dbs_mss_schema=ups
    This is E:\usr\sap\UPS\SYS\exe\run\tp.exe version 372.04.40 (release 701)
    Warning: Parameter INTERRUPT is no longer used.
    Warning: Parameter DAYLIGHT_SHUTDOWN is no longer used.
    Warning: Parameter WITH_TACOB is no longer used.
    Warning: Parameter IMPDP_BY_EVENT is no longer used.
    Warning: Parameter INTERRUPT is no longer used.
    Warning: Parameter DAYLIGHT_SHUTDOWN is no longer used.
    Warning: Parameter WITH_TACOB is no longer used.
    Warning: Parameter IMPDP_BY_EVENT is no longer used.
    Looking for effective putsteps ... ... ready (looking for putsteps)

    Hi Sunny,
    I cannot see any log created since XPRAS phase started, Latest log was created 16hours before in Upgrade directory.
    Below is the phase log which started on 05 oct 15.19 and the latest is 05 oct 16.44.
    1 ETQ201 Entering upgrade-phase "XPRAS_UPG" ("20091005151953")
    2 ETQ367 Connect variables are set for standard instance access
    4 ETQ399 System-nr = '00', GwService = 'sapgw00'
    4 ETQ399 Environment variables:
    4 ETQ399   dbs_mss_schema=ups
    4 ETQ399   auth_shadow_upgrade=0
    4 ETQ380 computing toolpath for request "TP_DEFAULT"
    4 ETQ382 translates to group "R3UP_TOOL_GROUP_SYS"
    4 ETQ383 translates to path "E:\usr\sap\UPS\SYS\exe\run"
    4 ETQ399 Set environment for standard connect:
    4 ETQ399 ENV: dbs_mss_schema=ups
    4 ETQ399 ENV: auth_shadow_upgrade=0
    4 ETQ399 Set RFC variables for standard connect:
    4 ETQ399 System-nr = '00', GwService = 'sapgw00'
    4 ETQ399 Set tool parameters for standard connect:
    4 ETQ399   default TPPARAM: DEFAULT.TPP
    1 ETQ206 Executing pre-phase DB specific actions.
    1 ETQ200 Executing actual phase 'MAIN_NEWBAS/XPRAS_UPG'.
    1 ETQ399 Phase arguments:
    2 ETQ399 Arg[0] = 'XPRASUPG.BUF'
    2 ETQ399 Arg[1] = 'XPRASUPG.TPP'
    2 ETQ399 Arg[2] = 'XPRASUPG.TP0'
    2 ETQ399 Arg[3] = 'XPRASUPG.ELG'
    2 ETQ399 Arg[4] = 'AFTXPRAS.BUF'
    Please advice..
    regards
    Anilsai

  • Upgrade in hangs in XPRAS_UPG phase

    We are experimenting an hang situation during the upgrade from 46C sandbox system to ECC6 Sr3, latest patches.
    The upgrade is in phase XPRAS_UPG, and in Sap we see the job RDDEXECL running from very long time (more than 1 days); in SM50 we see the several programmes (SAPLSTXG and others) working with sequential read, update or delete actions on the table STXL.
    But neither the job log is updated or the logs into the put directory on the filesystem.
    Before the upgrade we applied the note 558197 (that one for the script dba_ind_column,....), and we enlarged the shared_pool_size and shared_pool_reserved_size as described into the upgrade guide.
    We run also the del_priv_ind script as suggested by Prepare.
    We try also to stop and restart the upgrade, but nothing change; it continue to stay in hangs on the STXL table in phase XPRAS_UPG.
    The latest row of the SAPR700ZG1.SID is :
    "Post-import method 'AFTER_IMP_FORM' started for FORM 'L'  ....."
    Is the first time we see this situation during an upgrade.
    Any suggestion ?

    Hi,
    Is this your first test upgrade in the Landscape? How many records the table has?
    Is not uncommon that XPRAS_UPG takes a long time, in one system I won´t forget the downtime took 72 hours running ! and most of this time was during XPRAS_UPG so if this is taking so long and it is working it will be better to let it finish and analize the upgrade report. Normaly when some processes are running the log files are not updated because they don´t trace all work done by the processes. Have you analize if Hard disks are working more than normal during this phase? if so then let if finish and you will be able to see why it took so long.
    Good luck

  • XPRAS_UPG Error Messages

    Dear All,
    While performing an upgrade from 4.6c to ECC6.0. I have received 10 errors in the XPRAS_UPG Phases.
    As per the upgrade guide I following to find the name of the error messages
    as SAPK700ZG2 and checked the error message in SE09.
    Transport Logs:
    5    SAPK700ZG2              Rel. 700 AFTER_IMP objects: SOBJ/PDWS                                                                               
    5  DV2        DV2 - HPUX System                                                                               
    Import                                   12/17/2007 19:55:20    (0) Successfully Completed 
            5         Method Execution                         12/17/2007 21:28:56    (8) Ended with errors                                                                               
    12/17/2007 20:43:05    (8) Ended with errors                                               
                      12/17/2007 21:28:56    (8) Ended with errors                                                                               
    4  Import steps not specific to transport request                                                                               
    When I clicked on the long text for the above error message it gives the general help.
      Execution of programs after import (XPRA)                              
      Transport request   : SAPK700ZG2                                       
      System              : DV2                                              
      tp path             : /usr/sap/DV2/SYS/exe/run/tp                      
      Version and release: 372.03.35 700                                                                               
    Execution of programs after import (XPRA)                              
      End date and time : 20071217212856                                     
      Ended with return code:  ===> 8 <===                                   
    Can anyone help to solve this issue.
    I am enclosing the error file XPRASUPG.ELG:
      LIST OF ERRORS AND RETURN CODES  *******
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    XPRA ERRORS and RETURN CODE in SAPR700ZG2.DV2
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    2EEOL555 Object type '"BUS20370"' could not be generated
      Long text:
        Cause
          The object type could not be activated.
        What to do
          Select the function 'Check' in the object type and correct the error
          found. Then try to activate the object type again.
    2EEOL555 Object type '"BUS20350"' could not be generated
      Long text: see above
    2EEOL555 Object type '"BUS20310"' could not be generated
      Long text: see above
    2EEOL555 Object type '"BUS20300"' could not be generated
      Long text: see above
    2EEOL555 Object type '"BUS20310"' could not be generated
      Long text: see above
    2EEOL555 Object type '"BUS20360"' could not be generated
      Long text: see above
    2EEPU133 Errors occurred during post-handling "SWO_OBJTYPE_AFTER_IMPORT" for "SOBJ" "L"
      Long text:
        Cause
          During the upgrade, import post-processing &V#& was performed for
          object &V#& &V#&. Errors were reported.
        System Response
          The upgrade is interrupted.
        What to do
          You will find the error messages for post-processing &V#& directly
          before this message. First read these error messages and the respective
          long texts. You will find further information there on correcting the
          errors.
          If this information is not sufficient, look for error notes in the
          SAPNet - R/3 Front End. Keywords you can use for the search are
          the name of post-processing &V#& or
          the message numbers of the preceding error messages. The message number
          appears in the header of the long text display.
          If you enter a problem message for the error, enter the following
          information:
          the name of post-processing &V#&
          the message numbers of the preceding error messages
          the components in which the error occurred
    2EEPU136 The errors affect the following components:
      Long text:
        Cause
          During the upgrade or import of a transport request, errors occurred
          which affect particular components of the SAP System.
          The following messages list the components in which the errors
          occurred.
        System Response
          The upgrade or import of the transport request is interrupted.
        What to do
          Read the preceding error messages and their long texts for more
          information on correcting the errors.
    2EEPU137    "BC-DWB-TOO-BOB" ("Business Object Builder")
      Long text:
        Cause
          During the upgrade or import of a transport request, errors occurred in
          the component
         the component
             &V#& (&V#&).
        System Response
          The upgrade or import of the transport request is interrupted.
        What to do
          Read the preceding error messages and their long texts for more
          information on correcting the errors.
    1 ETP111 exit code           : "8"
    >>> PLEASE READ THE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<<
    XPRAs are application reports that run at the end of an upgrade.
    Most XPRA reports have a report documentation that explains what
    the report does and how errors can be corrected.
    Call transaction se38 in the SAP system, enter the report name,
    select 'Documentation' and click the 'Display' button.
    >>> The problematic XPRAs are mentioned in messages of type PU132 above <<<
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    XPRA ERRORS and RETURN CODE in SAPR-60007INFICA.DV2
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    1 ETP111 exit code           : "0"
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    XPRA ERRORS and RETURN CODE in SAPRGPGD07.DV2
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    1 ETP111 exit code           : "0"
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    XPRA ERRORS and RETURN CODE in SAPR-60007INISUT.DV2
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    1 ETP111 exit code           : "0"
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    XPRA ERRORS and RETURN CODE in SAPR-60007ININSURANC.DV2
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    1 ETP111 exit code           : "0"
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    XPRA ERRORS and RETURN CODE in SAPR-60007INFICAX.DV2
    so on.
    The error message doesn't give enough information neither the upgrade guide. Can anyone help me to overcome this error.
    Thanks & Regards
    Senthil

    The basic problem here is that the affected SWO1 objects depend on an Enhancement Spot containing a type group which is in-active and therefore not available for generation from SWO1.
    You have to activate the type group concerned.
    The following process should achieve activation of the SWO1 objects:
    1. TCODE: SE18
    Display PLM_AUDIT_LIST_ITEM in enhancement spot.
    Activate this object.
    2. TCODE SE80
    Package: PLM_AUDIT
    Find the PLM_BUS203* function groups and activate them. (same as generating from SWO1)
    You might want to try step 2 first, and only activate the object in step 1 if Step 2 fails.
    Hope this helps others who will prefer to fix rather than ignore this error.
    Best Regards
    Andre Rainsford-Alberts

  • Upgrade with XPRA ERRORS message at xpras_upg

    Hi,all
       I am upgrading sap ERP 4.72 (win2Ksql2K_sp3) to ECC6(win2003sql2K+sp4). Prepare is sucess.When the upgrade process is running xpras_upg,I got error message below.
    XPRA ERRORS and RETURN CODE in SAPR700ZE1.PRD
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    A2EESMMSS_ANALYZE 000 SQL error "446": "Cannot resolve collation conflict for concatenatio" "n operation." " "
    2EEPU133 Errors occurred during post-handling "MSS_SDBP_AFTER_IMP" for "SDBP" "L"
      Long text:
        Cause
          During the upgrade, import post-processing &V#& was performed for
          object &V#& &V#&. Errors were reported.
        System Response
          The upgrade is interrupted.
        What to do
          You will find the error messages for post-processing &V#& directly
          before this message. First read these error messages and the respective
          long texts. You will find further information there on correcting the
          errors.
          If this information is not sufficient, look for error notes in the
          SAPNet - R/3 Front End. Keywords you can use for the search are
          the name of post-processing &V#& or
          the message numbers of the preceding error messages. The message number
          appears in the header of the long text display.
          If you enter a problem message for the error, enter the following
          information:
          the name of post-processing &V#&
          the message numbers of the preceding error messages
          the components in which the error occurred
    2EEPU136 The errors affect the following components:
      Long text:
        Cause
          During the upgrade or import of a transport request, errors occurred
          which affect particular components of the SAP System.
          The following messages list the components in which the errors
          occurred.
        System Response
          The upgrade or import of the transport request is interrupted.
        What to do
          Read the preceding error messages and their long texts for more
          information on correcting the errors.
    2EEPU137    "BC-DB-MSS" ("Microsoft SQL Server")
      Long text:
        Cause
          During the upgrade or import of a transport request, errors occurred in
          the component
             "BC-DB-MSS" ("Microsoft SQL Server").
        System Response
          The upgrade or import of the transport request is interrupted.
        What to do
          Read the preceding error messages and their long texts for more
          information on correcting the errors.
    1 ETP111 exit code           : "8"
    >>> PLEASE READ THE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<<
    XPRAs are application reports that run at the end of an upgrade.
    Most XPRA reports have a report documentation that explains what
    the report does and how errors can be corrected.
    Call transaction se38 in the SAP system, enter the report name,
    select 'Documentation' and click the 'Display' button.
    >>> The problematic XPRAs are mentioned in messages of type PU132 above <<<
    I have searched  in sap notes and SDN,but no help to me.
    Can give me solution?
    Thanks a lot.

    Sorry,I have solved this problem.
    The version of  my sql is sql2k with sp3 before,but sp3 only support CP850_BIN. After sp3,microsoft support CP850_BIN2 and BIN.
    The default installation of the sql2k sp4 software from sap is supported CP850_BIN2 .
    So,the versionof  the sql server is BIN,and database is BIN in my ERP 4.72. Then I install sql2k with sp4 with BIN2,and database is BIN.
    I must change the BIN&BIN2 with instcoll.exe.
    More information,please read note 505906,600027.
    Thanks.
    Wensent Lee

  • SAP ECC6 memory and paging issues

    Dear Experts
    I have recently upgraded my 4.6C systems to an ECC 6 system (DB2 LUW 9.5 on AIX 5.3 TL9 64 Bit OS)
    I have been running the LPAR with 14 GB of memory and we are around 100-200+ users using the system, I was monitoring using nmon and found that Physical Memory was around 99.8% Used   (14311.8MB and 22.6MB was free) also the paging space was around 37.2% in result causing the system at times to run slow which can have a very negative effect on the users.
    After further investigation I found that after a system restart the Physical Memory would start around 50.9% and increased at a steady pace until it reached 99.8% that is when the system would start using the paging space which would steadily increase, I found that the only solution was a system restart at least once a week to reduce the memory consumption.
    At first glance it looked like a database manger memory leak with the process db2sysc, so I searched the net with the search words u201Cdb2 memory leaku201D and found the following APARs and notes.
    APAR JR30285 - Pervasive memory leak when compiling SQL statements that use SQL/XML functions
    APAR IZ35230 - There is a pervasive unix-specific private memory leak in the security component
    Note 1288341 - Memory leak in APPLHEAPSZ -> SQL0954C 
    Note 1352361 - Memory leak in shared memory area abrfci
    Note 1147821 - DB6: Known Errors and available Fixes in DB2 9.5 LUW
    After reading the notes and APARs I decided to updated DB2 to the latest fix pack (5SAP), but after the fix pack was implemented it did not solve the memory problem
    I started look at different problems with SAP ECC6, db2 and AIX with paging/memory problems and I found the following notes to do with AIX memory and paging but none of them helped as all parameters and settings were set accordingly  
    789477 - Large extended memory on AIX (64-bit) as of Kernel 6.20
    191801 - AIX 64-bit with very large amount of Extended Memory
    973227 - AIX Virtual Memory Management: Tuning Recommendations
    884393 - AIX saposcol consumes large amount of memory.
    856848 u2013 AIX Extended Memory Disclaiming 
    1048686 u2013 Recommended AIX settings for SAP
    1121904 u2013 SAP on AIX: Recommendations for Paging
    1086130 u2013 DB6: DB2 Standard Parameter Settings
    After even more investigation I found the following evidence suggesting AIX Virtual Memory Manager might have a problem

    Shared memories inside of pool 40
    Key:       42  Size:    17792992 (  17.0 MB) DB TTAB buffer              
    Key:       43  Size:    53606392 (  51.1 MB) DB FTAB buffer              
    Key:       44  Size:     8550392 (   8.2 MB) DB IREC buffer              
    Key:       45  Size:     7014392 (   6.7 MB) DB short nametab buffer     
    Key:       46  Size:       20480 (   0.0 MB) DB sync table               
    Key:       47  Size:    10241024 (   9.8 MB) DB CUA buffer               
    Key:       48  Size:      300000 (   0.3 MB) Number range buffer         
    Key:       49  Size:     2769392 (   2.6 MB) Spool admin (SpoolWP+DiaWP) 
    Shared memories outside of pools
    Key:        3  Size:   114048000 ( 108.8 MB) Disp. communication areas   
    Key:        4  Size:      523048 (   0.5 MB) statistic area              
    Key:        6  Size:   692224000 ( 660.2 MB) ABAP program buffer         
    Key:        7  Size:       14838 (   0.0 MB) Update task administration  
    Key:        8  Size:   134217828 ( 128.0 MB) Paging buffer               
    Key:        9  Size:   134217828 ( 128.0 MB) Roll buffer                 
    Key:       18  Size:     1835108 (   1.7 MB) Paging adminitration        
    Key:       19  Size:   119850000 ( 114.3 MB) Table-buffer                
    Key:       41  Size:    25010000 (  23.9 MB) DB statistics buffer        
    Key:       63  Size:      409600 (   0.4 MB) ICMAN shared memory         
    Key:       64  Size:     4202496 (   4.0 MB) Online Text Repository Buf. 
    Key:       65  Size:     4202496 (   4.0 MB) Export/Import Shared Memory 
    Key:     1002  Size:      400000 (   0.4 MB) Performance monitoring V01.0
    Key: 58900114  Size:        4096 (   0.0 MB) SCSA area                   
    Nr of operating system shared memory segments: 16
    Shared memory resource requirements estimated
    ================================================================
    Total Nr of shared segments required.....:         16
    System-imposed number of shared memories.:       1000
    Shared memory segment size required min..:  692224000 ( 660.2 MB)
    System-imposed maximum segment size......: 35184372088832 (33554432.0 MB)
    Swap space requirements estimated
    ================================================
    Shared memory....................: 1654.8 MB
    ..in pool 10  328.6 MB,   58% used
    ..in pool 40  143.3 MB,   30% used
    ..not in pool: 1174.1 MB
    Processes........................:  413.4 MB
    Extended Memory .................: 6144.0 MB
    Total, minimum requirement.......: 8212.2 MB
    Process local heaps, worst case..: 3814.7 MB
    Total, worst case requirement....: 21882.9 MB
    Errors detected..................:    0
    Warnings detected................:    3

  • Call tranasaction with skip first screen in ecc6

    Hi,
    We are doing upgrade from 4.7 to ecc 6. We are getting an error while running a report( The addition "AND SKIP FIRST SCREEN" can't be used with "CALL TRANSACTION .. USING".  ) in ecc6. This is not showing error in 4.7. Call transaction with skip first screen is fine in 4.7. But it is throwing an error in ecc6.
    Could anybody provide me the pointers to rectify this error.
    Regards,
    Ramesh

    Hi
    Did you pass all the mandatory field values to the calling transaction , Because when you use this addition you need to pass all the mandatory field values then only it works fine. Check out whether you are passing all the mandatory field values.
    Regards
    Pavan

  • RFC connection error between Netweaver 7 EHP1 and Ides ECC6

    Hi Friends,
    I try to create  source system  in BI from Netwever EHP1 to IDES ECC6 EHP3.
    During the creation I get a connection error, says. check connction parameter.
    I checked the parameter, everything is fine. Server, System and number.
    When I went to the SM59 and created a connction.
    I.E. with the same parameter like system = 06 and server = compi9 gave client 800 etc.
    The Host name is resolved to 192.168.2.111 wich is OK.
    But when I run the connection test it shows me  "ERROR: partner '80.156.86.78:sapgw06' not reached"
    I have no idea where this IP '80.156.86.78" is comming from.
    No Problem with the opposite way, from Ides to NW and login to the System is OK too.
    Can anybody help me with this problem.
    RG. Jimbob

    Hi,
    What is the next screen that comes up when you click on remote logon.
    If no screen comes up then:
    Check the user type of the user id used for this RFC.
    It should be either dialog or service user for able to remote login.
    If it open a new window and asks for password, then its excatly password issue.
    Also make sure that the password is in numeric and correct.
    Also make sure that the current user check box is unchecked.
    Even if it dosent work, delete the connection and create again.
    Please award points if helps.
    Thanks
    Santhosh

  • Upgrade - 4.6B - ECC6 phase TP_ACTION_CP2SINI - fails

    Platoform - Solaris 5.9
    Oracle - 10.2.0.2
    Upgrade of 4.6B - ECC6 fails in the phase <b>TP_ACTION_CP2SINI</b>
    This phase in the previous Mock had completed in 20 min aprox, but on the present mock upgrade its taken longer time.....
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    ERROR: No connect due to DbSl Load Lib Failure
    ERROR: The values set for DIR_LIBRARY ('/usr/sap/P35/SYS/exe/run') or dbms_type ('ORA') are invalid.
    ERROR: Connect to P35 failed (20070824170148).
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    ERROR: No entry for SAPKBBF700 in E070 or error during access.
    ERROR SAPKBBF700           P35 E 0012 20070824180341 DDIC         p35adm       RELSAPDB 20070824173846006328
    HALT 20070824180341
    ERROR: uncaught internal error: ORA-03114: not connected to ORACLE
    ERROR: EXIT(16) -> process ID is: 25384
    ERROR: Connect to P35 failed (20070824180342, probably wrong environment).
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Phase TP_ACTION_CP2SINI:
    INFO: Export of SAPKBBF700; client 0 taken from E070C
    Kind assistance appreciated.
    Regards,
    Siddhartha Gupte
    +91 9833888910

    Hi Markus,
    Oracle is running but give a problem when creating a tablespace - PSAPTEMP1 through sqlplus but when checked through the DB02, the size shown is '0'
    when try to modify or create any table through brtools below error is given.
    BR*Tools main menu
    1 = Instance management
    2 - Space management
    3 - Segment management
    4 - Backup and database copy
    5 - Restore and recovery
    6 - Check and verification
    7 - Database statistics
    8 - Additional functions
    9 - Exit program
    Standard keys: c - cont, b - back, s - stop, r - refr, h - help
    BR0662I Enter your choice:
    2
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.19
    BR0663I Your choice: '2'
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.19
    BR0656I Choice menu 5 - please make a selection
    Database space management
    1 = Extend tablespace
    2 - Create tablespace
    3 - Drop tablespace
    4 - Alter tablespace
    5 - Alter data file
    6 - Move data file
    7 - Additional space functions
    8 - Reset program status
    Standard keys: c - cont, b - back, s - stop, r - refr, h - help
    BR0662I Enter your choice:
    1
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.21
    BR0663I Your choice: '1'
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.21
    BR0657I Input menu 81 - please check/enter input values
    BRSPACE options for tablespace extension
    1 - BRSPACE profile (profile) ...... [initP35.sap]
    2 - Database user/password (user) .. [/]
    3 ~ Tablespace name (tablespace) ... []
    4 - Confirmation mode (confirm) .... [yes]
    5 - Scrolling line count (scroll) .. [20]
    6 - Message language (language) .... [E]
    7 - BRSPACE command line (command) . [-p initP35.sap -s 20 -l E -f tsextend]
    Standard keys: c - cont, b - back, s - stop, r - refr, h - help
    BR0662I Enter your choice:
    3
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.24
    BR0663I Your choice: '3'
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.24
    BR0681I Enter string value for "tablespace" []:
    psaptemp1
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.42
    BR0683I New value for "tablespace": 'psaptemp1'
    BR0280I BRTOOLS time stamp: 2007-08-24 20.51.42
    BR0657I Input menu 81 - please check/enter input values
    BRSPACE options for tablespace extension
    1 - BRSPACE profile (profile) ...... [initP35.sap]
    2 - Database user/password (user) .. [/]
    3 ~ Tablespace name (tablespace) ... [psaptemp1]
    4 - Confirmation mode (confirm) .... [yes]
    5 - Scrolling line count (scroll) .. [20]
    6 - Message language (language) .... [E]
    7 - BRSPACE command line (command) . [-p initP35.sap -s 20 -l E -f tsextend -t psaptemp1]
    Standard keys: c - cont, b - back, s - stop, r - refr, h - help
    BR0662I Enter your choice:
    c
    BR0280I BRTOOLS time stamp: 2007-08-24 20.52.05
    BR0663I Your choice: 'c'
    BR0259I Program execution will be continued...
    BR0291I BRSPACE will be started with options '-p initP35.sap -s 20 -l E -f tsextend -t psaptemp1'
    BR0280I BRTOOLS time stamp: 2007-08-24 20.52.05
    BR0670I Enter 'c[ont]' to continue, 'b[ack]' to go back, 's[top]' to abort:
    c
    BR0280I BRTOOLS time stamp: 2007-08-24 20.52.09
    BR0257I Your reply: 'c'
    BR0259I Program execution will be continued...
    BR1001I BRSPACE 7.00 (18)
    BR1002I Start of BRSPACE processing: sdvzqkms.tse 2007-08-24 20.52.10
    BR0280I BRSPACE time stamp: 2007-08-24 20.52.10
    BR0301W SQL error -904 at location BrsDblogOpen-6, SQL statement:
    'INSERT INTO SAP_DBAML (SYS_ID, OPER_ID, TASKNAME, JOB_NR, TRIAL, UTIL_NR, FUNC_ID, UPD_OP, TOOLSET, PROGNAME, LOG_NAME, STATUS, BEGIN_OP, END_OP, RC, INTERNAL) VALUES ('P35', '20070824205210', 'Extend tablespace', '0000000000', '1', '0000000000', 'tse', '20070824205210', 'SAP CCMS', 'BRSPACE', '/oracle/P35/sapreorg/sdvzqkms.tse', 'STARTED', '20070824205210', ' ', '0000', 'sdvzqkms')'
    ORA-00904: "TOOLSET": invalid identifier
    BR0324W Insertion of database log header failed
    BR0280I BRSPACE time stamp: 2007-08-24 20.52.10
    BR1009I Name of database instance: P35
    BR1010I BRSPACE action ID: sdvzqkms
    BR1011I BRSPACE function ID: tse
    BR1012I BRSPACE function: tsextend
    BR0280I BRSPACE time stamp: 2007-08-24 20.52.11
    BR0657I Input menu 303 - please check/enter input values
    Options for extension of tablespace PSAPTEMP1 (1. file)
    1 * Last added file name (lastfile) ....... [/oracle/P35/sapdata5/temp1_1/temp1.data1]
    2 * Last added file size in MB (lastsize) . [500]
    3 - New file to be added (file) ........... [/oracle/P35/sapdata5/temp1_2/temp1.data2]
    4 ~ Raw disk / link target (rawlink) ...... []
    5 - Size of the new file in MB (size) ..... [500]
    6 - File autoextend mode (autoextend) ..... [no]
    7 # Maximum file size in MB (maxsize) ..... []
    8 # File increment size in MB (incrsize) .. []
    9 - SQL command (command) ................. [alter tablespace PSAPTEMP1 add tempfile '/oracle/P35/sapdata5/temp1_2/temp1.data2' size 500M autoextend off]
    Standard keys: c - cont, b - back, s - stop, r - refr, h - help
    BR0662I Enter your choice:
    Expecting your kind reply,
    Siddhartha gupte

  • Error in ECC6 During installation

    Dear all
    Error in ECC6 During installation , the following contents is get from sapnst_dev.log
    148556:  if ( componentToBeCalled == 'NW_Usage_Types_Configuration_BI_ind_ind_ind_ind') 
    148557: 
    148560:  if ( componentToBeCalled == 'NW_Call_Offline_CTC_ind_ind_ind_ind') 
    148561: 
    148564: }
    ERROR      2008-06-27 07:43:37 [iaxxejsbas.cpp:178]
               EJS_ErrorReporter
    FJS-00003  TypeError: spStringRE.exec(labelString) has no properties (in script NW_Onehost|ind|ind|ind|ind, line 63483: ???)
    ERROR      2008-06-27 07:43:37
    FCO-00011  The step validateContent with step key |NW_Onehost|ind|ind|ind|ind|0|0|SAP_Software_Features_Enablement|ind|ind|ind|ind|4|0|SAP_Software_Features_GetContent|ind|ind|ind|ind|0|0|validateContent was executed with status ERROR .
    TRACE     
    <html><head></head><body><p>An error occurred while processing service <b>SAP ERP 2005 Support Release 2 > SAP Systems > Oracle > Central System > Central System Installation</b>. You may now</p><ul> <li>press <I>Retry</I> to repeat the current step.</li> <li>press the <I>View Log</I> button to get more information about the error.</li> <li>stop the task and continue with it later.</li></ul><p>Log files are written to <b>C:\Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS</b>.</p></body></html>
    TRACE      [iaxxgenimp.cpp:1155]
               showDialog()
    waiting for an answer from gui
    INFO       2008-06-27 07:45:05 [iaxxgenimp.cpp:782]
               showDialog()
    An error occured and the user decide to stop.\n Current step "|NW_Onehost|ind|ind|ind|ind|0|0|SAP_Software_Features_Enablement|ind|ind|ind|ind|4|0|SAP_Software_Features_GetContent|ind|ind|ind|ind|0|0|validateContent".

    Up !?

  • SAP EH&S 4.6C Migration to SAP ECC6

    Hi All,
    We are having separate SAP R/3 instance for EH&S module (4.6C system). The transactions system is SAP R/3 4.7 system and is due for ECC6 upgrade. Just want to know
    1.     Has anything changed in EHS module from 4.7 to ECC6. If yes, what?
    2.     if we migrate the EH&S functionality from the separate instance for EHS to transactional system in ECC6 / 4.7 R/3  system - will it get affected.
    3.     What will be the best time to do the migration of EHS data to transactional system (before or after upgrade). We are using specifications, active phrase libraries, reports, report templates and report generation variants and WWI server for MSDS.
    Request your help. Thanks
    PS: Even partial answers will also help a lot.
    Best Regards,
    Vithal

    Hi,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional perspective)
    /people/thomas.mann2/blog/2006/08/22/sap-upgrade-conflicts-1
    http://service.sap.com/instguides > mySAP Business Suite Applications > mySAP ERP > mySAP ERP 2005 > Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences, refer to the below site u2013
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6. Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality, which can be downloaded to a word document if required. Also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps some extent.
    regards,
    mahesh.

  • DataSource for FAGLFLEXT and BSEG, or New Table in ECC6?

    need to create an extractor to have all the information of FAGLFLEXT, because we need to keep the ledger information and the split of the information. However, we need to add 13 fields contained in BSEG.
    Therefore we thought to reads the line items table FAGLFLEXA, and then enhace it throught BSEG table.
    However, since we are using ECC6 and BI7. It is not support the creation of DataSources for FAGLFLEXA throught FAGLBW03.
    Is it an option to incorporate all fields into FAGLFLEXT.
    Can we creat a new table group based on FAGLFLEXT, and then adding the coding block extensions to that table -
    how does new g/l and the new table group work in parallel? Which is the procedure to do it?
    Documentation says we can create a new table group based on FAGLFLEXT --- its the how does it work in conjuction part...for example...the new g/l handles document splitting and one other thing georg referenced last night...will the split documents go into our new table group?
    BSEG does not have the document splitter information that we need (it's incomplete data). It's missing profit centers on many items, it's missing the proper split of transactions.
    Thanks for your comments.

    Here is more information about this post.
    Client situation:  Our client is implementing ECC 6 and is using the "New-GL" features.  Because of business requirements, the coding block has been extended (not insignificantly - 18 extra fields at the moment) to accommodate legal, regulatory and management reporting.  The reporting solution includes standard ECC reporting (e.g. report writer, report painter reports) as well as feeds to BW (BI 7).
    The Challenge:  Our understanding is that adding all of the coding block extensions to the New-GL tables (ie. FAGLFLEXA and FAGLFLEXT) may lead to performance degradation in the ECC system.  However, we still need to accommodate the requirement to report by the additional dimensions that are not currently included in the New-GL, so our challenge has been to find a solution that minimizes performance issues, while still allowing us to have all the necessary dimensions with which to do the required reporting.
    What we would like to know:  How have you handled this in similar situations?
    Have you added to the New-GL tables? How many fields? Performance issues encountered?
    Have you created additional table group(s) based on the New-GL and then modified that structure to have the new fields?  How does the additional table group work co-incident with New-GL (e.g. does the additional table group receive document splitting information?)?
    Have you created custom extractors for BW?  On what basis (we understand that FAGFLEXA cannot be created as a datasource to feed BW)?

  • HR - PA upgrade issue (4.6C to ECC6.0)

    dear all,
    we are currently in the process of upgrade from 4.6C to ECC6.0
    and we found this minor issue in the submodule PA:
    using tcode pa20/pa30 we can not see any record of IT0000 Actions using 'overview'
    but the all the detail actions can be displayed..
    the overview (mountain icon) can't show all the records- only happen when we want to overview the infotype IT0000 Actions.
    but all the details that we have recorded in IT0000 Actions, can still be displayed (using spectacle icon)
    this is only happen in IT0000 Actions
    all other infotypes can be overviewed using 'mountain icon' and can be displayed using 'spectacle icon' as normal condition.
    anyone ever gone through the same issue?
    we have updated patch for SAP HR : SP 32 and EA 7.
    the authorization is SAP ALL.
    looking forward to hearing from you.
    best regards,
    dhenny muliawaty (pei pei)

    Hi Abhishek,
    thanks for your reply and your guidance..
    we need more information from you..
    1. how to back up the table, is it right that we need to contact basis and ask our basis guy to back up the tables?
    2. after we do the backup of HR table T512W, before upgrading your HR support package, then we upgrade the support package and after that..
    is it right that we need to restore the table? or that the back up is use to do cross check on the content of the T512W after upgrade?
    V_512W_B                       Valuation Bases                                         
    V_512W_C                       Averages                                                
    V_512W_D                       Processing Classes, Cumulations, and Evaluation Classes 
    V_512W_O                       Complete View T512W                                     
    V_512W_T                       Wage Type Texts                                         
    thanks for informing us that it's a standard practice to backup this table before applying the HR patch to system. how do you know this is a standard practice?
    do you know any other additional standard practices for HR in upgrade project from 4.6C to ECC6.0?? do you have the link of this complete information?
    thank you for your kind attention and support.
    looking forward to hearing from you.
    thanks and best regards,
    dhenny muliawaty (pei pei)