Shift Operation in Prodcution order.
How to record the shift operation in the Production order?
Hi,
Please try to simply your subject of posting. It is not necessary your subject and body of discussion should be same.
Yes possible to remove under SQL management studio provided you have authorization to access.
Thanks & Regards,
Nagarajan
Similar Messages
-
Make Deletion Status for Operation in Prodcution Order
Hello Experts,
Is there any Function Module or BAPI to make status for Operation as deletion in production order. i.e I0013 is the status for the operation.
Thanks In Adavnce
Dhiraj Dangore.Hello,
Thanks for reply..
Let me explain the process we are following
I have two operations in an order.
Operation 1) Control Key M111(Internally Processed) - One component attached for this operation ( its a not stock item)
PR, PO and GR has been done and no issues in that.
Operation 2) Control key M222( Externally Processed) -
a) One Service attached with this operation which i want to delete from the order.
b) One Component also attached ( non stock item) and PR , PO, GR has been done for same.
For point a : Service is present in PR but not released therefore no PO , GR is done.
Now when i try to delete this serive from the operation then system does not allow me to do so. Also i want to delete from PR too and again i was not able to delete from it.
Please let me know how this can be possible.
Rgds
Himanshu -
Confirmation of Prodcution Order Operation in RR
Hi experts,
Can we make the confirmation of the QC operation in Production Order mandatory and/or a warning message while doing the RR of the inspection lot in std SAP? (For 03 ins type)
Changing the control key option to 2 "Confirmation required" does not seem to work.
Any user exits ?
Rgds
JMG
Edited by: Jomy George on Oct 13, 2008 5:16 PMHi,
First u have to create inspection point field combination in IMG,otherwise u can use standard inspection point.Assign tht in routing header.then go to operation overview screen,if u assign this in routing header,automatically in operation overview screen u will get QM-inspection point tap.its standard,no need of customizing.
Regards,
S.P.Selvathangam. -
Hi Guru's
i av n issue..
Total qty of the prdn order is 36,000 & DLV is 21,070.
i want to confirm the production order today for 400nos for vch goods issue has happened for 400nos and there is no scrap..
while i confirm the prodcution order for 400nos it is allowing me to confirm for only 390pcs.
Pls let me know the solution for this..
Thanx in advance
Bhanuhi sap guru's
sry for the late reply...
i tried out al the steps & solutions given by you...It didn't wok...
Finally got the solution...when i debugged into the program there was a condition that it shld not exceed more than 390pcs in every shift...
I m really sorry for the late reply...
Thanx for your support once again...
Regards,
Bhanu prakash.S -
Custom exit or badi for changing the user fields in operation of process order
Hi all
I want to find a exit or badi to set default value to the user fields in operation of process order when COR1.
I have tried exit 'PPCO0001', but this exit is call after commit work, so I can not change any thing
I also tried to use badi 'workorder_update', 'before_update', but all parameters in this BADI are importing, can't be changed, I've tried to change it and then program dump.
Do you have any solution for this question?
ThanksDo a Implicit Enhancement at the PBO of this subscreen.
-
Cost of Production BOM in Prodcution Order
Hello Experts,
Here is scenario that i need help :
Assume that we have a Production BOM with two components with a price of $10 in the pirce list :
Parent Item: A0001 ( Price of A0001 is $10)
Components : A0002,A0003 ( Price of A0002 is $0 and Price of A0003 is $10)
When we create a prodcution order for A0001 with a quantity 1000 and close , i noticed that in the summary tab of Prodcution Order and noticed that Actual component cost : $10,000 and Actual cost : $0 and Total Variance : $10,000.
Due to this there is variance in Prodcution Clearing Account. Could you please help me a right approach on how to enter correct cost for Production BOM.
Any help will be appreicated.
Thanks,
PraneethResolved
-
How to get F4 help for Standard Text Key of a operation based on Order type
Hi Experts,
How to get F4 help for Standard Text Key (STK) of a operation based on Order type entered in selection screen. The F4 help should give the STK of related order type. At the same time the F4 help for Task Types based on Notification type. How to acheive the above two. Please provide the table names or any search help name if exists or Function modules...
Thanks in Advance.
Regads,
BujjiHi Guys,
Any help on this...
Regards,
Bujji
Edited by: Bujji on Dec 22, 2008 12:42 PM
Edited by: Bujji on Jan 5, 2009 2:00 PM -
Creating Prodcution order using workflows
Hi all,
Iam new to workflows. I have been reading the documents on Workflows on SDN and few other sites.
I want to know whether we can create a production order using Workflows. If so, How we need to
pass necessary data like Material, Plant, Order type, Quantity and Basic Start date/ Basic finish date to
the Workflows? I have idea about Business objects, Events,Step types and overview of the workflow
terminology and pracitced few examples on workflows. Can anybody help me please?
Thanks & Regards,
Manjula.SI dont know about standard existing workflows available for your requirement as mentioned in one of the posts here. so you better check the availale standard first and then decide if you want to build a customised one
and wat i told you is wat u need to do if you go for a customising one................ first of all identify what abap you are going to write to create your prodcution order. either its BAPI or BDC whatever.......maybe you create your own function module for doing that stuff...............then you extend the busines object of the prod order , then you add another method in it and call your function module in this method.........
ok now you create activity step in your workflow that you have already made with all the start events and things like that.........this activity step will have a task that calls this new method of yours..... .
you need to know some basic fundamentals of workflow for doing all this and if its your first time then it wil take some time....... -
Scheduling issue for splitted operations in process order
Hello All,
I am facing problem after scheduling splitted operation in process order. The scenario is as follows.
In process order there are 5 operations. 10, 20, 30, 40 and 50. Out of the above operations 30 is splitted and two different resources are assigned to it. Control key assigned to splitted operation (30) is also scheduling relevant. Now the flow of operations will be as below.
1. Operation 10
2. Operation 20
3. Operation 30 - Operations is splitted (Resource used is A), qty to be produced - 10 kg.
a. Operation 32 - Quantity of operation 32 is changed to 5 kg. Resource used is B.
b. Operation 34 - Quantity of operation 34 is changed to 5 kg. Resource used is C.
4. Operation 40
5. Operation 50
Relationship exists between opearion 10-20, 20-30, 40-50 and between 30,32, 34 with 40. But there is no relationship exists between splitted operations 32 and 34 with any of the previous operations for eg. 10 & 20.
Issue is after scheduling all operations relationship remains maintained between operations 32, 34, 40 & 50. As operation 30 is splitted to two different operations equally total time for scheduling gets reduced but after scheduling of all operations all previous operations before operations 30 does not get resceduled? Scheduling type maintained for order is Backward Scheduling.
Please check this and guide me how all operations before operation 30 can be rescheduled as per changed timing of operations 32 and 34.
Best Regards.
Edited by: Avinash Mohite on Mar 19, 2010 12:43 PM
Edited by: Avinash Mohite on Mar 19, 2010 3:14 PMHi,
I hope u r doing in this way:
In the capacity header screen enter individual capacity as 2. then click on Got( on top of same screen) and go to individual capacites. Enter the names of two individual capacities, for example 1 and 2. These are the names of two work centres where u r splitting ur operation.
Double Click on operation 0030 and go to tab 'splitting' . Tick on ' required splitting' and enter maximum no. of splits as 2.Then go to capacity requirements assignment tab. enter the individual capacity as 1 and 2 and enter the splitted quanitites.Save and reschedule .
Check and revert.
Regards. -
BOM selection in Prodcution Order
Hi
Need help
I have alternarnate routings ( group counter 1 and 2) and BOMs (alternate 1 and 2)
for e.g. I have assigned Alternatte BOM 1 to routing GC1 and Alternate BOM 2 to Routing GC2 using component allocation in routings.
But when I create prodcution Order and select the Routing GC 2 also system is picking BOM 1 buy default..why its happening..
Could you pl share your thoughts on this nad help me?
Rewards points will be given immediatly
BRHi SAM
BOM explosion during MRP is based on the lot size or validity date. *Differentiate BOM from to lot size for both the BOM's.* Ex for BOM 1 from qty may be 0 - to qty 500, for BOM 2 from may be 501- to 9999999.
Then the system will select automatically the required BOM1 or BOM 2 based on the lot size.
If you maintain Both the lot size same. The systme will automatically select the first valid BOM.
As you said Routing also selected based on the lot size.
Otherwise as senthil said used PV scenario.
Hope this is clear.
Regards
J . Saravan -
Phases/operation in process order does not exist
phases/operation in process order does not exist this error coming when cor6n is using.why?
HI
After creating Master recipe in C201, under the operations tab you need to define the operations involved in recipe . along with the operation column there is phase indicator column is there which is to be selected whether this operation is phase or not...
Check and revert
Regards
Anupam Sharma -
Function module to get PRT for the operation in Maintenance Order
Hi,
Please tell me the function module to get PRT document for the all operation in Maintenance Order? and also tell me the FM to get all details of those PRT Docs so that I can Print those documents.
Thanks.Hi,
Please tell me the function module to get PRT document for the all operation in Maintenance Order in TCode IW31/32/33? and also tell me the Function Module to get all details of those PRT Documents so that I can take Print out of those documents.
Thanks,
Jay. -
How to manage the operations on service order ?
Hello,
Do you know some bapi or MF to manage the operation on service order (IW32).
I have to create some operation, and in dialogue mode Iu2019m using
"Task list selection, to reference object."
But I need to do it by a bapi or MF.
Tks a lot.
R.Hi,
Check with the following FM:
MAINTENANCE_ITEM_POST
Regards,
Venkat. -
Left-shift operator used on byte values
Hello,
I'm reviewing some problems, and I need some help. I have a program that has some code like the following:
byte y = 10; // 00001010 in binary
byte result = (byte) (y << 1);
System.out.println("result: " + result); // 20. Ok.
result = (byte) (y << 7);
System.out.println("result: " + result); // 0. Ok.
result = (byte) (y << 8);
System.out.println("result: " + result); // 0. Why???
// I was expecting a shift of 0 bits because the
// right-hand operand is equal to the number of
// bits for the size of the result type--in this case
// 8 bits for a byte.
// 8 % 8 = 0 number of bits for the shift.
result = (byte) (y << 6);
System.out.println("result: " + result); // -128. Ok.
result = (byte) (y << 10);
System.out.println("result: " + result); // 0. Why???
// Shouldn't it be 2 bits for the shift?
// That is, 10 % 8 = 2.
// I was expecting 40 as the the answer for this one.I understand that for binary operations that the operands will be promoted to at least int types before execution occurs, but I still don't see how it would make a difference for the left-shift operator. Any help and clarification on this will be appreciated. It would be helpful to see the binary representation of the the "result" variable for the ones that I'm asking about. Thanks in advance.result = (byte) (y << 8);
System.out.println("result: " + result); // 0. Why???
// I was expecting a shift of 0 bits because the
// right-hand operand is equal to the number of
// bits for the size of the result type--in this case
// 8 bits for a byte.the result of (y << 8) is an int, not a byte. the byte "y" is promoted to int for the bit shift. so the int result of the bit shift is 00000000 00000000 00001010 00000000. when you cast that back to byte, the 24 leftmost bits get lopped off, and you're left with zero.
hth,
p -
To Control status of the operations of maintenance orders individually
Hi,
To Control status of the operations of maintenance orders individually
Anyone know how to control individually the operation status of maintenance orders?, see the image below?
Exsample: I need complete (TECO) only the operation 0010
Thanks,
Adilson DelfinoAdilson Delfino
The system-statuses cannot be set manually by the user (like you can with user-statuses).
You need to process a function to make these statuses change, e.g. releasing the order header, TECOing and order or dispatching operations. Alternatively you can develop a solution that may be able to change these statuses (see above post).
I don't think you will be able to set the TECO status on individual operations.
Have you considered user-statuses on the operations?
PeteA
Maybe you are looking for
-
How do I create a single PDF file with multiple pages?
Hi, I occasionally need merge several jpg images into a single pdf file with multiple pages (one Jpg per page). I have tried doing this on Preview, and by selecting all the pages I want to include in my document and trying to save to Pdf through the
-
Hi can anyone help with a mac that had magnet put on it. I turned it on and then off but a white screen appears with a file with a question mark on it?
-
Hi, I have an iBook G3 500 MHz w/ 256 MB Ram and a DVD-Rom. The drive will accept a CD or DVD fine, but when the program DVD Player opens to play the DVD, I just get a large black window on the screen. If I stop the playback, it will go to the title
-
How to resolve double records entry
Hi Gurus Can any body tell if i will be asked like how do you solve the issues regarding double records? thanks in advance murali
-
What's the general guidelines for keeping original files after completing a project? Do most of you discard them, or keep them? Being as I'm not a very efficient shooter, I sometimes have a couple minutes of video for just ten seconds of needed foota