Shift sequence query in PP work center
Dear All,
I am having one problem while maintaining shift sequence in work center. I have maintain all config settings in OP4A shift 1 shift 2 shift 3 but when I create work center and select shift sequence, it is only taking shift 1 and not all 3 shift for all 7 days.
Can anyone tell me the solution?
Thanks in advance.
Regards,
Max
Dear Santosh,
Thanks for the valuable inputs.
I have created following sequence in OP4A.
1, Create a Group eg. CB
2.Create a shift definitions like SHIFT1,SHIFT2,SHIFT2, START/END DATE, START/FINISH TIME OF SHIFTS, NO BREAKS ARE THERE and assign it to group.
3. Define individual shifts SEQUENCE DAYWISE wrt to groupo.
4..Assign grouping in capacity header of work center.
5.Now go to add interval option and create a new version of capcity which contains desired shift sequence from the shift group assigned.
7. assign proper valid froma and valid to dates.
8. In capacity header screena ssign the newly created capcity vesrion as active vesrion.
BUT STILL i WILL ABLE TO MAINTAIN ONLY FIRST SHIFT SEQUENCE FOR ALL 7 DAYS.
SYSTEM IS NOT SHOWING 2ND AND 3RD SHIFT.
PLEASE HELP ME OUT.
THANKS
MAX
Similar Messages
-
how we configure the shifts in work center. please describe the whole procedure.
thanks in advanceDear,
You need to define a shift in OP4A - define new grouping
click on New entries...let us say 99, give some text
Select 99 and double click on shift definition
click on new entry
shift - 1, text - first shift, start date-010108, end date - 31129999, start=07:00:00, finish-15:00:00
shift - 2, text - second shift, start date-010108, end date - 31129999, start=15:00:00, finish-23:00:00
shift - 3, text -Generalshift, start date-010108, end date - 31129999, start=08:30:00, finish-16:30:00
Double click on shift Sequence
Seq-1shift-1,des-shift-1,day1-1,day2-1,day3-1,day4-1,day5-1,day6-1,day7-1
Seq-1shift-2,des-shift-2,day1-2,day2-2,day3-2,day4-2,day5-2,day6-2,day7-2
Seq-1shift-3,des-shift-3,day1-3,day2-3,day3-3,day4-3,day5-3.(hope only 5 days working for General shift)
save this.
In work center change transaction capacity view
assign this grouping no 99.
Enter active version = 1
Click on interval and shift push button (left top)
follow the menu path Edit>insert>insert interval
enter valid from and valid from field enter shift sequence and remove the data if there in any other filed and click on ENTER. all the days in week are defaulted with the shift seq you defined.
Hope it is clear, or come back
Please check this link also,
[Shift Sequence|https://forums.sdn.sap.com/click.jspa?searchID=16735253&messageID=3810730]
Regards,
R.Brahmankar -
Hi all,
Im little confused with the capacity header in work center. In the capacity header there is one place to give start time, end time, length of break and number of individual capacity. And in grouping key i can define the shift and shift sequence. So if im maintaining both of these ( standard avilable capacity and grouping key), which will be considered to calaculate avilable capacity?Hi
If you are running three shifts ,please maintain the data as given belwo
start :00:00:00
End:23:59:59
Break :03:00:00 ( 1 Hour per shift so 3 hrs for 3 shifts)
No.of individual capacity :1
System will understand that it is round the clock operation with total three hour brak and you will get 21 hour per capacity
Hope this helps
regards
Prakash -
Hi PP Expert,
I have requirement for this shift :
Shift 1 : 08.00 to 17.00
Shift 2 : 20.00 to 04.00 next day
How do you define it in SAP ?
Should i create that like this ?
Shift 1 : 00.00 to 04.00
Shift 2 : 08.00 to 17.00
Shift 3 : 20.00 to 24.00
Is it normally maintain like that or is there any way to create in two shift definition?
Regards,
Arman LieDear Arman,
During shift definition generally the previous shift end time will be taken as the next shift start time,but in your case the first shift
starts at 08:00 and ends at 17:00.
The second shift is starting at 20:00(Night 8'o clock) and ending at 04:00 in the morning.How do you treat the time between 17:00
to 20:00?
Check out in this way,In OP4A,create the grouping logic->shift defiition->
S1 first shift 01.08.2011 31.12.9999 08:00:00 17:00:00 9.00
S2 second shift 01.08.2011 31.12.9999 20:00:00 04:00:00 8.00
Then under Shift Sequence,
2S 1 2 shift sequence S1 S1 S1 S1 S1 S1
2S 2 S2 S2 S2 S2 S2 S2
Assign this in the work center capacity header,by definish the shift start as 08:00:00 and end time as 04:00:00 by mentioning the
duration of break,then in the grouping mention the respective shift grouping,in the intervals and shifts mention the start date and
end date and select the shift sequence.
Now in CM01 accordingly you will be able to see the available capacity,assuming you have not defined any break timings either in
the shift sequence or else in the capacity header in the work center.
Check and revert back with your queries.
Regards
Mangalraj.S -
Assignment of shift sequence to work centre
I have created a new shift sequence. where can I assign it in the work centre?
Hi,
you need to define the grouping key /shift definition /shift sequence in SPRO.
Assign the grouping key work center capacity tab pageunder capacity header.
Regards,
nandha -
Work Center Capacity Shift Interval
Hello,
I'm looking for a function or Tables from which I can get Work Center Capacity Shift & Interval data, Transaction CRC3.
Any help in this regard will be highly appreciated.
Regards,
Hashir Ahmed.hi,
check these tables.
AFIH Transparent table Maintenance order header Application table (master and transaction data)
AFKO Transparent table Order header data PP orders Application table (master and transaction data)
AFRU Transparent table Order Confirmations Application table (master and transaction data)
AFVC Transparent table Operation within an order Application table (master and transaction data)
CABN Transparent table Characteristic Application table (master and transaction data)
CBPR Transparent table CO-ABC: Activity Master Table Application table (master and transaction data)
COEP Transparent table CO Object: Line Items (by Period) Application table (master and transaction data)
CRCA Transparent table Work Center Capacity Allocation Application table (master and transaction data)
CRHD Transparent table Work Center Header Application table (master and transaction data)
CSKS Transparent table Cost Center Master Data Application table (master and transaction data)
CSSL Transparent table Cost Center / Activity Type Application table (master and transaction data) -
Regarding Shifts in a work center
Hi experts,
I am facing an issue regarding the shift in workcenter.
I have done all the prerequisite settings in spro like
1. defing a grouping key,
2 defining work break schedule key,
3.definining shift definition,
4.defining shift sequence
now is there something called shift pattern key which does the shift changing on the desired basis like monthly or daily or weekly.
i have created one for my requirement.but whenever I am aasigning my grouping key to the workcenter only one shift reflect in the system.
So can you please help me.
Regards,
VivekHi Vivek,
This seems to be a different question all together,you have to create new thread for each question to get proper/prompt reply
First of all before cerating an inspection plan,you have to first decide what type of inspection you want to do
You can find the std inspection types in the QM view of the material master under Insp.setup
Then maintain the respective inspection type
like Inspection after GR from production
After that create inspection plan for the material in QP01 tcode
Before that you should have inspection characteristics created(MIC's)
It is created in QS21 tcode,here you will have to mention whether its qualitative or quantitative & input data accordingly
In QP01 you have to maintain the usage accordingly like 5,6 etc
Rest is like normal routing
In case of inproces inspection you dont need to create a seperate inspection plan,you can maintain the same in the production routing with MIC's
Hope this hepls
Rgds,
SVP -
Work center screen sequence change
Dear Guru,
Can you guide me how to change the screen sequence of work center.
Regards,
Sanjay SahooDear Sandeep,
My requirement to change in sequence in Tab page.
I changed the sequence in OP13, But screen sequence does automatically change as per sequence maintain in OP13.
If we use the navigation tool, then only system take you to the next Tab Page which we maintain in the OP13.
Can it be possible to diaplay the Tab Page sequence as per OP13 at the time creation of work center?
Regards,
Sanjay Sahoo -
Assignment of shift sequence in work centre
I have already created the grouping key & shift sequences in OP4A. There are 7 groupings when I see in OP4A. But when I try to assign them in CR02 capacity header screen , I see only 3 grouping keys. I dont see the one I have created too. What could be the reason?
Please check you have any letters in grouping code?
use only nunmbers - it will appears
instead of AA, AB, AC create with 11,12,13
Please close the thread if answer is okay, otherwise revert back -
Same work center being used in different routings
Hi
I have requirement like this:
Workcenter WC1 works in two shifts Shist A & B.
It is being used in two routings for different products X & Y.
Product X will be prodiced in shift A.
Product Y will be produced in Shift B.
How to schedule it for different shifts for different products.
Thankls in advance.
Regards
YMREDDYsince workcentre is not working on the material based.
but the routing worked on the material based
give the shifting timing and the break timing in the work center alone
you have to select the matrl product x in the routing and the sequence of operation for the product is mentioned that the product that be there for the working in the
shift A .
product Y is to be sequenced to work at that w.c at shift B -
Work Center (No. of indiv. cap)
Hi,
I have Assembly Work center for details are as follows,
Start 06:30:00
Finish 23:30:00 Capacity utilization 100
Length of breaks 01:00:00 No. of indiv. cap. 2
Operating time 16.00 Capacity 32.00 H
Here available capacity is shown as 16 Hours.
But in actual there are two shift 06.30 to 15.00 with 1 person and second 15.00 to 23.30 with 1 person
So available capacity should be 8 Hours as two person are working in two shift but system shows that two person are working for 16 Hours hence available capacity as 32 hours which is wrong.
Please let me know how we can show available hours as 8 in this case withoout changing utilization,no of ind.
Thanks,
LalitDear Lalit,
1.In the capacity header of that work center,click on intervals and shift and click on interval by mentioning the valid from and to
date and allocate the shift sequence(first shift starting from 06:30:00 and ending at 15:00:00) and the second shift starting at
15:00:00 and ending at 23:30:00(assuming the length of brak for each shift has also been properly defined).
In the capacity header page also mention the active version as 01(for which you have defined the shifts).
2.Now in CM01,for the same work center in the top settings->General->mention the capacity version as 01 and check the
results.
Check and revert back
Regards
Mangalraj.S -
Hi,
In our system in transaction OP4A lot of ‘Shift definations’, ‘shift sequences’ are maintained unnecessary. We want to clean this data (Remove unwanted).
Is there any report available for work center like 'where used' function to identify shift pattern, sequences used in system so that I can remove other data.
Regards,Hi Caetano,
Thank you for your help, as you suggested I can check 'Shift Sequence' at table level.
Still the problem is we have to remove unnecessary shifts defined in system and it is possible to assign defined shifts to work center intervals directly means without giving 'Shift sequence' as input.
Is there any table available where I can get the 'Shifts' assigned to work centers?
Regards, -
Hi all ,
What is the use of shift sequence ?
I have defined Shift sequence , assigned to work center Etc .
But whr does the same will appear or what is the use of the same .
(HR module is not implemented here )
RegardsHi venky
Normally the available capacity of that particular work center is calculated from the data we are giving in the capacity header/Available Hrs from - To and the break time, the number of work center and efficiency
If we give shift definition and shift sequence. We have to assign that in shift group in the capacity tab.
The available capacity will be calculated from your shift definition and brake time which is given in your shift group.
if your shift start time is 06.00 end time 14.00 break time is .5 hrs. Then Available capacity per day is 7.5 Hrs.
If your are giving shift sequence also 14.00 to 22.00 - 22.00- 06.00. Then the available capacity 7.5 X 3 = 22.5 Hrs per day.
Regards
J. Saravan -
Shift sequence in available capacity
hi, all SAP experts,
my question is as follows
I created grouping in which shift sequences are defined and i assign this group to work center in capacity header. So work center should have to select shift sequence in capacity tab but i enter manually start time and finish time in capacity header.So why systm can't show interval of available capacity daywise automatically through grouping or is there any setting for this?
thanks in advance
i will look for points also
regards
Nitin NerkarDear,
In work center change transaction capacity view
assign this grouping no XX.
Enter active version = 1
Then Click on interval and shift push button (left top)
follow the menu path Edit>insert>insert interval
enter
valid from and valid from field
enter shift sequence and remove the data if there in any other filed and click on ENTER. all the days in week are defaulted with the shift seq you defined.
It will work for you.
Regards,
R.Brahmankar -
Rotating Off-Days in PM Work Center Available Capacity
Good Day!
Background:
Each Maintenance person is represented by a PM Work Center.
Maintenance person have a rotating off-days which cycle repeats after 21 days.
Requirement:
We want to reflect rotating off-days to PM Work Center Available Capacity.
Options tried but did not worked;
Shift Definition Grouping: Off-days is in HR's Period Work Schedule but only Daily Work Schedule can be pulled into Shift Definition Grouping and then into Work Center
Reference Available Capacity: Can be achieved via Shift Sequence Key in interval of available capacity but needs to maintain for each week with on-going maintenance
Do anyone has implemented this similar requirement that we can reapply/build on?
Your valuable inputs are deeply appreciated.
Thanks!In work center capacity header
click change intervals
click insert
Enter manually
valid from and valid to dates
No of ind capacity - 0
Maybe you are looking for
-
Converting xmltype to document/node
I am trying to take XMLType and create a DOMDocument or DOMNode. How can this be done. Thank you, Jim
-
0EC_PCA_ 1 and balance sheet
Hello Everyone, I am using datasource 0EC_PCA_1 in full load. I have created a balance sheet query (via a hierarchy). My query is showing data incorrectly. In incorrectly I mean the data doesn't look like it has a begining balance, so the numbers
-
Is there an InDesign JavaScript Reference?
As a long time Photoshop scripter, I use the Photoshop JavaScript Reference often. It is a full reference to the Photoshop DOM. I now need to create some scripts for InDesign and can't find a DOM reference on the Adobe dev site. Does one exists? Or w
-
I need to be able to read a bunch of PhotoCD's and I noticed that CS4 no longer bundles the plugin on the extras CD. I also read here that people suggest getting the plugin from the CS3 CD however I bypassed CS3 when I upgraded from CS1. SO no luck.
-
User Roles for changing tables?
Which user roles are there in the environment for changing tables? Any help is appreciated. Regards, Neetu